CN107503354A - A kind of tower crane goes along with sb. to guard him bracing reinforcement and excavation method - Google Patents

A kind of tower crane goes along with sb. to guard him bracing reinforcement and excavation method Download PDF

Info

Publication number
CN107503354A
CN107503354A CN201610413617.5A CN201610413617A CN107503354A CN 107503354 A CN107503354 A CN 107503354A CN 201610413617 A CN201610413617 A CN 201610413617A CN 107503354 A CN107503354 A CN 107503354A
Authority
CN
China
Prior art keywords
tower crane
steel sheet
sheet pile
purlin
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610413617.5A
Other languages
Chinese (zh)
Inventor
黄鹤敏
蒋吉财
陈成年
许建平
朱科
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201610413617.5A priority Critical patent/CN107503354A/en
Publication of CN107503354A publication Critical patent/CN107503354A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys

Abstract

A kind of tower crane goes along with sb. to guard him bracing reinforcement and excavation method, it is characterised in that comprises the following steps:A, according to tower crane position for Larsen steel sheet pile carry out line setting, b, according to line setting excavate groove, c, squeeze into steel sheet pile;Carry out first stage shoveling, d, weld purlin, add support, purlin support diagonal brace carries out full weld processing with steel sheet pile welding, e, Larsen steel sheet pile purlin and support are both needed to construction completion, f, carry out tower crane installation, reinforcing bar, template construction, g, after the completion of foundation construction, after tower crane construction base concrete reaches the 70% of intensity, carry out backfilling of earthwork, remove steel purlin, extract Larsen steel sheet pile.It is difficult with solving tower crane deep pit digging in soft soil foundation that the tower crane of the present invention goes along with sb. to guard him bracing reinforcement and excavation method, tower crane and basement is effectively avoided to occur earthwork slope failure unstability during soft soil foundation earth excavation, the advantages of saving the duration and reduce engineering cost.

Description

A kind of tower crane goes along with sb. to guard him bracing reinforcement and excavation method
Technical field
The present invention relates to a kind of basis of civil engineering to go along with sb. to guard him excavation method, is that a kind of tower crane is gone along with sb. to guard him specifically Bracing reinforcement and excavation method.
Background technology
Growing with China's urban construction, more and more skyscrapers are rised sheer from level ground, must not as construction The vertical transportation machinery that can lack, tower crane obtain because of the features such as its lifting altitude is big, broad covered area in modern industry and civil buildings Used to extensive.According to project characteristic, architecture structure form, spot plane rational management selection tower crane plan-position and basis Form, tower crane is arranged on ground storehouse and excavation slope is relatively conventional, during earth excavation, especially in soft soil foundation Excavated under the conditions of matter, if attention degree is insufficient, is easily caused tower crane pile foundation and periphery engineering pile and is extruded by the earthwork or cave in and cause stake Base failure by shear, further triggers security incident, so as to cause duration, economic damages.
Therefore known tower crane go along with sb. to guard him bracing reinforcement and digging mode there are problems that above-mentioned a variety of inconvenience and.
The content of the invention
The purpose of the present invention, be to propose it is a kind of avoid a cubic metre of earth tower crane for slope failure unstability go along with sb. to guard him bracing reinforcement and Excavation method.
To achieve the above object, technical solution of the invention is:
A kind of tower crane goes along with sb. to guard him bracing reinforcement and excavation method, it is characterised in that comprises the following steps:
A, line setting, Larsen steel sheet pile accurate positioning, specific size are carried out for Larsen steel sheet pile according to tower crane position According to specific tower crane model, base position is determined, and need to ensure that basic installation has enough operating surfaces;
B, groove is excavated according to line setting, steel sheet pile construction saddle is installed, steel sheet pile is beaten in advance, according to tower crane buried depth mark Height, it is determined that construction steel sheet pile length;
C, steel sheet pile is squeezed into;First stage shoveling is carried out, according to 1:2.0 progress slopes are excavated to shaped steel purlin position;Excavation face Product need to meet to load earthworks requirements in foundation ditch under site operation backacter construction radius;
D, weld purlin, add support, purlin support diagonal brace carries out full weld processing with steel sheet pile welding, and weld seam is full;
E, Larsen steel sheet pile purlin and support are both needed to construction completion, after welding quality is qualified, carries out the basic second stage earthwork and open Dig, the earthwork in excavation pit, cut the earth for machinery less than bit position, using manual cleaning, after the completion of casting concrete bed course;
F, tower crane installation, reinforcing bar, template construction, casting concrete are carried out;
G, after the completion of foundation construction, after tower crane construction base concrete reaches the 70% of intensity, backfilling of earthwork is carried out, dismounting steel encloses Purlin, extract Larsen steel sheet pile.
The tower crane of the present invention, which goes along with sb. to guard him bracing reinforcement and excavation method, to enter one using following technical measures Step is realized.
Foregoing method, wherein the purlin support diagonal brace is 45 degree with steel sheet pile soldering angle.
Foregoing method, excavated wherein the earth excavation " segmentation, should be layered, be symmetrical ", pay attention to periphery in digging process Engineering pile, the protection of tower crane stake, if special messenger commands, dig and break or by soil body failure by shear to prevent pile tube.
After adopting the above technical scheme, the tower crane of the present invention go along with sb. to guard him bracing reinforcement and excavation method have it is following excellent Point:
1st, solve tower crane deep pit digging difficulty in soft soil foundation, effectively avoid tower crane and basement in weak soil Occur earthwork slope failure unstability, extruding, failure by shear periphery tower crane pile foundation or engineering pile phenomenon during base earth excavation;
2nd, construction quality is safe and reliable, efficiently solve tower crane, excavation slope safety problem in the digging process of storehouse;
3rd, the duration is saved, reduces engineering cost.
Brief description of the drawings
Fig. 1 is tower crane, the Larsen steel sheet pile horizontal layout schematic diagram of the embodiment of the present invention;
Fig. 2 is that the tower crane of the embodiment of the present invention goes along with sb. to guard him supporting plane figure;
Fig. 3 is the foundation pit enclosure profile of the embodiment of the present invention;
Fig. 4 is the shaped steel purlin and support connection diagram of the embodiment of the present invention;
Fig. 5 is the A-A sectional views in Fig. 4;
Fig. 6 is the shaped steel purlin and steel sheet pile connection diagram of the embodiment of the present invention;
Fig. 7 is the foundation pit enclosure profile of the embodiment of the present invention and each stage earth excavation floor map;
Fig. 8 is the earth excavation diagrammatic cross-section of the embodiment of the present invention.
In figure:1 Larsen steel sheet pile, 2 underground garage pile foundations, 3 tower cranes, the shaped steel purlin of main building 4,5,6 type steel supports, 7 Foundation ditch slope, 8 reinforcing bar shelf brackets, 9 tower crane pile foundations, 10 support center lines, 11 put more energy into floor, 12 channel-section steel supports, 13 first stage Earthwork slope in foundation ditch periphery is excavated, unloading, earth excavation in 14 second stage tower crane foundation ditches.
Embodiment
With reference to embodiments and its accompanying drawing illustrates further to the present invention.
Embodiment 1
The tower crane of the present invention goes along with sb. to guard him bracing reinforcement and the tower crane of excavation method goes along with sb. to guard him support and earth excavation construction stream Journey is as follows:
→ → steel sheet pile inserts and beats → sink and beat steel sheet pile → in advance and opens Larsen steel sheet pile line setting → excavation groove for saddle installation Dig to shaped steel purlin position → setting purlin, support → foundation ditch periphery earthwork slope is excavated, earth excavation in unloading → foundation ditch → Tower crane is constructed, and → banketing and remove purlin → pulls out steel sheet pile.
The tower crane of the present invention goes along with sb. to guard him bracing reinforcement and excavation method, comprises the following steps:
A, line setting, Larsen steel sheet pile accurate positioning, specific size are carried out for Larsen steel sheet pile according to tower crane position According to specific tower crane model, base position is determined, and need to ensure that basic installation has enough operating surfaces;Fig. 1 is the present invention Tower crane, the Larsen steel sheet pile horizontal layout schematic diagram of embodiment.
B, groove is excavated according to line setting, steel sheet pile construction saddle is installed, steel sheet pile is beaten in advance, according to tower crane buried depth Absolute altitude, it is determined that construction steel sheet pile length;Fig. 2 is that the tower crane of the embodiment of the present invention goes along with sb. to guard him supporting plane figure.
C, steel sheet pile is squeezed into;First stage shoveling is carried out, according to 1:2.0 progress slopes are excavated to shaped steel purlin position;Open Digging area need to meet to load earthworks requirements in foundation ditch under site operation backacter construction radius;Fig. 3 is the embodiment of the present invention Foundation pit enclosure profile.
D, weld purlin, add support, purlin support diagonal brace carries out full weld processing with steel sheet pile welding, and weld seam is full;Institute It is 45 degree that purlin support diagonal brace, which is stated, with steel sheet pile soldering angle.Fig. 4 is that the shaped steel purlin of the embodiment of the present invention and support connection are shown It is intended to, Fig. 5 is the A-A sectional views in Fig. 4.
E, Larsen steel sheet pile purlin and support are both needed to construction completion, after welding quality is qualified, carry out basic second stage soil Side is excavated, the earthwork in excavation pit, is cut the earth for machinery less than bit position, using manual cleaning, after the completion of casting concrete pad Layer;Fig. 6 is the shaped steel purlin and steel sheet pile connection diagram of the embodiment of the present invention.
F, tower crane installation, reinforcing bar, template construction, casting concrete are carried out;
G, after the completion of foundation construction, after tower crane construction base concrete reaches the 70% of intensity, backfilling of earthwork is carried out, dismounting steel encloses Purlin, extract Larsen steel sheet pile.The earth excavation " segmentation, should be layered, be symmetrical " and excavate, and periphery engineering is paid attention in digging process Stake, the protection of tower crane stake, if special messenger commands, dig and break or by soil body failure by shear to prevent pile tube.Fig. 7 is the base of the embodiment of the present invention Pit enclosure profile and each stage earth excavation floor map, Fig. 8 are the earth excavation diagrammatic cross-section of the embodiment of the present invention.
The present invention has substantive distinguishing features and significant technological progress, and tower crane of the invention is gone along with sb. to guard him bracing reinforcement and opened Excavation method, which is gone along with sb. to guard him from tower crane, earth excavation is constructed starts with terms of two, efficiently solve tower crane, storehouse digging process Middle excavation slope safety problem, while ensure that project smoothly completion and the side of taking part in building of each factory interests.
The tower crane of the present invention goes along with sb. to guard him bracing reinforcement and excavation method in Shanghai Sheshan, Songjiang commercial residential buildings projects Middle utilization, significant effect, obtain exploiting entity, supervisor and construction unit's abundant affirmation.
Above example is used for illustrative purposes only, rather than limitation of the present invention, the technology people about technical field Member, without departing from the spirit and scope of the present invention, can also make various conversion or change.Therefore, it is all equivalent Technical scheme should also belong to scope of the invention, should be limited by each claim.

Claims (3)

1. a kind of tower crane goes along with sb. to guard him bracing reinforcement and excavation method, it is characterised in that comprises the following steps:
A, line setting, Larsen steel sheet pile accurate positioning, specific size are carried out for Larsen steel sheet pile according to tower crane position According to specific tower crane model, base position is determined, and need to ensure that basic installation has enough operating surfaces;
B, groove is excavated according to line setting, steel sheet pile construction saddle is installed, steel sheet pile is beaten in advance, according to tower crane buried depth mark Height, it is determined that construction steel sheet pile length;
C, steel sheet pile is squeezed into;First stage shoveling is carried out, according to 1:2.0 progress slopes are excavated to shaped steel purlin position;Excavation face Product need to meet to load earthworks requirements in foundation ditch under site operation backacter construction radius;
D, weld purlin, add support, purlin support diagonal brace carries out full weld processing with steel sheet pile welding, and weld seam is full;
E, Larsen steel sheet pile purlin and support are both needed to construction completion, after welding quality is qualified, carries out the basic second stage earthwork and open Dig, the earthwork in excavation pit, cut the earth for machinery less than bit position, using manual cleaning, after the completion of casting concrete bed course;
F, tower crane installation, reinforcing bar, template construction, casting concrete are carried out;
G, after the completion of foundation construction, after tower crane construction base concrete reaches the 70% of intensity, backfilling of earthwork is carried out, dismounting steel encloses Purlin, extract Larsen steel sheet pile.
2. tower crane as claimed in claim 1 goes along with sb. to guard him bracing reinforcement and excavation method, it is characterised in that the purlin support Diagonal brace is 45 degree with steel sheet pile soldering angle.
3. tower crane as claimed in claim 1 goes along with sb. to guard him bracing reinforcement and excavation method, it is characterised in that the earth excavation " segmentation, it should be layered, be symmetrical " and excavate, periphery engineering pile, the protection of tower crane stake are paid attention in digging process, if special messenger commands, to prevent Pile tube, which is dug, to break or by soil body failure by shear.
CN201610413617.5A 2016-06-14 2016-06-14 A kind of tower crane goes along with sb. to guard him bracing reinforcement and excavation method Pending CN107503354A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610413617.5A CN107503354A (en) 2016-06-14 2016-06-14 A kind of tower crane goes along with sb. to guard him bracing reinforcement and excavation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610413617.5A CN107503354A (en) 2016-06-14 2016-06-14 A kind of tower crane goes along with sb. to guard him bracing reinforcement and excavation method

Publications (1)

Publication Number Publication Date
CN107503354A true CN107503354A (en) 2017-12-22

Family

ID=60678423

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610413617.5A Pending CN107503354A (en) 2016-06-14 2016-06-14 A kind of tower crane goes along with sb. to guard him bracing reinforcement and excavation method

Country Status (1)

Country Link
CN (1) CN107503354A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114687355A (en) * 2022-04-14 2022-07-01 北京京水建设集团有限公司 Ship lock foundation pit excavation and supporting structure and construction method thereof
CN115233701A (en) * 2022-08-31 2022-10-25 中国十七冶集团有限公司 Foundation pit supporting device under coastal complex geological conditions and construction method
CN115787705A (en) * 2022-12-27 2023-03-14 广州市第三市政工程有限公司 Construction method for pre-arranging tower crane foundation in foundation pit

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704504A (en) * 2012-06-26 2012-10-03 南通华新建工集团有限公司 Method for constructing tower crane foundation
CN104895079A (en) * 2015-06-11 2015-09-09 辽宁紫竹桩基础工程股份有限公司 Reverse construction method for piling steel sheet piles
CN104929133A (en) * 2015-06-09 2015-09-23 沈阳市政集团有限公司 Deep foundation pit Larsen steel sheet pile bottom sloping support construction method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704504A (en) * 2012-06-26 2012-10-03 南通华新建工集团有限公司 Method for constructing tower crane foundation
CN104929133A (en) * 2015-06-09 2015-09-23 沈阳市政集团有限公司 Deep foundation pit Larsen steel sheet pile bottom sloping support construction method
CN104895079A (en) * 2015-06-11 2015-09-09 辽宁紫竹桩基础工程股份有限公司 Reverse construction method for piling steel sheet piles

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
宁英杰等: "拉森钢板桩在承台深基坑中的应用", 《交通世界》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114687355A (en) * 2022-04-14 2022-07-01 北京京水建设集团有限公司 Ship lock foundation pit excavation and supporting structure and construction method thereof
CN115233701A (en) * 2022-08-31 2022-10-25 中国十七冶集团有限公司 Foundation pit supporting device under coastal complex geological conditions and construction method
CN115787705A (en) * 2022-12-27 2023-03-14 广州市第三市政工程有限公司 Construction method for pre-arranging tower crane foundation in foundation pit

Similar Documents

Publication Publication Date Title
CN104612162B (en) A kind of Deep Foundation Pit of Metro Stations excavation construction method
CN102454167B (en) The construction method of especially big & deep open caisson
CN102535474B (en) A kind of construction method of deep-foundation pit excavation
CN102434717B (en) Construction method of joist steel pipe-jacking work pit
CN106677189B (en) A kind of taper pile wall supporting type foundation pit supporting construction and its construction method
CN103938634B (en) A kind of deep foundation pit supporting structure and construction method
CN100510281C (en) Semi-inverse construction method of super large diameter, ultra-burial depth storage pond
CN111236241B (en) Weak water-rich stratum subway foundation pit reinforcing excavation method based on half-cover excavation method
CN113266392B (en) Pipe jacking construction method for penetrating through existing anchor cable group
CN104563146A (en) Construction method for open caisson engineering of fixed and direct burial type rainwater and sewage pumping station
CN112576056A (en) Underpinning support system for storey-adding reconstruction of existing building basement and construction method thereof
CN103290847A (en) Inner oblique beam supporting structure for oversized-area deep foundation pit and construction method
CN103114595A (en) Support method and device of support pile preformed core-soil double-buttress inclined inner-strut foundation ditch
CN108385627B (en) Hydropower station diversion tunnel plugging construction method based on karst landform
CN107503354A (en) A kind of tower crane goes along with sb. to guard him bracing reinforcement and excavation method
CN207159990U (en) One kind combination steel construction support pile
CN110158630A (en) A kind of deep covering layer area large-span arch bridge annular ground continuous wall base
CN109610473A (en) A kind of construction method of the large-scale pool structure foundation pit supporting system of municipal administration
CN212641468U (en) Pit-in-pit rapid construction structure
CN111305218A (en) Construction method for foundation pit excavation
CN107326896A (en) One kind combination steel construction support pile and construction method
CN112281888A (en) Excavation supporting method for foundation pit caisson
CN106498957A (en) Steel sheet pile cofferdam construction platform and integral construction method
CN201078234Y (en) Integral hydraulic pressure steel sheet piling curtain of vertical shaft construction overflowing sand bed
CN103866787B (en) A kind of spacious reverse masonry method concrete cut that digs builds construction technology

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171222

RJ01 Rejection of invention patent application after publication