CN109555129A - One kind is quickly met an urgent need diagonal brace and construction method for salvage of foundation pits - Google Patents

One kind is quickly met an urgent need diagonal brace and construction method for salvage of foundation pits Download PDF

Info

Publication number
CN109555129A
CN109555129A CN201811579672.7A CN201811579672A CN109555129A CN 109555129 A CN109555129 A CN 109555129A CN 201811579672 A CN201811579672 A CN 201811579672A CN 109555129 A CN109555129 A CN 109555129A
Authority
CN
China
Prior art keywords
foundation pit
fitting
built
foundation
diagonal brace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811579672.7A
Other languages
Chinese (zh)
Inventor
黄飞祥
卫军明
郭延义
翟之阳
赵欣
吴樟强
胡董超
廖志斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 2 Group Co Ltd
Original Assignee
Shanghai Construction No 2 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 2 Group Co Ltd filed Critical Shanghai Construction No 2 Group Co Ltd
Priority to CN201811579672.7A priority Critical patent/CN109555129A/en
Publication of CN109555129A publication Critical patent/CN109555129A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • E02D19/18Restraining of underground water by damming or interrupting the passage of underground water by making use of sealing aprons, e.g. diaphragms made from bituminous or clay material

Abstract

One kind of the invention is quickly met an urgent need diagonal brace and construction method for salvage of foundation pits, it is related to technical field of building construction, for solving large area, deep basal pit, in unsupported earth excavation, foundation pit enclosure wall stress and rate of deformation excessive the case where security risk is generated to scene is effectively relieved.It installs built-in fitting one by the vertical direction of the supporting and retaining system formula building enclosure at foundation pit platform on the side wall on the inside of foundation pit, built-in fitting two is installed on the thickening bed course of bottom of foundation ditch, the both ends of the type steel support of factory's production are fully welded and are connect with built-in fitting one and built-in fitting two respectively again, diagonal brace is formed, thus as foundation pit emergency treatment.Type steel support can shorten the emergency repair time effectively so as to shorten the construction period;Biggish construction space is saved for the construction of main structure body;Type steel support stress form is preferable, and foundation pit enclosure wall stress is mutually offset with uplift of soil stress, can effectively reinforce to foundation pit enclosure form.

Description

One kind is quickly met an urgent need diagonal brace and construction method for salvage of foundation pits
Technical field
It is the present invention relates to technical field of building construction, in particular to a kind of quickly to meet an urgent need diagonal brace and construction for salvage of foundation pits Method.
Background technique
When Extra-Deep Foundation Pit form uses underground enclosure wall (supporting and retaining system formula structure), foundation depth is more than 6m, foundation pit area Type steel support emergency measure can be used in larger situation.If using general type salvage of foundation pits measure, such as top of the slope unloading, slope Foot back-pressure, bolt anchorage, combined bolting and shotcrete etc., since the foundation pit enclosure measure originally having and biggish foundation depth, top of the slope are unloaded Load, which can go along with sb. to guard him original cast-in-situ bored pile, to be destroyed, and increases difficulty to construction instead;Slope foot back-pressure then can be to main structure bottom Plate construction impacts, and construction speed is caused to lag, and construction bottom plate is still required to remove slope foot weight, belongs to palliative and arranges It applies;When base pit engineering lower part building enclosure is double cast-in-situ bored pile and coupling beam, bolt anchorage, combined bolting and shotcrete are not applicable.
Summary of the invention
It is an object of that present invention to provide a kind of rapid rescue type steel support, that is, salvage of foundation pits applied to foundation pit enclosure is quick Diagonal brace and the construction method of meeting an urgent need can be effectively relieved foundation pit and enclose in large area, deep basal pit, the construction of unsupported earth excavation Parapet wall body stress and rate of deformation are excessive to live the case where generating security risk, while guaranteeing that earth excavation is applied with main structure Work progress.
The technical solution adopted by the present invention to solve the technical problems is:
One kind is quickly met an urgent need diagonal brace for salvage of foundation pits, the foundation pit by top of the slope road second level slope to foundation pit platform, with Earth excavation is supporting and retaining system formula building enclosure at foundation pit platform to bottom of foundation ditch afterwards, and the vertical direction of supporting and retaining system formula building enclosure is close Side wall on the inside of foundation pit is equipped with built-in fitting one;Bottom of foundation ditch corresponding position, which is equipped with, thickeies bed course, is arranged on the thickening bed course Built-in fitting two;It further include type steel support, the both ends of the type steel support are fully welded and connect with built-in fitting one and built-in fitting two respectively, shape At diagonal brace.
Compared with prior art, the present invention is beneficial has the technical effect that
One, of the invention quickly to meet an urgent need diagonal brace for salvage of foundation pits, it is applied to foundation pit compared with deep, area is larger, supporting and retaining system formula knot Structure is gone along with sb. to guard him in the foundation pit of form, and side wall of the vertical direction of the supporting and retaining system formula building enclosure at foundation pit platform on the inside of foundation pit is passed through Upper installation built-in fitting one, on the thickening bed course of bottom of foundation ditch install built-in fitting two, then by factory production type steel support two End is fully welded and connect with built-in fitting one and built-in fitting two respectively, diagonal brace is formed, thus as foundation pit emergency treatment.The diagonal brace is adopted With type steel support form, the emergency repair time can be shortened effectively so as to shorten the construction period.Moreover, the diagonal brace is main structure body Construction save biggish construction space, be conducive to comprehensive development of main structure construction of bottom plates working face.Most importantly, Type steel support stress form is preferable, and foundation pit enclosure wall stress is mutually offset with uplift of soil stress, can be effectively to base Pit enclosure form is reinforced.
Two, of the invention quickly to meet an urgent need the construction method of diagonal brace for salvage of foundation pits, it is easy to operate, and it is existing to reduce construction The operation difficulty of field, it is at low cost, in large area, deep foundation pit earthwork digging construction, consolidation process can be carried out to foundation pit, prevented Foundation pit further deforms, and can play the effect of emergency repair.
Further, the thickening bed course successively includes steel pipe layer, steel bar layer and surface layer, the steel pipe layer packet from the bottom to top It includes several along the spaced two-way steel pipe of plane;The steel bar layer is double-layer double-direction reinforcing bar.In view of the medium-sized bracing members of diagonal brace Bottom end be fixed on the built-in fitting two of bottom of foundation ditch, in order to meet force request, install at built-in fitting two to thicken bed course, steel 3m long steel pipe anchors into the length for thickening bed course not less than 300mm in tube layer, and steel pipe spacing is 500mm.
Further, in order to guarantee the waterproof effect of main structure, when the also unstable diagonal brace of building enclosure can not be removed, When main structure is constructed, the type steel support, which passes through, is arranged steel plate for sealing water at base plate of foundation pit and structure outer plate.To foundation pit Construction of bottom plates completion reaches intensity, and building enclosure stabilizes, and diagonal brace can just be removed.
Further, the steel plate for sealing water is mutually perpendicular to, bottom plate along one circle of type steel support periphery setting with type steel support The center of base plate thickness is arranged in the steel plate for sealing water center at place, and the steel plate for sealing water center setting at structure outer plate exists Side fascia plate thickness center, to play the role of water seepage prevention.
Further, the supporting and retaining system formula building enclosure is the double cast-in-situ bored pile at a distance of a fixed spacing, coupling beam and mixes The gravity dam that solidifying fortifield village's purlin is formed, the concrete purlin are respectively arranged at cast-in-situ bored pile top, lead between concrete purlin Coupling beam connection is crossed, the built-in fitting one is set along the cast-in-situ bored pile stake top concrete purlin interval on the inside of foundation pit It sets.Spacing 6m being enclosed along foundation pit periphery one, one built-in fitting one being set, built-in fitting one can use 600mm × 600mm × 16mm The reinforced steel bar perforation plug welding that 9 HRB400 grades of diameters are 20mm can be arranged therebetween and connect with steel plate for steel plate.
The present invention also provides a kind of quickly to meet an urgent need the construction method of diagonal brace for salvage of foundation pits, and the foundation pit is by top of the slope road Road second level slope is to foundation pit platform, subsequent earth excavation to bottom of foundation ditch, is supporting and retaining system formula building enclosure, the construction at foundation pit platform Method includes:
The vertical direction of supporting and retaining system formula building enclosure installs built-in fitting one on the side wall on the inside of foundation pit;
Accordingly it is arranged after earth excavation in bottom of foundation ditch and thickeies bed course, and built-in fitting two is installed on thickening bed course, it is described Thicken bed course from the bottom to top successively include steel pipe layer, steel bar layer and surface layer, the steel pipe layer include it is several along interplanar every setting Two-way steel pipe;The steel bar layer is double-layer double-direction reinforcing bar;
The type steel support of factory process is lifted to corresponding position so that the both ends of type steel support respectively with built-in fitting one and Built-in fitting two is fully welded connection, forms diagonal brace;
It is passed through respectively in type steel support and steel plate for sealing water is set at base plate of foundation pit and structure outer plate.
Further, the supporting and retaining system formula building enclosure is the double cast-in-situ bored pile at a distance of a fixed spacing, coupling beam and mixes The gravity dam that solidifying fortifield village's purlin is formed, the concrete purlin are respectively arranged at cast-in-situ bored pile top, lead between concrete purlin Coupling beam connection is crossed, the built-in fitting one is set along the cast-in-situ bored pile stake top concrete purlin interval on the inside of foundation pit It sets.In view of the spacing between double cast-in-situ bored pile is 6m, spacing 6m is enclosed along foundation pit periphery one, one built-in fitting one is set, in advance Embedded part one can use 600mm × 600mm × 16mm steel plate, and it is 20mm that 9 HRB400 grades of diameters can be arranged therebetween Reinforced steel bar perforation plug welding connect with steel plate.
Further, the steel plate for sealing water is mutually perpendicular to, bottom plate along one circle of type steel support periphery setting with type steel support The center of base plate thickness is arranged in the steel plate for sealing water center at place, and the steel plate for sealing water center setting at structure outer plate exists Side fascia plate thickness center.
Detailed description of the invention
Fig. 1 is quickly to meet an urgent need the schematic diagram of diagonal brace in one embodiment of the invention for salvage of foundation pits;
Fig. 2 is the structural schematic diagram of built-in fitting one during the present invention one is implemented;
Fig. 3 is the structural schematic diagram of built-in fitting two in one embodiment of the invention;
Fig. 4 is the structural schematic diagram of built-in fitting two in one embodiment of the invention;
Fig. 5 is that steel pipe floor plan below bed course is thickeied in one embodiment of the invention;
Fig. 6 is quickly to meet an urgent need the using renderings of diagonal brace in one embodiment of the invention for salvage of foundation pits.
In figure:
10- cast-in-situ bored pile, 11- coupling beam, 12- concrete purlin;The skirt 20- ruggedized construction, 21- plain concrete power transmission Band;31- built-in fitting one, 32- thicken bed course, and 33- built-in fitting two, 34- type steel support, 35- diameter is the reinforcing bar of 20mm;40- stops Water steel plate;50- steel pipe;60- bottom plate;70- Side fascia.
Specific embodiment
Below in conjunction with the drawings and specific embodiments to it is proposed by the present invention it is a kind of for salvage of foundation pits quickly meet an urgent need diagonal brace and Construction method is described in further detail.According to following explanation, advantages and features of the invention will be become apparent from.It below will be by institute The embodiment combination attached drawing enumerated, the technology contents and feature that the present invention will be described in detail.Need in addition it illustrate, attached drawing is all made of Very simplified form and use non-accurate ratio, only to it is convenient, lucidly aid in illustrating the mesh of the embodiment of the present invention 's.For sake of convenience, "upper" described below, "lower" are consistent with the upper and lower direction of attached drawing, but this can't be the present invention The limitation of technical solution.
Embodiment one
In conjunction with Fig. 1 to Fig. 6, the present invention will be described in detail quickly meets an urgent need the structure composition of diagonal brace for salvage of foundation pits.
Please refer to Fig. 1 to Fig. 6, one kind is quickly met an urgent need diagonal brace for salvage of foundation pits, foundation pit by top of the slope road second level slope extremely Foundation pit platform, subsequent earth excavation to bottom of foundation ditch is supporting and retaining system formula building enclosure at foundation pit platform, supporting and retaining system formula building enclosure it is perpendicular Histogram is equipped with built-in fitting 1 to the side wall on the inside of foundation pit;Bottom of foundation ditch corresponding position, which is equipped with, thickeies bed course 32, thickeies Built-in fitting 2 33 is set on bed course 32;Further include type steel support 34, the both ends of type steel support 34 respectively with built-in fitting 1 and pre- Embedded part 2 33 is fully welded connection, forms diagonal brace.
Specifically, of the invention quickly to meet an urgent need diagonal brace for salvage of foundation pits, it is applied to foundation pit compared with deep, area is larger, branch In the foundation pit of gear formula structural envelope form, through the vertical direction of the supporting and retaining system formula building enclosure at foundation pit platform on the inside of foundation pit Side wall on install built-in fitting 1, on the thickening bed course 32 of bottom of foundation ditch install built-in fitting 2 33, then by factory production The both ends of type steel support 34 are fully welded and connect with built-in fitting 1 and built-in fitting 2 33 respectively, diagonal brace are formed, to answer as foundation pit Measure is helped in first aid.The diagonal brace uses type steel support form, can shorten the emergency repair time effectively so as to shorten the construction period.And And the diagonal brace saves biggish construction space for the construction of main structure body, is conducive to 60 construction working face of main structure bottom plate Comprehensive development.Most importantly, 34 stress form of type steel support is preferable, foundation pit enclosure wall stress and uplift of soil stress phase It is mutually offset, effectively foundation pit enclosure form can be reinforced.
In the present embodiment, it is highly preferred that thicken bed course 32 from the bottom to top successively include steel pipe layer, steel bar layer and surface layer, Steel pipe layer includes several along the spaced two-way steel pipe 50 of plane;Steel bar layer is double-layer double-direction reinforcing bar.In view of diagonal brace is medium-sized The bottom end of bracing members 34 is fixed on the built-in fitting 2 33 of bottom of foundation ditch, in order to meet force request, is at installation built-in fitting two Bed course 32 is thickeied, 3m long steel pipe 50 anchors into the length for thickening bed course 32 not less than 300mm in steel pipe layer, and 50 spacing of steel pipe is 500mm。
In the present embodiment, it is highly preferred that waterproof effect in order to guarantee main structure, when building enclosure also it is unstable tiltedly When support can not remove, when main structure is constructed, type steel support 34 passes through to be arranged at base plate of foundation pit 60 and structure outer plate 70 Steel plate for sealing water 40.It completes to reach intensity to the construction of base plate of foundation pit 60, building enclosure stabilizes, and diagonal brace can just be removed.In this reality It applies in example, it is highly preferred that steel plate for sealing water 40 is mutually perpendicular to, bottom along 34 periphery setting of type steel support, one circle with type steel support 34 40 center of steel plate for sealing water at plate 60 is arranged in the center of 60 thickness of bottom plate, in the steel plate for sealing water 40 at structure outer plate 70 Heart position is arranged at 70 plate thickness center of Side fascia, to play the role of water seepage prevention.
In the present embodiment, it is highly preferred that supporting and retaining system formula building enclosure be at a distance of a fixed spacing double cast-in-situ bored pile 10, The gravity dam that coupling beam 11 and concrete purlin 12 are formed, concrete purlin 12 are respectively arranged at 10 top of cast-in-situ bored pile, mix It is connected between solidifying fortifield village's purlin 12 by coupling beam 11, built-in fitting 1 is along the 10 stake top coagulation of cast-in-situ bored pile on the inside of foundation pit The setting of the interval of fortifield village's purlin 12.Spacing 6m being enclosed along foundation pit periphery one, one built-in fitting 1 being set, built-in fitting 1 can use The perforation plug of reinforcing bar 35 that 9 HRB400 grades of diameters are 20mm can be arranged in 600mm × 600mm × 16mm steel plate therebetween Weldering is connect with steel plate.
Please continue to refer to Fig. 1 to Fig. 6, the present invention also provides a kind of quickly to meet an urgent need the construction party of diagonal brace for salvage of foundation pits Method, the foundation pit is by top of the slope road second level slope to foundation pit platform, subsequent earth excavation to bottom of foundation ditch, is supporting and retaining system at foundation pit platform Formula building enclosure, side wall of the vertical direction of supporting and retaining system formula building enclosure on the inside of foundation pit are equipped with built-in fitting 1, the construction Method includes:
The vertical direction of supporting and retaining system formula building enclosure installs built-in fitting 1 on the side wall on the inside of foundation pit;
Accordingly it is arranged after earth excavation in bottom of foundation ditch and thickeies bed course 32, and built-in fitting two is installed on thickening bed course 32 33, thicken bed course 32 from the bottom to top successively include steel pipe layer, steel bar layer and surface layer, steel pipe layer include it is several along interplanar every setting Two-way steel pipe 50;Steel bar layer is double-layer double-direction reinforcing bar;
By the type steel support 34 of factory process lifting to corresponding position so that the both ends of type steel support 34 respectively with built-in fitting 1 and built-in fitting 2 33 be fully welded connection, form diagonal brace;
It is passed through respectively in type steel support 34 and steel plate for sealing water 40 is set at base plate of foundation pit 60 and structure outer plate 70.Particularly, Steel plate for sealing water 40 is mutually perpendicular to, the steel plate for sealing water at bottom plate 60 along 34 periphery setting of type steel support, one circle with type steel support 34 The center of 60 thickness of bottom plate is arranged in 40 centers, and 40 center of steel plate for sealing water at structure outer plate 70 is arranged in exterior wall 70 plate thickness center of plate.
In the present embodiment, it is highly preferred that supporting and retaining system formula building enclosure be at a distance of a fixed spacing double cast-in-situ bored pile 10, The gravity dam that coupling beam 11 and concrete purlin 12 are formed, concrete purlin 12 are respectively arranged at 10 top of cast-in-situ bored pile, mix It is connected between solidifying fortifield village's purlin 12 by coupling beam 11, built-in fitting 1 is along the 10 stake top coagulation of cast-in-situ bored pile on the inside of foundation pit The setting of the interval of fortifield village's purlin 12.Spacing 6m being enclosed along foundation pit periphery one, one built-in fitting 1 being set, built-in fitting 1 can use The perforation plug of reinforcing bar 35 that 9 HRB400 grades of diameters are 20mm can be arranged in 600mm × 600mm × 16mm steel plate therebetween Weldering is connect with steel plate.
The construction method is easy to operate, reduces the operation difficulty of construction site, at low cost, in large area, deep foundation pit soil In square excavation construction, consolidation process can be carried out to foundation pit, prevent foundation pit from further deforming, the effect of emergency repair can be played Fruit.
Foregoing description is only the description to present pre-ferred embodiments, not to any restriction of the scope of the invention, this hair Any change, the modification that the those of ordinary skill in bright field does according to the disclosure above content, belong to the protection of claims Range.

Claims (8)

1. one kind is quickly met an urgent need diagonal brace for salvage of foundation pits, which is characterized in that the foundation pit is by top of the slope road second level slope to base Cheat platform, subsequent earth excavation to bottom of foundation ditch is supporting and retaining system formula building enclosure at foundation pit platform, supporting and retaining system formula building enclosure it is vertical Side wall of the direction on the inside of foundation pit is equipped with built-in fitting one;Bottom of foundation ditch corresponding position, which is equipped with, thickeies bed course, the thickening pad Built-in fitting two is set on layer;It further include type steel support, the both ends of the type steel support are full with built-in fitting one and built-in fitting two respectively Weldering connection, forms diagonal brace.
2. according to claim 1 quickly meet an urgent need diagonal brace for salvage of foundation pits, which is characterized in that the thickening bed course is under Supreme includes successively steel pipe layer, steel bar layer and surface layer, and the steel pipe layer includes several along the spaced two-way steel pipe of plane;Institute Stating steel bar layer is double-layer double-direction reinforcing bar.
3. according to claim 1 quickly meet an urgent need diagonal brace for salvage of foundation pits, which is characterized in that the type steel support passes through Steel plate for sealing water is set at base plate of foundation pit and structure outer plate.
4. according to claim 3 quickly meet an urgent need diagonal brace for salvage of foundation pits, which is characterized in that the steel plate for sealing water along One circle of type steel support periphery setting, is mutually perpendicular to type steel support, and the steel plate for sealing water center setting at bottom plate is in bottom plate thickness The center of degree, the steel plate for sealing water center at structure outer plate are arranged at outer wallboard plate thickness center.
5. according to claim 1 quickly meet an urgent need diagonal brace for salvage of foundation pits, which is characterized in that the supporting and retaining system formula goes along with sb. to guard him knot Structure is the gravity dam that the double cast-in-situ bored pile at a distance of a fixed spacing, coupling beam and concrete purlin are formed, the coagulation fortifield village Purlin is respectively arranged at cast-in-situ bored pile top, is connected between concrete purlin by coupling beam, the built-in fitting one is along close to base The cast-in-situ bored pile stake top concrete purlin interval setting of hole inside.
6. a kind of construction method for diagonal brace of quickly meeting an urgent need for salvage of foundation pits, which is characterized in that the foundation pit is by top of the slope road two Grade slope is to foundation pit platform, subsequent earth excavation to bottom of foundation ditch, is supporting and retaining system formula building enclosure, the construction method at foundation pit platform Include:
The vertical direction of supporting and retaining system formula building enclosure installs built-in fitting one on the side wall on the inside of foundation pit;
Accordingly it is arranged after earth excavation in bottom of foundation ditch and thickeies bed course, and built-in fitting two, the thickening is installed on thickening bed course Bed course successively includes steel pipe layer, steel bar layer and surface layer from the bottom to top, and the steel pipe layer includes several spaced double along plane To steel pipe;The steel bar layer is double-layer double-direction reinforcing bar;
The type steel support of factory process is lifted to corresponding position so that the both ends of type steel support respectively with built-in fitting one and pre-buried Part two is fully welded connection, forms diagonal brace and forms diagonal brace;
It is passed through respectively in type steel support and steel plate for sealing water is set at base plate of foundation pit and structure outer plate.
7. construction method according to claim 6, which is characterized in that the supporting and retaining system formula building enclosure is at a distance of a fixed spacing Double cast-in-situ bored pile, the gravity dam that is formed of coupling beam and concrete purlin, the concrete purlin is respectively arranged at drilling Bored concrete pile top is connected by coupling beam between concrete purlin, and the built-in fitting one is along the drilling on the inside of foundation pit The setting of bored concrete pile stake top concrete purlin interval.
8. construction method according to claim 6, which is characterized in that the steel plate for sealing water is arranged along type steel support periphery One circle, is mutually perpendicular to, the center of base plate thickness, structure outer is arranged in the steel plate for sealing water center at bottom plate with type steel support Steel plate for sealing water center at plate is arranged at outer wallboard plate thickness center.
CN201811579672.7A 2018-12-24 2018-12-24 One kind is quickly met an urgent need diagonal brace and construction method for salvage of foundation pits Pending CN109555129A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811579672.7A CN109555129A (en) 2018-12-24 2018-12-24 One kind is quickly met an urgent need diagonal brace and construction method for salvage of foundation pits

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811579672.7A CN109555129A (en) 2018-12-24 2018-12-24 One kind is quickly met an urgent need diagonal brace and construction method for salvage of foundation pits

Publications (1)

Publication Number Publication Date
CN109555129A true CN109555129A (en) 2019-04-02

Family

ID=65870902

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811579672.7A Pending CN109555129A (en) 2018-12-24 2018-12-24 One kind is quickly met an urgent need diagonal brace and construction method for salvage of foundation pits

Country Status (1)

Country Link
CN (1) CN109555129A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110206039A (en) * 2019-05-31 2019-09-06 中国一冶集团有限公司 Complex geological condition cheats Larsen steel sheet pile construction method in hole
CN113897970A (en) * 2021-03-05 2022-01-07 华润建筑有限公司 Temporary steel support structure for deep foundation pit construction and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105239586A (en) * 2015-11-05 2016-01-13 云南建工集团有限公司 Support structure for supporting foundation pit and method for supporting foundation pit
CN206289632U (en) * 2016-12-16 2017-06-30 中国建筑第八工程局有限公司 Tiltedly throw support support replacement beam support system
CN107476313A (en) * 2017-08-22 2017-12-15 江苏省岩土工程公司 A kind of method tiltedly thrown support support system and constructed simultaneously with sole plate
CN209585054U (en) * 2018-12-24 2019-11-05 上海建工二建集团有限公司 One kind is quickly met an urgent need diagonal brace for salvage of foundation pits

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105239586A (en) * 2015-11-05 2016-01-13 云南建工集团有限公司 Support structure for supporting foundation pit and method for supporting foundation pit
CN206289632U (en) * 2016-12-16 2017-06-30 中国建筑第八工程局有限公司 Tiltedly throw support support replacement beam support system
CN107476313A (en) * 2017-08-22 2017-12-15 江苏省岩土工程公司 A kind of method tiltedly thrown support support system and constructed simultaneously with sole plate
CN209585054U (en) * 2018-12-24 2019-11-05 上海建工二建集团有限公司 One kind is quickly met an urgent need diagonal brace for salvage of foundation pits

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110206039A (en) * 2019-05-31 2019-09-06 中国一冶集团有限公司 Complex geological condition cheats Larsen steel sheet pile construction method in hole
CN110206039B (en) * 2019-05-31 2021-05-18 中国一冶集团有限公司 Construction method of Larsen steel sheet pile in pit under complex geological conditions
CN113897970A (en) * 2021-03-05 2022-01-07 华润建筑有限公司 Temporary steel support structure for deep foundation pit construction and construction method thereof

Similar Documents

Publication Publication Date Title
CN205742213U (en) Foundation pit supporting construction
CN105804089B (en) Locally increase deep support system and its construction method after a kind of former deep foundation pit construction
CN209585054U (en) One kind is quickly met an urgent need diagonal brace for salvage of foundation pits
CN106522241A (en) Deep foundation pit supporting method of ultrahigh floor height type basement structure
CN102162258B (en) Concrete-filled steel tubular high-pile tower footing structure of tower crane and construction method thereof
WO2021013200A1 (en) Secant pile and retaining wall combined foundation pit supporting structure and method
CN103938634B (en) A kind of deep foundation pit supporting structure and construction method
CN104790412B (en) Big width foundation pit supporting construction in the case of artesian water
CN103114595A (en) Support method and device of support pile preformed core-soil double-buttress inclined inner-strut foundation ditch
CN106368219A (en) Supporting reinforcing structure of deep foundation pit and construction method
CN113585360A (en) Anti-floating anchor rod device and construction method
CN102839672A (en) Foundation pit supporting method for preventing displacement limit exceeding of soft base cement mixing pile
CN109555129A (en) One kind is quickly met an urgent need diagonal brace and construction method for salvage of foundation pits
CN205024712U (en) Modular tower crane basis
CN207659986U (en) A kind of building or structures foundation stabilization underpin pier
CN203768914U (en) Foundation pit bracing diagonal support pile structure
CN106480891A (en) A kind of shaft construction method
CN107558477B (en) Supporting structure combining foundation pit and side slope and construction method
CN109577322A (en) A kind of constructing device for inside soil body existing pile foundation pile extension
CN103882883B (en) Tower crane and garage frame post share a foundation construction method
CN206477341U (en) A kind of foundation pit support system
CN203821399U (en) Deep foundation pit supporting structure
CN107503354A (en) A kind of tower crane goes along with sb. to guard him bracing reinforcement and excavation method
CN206562618U (en) A kind of basin excavation steel structure horizontal bracing unit
CN206667263U (en) A kind of foundation pit supporting construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination