CN109914434A - A kind of foundation pit supporting pile apical cap beam constructing structure - Google Patents

A kind of foundation pit supporting pile apical cap beam constructing structure Download PDF

Info

Publication number
CN109914434A
CN109914434A CN201910305362.4A CN201910305362A CN109914434A CN 109914434 A CN109914434 A CN 109914434A CN 201910305362 A CN201910305362 A CN 201910305362A CN 109914434 A CN109914434 A CN 109914434A
Authority
CN
China
Prior art keywords
support pile
steel truss
frame body
anchorage
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910305362.4A
Other languages
Chinese (zh)
Inventor
胡贺祥
陈华里
宋福渊
刘嘉茵
汤德芸
庞玉洁
吴学军
李冠军
时雨
刘东超
陈彬
赵辰
解煜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Engineering Corp Ltd CSCEC
China Construction First Group Corp Ltd
China Construction First Group the Fifth Construction Co Ltd
Original Assignee
China State Construction Engineering Corp Ltd CSCEC
China Construction First Group Corp Ltd
China Construction First Group the Fifth Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Engineering Corp Ltd CSCEC, China Construction First Group Corp Ltd, China Construction First Group the Fifth Construction Co Ltd filed Critical China State Construction Engineering Corp Ltd CSCEC
Priority to CN201910305362.4A priority Critical patent/CN109914434A/en
Publication of CN109914434A publication Critical patent/CN109914434A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a kind of foundation pit supporting pile apical cap beam constructing structures comprising: steel truss crown beam, support pile, anchor cable, anchorage and backing plate;Steel truss crown beam is mounted on the top of support pile, is mutually perpendicular to support pile;Support pile is reinforced concrete structure;Anchor cable is embedded in support pile, and the top of support pile is stretched out in one end of anchor cable;Anchorage connects the end that anchor cable stretches out support pile;Anchorage locks anchorage cable stretching, is linked together steel truss crown beam and support pile;Backing plate is mounted on the top of support pile, is arranged between anchorage and support pile.The beneficial effects of the present invention are: the present invention uses steel truss structure, it is advantageously implemented industrialization, construction site number of workers is reduced, speed of application is greatly improved.Meanwhile simple structure of the present invention, crown beam construction are not necessarily to supporting module, are not necessarily to casting concrete, it is easy to operate.Steel truss crown beam can whole recycling and reusings, can both greatly save cost, can also be achieved energy conservation and environmental protection, practical value is high.

Description

A kind of foundation pit supporting pile apical cap beam constructing structure
Technical field
The invention belongs to build, the foundation pit support constructions technical field such as subway, more particularly to a kind of pattern foundation pit supporting structure stake top Crown beam structure.
Background technique
The stake top crown beam of traditional foundation pit supporting pile, is generally used cast-in-place, but there are following problems using cast-in-place: the First is that crown beam concrete using cast-in-place, needs supporting module, template construction is costly, holding time is long.Second is crown beam reinforcing bar Cage binding, concreting need a large amount of workers, cannot achieve industrialization.
In spite of stake top crown beam using half prefabricated, half cast-in-place, although having saved the expense of part supporting module, construction Speed is still not efficient enough, and process increases, and practice of construction cost is higher instead.Some stake tops use full precast reinforced concrete Crown beam, with cast-in-place concrete ratio, although recycling and reusing can be realized, weight is larger, the connection precision of crown beam and support pile It is required that also higher.
Summary of the invention
The object of the present invention is to provide a kind of foundation pit supporting pile apical cap beam constructing structure, with solve existing complete cast-in-place crown beam and The defect of full precast reinforced concrete crown beam.
The technical scheme to solve the above technical problems is that a kind of foundation pit supporting pile apical cap beam constructing structure, It include: steel truss crown beam, support pile, anchor cable, anchorage and backing plate;The steel truss crown beam is mounted on the top of the support pile, It is mutually perpendicular to the support pile;The support pile is reinforced concrete structure;The anchor cable is embedded in support pile, anchor cable The top of the support pile is stretched out in one end;The anchorage connection anchor cable stretches out the end of support pile;Anchorage locks anchorage cable stretching, It is linked together steel truss crown beam and support pile;The backing plate is mounted on the top of the support pile, is arranged in anchorage and supporting Between stake.
Present invention foundation pit supporting pile apical cap beam constructing structure as described above, further, two adjacent steel truss crown beams Using anchor bolts or adjacent two steel truss crown beams using welded connecting.
Present invention foundation pit supporting pile apical cap beam constructing structure as described above, further, the steel truss crown beam includes phase Mutual first frame body and the second frame body disposed in parallel, the first frame body and the second frame body are linked together using tranverse connecting rod welding;It is described Anchor cable is pierced by steel truss crown beam between the first frame body and the second frame body, and backing plate is arranged on the first frame body and the second frame body.
Present invention foundation pit supporting pile apical cap beam constructing structure as described above, further, first frame body includes top Beam column, lower part beam column and vertical connecting rod, top beam column and lower part beam column are linked together using perpendicular.
The beneficial effects of the present invention are: the present invention uses steel truss structure, it is advantageously implemented industrialization, reduces construction site Speed of application is greatly improved in number of workers.Meanwhile simple structure of the present invention, crown beam construction is not necessarily to supporting module, mixed without pouring Solidifying soil, it is easy to operate.Steel truss crown beam can whole recycling and reusings, can both greatly save cost, can also be achieved energy conservation and environmental protection, it is real It is high with value.
Detailed description of the invention
It will be become by made detailed description, above-mentioned and/or otherwise advantage of the invention in conjunction with the following drawings It becomes apparent from and is easier to understand, these attached drawings are only schematical, are not intended to limit the present invention, in which:
Fig. 1 is a kind of foundation pit supporting pile apical cap beam constructing structure side schematic view of embodiment;
Fig. 2 is a kind of foundation pit supporting pile apical cap beam constructing structure schematic top plan view of embodiment.
In attached drawing, parts list represented by the reference numerals are as follows:
1, steel truss crown beam, 2, backing plate, 3, anchorage, 4, anchor cable, 5, support pile, the 11, first frame body, the 12, second frame body, 13, cross Connecting rod, 14, top beam column, 15, lower part beam column, 16, vertical connecting rod.
Specific embodiment
Hereinafter, the embodiment of foundation pit supporting pile apical cap beam constructing structure of the invention is described with reference to the accompanying drawings.
The embodiment recorded herein is specific specific embodiment of the invention, for illustrating design of the invention, Be it is explanatory and illustrative, should not be construed as the limitation to embodiment of the present invention and the scope of the invention.Except what is recorded herein Outside embodiment, those skilled in the art can also based on the claim of this application book and specification disclosure of that using aobvious and The other technical solutions being clear to, these technical solutions include using any obvious to making for the embodiment recorded herein The technical solution of substitutions and modifications.
The attached drawing of this specification is schematic diagram, aids in illustrating design of the invention, it is schematically indicated the shape of each section And its correlation.It note that for the ease of clearly showing the structure of each component of the embodiment of the present invention, between each attached drawing Do not drawn according to identical ratio.Identical reference marker is for indicating identical part.
Fig. 1 and foundation pit supporting pile apical cap beam constructing structure Fig. 2 shows an embodiment of the present invention comprising: steel truss Crown beam 1, support pile 5, anchor cable 4, anchorage 3 and backing plate 2;The steel truss crown beam 1 is mounted on the top of the support pile 5, with institute Support pile 5 is stated to be mutually perpendicular to;The support pile 5 is reinforced concrete structure;The anchor cable 4 is embedded in support pile 5, anchor cable 4 One end stretch out the top of the support pile 5;Anchor cable is placed in concrete in support pile filling concrete, effect master It will be as the connector of steel truss crown beam and support pile.The anchorage 3 connects the end that anchor cable 4 stretches out support pile 5;Anchorage 3 will 4 tensioning fixation of anchor cable is linked together steel truss crown beam 1 and support pile 5;Anchorage is the locking device of anchor cable.The backing plate 2 is pacified Mounted in the top of the support pile 5, it is arranged between anchorage 3 and support pile 5, billet is the device of transmitting and diffusion anchor force Part.
The foundation pit supporting pile apical cap beam constructing structure of above-described embodiment is implemented by following steps:
Step 1, steel truss crown beam is completed according to design drawing in factory;Step 2, the more truss crown beam made is transported into construction Scene;Steel truss crown beam is stacked into stockyard at the scene;Step 3, anchor cable is placed on concrete in support pile filling concrete In;Step 4, supporting stake top concrete is picked into chisel in place;Step 5, positioning is measured according to construction drawing;Step 6, by steel truss Frame crown beam section successively hangs billet and anchorage in place, by the anchor cable on support pile in crown beam;Step 7, pass through anchorage Anchorage cable stretching is locked;Step 8, after Underground Construction to ground, fertile slot backfill, steel truss crown beam can be dismantled Recycling, other projects exercise use again.
Compared with traditional cast-in-situ steel reinforced concrete crown beam and full precast reinforced concrete crown beam, the present invention uses steel truss knot Structure is advantageously implemented industrialization, reduces construction site number of workers, speed of application is greatly improved.Meanwhile the present invention constructs letter Single, crown beam construction is not necessarily to supporting module, is not necessarily to casting concrete, easy to operate.Steel truss crown beam can whole recycling and reusings, both Cost can be greatlyd save, can also be achieved energy conservation and environmental protection, practical value is high.
The foundation pit supporting pile apical cap girder construction of the above embodiment of the present invention, moreover it is possible to be improved as follows, single steel truss hat When beam is not able to satisfy the length that construction needs, need to carry out the connection of steel truss crown beam, two adjacent steel truss crown beams 1 use Anchor bolts or adjacent two steel truss crown beams 1 are using welded connecting.It is more square using anchor bolt type connection later period disassembly Just, but spare additional anchor bolt is needed.Welding manner is easy to operate early period, but later period dismantling recycling steel truss crown beam is compared It is more difficult in anchor bolts.
The foundation pit supporting pile apical cap beam constructing structure of the above embodiment of the present invention, moreover it is possible to be improved as follows, such as Fig. 2 institute Show, the steel truss crown beam 1 includes the first frame body 11 and the second frame body 12 arranged in parallel, the first frame body 11 and the second frame Body 12 is linked together using the welding of tranverse connecting rod 13;The anchor cable 4 is pierced by steel truss between the first frame body 11 and the second frame body 12 Crown beam 1, backing plate 2 are arranged on the first frame body 11 and the second frame body 12.As shown in connection with fig. 1, first frame body 11 includes upper Portion's beam column 14, lower part beam column 15 and vertical connecting rod 16, top beam column 14 and lower part beam column 15 are linked together using perpendicular.
Each technical characteristic of above-mentioned disclosure is not limited to disclosed and other feature combination, and those skilled in the art are also Can carry out other combinations between each technical characteristic according to the purpose of invention, be subject to realize the present invention purpose.

Claims (4)

1. a kind of foundation pit supporting pile apical cap beam constructing structure characterized by comprising steel truss crown beam (1), support pile (5), anchor Rope (4), anchorage (3) and backing plate (2);The steel truss crown beam (1) is mounted on the top of the support pile (5), with the supporting Stake (5) is mutually perpendicular to;The support pile (5) is reinforced concrete structure;The anchor cable (4) is embedded in support pile (5), anchor cable (4) top of the support pile (5) is stretched out in one end;Anchorage (3) connection anchor cable (4) stretches out the end of support pile (5);Anchor Have (3) for anchor cable (4) tensioning fixation, is linked together steel truss crown beam (1) and support pile (5);The backing plate (2) is mounted on institute The top of support pile (5) is stated, is arranged between anchorage (3) and support pile (5).
2. a kind of foundation pit supporting pile apical cap beam constructing structure according to claim 1, which is characterized in that two adjacent steel Truss crown beam (1) is using anchor bolts or adjacent two steel truss crown beams (1) using welded connecting.
3. a kind of foundation pit supporting pile apical cap beam constructing structure according to claim 1, which is characterized in that the steel truss hat Beam (1) includes the first frame body (11) and the second frame body (12) arranged in parallel, the first frame body (11) and the second frame body (12) It is linked together using tranverse connecting rod (13) welding;The anchor cable (4) is pierced by steel between the first frame body (11) and the second frame body (12) Truss crown beam (1), backing plate (2) are arranged on the first frame body (11) and the second frame body (12).
4. a kind of foundation pit supporting pile apical cap beam constructing structure according to claim 3, which is characterized in that first frame body It (11) include top beam column (14), lower part beam column (15) and vertical connecting rod (16), top beam column (14) and lower part beam column (15) utilize It is perpendicular to be linked together.
CN201910305362.4A 2019-04-16 2019-04-16 A kind of foundation pit supporting pile apical cap beam constructing structure Pending CN109914434A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910305362.4A CN109914434A (en) 2019-04-16 2019-04-16 A kind of foundation pit supporting pile apical cap beam constructing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910305362.4A CN109914434A (en) 2019-04-16 2019-04-16 A kind of foundation pit supporting pile apical cap beam constructing structure

Publications (1)

Publication Number Publication Date
CN109914434A true CN109914434A (en) 2019-06-21

Family

ID=66977353

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910305362.4A Pending CN109914434A (en) 2019-04-16 2019-04-16 A kind of foundation pit supporting pile apical cap beam constructing structure

Country Status (1)

Country Link
CN (1) CN109914434A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111379578A (en) * 2020-03-13 2020-07-07 叶小雳 High-stress combined ring body beam supporting structure and construction method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000104221A (en) * 1998-09-28 2000-04-11 Nkk Corp Combined truss bridge and erection method of the same
CN101775807A (en) * 2010-03-03 2010-07-14 天津二十冶建设有限公司 Structure for supporting deep foundation pit of soft soil foundation
CN105804093A (en) * 2016-05-05 2016-07-27 宁波建工工程集团有限公司 Prefabricated double-row pile and water-stop curtain integrated foundation pit supporting structure and construction method thereof
CN106759376A (en) * 2016-12-21 2017-05-31 大连交通大学 Anchored Sheet Pile Wall for Excavation system and its construction method for closing on existing underground structure
KR101822175B1 (en) * 2017-08-23 2018-01-25 케이투건설 주식회사 Retaining Wall using Precast Piles and Constructing Method thereof
CN108118701A (en) * 2017-12-21 2018-06-05 上海市政工程设计研究总院(集团)有限公司 A kind of double Larsen steel sheet pile rigit-frame beam and its installation method
CN109098181A (en) * 2018-08-31 2018-12-28 中国建筑股份有限公司 The recyclable full prefabricated pile apical cap beam recycled and its construction method
CN209779640U (en) * 2019-04-16 2019-12-13 中建一局集团第五建筑有限公司 foundation pit supporting pile top crown beam construction structure

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000104221A (en) * 1998-09-28 2000-04-11 Nkk Corp Combined truss bridge and erection method of the same
CN101775807A (en) * 2010-03-03 2010-07-14 天津二十冶建设有限公司 Structure for supporting deep foundation pit of soft soil foundation
CN105804093A (en) * 2016-05-05 2016-07-27 宁波建工工程集团有限公司 Prefabricated double-row pile and water-stop curtain integrated foundation pit supporting structure and construction method thereof
CN106759376A (en) * 2016-12-21 2017-05-31 大连交通大学 Anchored Sheet Pile Wall for Excavation system and its construction method for closing on existing underground structure
KR101822175B1 (en) * 2017-08-23 2018-01-25 케이투건설 주식회사 Retaining Wall using Precast Piles and Constructing Method thereof
CN108118701A (en) * 2017-12-21 2018-06-05 上海市政工程设计研究总院(集团)有限公司 A kind of double Larsen steel sheet pile rigit-frame beam and its installation method
CN109098181A (en) * 2018-08-31 2018-12-28 中国建筑股份有限公司 The recyclable full prefabricated pile apical cap beam recycled and its construction method
CN209779640U (en) * 2019-04-16 2019-12-13 中建一局集团第五建筑有限公司 foundation pit supporting pile top crown beam construction structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111379578A (en) * 2020-03-13 2020-07-07 叶小雳 High-stress combined ring body beam supporting structure and construction method thereof
CN111379578B (en) * 2020-03-13 2021-08-27 广东恒普建设工程有限公司 High-stress combined ring body beam supporting structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN101936170B (en) Cavern arch mould spraying concrete construction structure and process
CN106661881A (en) Safety-enhanced pc truss wall structure, and underground-structure construction method using same
CN108004925A (en) Prestress reinforced concrete circular arch tower construction method
CN104294769A (en) Built abutment structure reinforced through combination of pile supplementing and abutment cap enlarging and construction method
CN113005926A (en) Construction method of mountain area abrupt slope pier reinforcing device
CN114457668B (en) Large-span space special-shaped arch rib delphinium type basket steel box arch bridge and rapid construction method
CN108360535A (en) Foundation pit supporting construction based on campshed and inner support and its construction method
CN108423565A (en) The erection of U-shaped twin beams gantry crane with hook and Demolition Construction method
CN108547311A (en) Isolated footing under a kind of prefabricated assembled profile steel concrete column
CN108222062A (en) A kind of underground pipe gallery framework of steel reinforcement temporary fixing rack and longitude and latitude binding method
CN105064711A (en) Method for constructing underground garage between residential buildings
CN209779640U (en) foundation pit supporting pile top crown beam construction structure
CN212452655U (en) A reinforced structure that is used for SMW worker method stake to strut system
CN212129160U (en) Oblique-pulling foundation pit supporting structure for pile top
CN109914434A (en) A kind of foundation pit supporting pile apical cap beam constructing structure
CN205776152U (en) Prestressed anchor waveform sheet pile retaining structure
CN108755701A (en) The construction method of the support construction of deep basal pit
CN208293583U (en) A kind of double-row pile heel row anchor drawing foundation pit supporting construction
CN210597363U (en) Pile bearing anchor retaining wall assembly type structure
CN106120690A (en) A kind of inverter box flattens platform and preparation method thereof
CN208219667U (en) Foundation pit supporting construction based on campshed and inner support
CN112376603A (en) Assembly type fan foundation and assembly method thereof
CN207448750U (en) A kind of U-shaped girder prefabricated pedestal of peg board formula track traffic pre-tensioning system
CN206902719U (en) Preassembling support beam combines support system
CN105064355A (en) Anchor rope composite pile structure as stand column of main structure and construction method of anchor rope composite pile structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination