CN207405974U - Construction hanging basket - Google Patents

Construction hanging basket Download PDF

Info

Publication number
CN207405974U
CN207405974U CN201721043075.3U CN201721043075U CN207405974U CN 207405974 U CN207405974 U CN 207405974U CN 201721043075 U CN201721043075 U CN 201721043075U CN 207405974 U CN207405974 U CN 207405974U
Authority
CN
China
Prior art keywords
hanging basket
basket frame
frame
grafting chamber
pieces
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721043075.3U
Other languages
Chinese (zh)
Inventor
昝洪亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721043075.3U priority Critical patent/CN207405974U/en
Application granted granted Critical
Publication of CN207405974U publication Critical patent/CN207405974U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of construction hanging baskets, including hanging basket frame, the side of hanging basket frame has frame door hinged therewith, the upper end of hanging basket frame has lifting lug, the both sides of hanging basket frame are equipped with installation grafting chamber, capping device passes through the cooperation with installing grafting chamber, it is arranged on the top of hanging basket frame, capping device includes 2 pieces of upper shutters, connected between 2 pieces of upper shutters by connection framework, and the end of 2 pieces of upper shutters also has with installing the matched inserting column of grafting chamber, it is inserted by inserting column in the inner cavity of installation grafting chamber, and it is bolted, capping device is fixed on the top of hanging basket frame, also there is intercept net.The utility model is rational in infrastructure, and manufacture is at low cost, while can protecting construction personnel, protects bottom operation personnel, and can provide protection when hanging basket hits exterior wall.

Description

Construction hanging basket
Technical field
The utility model is related to hanging baskets during a kind of construction.
Background technology
Social now, high-lift operation hanging cradle has been obtained for large-scale use, to substitute traditional scaffolding structure, uses Hanging basket can substantially reduce labor intensity, reduce cost of labor, shorten the construction period, and further, and social skyscraper is many now More, hanging basket has important role as a kind of basic construction equipment, the working at height such as External Wall construction, the transport of building high-altitude;
And the hanging basket of the prior art, structure are simultaneously not perfect, there is or have a series of problems in use, firstly for hanging basket The protection of middle personnel is inadequate, and the part of falling from high altitude is easy to pound the worker in hanging basket, causes security incident, and in hanging basket In constructing operation, also easily drop worker part, injures the personnel of floor bottom by a crashing object;
Simultaneously as hanging basket in working at height there is no good stabilizing measures, easily influenced to make by strong wind, construction Into rocking, when hanging basket constantly hits cavity, the construction of worker can be influenced, while while hanging basket is impaired, also easily hurts exterior wall.
The content of the invention
The purpose of this utility model is to provide a kind of rational in infrastructure, manufacture is at low cost, can protect that construction personnel's is same When, bottom operation personnel are protected, and the construction hanging basket of protection can be provided when hanging basket hits exterior wall.
In order to achieve the above object, the technical solution of the utility model is:A kind of construction hanging basket, including basket Frame, hanging basket frame have frame door hinged therewith, and the upper end of hanging basket frame has lifting lug, and the both sides of hanging basket frame are equipped with installation and insert Chamber is connect, capping device is arranged on the top of hanging basket frame, capping device on 2 pieces including hiding by the cooperation with installing grafting chamber Baffle is connected by connection framework between 2 pieces of upper shutters, and the ends of 2 pieces of upper shutters also have and install grafting chamber phase The inserting column of cooperation is inserted into the inner cavity of installation grafting chamber by inserting column, and is bolted, and capping device, which is fixed on, to be hung The top of hoop frame, also with intercept net, the surrounding of intercept net is strapped in connection framework, and the both sides of hanging basket frame are located at installation The lower section of grafting chamber is equipped with post-receiving chamber, and lower shutter realizes that the rotation with hanging basket frame connects by the cooperation of shaft and post-receiving chamber It connects, the both sides lower end of hanging basket frame is equipped with stop block, and lower shutter is realized by stop block and fixed.
The surface of the hanging basket frame be equipped with anticollison block, anticollison block have connecting plate and installing plate, connecting plate and hanging basket Frame connects, and a side surface of installing plate is equipped with yielding rubber piece, and another side surface of installing plate has connecting tube group, and 2 pieces turn Plate is realized and is flexibly connected with installing plate, the both sides of connecting plate have bearing plate, bearing plate by the cooperation of shaft and connecting tube group The first compression spring is equipped with, one end of the first compression spring is connected by rubber column with bearing plate, and the other end connects with the end of flap, even The second compression spring is additionally provided on fishplate bar, one end of the second compression spring connects with connecting plate, and the other end connects with flap.
There is angle α, the scope of angle α is 100 °~150 ° between the upper shutter and inserting column.
The yielding rubber piece is double-layer structure, and steel plate layer is equipped between 2 layers of yielding rubber piece.
The yielding rubber on piece is equipped with turning rolls, and idler wheel is fixed on by turning rolls on anticollison block.
With the above structure, it is as follows the advantages of the utility model:
The utility model can protect constructing operation personnel, be embodied in, and capping device passes through with installing grafting chamber Cooperation, is arranged on the top of hanging basket frame, and capping device includes 2 pieces of upper shutters, passes through connection framework between 2 pieces of upper shutters Connect, and the end of 2 pieces of upper shutters also has with installing the matched inserting column of grafting chamber, is inserted by inserting column insertion installation It connecing in the inner cavity of chamber, and is bolted, capping device is fixed on the top of hanging basket frame, this spline structure is advantageous in that, Such structure causes the selectivity of the utility model to increase, when only External Wall is cleaned, when operating mode is uncomplicated, just not It needs to use capping device, and when applicable situation is at construction site, operating mode complexity, it is possible to when slinging, by upper cover Device inserts the top for being fixed on hanging basket frame, and 2 pieces of shutters can be located at the overhead of worker, in this way, attic falls When falling workpiece sundries, the plate that will be blocked shelters from, and will not pound worker;
Also there is intercept net, the surrounding of intercept net is strapped in connection framework, in this way, being just provided between 2 pieces of shutters Intercept net, intercept net can either block the workpiece sundries to drop, and can give worker's sight of operation, avoid and thoroughly block work The sight of people.
And the utility model can also prevent the workpiece that drops during operation, injure the people of bottom, the both sides of hanging basket frame by a crashing object Post-receiving chamber is equipped with positioned at the lower section of installation grafting chamber, lower shutter is realized and hanging basket frame by the cooperation of shaft and post-receiving chamber Rotation connection, the both sides lower end of hanging basket frame is equipped with stop block, and lower shutter is realized by stop block and fixed, in this way, making Used time, lower shutter just can be in expansion shape, and a wing side is formed in hanging basket frame both sides, when construction worker operates, workpiece pendant The probability fallen just reduces, and further,, can be with after workpiece is blocked first by upper shutter when attic has workpiece to drop Lower shutter is slipped to from upper shutter, and is lived by support, workpiece is avoided and continues to drop, injure bottom personnel by a crashing object.
And the surface of the hanging basket frame be equipped with anticollison block, anticollison block have connecting plate and installing plate, connecting plate with hanging Hoop frame connects, and a side surface of installing plate is equipped with yielding rubber piece, and another side surface of installing plate has a connecting tube group, 2 pieces Flap is realized and is flexibly connected with installing plate, the both sides of connecting plate have bearing plate, pressure-bearing by the cooperation of shaft and connecting tube group Plate is equipped with the first compression spring, and one end of the first compression spring is connected by rubber column with bearing plate, and the other end connects with the end of flap, The second compression spring is additionally provided on connecting plate, one end of the second compression spring connects with connecting plate, and the other end connects with flap, this spline structure It is advantageous in that, when installing plate is pressurized, can be moved downwardly against connecting plate, thus drive flap and one end that it connects downward Movement, at this point, the other end of flap can be offseted by the first compression spring, the first compression spring and rubber column can be played slow by bearing plate Punching and the effect of shock-absorbing, meanwhile, when flap moves downward, also press to the second compression spring, by installing plate, the second compression spring also can Buffering and the effect of shock-absorbing are enough played, such structure ensures that the implementation of the second weight function of seismic resistance, meanwhile, it is actually using When, bearing plate also opposite can shelter from connecting plate and installing plate, avoid external aggression as far as possible, prolong the service life, in this way, Be not just between hanging basket frame and exterior wall it is simple contact directly, but with anticollison block into row buffering, in this way, hanging basket frame Stability improve, while being not easy to break, be also not easy exterior wall surface of wounding;
And there is angle α between the upper shutter and inserting column, the scope of angle α is 100 °~150 °, this spline structure It is advantageous in that, upper shutter is oblique, when attic has sundries to drop, can be slipped to lower shutter.
And the yielding rubber piece is double-layer structure, and steel plate layer is equipped between 2 layers of yielding rubber piece, yielding rubber piece is set On a mounting board, when a collision occurs, it is in contact first with outside, plays the role of protecting installing plate, and steel plate layer can carry High rigidity avoids yielding rubber piece excessive deformation;
And the yielding rubber on piece is equipped with turning rolls, idler wheel is fixed on anticollison block by turning rolls, had on anticollison block After having idler wheel, when hanging basket frame is contacted with exterior wall, it is possible to be contacted for idler wheel with exterior wall, even if hanging basket frame is transported up and down Dynamic, anticollison block can will not be that idler wheel slides on exterior wall, it is not easy to exterior wall is damaged, also beneficial to basket with exterior wall friction Frame slides up and down.
Description of the drawings
Fig. 1 is the structure diagram of the utility model;
Fig. 2 is the structure diagram of the utility model anticollison block 13;
Fig. 3 is the utility model shutter 6, connection framework 7, the structure diagram of intercept net 9.
Specific embodiment
The utility model is described in further detail below in conjunction with the embodiment that attached drawing provides.
As shown in Figures 1 to 3, a kind of construction hanging basket, including hanging basket frame 1, hanging basket frame 1 has frame hinged therewith Door 2, the upper end of hanging basket frame 1 have a lifting lug 3, and the both sides of hanging basket frame 1 are equipped with installation grafting chamber 4, capping device 5 by with peace The cooperation of grafting chamber 4 is filled, is arranged on the top of hanging basket frame 1, capping device 5 includes 2 pieces of upper upper shutters 6 of 6,2 pieces of shutter Between connected by connection framework 7, and the ends of 2 pieces of upper shutters 6 also have and install 4 matched inserting column of grafting chamber 8, it is inserted by inserting column 8 in the inner cavity of installation grafting chamber 4, and be bolted, capping device 5 is fixed on hanging basket frame 1 Top, also with intercept net 9, the surrounding of intercept net 9 is strapped in connection framework 7, and the both sides of hanging basket frame 1 are located at installation The lower section of grafting chamber 4 is equipped with post-receiving chamber 10, and lower shutter 11 is realized and hanging basket frame 1 by the cooperation of shaft and post-receiving chamber 10 Rotation connection, the both sides lower end of hanging basket frame 1 is equipped with stop block 12, and lower shutter 11, which passes through stop block 12, to be realized and fix.
The surface of the hanging basket frame 1 is equipped with anticollison block 13, and anticollison block 13 has connecting plate 14 and installing plate 15, connecting plate 14 connect with hanging basket frame 1, and a side surface of installing plate 15 is equipped with yielding rubber piece 16, and another side surface of installing plate 15 has There is cooperation of 17, the 2 pieces of flaps 18 of connecting tube group by shaft and connecting tube group 17, realization is flexibly connected with installing plate 15, is connected The both sides of plate 14 have bearing plate 19, and bearing plate 19 is equipped with the first compression spring 20, and one end of the first compression spring 20 passes through rubber column 21 Connect with bearing plate 19, the other end connects with the end of flap 18, and the second compression spring 22, the second compression spring are additionally provided on connecting plate 14 22 one end connects with connecting plate 14, and the other end connects with flap 18.
There is angle α, the scope of angle α is 100 °~150 ° between the upper shutter 6 and inserting column 8.
The yielding rubber piece 16 is double-layer structure, and steel plate layer 23 is equipped between 2 layers of yielding rubber piece 16.
The yielding rubber piece 16 is equipped with turning rolls 24, and idler wheel 25 is fixed on by turning rolls 24 on anticollison block 13.
In actual use, hook 26 can also be set up on the lifting lug 3 of hanging basket frame 1, in the upper end of lower shutter 11 Connecting rope 27 is added, connecting rope 27 has retaining ring 28, in this way, when that lower shutter 11 need not be unfolded, it is possible to pass through connection It restricts shutter 11 under 27 pull-ups, and the winding of connecting rope 27 is strapped on hook 26, and pass through 28 clasp of retaining ring and fix.

Claims (5)

1. a kind of construction hanging basket, including hanging basket frame (1), hanging basket frame (1) has frame door (2) hinged therewith, hanging basket The upper end of frame (1) has lifting lug (3), it is characterised in that:The both sides of hanging basket frame (1) are equipped with installation grafting chamber (4), upper cover dress (5) are put by the cooperation with installation grafting chamber (4), are arranged on the top of hanging basket frame (1), capping device (5) on 2 pieces including hiding Baffle (6) is connected by connection framework (7) between 2 pieces of upper shutters (6), and the ends of 2 pieces of upper shutters (6) also have with Grafting chamber (4) matched inserting column (8) is installed, is inserted into the inner cavity of installation grafting chamber (4), and passed through by inserting column (8) Bolt is fixed, and capping device (5) is fixed on the top of hanging basket frame (1), and also with intercept net (9), the surrounding of intercept net (9) is tied up It is tied in connection framework (7), the both sides of hanging basket frame (1) are located at the lower section of installation grafting chamber (4) equipped with post-receiving chamber (10), lower screening Baffle (11) realizes the rotation connection with hanging basket frame (1) by the cooperation of shaft and post-receiving chamber (10), hanging basket frame (1) Both sides lower end is equipped with stop block (12), and lower shutter (11) is realized by stop block (12) and fixed.
2. construction hanging basket as described in claim 1, it is characterised in that:The surface of the hanging basket frame (1) is equipped with anticollision Block (13), anticollison block (13) have connecting plate (14) and installing plate (15), and connecting plate (14) connects with hanging basket frame (1), pacify One side surface of loading board (15) is equipped with yielding rubber piece (16), and another side surface of installing plate (15) has a connecting tube group (17), and 2 Block flap (18) is flexibly connected by the cooperation of shaft and connecting tube group (17), realization with installing plate (15), connecting plate (14) Both sides have bearing plate (19), and bearing plate (19) is equipped with the first compression spring (20), and one end of the first compression spring (20) passes through rubber column (21) connect with bearing plate (19), the other end connects with the end of flap (18), and connecting plate is additionally provided with the second compression spring on (14) (22), one end of the second compression spring (22) connects with connecting plate (14), and the other end connects with flap (18).
3. construction hanging basket as described in claim 1, it is characterised in that:Between the upper shutter (6) and inserting column (8) With angle α, the scope of angle α is 100 °~150 °.
4. construction hanging basket as claimed in claim 2, it is characterised in that:The yielding rubber piece (16) be double-layer structure, 2 Steel plate layer (23) is equipped between layer yielding rubber piece (16).
5. construction hanging basket as claimed in claim 4, it is characterised in that:The yielding rubber piece (16) is equipped with turning rolls (24), idler wheel (25) is fixed on by turning rolls (24) on anticollison block (13).
CN201721043075.3U 2017-08-18 2017-08-18 Construction hanging basket Active CN207405974U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721043075.3U CN207405974U (en) 2017-08-18 2017-08-18 Construction hanging basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721043075.3U CN207405974U (en) 2017-08-18 2017-08-18 Construction hanging basket

Publications (1)

Publication Number Publication Date
CN207405974U true CN207405974U (en) 2018-05-25

Family

ID=62323107

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721043075.3U Active CN207405974U (en) 2017-08-18 2017-08-18 Construction hanging basket

Country Status (1)

Country Link
CN (1) CN207405974U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109944432A (en) * 2019-03-26 2019-06-28 中铁建设集团设备安装有限公司 A kind of architectural engineering personal protection means
CN112442951A (en) * 2020-11-30 2021-03-05 马征 A cage structure for bridge railing maintains

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109944432A (en) * 2019-03-26 2019-06-28 中铁建设集团设备安装有限公司 A kind of architectural engineering personal protection means
CN112442951A (en) * 2020-11-30 2021-03-05 马征 A cage structure for bridge railing maintains
CN112442951B (en) * 2020-11-30 2022-04-29 腾盛桥工科技(重庆)有限公司 A cage structure for bridge railing maintains

Similar Documents

Publication Publication Date Title
CN207920039U (en) A kind of building hanging basket with buffer protection function
CN205421984U (en) Net is weighed down in high air defence with cushioning effect
CN208749070U (en) Construction hanging basket
CN207405974U (en) Construction hanging basket
CN201486124U (en) Outer wall engineering suspended basket net protective device
CN211573582U (en) Coal mine underground rescue device
CN101947363B (en) Escape and transporting device for tall buildings
CN201437634U (en) Exterior wall engineering net protecting device with horizontally-movable hanging basket
CN207934429U (en) A kind of construction site high-altitude hanging basket
CN207484937U (en) A kind of high-altitude hanging basket safety device
CN206172726U (en) Safety elevator with rock protection device
CN205591521U (en) Rock climbing formula robot protective screen
CN108086702A (en) A kind of protective stent for building
CN109205482A (en) The hanging apparatus of curtain wall lighting roof
CN107176537B (en) A kind of hanging device and its hanging method
CN212129995U (en) Safety device is used in room construction
CN209210243U (en) The hanging apparatus of curtain wall lighting roof
CN206624612U (en) A kind of construction high-altitude hanging basket
CN206571184U (en) A kind of high rise elevator well construction safety device
CN202325198U (en) Automatic falling-preventing device of flexible door
CN203129617U (en) Quick-disassembling protective fence
CN209011607U (en) A kind of security platform of elevator fall arrest
CN219196799U (en) Building construction anti-falling device
CN205713045U (en) Stationarity adjusts building hanging basket easily
CN204311718U (en) A kind of outer overhanging type steel scaffold with horizontal protective function

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant