CN105064357B - A kind of embedded anchor of prestress anchorage cable and anchoring process - Google Patents
A kind of embedded anchor of prestress anchorage cable and anchoring process Download PDFInfo
- Publication number
- CN105064357B CN105064357B CN201510489685.5A CN201510489685A CN105064357B CN 105064357 B CN105064357 B CN 105064357B CN 201510489685 A CN201510489685 A CN 201510489685A CN 105064357 B CN105064357 B CN 105064357B
- Authority
- CN
- China
- Prior art keywords
- soil
- anchor
- strand wires
- baffling
- steel strand
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The invention discloses a kind of embedded anchor of prestress anchorage cable, including reinforcing structure, reinforcing structure is connected with soil-baffling structure framework of steel reinforcement, and anchor chair is provided with reinforcing structure, and steel strand wires hole is provided with anchor chair.With soil-baffling structure can be directly connected to anchor cable by the device.The method of anchoring, specifically implements according to following steps:Step 1, makes soil-baffling structure framework of steel reinforcement, and the embedded anchor of prestress anchorage cable is fixed on soil-baffling structure framework of steel reinforcement;Step 2, hangs soil-baffling structure framework of steel reinforcement in the soil-baffling structure hole for pre-setting, and gives soil-baffling structure framework of steel reinforcement casting concrete, so as to form soil-baffling structure, soil-baffling structure sets several;Step 3, after soil-baffling structure concrete setting, chisels concrete cover at anchor chair and exposes steel strand wires hole in anchor cable elevation location;Step 4, steel strand wires hole is passed through by the free end of the steel strand wires of anchor cable, uses anchorage tensioning fixation.The method easy construction, without anchor structure falling risk.
Description
Technical field
The invention belongs to Geotechnical Engineering Prevention Technique field, it is related to a kind of embedded anchor of prestress anchorage cable, also relates to
And using the pull-type retaining structure anchoring process of anchor of said apparatus.
Background technology
Prestress anchorage cable with concrete stake, post, plate soil-baffling structure constitute the pull-type retaining structure of anchor in high slope control, deep basal pit
There is relatively broad application in the Geotechnical Engineering prevention and control field such as supporting.Power transmission method is generally beam between traditional anchor cable and soil-baffling structure
Formula power transmission method, i.e., between stake or intercolumniation set steel wale or concrete breast beam, the anchor force of anchor cable is passed to by waist rail
Soil-baffling structure, so that it is guaranteed that retaining structure and stability of slope, reach Geotechnical Engineering and prevent and treat purpose.
The problem that traditional pull-type retaining structure of anchor is present:
The 1st, waist rail is set on retaining structure, steel wale is especially set, due to soil-baffling structure construction deviation, its center line
Not in approximately the same plane, so as to after waist rail erection, it is impossible to effectively contacted with part soil-baffling structure, cause anchor cable, waist rail to be received
Power uneven generation partly or wholly property destruction.
2nd, peripheral hardware waist rail on retaining structure, need to take certain construction operation width, and conventional steel wale about 400mm is mixed
Solidifying soil waist rail is then bigger, and thereby resulting in earth excavation and backfill amount increases.
3rd, external beam or existing other kinds of anchor structure are not fixed easily, and construction deviation is big, and input manpower and materials
It is many, there is falling risk during construction and use.
4th, the anchor force of anchor cable is passed to retaining structure and increased Path of Force Transfer by beam type power transmission method requirement waist rail, and power transmission is not
Directly.
The 5th, waist rail is set on retaining structure, steel wale is especially set, long-term exposed, easy-to-rust causes stress loss
It is larger.Exposed waist rail is often scratched by earth excavation, structure construction collision and falling object impact etc. unfavorable factor influenceed.
6th, in foundation ditch, the slope project in sideline (such as arc, shaped form sideline) in irregular shape, external waist rail should
With being restricted, or even it is difficult with.
The content of the invention
It is an object of the invention to provide a kind of embedded anchor of prestress anchorage cable, the device can be by anchor cable and earth-retaining
Structure is directly connected to.
It is another object of the present invention to provide the pull-type retaining structure anchoring process of anchor using said apparatus, the method
Easy construction, without anchor structure falling risk.
The technical solution adopted in the present invention is, a kind of embedded anchor of prestress anchorage cable, including reinforcing structure, plus
Strength structure is connected with soil-baffling structure, and anchor chair is provided with reinforcing structure, and steel strand wires hole is provided with anchor chair.
The features of the present invention is also resided in,
Reinforcing structure is annular stiffener, square stiffener, closing irregular shape stiffener, arc stiffener, straight line
Shape put more energy into version, flute profile put more energy into version, do not close irregular shape stiffener or reinforcing bar.
Soil-baffling structure is support pile, the cage bar of reinforcing structure and support pile, the spiral bar of support pile or muscle of putting more energy into welding.
Anchor chair sets several, at least provided with an anchor chair on same plane.
Steel strand wires hole sets several, and the center of circle in several steel strand wires holes is located along the same line.
Steel strand wires hole sets several, and several steel strand wires holes are divided into the center of circle positioned at 2 groups on different straight lines.
Another technical scheme of the present invention is, the anchoring process of the pull-type retaining structure of anchor, using a kind of prestressing force
The embedded anchor of anchor cable, specifically implements according to following steps:
Step 1, makes soil-baffling structure framework of steel reinforcement, and the embedded anchor of prestress anchorage cable is fixed on into soil-baffling structure steel
On muscles and bones frame;
Step 2, hangs soil-baffling structure framework of steel reinforcement in the soil-baffling structure hole for pre-setting, and is poured to soil-baffling structure framework of steel reinforcement
Concrete is built, so as to form soil-baffling structure, soil-baffling structure sets several;
Step 3, after soil-baffling structure concrete setting, chisels concrete cover at anchor chair and discloses in anchor cable elevation location
Go out steel strand wires hole;
Step 4, steel strand wires hole is passed through by the free end of the steel strand wires of anchor cable, uses anchorage tensioning fixation.
The features of the present invention is also resided in,
Two anchor cables, two free ends of the steel strand wires of anchor cable point are set between two neighboring soil-baffling structure on same absolute altitude
Steel strand wires hole that Chuan Guo be on two soil-baffling structures, uses anchorage tensioning fixation.
One anchor cable, the steel of the anchor cable between two soil-baffling structures are set between two neighboring soil-baffling structure on same absolute altitude
Twisted wire is divided into two beams, and the free end of two beam steel strand wires is each passed through the steel strand wires hole on two soil-baffling structures, uses anchorage tensioning lock
It is fixed.The free end of the steel strand wires of the anchor cable on the outside of first and last soil-baffling structure passes through steel strand wires hole, uses anchorage tensioning
Locking.
The beneficial effects of the invention are as follows:
1st, directly by anchorage cable anchoring on soil-baffling structure, the pull-type retaining structure of anchor is formed, not by soil-baffling structure construction deviation
Influence, strong adaptability, anchor cable and soil-baffling structure uniform force, structural stability are preferable.
2nd, the embedded anchor is arranged in soil-baffling structure, between the protection of linked network spray plane is arranged at soil-baffling structure, completely
It is not take up exceptional space;For base pit engineering, can reduce and distance is put outside excavation of foundation pit line, and then reduce the excavation of the earthwork, return
The amount of filling out, better economy.
3rd, directly by anchorage cable anchoring on soil-baffling structure, anchor cable is directly connected to soil-baffling structure, and Path of Force Transfer is simple, structure
Reliability it is preferable.
4th, it is arranged in soil-baffling structure, it is simple, light and handy, after after anchorage cable stretching locking, it is easier to closing, good corrosion resistance, drop
It is low such as to be scratched by external world's construction, impact and influence.
5 and soil-baffling structure be one overall, do not controlled by foundation ditch, slope anchorage sideline shape, be applicable to unilateral anchoring bar
Part.
6th, the concrete anti-pressure ability of anchor present position near zone soil-baffling structure is effectively improved.
7th, prestressed cable anchorage device is fixed on framework of steel reinforcement in soil-baffling structure Making of reinforcement cage, with reinforcing bar
Frame is produced on same workbench, is constructed simultaneously with framework of steel reinforcement, without anchor structure falling risk, easy construction.
8th, before anchorage cable stretching locking, corresponding position concrete cover is disclosed, can be with anchor cable pore-forming, slip casting etc. simultaneously
Construction, the excavation construction time is not taken individually.
9th, without the waist rail fabrication and installation operation of the pull-type retaining structure beam type power transmission method of anchor, the duration is saved.
10th, suitable for the retaining structure mode of a traditional anchor, it is also applied for a retaining structure mode for two anchors.
Brief description of the drawings
Fig. 1 is a kind of embedded distributing anchor chair anchor of anchor embodiment one of prestress anchorage cable of the invention
Structural representation;
Fig. 2 is the front view of Fig. 1;
Fig. 3 is a kind of embedded synthesis type anchor chair anchor of anchor embodiment two of prestress anchorage cable of the invention
Structural representation;
Fig. 4 is the front view of Fig. 3;
Fig. 5 is a kind of prestress anchorage cable of the invention centralized anchor chair anchor of embedded anchor embodiment three
Structural representation;
Fig. 6 is the front view of Fig. 5;
Fig. 7 is a kind of embedded anchor example IV arc reinforcing structure anchor of prestress anchorage cable of the invention
Structural representation;
Fig. 8 is the front view of Fig. 7;
Fig. 9 is the connection status schematic diagram of the embedded anchor of a kind of prestress anchorage cable of the invention and support pile;
Figure 10 is the view of anchoring process embodiment one of the pull-type retaining structure of anchor of the present invention;
Figure 11 is the anchoring process embodiment two-state schematic diagram of the pull-type retaining structure of anchor of the present invention;
Figure 12 is that a kind of synthesis type anchor chair anchor of the embedded anchor of prestress anchorage cable of the invention uses shape
State schematic diagram;
Figure 13 is that a kind of centralized anchor chair anchor of the embedded anchor of prestress anchorage cable of the invention uses shape
State schematic diagram.
In figure, 1. reinforcing structure, 2. support pile, 3. anchor chair, 4. steel strand wires hole, 5. annular stiffener, 6. arc put more energy into
Plate, 7. cage bar, 8. spiral bar, muscle of 9. putting more energy into, 10. steel strand wires, 11. anchorages.
Specific embodiment
The present invention is described in detail with reference to the accompanying drawings and detailed description.
The invention provides a kind of embedded anchor of prestress anchorage cable, as shown in figure 9, including reinforcing structure 1, putting more energy into
Structure 1 is connected with soil-baffling structure, and soil-baffling structure is support pile 2, the spiral of the cage bar 7, support pile of reinforcing structure 1 and support pile 2
Muscle 8 or muscle 9 of putting more energy into are welded.
As shown in figures 1-8, anchor chair 3 is provided with reinforcing structure 1, steel strand wires hole 4 is provided with anchor chair 3.
Reinforcing structure 1 is annular stiffener 5, square stiffener, closing irregular shape stiffener, arc stiffener 6, straight
Linear version of putting more energy into, flute profile put more energy into version, do not close irregular shape stiffener or reinforcing bar.
As depicted in figs. 1 and 2, reinforcing structure 1 is annular stiffener 5;Anchor chair 3 sets 6, is set with circumferential section
2 corresponding anchor chairs 3, set 1 steel strand wires hole 4 on anchor chair 3;
As shown in Figure 3 and Figure 4, reinforcing structure 1 is annular stiffener 5;Anchor chair 3 sets 2, and 2 anchor chairs 3 are located at and add
On the same circumferential section of strength structure 1,3 steel strand wires holes 4 are uniformly arranged on anchor chair 3;
As shown in Figure 5 and Figure 6, reinforcing structure 1 is annular stiffener 5;Anchor chair 3 sets 1, and 4 are set on anchor chair 3
Steel strand wires hole 4;
As shown in Figure 7 and Figure 8, reinforcing structure 1 is arc stiffener 6;Anchor chair 3 sets 1, and 6 are set on anchor chair 3
The uniform arrangement of staggering in 4,6, steel strand wires hole steel strand wires hole 4;
The anchoring process embodiment one of the pull-type retaining structure of anchor, a retaining structure mode for two anchors, as shown in Figure 10, adopts
With a kind of embedded anchor of prestress anchorage cable, specifically implement according to following steps:
Step 1, makes the reinforcement cage skeleton of support pile 2, and the embedded anchor of prestress anchorage cable is fixed on into steel reinforcement cage
On skeleton;
Step 2, hangs the framework of steel reinforcement of support pile 2 in the supporting stake holes for pre-setting, and is poured to the framework of steel reinforcement of support pile 2 mixed
Solidifying soil, so as to form support pile 2, support pile 2 sets several;
Step 3, after the concrete setting of support pile 2, chisels concrete cover at anchor chair 3 and discloses in anchor cable elevation location
Go out steel strand wires hole 4;
Step 4, sets two anchor cables, two freedom of the steel strand wires of anchor cable 10 on same absolute altitude between two support piles 2
End is each passed through the steel strand wires hole 4 on two support piles 2, with the tensioning fixation of anchorage 11, as shown in Figure 12 or 13.
The anchoring process embodiment two of the pull-type retaining structure of anchor, a retaining structure mode for an anchor, as shown in figure 11, adopts
With a kind of embedded anchor of prestress anchorage cable, specifically implement according to following steps:
Step 1, makes the reinforcement cage skeleton of support pile 2, and the embedded anchor of prestress anchorage cable is fixed on into steel reinforcement cage
On skeleton;
Step 2, hangs the framework of steel reinforcement of support pile 2 in the supporting stake holes for pre-setting, and is poured to the framework of steel reinforcement of support pile 2 mixed
Solidifying soil, so as to form support pile 2, support pile 2 sets several;
Step 3, after the concrete setting of support pile 2, chisels concrete cover at anchor chair 3 and discloses in anchor cable elevation location
Go out steel strand wires hole 4;
Step 4, sets an anchor cable, the anchor cable between two support piles 2 on same absolute altitude between two neighboring support pile 2
Steel strand wires 10 be divided into two beams, the free end of two beam steel strand wires 10 is each passed through the steel strand wires hole 4 on two support piles 2, uses anchor
Have 11 tensioning fixations.First passes through steel strand wires hole with the free end of the steel strand wires 10 of the anchor cable in last outside of support pile 2
4, with the tensioning fixation of anchorage 11, as shown in Figure 12 or 13.
Prestressed cable anchorage device is fixed on framework of steel reinforcement in soil-baffling structure Making of reinforcement cage, with framework of steel reinforcement
It is produced on same workbench, is constructed simultaneously with framework of steel reinforcement, without anchor structure falling risk, easy construction;
Before anchorage cable stretching locking, corresponding position concrete cover is disclosed, can simultaneously be applied with anchor cable pore-forming, slip casting etc.
Work, the excavation construction time is not taken individually;There is no the waist rail fabrication and installation operation of the pull-type retaining structure beam type power transmission method of anchor, save
Duration.
Claims (4)
1. the embedded anchor of a kind of prestress anchorage cable, it is characterised in that:Including reinforcing structure (1), reinforcing structure (1) and gear
Soil structure is connected, and anchor chair (3) is provided with reinforcing structure (1), and steel strand wires hole (4) is provided with anchor chair (3);
The reinforcing structure (1) is annular stiffener (5), square stiffener, closing irregular shape stiffener, arc stiffener
(6), linear stiffener, flute profile stiffener, do not close irregular shape stiffener or reinforcing bar;
The soil-baffling structure is cage bar (7), the spiral bar (8) of support pile of support pile (2), reinforcing structure (1) and support pile (2)
Or muscle of putting more energy into (9) welding;
The anchor chair (3) sets several, at least provided with 1 anchor chair (3) on same plane;
The steel strand wires hole (4) sets several, and several steel strand wires holes (4) are divided into the center of circle positioned at 2 groups on different straight lines.
2. a kind of anchoring process, it is characterised in that using a kind of embedded anchoring dress of the prestress anchorage cable described in claim 1
Put, specifically implement according to following steps:
Step 1, makes soil-baffling structure framework of steel reinforcement, and the embedded anchor of prestress anchorage cable is fixed on into soil-baffling structure reinforcing bar
On frame;
Step 2, hangs soil-baffling structure framework of steel reinforcement in the soil-baffling structure hole for pre-setting, and is poured to soil-baffling structure framework of steel reinforcement mixed
Solidifying soil, so as to form soil-baffling structure, soil-baffling structure sets several;
Step 3, after soil-baffling structure concrete setting, anchor chair (3) place concrete cover is chiseled in anchor cable elevation location, is disclosed
Go out steel strand wires hole (4);
Step 4, passes through steel strand wires hole (4), with anchorage (11) tensioning fixation by the free end of the steel strand wires (10) of anchor cable.
3. a kind of anchoring process according to claim 2, it is characterised in that in the step 4, two neighboring earth-retaining knot
Two anchor cables are set between structure on same absolute altitude, and the free end of two steel strand wires of anchor cable (10) is each passed through two soil-baffling structures
On steel strand wires hole (4), with anchorage (11) tensioning fixation.
4. a kind of anchoring process according to claim 2, it is characterised in that in the step 4, two neighboring soil-baffling structure
Between an anchor cable is set on same absolute altitude, the steel strand wires (10) of the anchor cable between two soil-baffling structures are divided into two beams, two beam steel
The free end of twisted wire (10) is each passed through the steel strand wires hole (4) on two soil-baffling structures, with anchorage (11) tensioning fixation, first
Free end with the steel strand wires (10) of the anchor cable on the outside of last soil-baffling structure passes through steel strand wires hole (4), with anchorage (11)
Zip is determined.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510489685.5A CN105064357B (en) | 2015-08-10 | 2015-08-10 | A kind of embedded anchor of prestress anchorage cable and anchoring process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510489685.5A CN105064357B (en) | 2015-08-10 | 2015-08-10 | A kind of embedded anchor of prestress anchorage cable and anchoring process |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105064357A CN105064357A (en) | 2015-11-18 |
CN105064357B true CN105064357B (en) | 2017-06-13 |
Family
ID=54493844
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510489685.5A Expired - Fee Related CN105064357B (en) | 2015-08-10 | 2015-08-10 | A kind of embedded anchor of prestress anchorage cable and anchoring process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105064357B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109252517A (en) * | 2018-10-31 | 2019-01-22 | 五冶集团上海有限公司 | A kind of anchorage pile anchorage and its application method |
CN111926828B (en) * | 2020-09-23 | 2024-06-25 | 大连理工大学 | Waist-beam-free pile anchor supporting structure for rapidly disposing landslide and construction method thereof |
CN113123344B (en) * | 2021-06-08 | 2022-05-13 | 长沙市公共工程建设中心 | Anchor point structure of foundation pit support and setting method thereof |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2274740A1 (en) * | 1975-06-27 | 1976-01-09 | Fischer Joachim | Extraction method for steel rod ground anchors - rupture zone in rod adjacent to anchor block is formed by heating |
CN1046149C (en) * | 1996-03-12 | 1999-11-03 | 李宪奎 | Anchoring structure for retaining wall |
CN101761085B (en) * | 2009-12-18 | 2011-05-25 | 铁道第三勘察设计院集团有限公司 | Built-in anchor head embedded-type anchoring pile |
CN103452107B (en) * | 2013-08-28 | 2015-09-02 | 韩凤霞 | A kind of material-saving device and method supporting laterally bearing pile |
CN204000889U (en) * | 2014-07-25 | 2014-12-10 | 西安天睿岩土工程有限责任公司 | A kind of two anchors and soil nailing mixed type soil-baffling structure |
CN204982880U (en) * | 2015-08-10 | 2016-01-20 | 徐传召 | Embedded anchor of prestressed anchorage cable |
-
2015
- 2015-08-10 CN CN201510489685.5A patent/CN105064357B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN105064357A (en) | 2015-11-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106522242B (en) | For soft stratum close to underground structure foundation pit supporting system construction method | |
CN106498950A (en) | Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system and its implementation of pile body | |
CN106522236B (en) | The structure and construction method of pattern foundation pit supporting structure | |
CN207017275U (en) | Recyclable system of deep foundation pit support can be assembled | |
CN105937274B (en) | The prefabricated horizontal piece channel steel of shear wall is welded to connect device and connection method | |
CN206693244U (en) | A kind of basalt composite reinforcing material foundation pit supporting pile | |
CN105064357B (en) | A kind of embedded anchor of prestress anchorage cable and anchoring process | |
CN105002914B (en) | Deformation-controllable prestressed concrete cantilever supporting structure and design and construction method thereof | |
CN108951653A (en) | A kind of foundation pit campshed supporting inter-pile soil reinforcement means | |
WO2015048175A1 (en) | Systems and methods to reinforce excavation walls | |
CN206408630U (en) | Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system of pile body | |
CN202194129U (en) | Composite prestress soil-blocking pile | |
CN110616740A (en) | Structure for expanding subway section in subway mine method construction interval and construction method thereof | |
CN110777802A (en) | Deep foundation pit high-low span supporting structure and construction method thereof | |
CN111335270A (en) | Prestress reinforcement structure of face rockfill dam and construction method thereof | |
CN113417300B (en) | Slope support system and construction method thereof | |
CN101570968B (en) | Combination stiffening filling pile | |
CN206233249U (en) | Complicated precipitous precipice depth side slope comprehensive support structure | |
CN106223344B (en) | A kind of ground line piled anchor frame foundation pit supporting method | |
CN109914434A (en) | A kind of foundation pit supporting pile apical cap beam constructing structure | |
CN205776152U (en) | Prestressed anchor waveform sheet pile retaining structure | |
CN102322060A (en) | Composite prestressing retaining pile | |
CN204982880U (en) | Embedded anchor of prestressed anchorage cable | |
CN103147446A (en) | Visible-beam and hidden-rib lattice anchor cable foundation pit supporting structure | |
CN206233244U (en) | The supporting construction of foundation ditch |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |