CN209066470U - A kind of steel tube-concrete series connection stake combination multi-column pier foundation - Google Patents

A kind of steel tube-concrete series connection stake combination multi-column pier foundation Download PDF

Info

Publication number
CN209066470U
CN209066470U CN201821874041.3U CN201821874041U CN209066470U CN 209066470 U CN209066470 U CN 209066470U CN 201821874041 U CN201821874041 U CN 201821874041U CN 209066470 U CN209066470 U CN 209066470U
Authority
CN
China
Prior art keywords
stake
steel
steel pipe
series connection
cushion cap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821874041.3U
Other languages
Chinese (zh)
Inventor
王云江
刘勇
祝拥军
崔兆云
叶永建
李晋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Highway Construction Group Co Ltd
Shandong Jiaotong University
Original Assignee
Qingdao Highway Construction Group Co Ltd
Shandong Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Highway Construction Group Co Ltd, Shandong Jiaotong University filed Critical Qingdao Highway Construction Group Co Ltd
Priority to CN201821874041.3U priority Critical patent/CN209066470U/en
Application granted granted Critical
Publication of CN209066470U publication Critical patent/CN209066470U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

Multi-column pier foundation is combined in the steel tube-concrete series connection stake of the utility model, it is characterized by comprising 3 or 3 or more series connection stakes, cushion cap and steel pipe column Temporary Piers, each series connection stake is made of hole stake and steel pipe, hole stake and steel pipe are respectively positioned among ground, and steel pipe is located at the lower section of hole stake and coaxial line;Hole stake is by the coagulation local soil type of steel reinforcement cage and package steel reinforcement cage at the upper end of steel pipe is mutually fixed with the lower end of steel reinforcement cage, and cushion cap is fixed on the upper end of hole stake, and steel pipe column Temporary Piers are fixed on cushion cap.A clump of piles for the steel tube-concrete pile foundation of the utility model, 3 or 3 or more series connection stake compositions ensure that the firm of basis, and be suitable for building interim pier foundation in the narrow spanning existing railway of working space, highway environment.

Description

A kind of steel tube-concrete series connection stake combination multi-column pier foundation
Technical field
The utility model relates to a kind of combination multi-column pier foundations, more specifically, more particularly to a kind of steel tube-concrete series connection Stake combination multi-column pier foundation.
Background technique
In bridge construction, the construction environment of spanning existing railway Xian He highway is frequently encountered, in bridge cross-line bridge construction, It is in place that superstructure usually uses incremental launching method.Interim pier foundation as transition is during Large Span Bridges incremental launching construction It is vital component part.However, the construction environment of cross-line bridge is complicated in many cases, in a plurality of existing railway line Between when building interim pier foundation, level of ground water narrow by working space is limited, it is caused to use limited even nothing Method uses large scale equipment organizing construction, increases difficulty of construction;Or influenced by execution conditions, large scale equipment can not reach construction Scene makes construction be obstructed.
Therefore will lead to existing highway bridge basis in there are the following problems: (1) construction operation platform is larger, is unfavorable in small work Industry surface construction;(2) for temporary structure, existing highway bridge basis will cause the waste of material;(3) complicated construction technique, construction speed Degree is slower, is unfavorable for the control of construction period.
Basis can be divided into shallow foundation and deep foundation according to buried depth.Wherein, shallow foundation is divided into rigid foundation and flexible base Plinth, deep foundation are divided into tube caisson foudations, well foundation, pneumatic caisson foundation etc..And these two types of bases lead to during constructing and implementing Often big machinery is needed to drill, there is operation sides it is larger, number of devices is more the problems such as, be not suitable for work surface Relatively narrow overbridge.At the same time, if using such basis as the temporary base of overbridge, it be easy to cause a large amount of resource wave Take, increase construction cost, and is unfavorable for the control of construction period.Existing steel pipe pile foundation is more applied to temporary support structure, But its bearing capacity is lower, stability is poor, is unable to satisfy the bridge construction temporary structure compared with high-bearing capacity requirement.
Summary of the invention
The utility model in order to overcome the shortcomings of the above technical problems, provides a kind of steel tube-concrete series connection stake combination Multi-column pier foundation.
Multi-column pier foundation is combined in the steel tube-concrete series connection stake of the utility model, it is characterised in that: including 3 or 3 or more Series connection stake, cushion cap and steel pipe column Temporary Piers, each series connection stake by hole stake and steel pipe form, hole stake and steel pipe be respectively positioned on ground Among, steel pipe is located at the lower section of hole stake and coaxial line;Hole stake is by the coagulation local soil type of steel reinforcement cage and package steel reinforcement cage at steel pipe Upper end and the lower end of steel reinforcement cage mutually fix, cushion cap is fixed on the upper end of hole stake, and steel pipe column Temporary Piers are fixed on cushion cap.
Multi-column pier foundation is combined in the steel tube-concrete series connection stake of the utility model, and the cushion cap is steel plate or armored concrete Structure is fixedly connected as the reinforcing bar in the steel plate or reinforced concrete structure of cushion cap with the steel reinforcement cage in each stake of connecting.
Multi-column pier foundation is combined in the steel tube-concrete series connection stake of the utility model, the steel pipe column Temporary Piers by angle steel and Bolt is anchored on cushion cap.
Multi-column pier foundation is combined in the steel tube-concrete series connection stake of the utility model, under the upper end and steel reinforcement cage of the steel pipe The lap at end is connected by welding.
The beneficial effects of the utility model are: the steel tube-concrete series connection stake combination multi-column pier foundation of the utility model, 3 Or 3 or more series connection stakes, cushion cap and steel pipe column Temporary Piers form, each series connection stake is by hole and the steel pipe being disposed below At hole stake is again by steel reinforcement cage and coagulation local soil type at by squeezing into steel pipe in the soil layer of bottom after pore digging, so that entire stake The depth of base is deepened;To be formed by hole stake after the peripheral casting concrete of steel reinforcement cage with high intensity, steel reinforcement cage The lap of upper end and steel pipe is attached fixation, the group of 3 or 3 or more series connection stake compositions by welding Stake, ensure that the bonding strength of lower part steel pipe Yu upper hole stake, also ensures the cushion cap being fixed in series connection stake, is fixed on cushion cap On steel pipe column Temporary Piers intensity, form the interim pier foundation met the requirements;The building course of entire pile foundation is without large size Mechanical equipment, only need personnel dig stake holes, and with crane by steel pipe, reinforcing bar cage hoisting in place, suitable for narrow in working space Interim pier foundation is built in spanning existing railway, highway environment, beneficial effect is significant, is suitable for the application of popularization.
The steel tube-concrete series connection stake combination multi-column pier foundation of the utility model has the advantage that compared with the existing technology
(1), narrow work surface quick construction is easy;
(2), Effect of Underground Water Level is small;
(3), speed of application is fast, is conducive to shorten the construction period;
(4), reduce the use of concrete, reduce cost, reduce the wasting of resources;
(5), after bridge incremental launching construction, steel pipe column Temporary Piers recoverable is conducive to environmental protection;
(6), be conducive to improve soft layer, reduce settlement of foundation.
Detailed description of the invention
Fig. 1 is that the main view of multi-column pier foundation is combined in the steel tube-concrete series connection stake of the utility model;
Fig. 2 is that the top view of multi-column pier foundation is combined in the steel tube-concrete series connection stake of the utility model;
Fig. 3 is that the bottom view of multi-column pier foundation is combined in the steel tube-concrete series connection stake of the utility model.
In figure: the stake of 1 hole, 2 steel pipes, 3 steel reinforcement cages, 4 concrete, 5 cushion caps, 6 steel pipe column Temporary Piers, 7 series connection stakes.
Specific embodiment
The utility model is described in further detail with embodiment with reference to the accompanying drawing.
As shown in Figure 1, Figure 2 and Figure 3, the steel tube-concrete series connection stake combination clump of piles base of the utility model is set forth Main view, the top and bottom perspective views of plinth are made of, each series connection cushion cap 5, steel pipe column Temporary Piers 6 and 4 series connection stakes 7 Stake 7 be made of hole stake 1 and steel pipe 2, and steel pipe 2 is located at the lower section in hole 1, and steel pipe 2, hole 1 are at vertical state, and steel pipe 2 It is coaxially arranged with hole stake 1.Shown in hole stake 1 be made of steel reinforcement cage 3 and concrete 4, hole stake 1 is formed in is dug out by worker's layering Stake holes 1 in, the bottom of stake holes is protruded into the upper end of steel pipe 2, and 3 lower part of the steel reinforcement cage part Chong Die with 2 upper end of steel pipe is welded on one It rises, to realize the secured connection of steel pipe 2 Yu steel reinforcement cage 3.
Shown in cushion cap 5 be fixed on the upper end of hole stake 1, cushion cap 5 can be used reinforced concrete member, steel plate can also be used, When cushion cap 5 is using reinforced concrete member, the bar construction in cushion cap 5 is tied up with the upper end of 4 steel reinforcement cages connected in stake 73 It pricks or welds together, when cushion cap 5 is using steel plate, the upper end of the steel reinforcement cage 3 in 4 series connection stakes 7 should be welded on.Steel pipe column Temporary Piers 6 are the steel pipe column with certain length, and lower end is fixed on cushion cap 5, and steel pipe column Temporary Piers 6 are according to be carried of position The height setting set.
In the steel tube-concrete series connection stake combination multi-column pier foundation building process of the utility model, stake holes is by artificial merogenesis Shoveling is made, and does supporting using concrete spraying, level of ground water is excavated compared with Gao Shixu when drawing water.Steel pipe 2 is beaten using piling machine Enter, primarily serves the effect for increasing soil strength, for steel reinforcement cage 3 using in crane lifting to stake holes, lower part and steel pipe 2 are higher by position Welding, surrounding casting concrete 4, effect are that concrete and rebar cage is made to become an entirety, shape drilling pile 1.Concrete 4 In steel pipe top, it is filled in 3 surrounding of steel reinforcement cage, plays the role of increasing structure compression strength.Cushion cap 5 primarily serves transmitting load Effect, steel pipe column is interim, and 6 can be anchored in above cushion cap using angle steel, bolt.
The utility model steel tube-concrete series connection stake combination multi-column pier foundation construction method, can by following steps come It realizes:
A) explore soil layer, near the temporary base built region carry out geological prospecting, determine soil layer composition, The severe and thickness of each soil layer;
B) determines borehole depth, steel pipe embedded depth, is equal to the bearing capacity and hole that steel tubing portions undertake with bearing capacity of pile foundation The sum of the bearing capacity that stake part undertakes calculates bearing capacity of pile foundation, and is constraint item not less than engine request with bearing capacity of pile foundation Part calculates borehole depth and steel pipe embedded depth;
C) mark construction position, determines the construction location of each series connection stake on the ground, and is labeled;
D) merogenesis digs stake holes, the form cut the earth using merogenesis, digs stake holes, one section of every digging in foundation construction position by worker Stake holes just uses concrete spraying retaining wall, until dug stake holes depth meets depth requirements;During digging stake holes, if ground Lower water level is higher, then carries out borehole operation using the method excavated when drawing water;
E) steel pipe is squeezed into, and after stake holes is dug, steel pipe is hung in stake holes using crane, and is adjusted steel pipe and be located at stake Hole center, is squeezed into steel pipe to designated depth using piling machine;
F) steel pipe is cut, and worker prolongs under borehole retaining wall step to stake holes bottom, is cut to steel pipe, is made steel pipe upper end Some is stretched in stake holes;
G) steel reinforcement cage welds, and is sunk to steel reinforcement cage in stake holes with crane, keeps steel reinforcement cage in a vertical state, by worker The bottom for arriving stake holes down welds together the lap of steel reinforcement cage and steel pipe;
H) casting concrete, the casting concrete into the stake holes for be provided with steel reinforcement cage, and filled during pouring Divide and vibrate, steel reinforcement cage and the concrete poured are formed hole stake, and hole stake is formed stake of connecting with steel pipe below;It repeats Step d) to step h), until all series connection stakes are all built and finished;
I) builds cushion cap, after the concreting of all series connection stakes, after maintenance reaches design strength in 28 days, then The hole stake top portion of each series connection stake builds cushion cap;
J) steel pipe column Temporary Piers are arranged in, and steel pipe column Temporary Piers are hoisted to designated position above cushion cap, using welding or The mode of angle steel and bolt anchoring, steel pipe column Temporary Piers are fixed on cushion cap, that is, realize steel tube-concrete series connection stake combination The building of multi-column pier foundation.
Steel pipe 2, steel reinforcement cage 1 should be configured according to intensity needed for Practical Project, to guarantee the intensity on entire basis, concrete 4 Mixing material made of being deployed according to a certain percentage as sand, stone, water, cement, additive etc..
In the process of construction of Aksu of Xinjiang's weaving bridge, across 4 railways, for ensure the bridge across railway just Often operation ensures smooth engineering construction and construction quality simultaneously, it is necessary to use certain solution, construction is avoided to transport railway Battalion impacts, and therefore, reducing operation side is the difficult point and emphasis in Construction control.Just use the steel of the utility model Multi-column pier foundation is combined in pipe-concrete series connection stake, requires the bearing capacity of each series connection stake 7 to reach in engineering by calculating 1536.3KN, in process of construction:
By geological prospecting, determine soil layer be followed successively by downwards from ground silty sand ground (5.9 meters of thickness, severe 19kN/m3), Fine sand layer (2.3 meters of thickness, severe 19kN/m3), circle gravel native (1.2 meters of thickness, severe 20kN/m3), fine sand layer (4.5 meters of thickness) Silt (1.7 meters of thickness), fine sand layer (2.7 meters of thickness);
And drafting borehole depth is 9m, steel pipe embedded depth is 9.3m.It is found that stake holes dig round gravel soil layer go deep into be 0.8m, depth of the steel pipe in circle gravel soil layer is 0.4m.
Steel pipe pile body perimeter u is 1.98m, and the standard value of bearing capacity of fine sand layer soil is 210kPa, the stake of steel pipe at 2 end of steel pipe Body cross-sectional area is 0.312m2, α can be obtained by tabling look-upi、αrIt is 1.0, circle gravel from top to bottom is obtained by static sounding experiment Soil layer, fine sand layer, powder soil horizon, fine sand layer and steel pipe pile side friction are respectively 60kPa, 35kPa, 40kPa, 50kPa, fine sand layer Standard value of bearing capacity be 210, bring formula (1) into, the bearing capacity of steel pipe can be calculated:
Artificial digging pile stake end section area is 1.13m2, first by the calculating of following formula portal silty sand ground where stake, The weighted average severe of fine sand layer, circle gravel soil layer:
Clear bottom Coefficient m0Take 1.0, correction factor λ to take 0.7, foundation bearing capacity with depth correction factor k25.0 are taken, hole stake The basic feasible value of bearing capacity of circle gravel soil layer is 430kPa where lower end, and the carrying of soil layer at an end is calculated according to formula (3) Power feasible value:
qr=m0λ[[fα0]+k2γ2(h-3)]
=1.0 × 0.7 × [430+5.0 × 22.475 × (9-3)]
=772.975 (kPa)
Circumference u ' is 3.77m outside the stake cross section of hole, and artificial digging pile stake end section area is 1.13m2, utilize formula (2) bearing capacity of hole stake can be calculated:
By calculated steel pipe bearing capacity [Ra]1With hole pile bearing capacity [Ra]2Bringing formula (4) into can obtain:
[Ra]=[Ra]1+[Ra]2
=413.415+1449.33
=1862.745 (kN)
In conclusion the bearing capacity of pile foundation that steel-pipe pile part and artificial digging pile are partly superimposed together is 1773.855KN > 1536.3KN meets the requirement of bearing capacity.
It is above-mentioned although specific embodiments of the present invention are described with reference to the accompanying drawings, but it is not practical new to this The limitation of type protection scope, those skilled in the art should understand that, based on the technical solution of the present invention, ability Field technique personnel do not need to make the creative labor the various modifications or changes that can be made still in the protection model of the utility model Within enclosing.

Claims (4)

1. multi-column pier foundation is combined in a kind of steel tube-concrete series connection stake, it is characterised in that: including 3 or 3 or more series connection stakes (7), cushion cap (5) and steel pipe column Temporary Piers (6), each series connection stake are made of hole stake (1) and steel pipe (2), and hole stake and steel pipe are equal Among ground, steel pipe is located at the lower section of hole stake and coaxial line;Hole stake by steel reinforcement cage (3) and package steel reinforcement cage coagulation Native (4) composition, the upper end of steel pipe are mutually fixed with the lower end of steel reinforcement cage, and cushion cap is fixed on the upper end of hole stake, and steel pipe column Temporary Piers are solid Due on cushion cap.
2. multi-column pier foundation is combined in steel tube-concrete series connection stake according to claim 1, it is characterised in that: the cushion cap (5) For steel plate or reinforced concrete structure, as reinforcing bar and each stake of connecting (7) in the steel plate or reinforced concrete structure of cushion cap In steel reinforcement cage (3) be fixedly connected.
3. multi-column pier foundation is combined in steel tube-concrete series connection stake according to claim 1 or 2, it is characterised in that: the steel pipe Column Temporary Piers (6) are anchored on cushion cap (5) by angle steel and bolt.
4. multi-column pier foundation is combined in steel tube-concrete series connection stake according to claim 1 or 2, it is characterised in that: the steel pipe (2) upper end is connected by welding with the lap of the lower end of steel reinforcement cage (3).
CN201821874041.3U 2018-11-14 2018-11-14 A kind of steel tube-concrete series connection stake combination multi-column pier foundation Expired - Fee Related CN209066470U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821874041.3U CN209066470U (en) 2018-11-14 2018-11-14 A kind of steel tube-concrete series connection stake combination multi-column pier foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821874041.3U CN209066470U (en) 2018-11-14 2018-11-14 A kind of steel tube-concrete series connection stake combination multi-column pier foundation

Publications (1)

Publication Number Publication Date
CN209066470U true CN209066470U (en) 2019-07-05

Family

ID=67099074

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821874041.3U Expired - Fee Related CN209066470U (en) 2018-11-14 2018-11-14 A kind of steel tube-concrete series connection stake combination multi-column pier foundation

Country Status (1)

Country Link
CN (1) CN209066470U (en)

Similar Documents

Publication Publication Date Title
CN204491626U (en) The foundation pit enclosure structure that Larsen steel sheet pile and prestressed anchor combine
CN102352590A (en) Method for splicing highfill roadbed by adopting pile-sheet retaining wall
CN109505229A (en) Highway high gradient slope stress equilibrium and vibration damping are taken precautions against natural calamities high bridge pier structure and construction method
CN105201011A (en) Complex anchored-plate retaining wall and construction method thereof
CN109138011B (en) Foundation reinforcing and deviation rectifying method for existing building
CN106884433A (en) Control vibrations pile pulling causes the structure of underground structure depression and control depression method
CN110700291A (en) Combined retaining structure and construction method thereof
CN109339065A (en) Method for deep water exposed bedrock close-packed pile supporting construction bearing platform
CN113174958A (en) Construction method for foundation pit of adjacent road under poor ground condition
CN208088288U (en) The big areas grain size shiver stone Gao Tian pile foundation fast pore-creating structure
CN106869138A (en) A kind of load retaining wall Retaining Structure with Double-row Piles and its foundation ditch excavation method
CN104264683A (en) Concave ultra-deep foundation pit zoned supporting method for three-side surrounded cultural protection building
CN114411761A (en) Advanced pre-support system for planned subway tunnel during construction of newly-built building and pre-support construction method
CN109577322A (en) A kind of constructing device for inside soil body existing pile foundation pile extension
CN109208623A (en) A kind of steel tube-concrete pile foundation and its construction method as temporary base
CN109610473A (en) A kind of construction method of the large-scale pool structure foundation pit supporting system of municipal administration
CN109826224A (en) A kind of sinking well protection wall digging foundation and its construction method for desert region iron tower of power transmission line
CN108978742A (en) One kind cutting stake forced-landing tilt correcting structure, method
CN100443673C (en) Method of construction
CN105672329B (en) The large size prefabricated building enclosure of deep basal pit and construction method
CN105484270B (en) Reinforcement protection construction method of high steep old rubble retaining wall adjacent to deep foundation pit
CN110258600B (en) Vertical cofferdam construction method suitable for deepwater area
CN112431225A (en) Top-down construction method for pipe-jacking brick-built working well
CN209066470U (en) A kind of steel tube-concrete series connection stake combination multi-column pier foundation
CN109183828A (en) A kind of steel tube-concrete series connection stake combination multi-column pier foundation and its construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190705

Termination date: 20191114

CF01 Termination of patent right due to non-payment of annual fee