CN207934429U - A kind of construction site high-altitude hanging basket - Google Patents
A kind of construction site high-altitude hanging basket Download PDFInfo
- Publication number
- CN207934429U CN207934429U CN201721822759.3U CN201721822759U CN207934429U CN 207934429 U CN207934429 U CN 207934429U CN 201721822759 U CN201721822759 U CN 201721822759U CN 207934429 U CN207934429 U CN 207934429U
- Authority
- CN
- China
- Prior art keywords
- hanging basket
- mounting bracket
- guardrail
- construction site
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of construction site high-altitude hanging baskets, including hanging basket ontology, the face of top four of the hanging basket ontology is fixed with guardrail mounting bracket, the lower inside of the guardrail mounting bracket is provided with steel wire, the steel wire is fixedly arranged above mounting rod, the mounting rod is fixedly arranged above guardrail, the corner of top four of the guardrail mounting bracket is respectively and fixedly provided with mounting post, the mounting post is fixedly arranged above inclined fixed frame, the utility model is provided with steel wire, the tool that steel wire can stop inside hanging basket is fallen, the tool of avoiding falls the staff for injuring lower section by a crashing object;Top is pounded provided with anti-, it is anti-to pound the staff that pushes up and be pounded to avoid falling from high altitude object inside hanging basket, it ensure that the life security of staff;Provided with damping spring, when height encounters vibrations in the air, damping spring can absorb vibrations, avoid the direct collision of hanging basket and wall, ensure that hanging basket will not be knocked and damage.
Description
Technical field
The utility model is related to high-altitude hanging basket technical field, specifically a kind of construction site high-altitude hanging baskets.
Background technology
Hanging basket is the building machinery of architectural engineering working at height, and hanging basket, which is one kind, can substitute traditional scaffold, can mitigate
Labor intensity improves working efficiency, and the novel high-rise working equipment that can be reused.The use of building hanging basket is gradual
As a kind of trend, it is higher by the external wall construction of high layer multi-layer high building, curtain wall installation, heat preservation construction and repair cleaning exterior wall etc.
It is widely recognized in operation, using this product, scaffolding can be exempted from.Construction cost is set to reduce, operating expenses is traditional pin hand
The 28% of frame, and working efficiency greatly improves, but but there is certain defects for existing hanging basket, such as carried on hanging basket
Tool can be fallen when hanging basket has fraction of inclination, the serious staff that can be pounded to lower section causes one to staff
The top of fixed injury, next hanging basket is generally hollow structure, so if having thing to fall above building, pounds on hanging basket
Staff will result in casualties.
Utility model content
The purpose of this utility model is to provide a kind of construction site high-altitude hanging baskets, to solve in the prior art ask
Topic.
To achieve the above object, the utility model provides the following technical solutions:A kind of construction site high-altitude hanging basket, including
The face of top four of hanging basket ontology, the hanging basket ontology is fixed with guardrail mounting bracket, and the lower inside of the guardrail mounting bracket is set
It is equipped with steel wire, the steel wire is fixedly arranged above mounting rod, and the mounting rod is fixedly arranged above guardrail, the guardrail peace
The corner of the top shelved four is respectively and fixedly provided with mounting post, and the mounting post is fixedly arranged above inclined fixed frame, described solid
Determine frame inside be fixed with it is anti-pound top, four corners of the guardrail mounting bracket close to a side of wall, which are respectively and fixedly provided with, to be subtracted
Spring is shaken, side of the damping spring far from guardrail mounting bracket is fixed with partition board, in the inside upper surface of the hanging basket ontology
Between be provided with water channel.
Preferably, the both sides of the guardrail mounting bracket are fixed with pulling apparatus mounting bracket.
Preferably, the inner homogeneous of the water channel is provided with 12 leakage holes.
Preferably, the anti-angle of inclination for pounding top is 15 degree.
Preferably, the corner of the lower section of the hanging basket ontology four is respectively and fixedly provided with idler wheel.
Preferably, side of the inside far from damping spring of the hanging basket ontology is fixed with workbin.
Preferably, it is hinged with lid above the workbin.
Compared with prior art, the utility model has the beneficial effects that:The utility model is provided with steel wire, and steel wire can
It is fallen with stopping the tool inside hanging basket, the tool of avoiding falls the staff for injuring lower section by a crashing object;Top is pounded provided with anti-, it is anti-to pound
Top can pound the staff inside hanging basket to avoid falling from high altitude object, ensure that the life security of staff;Provided with subtracting
Spring is shaken, when height encounters vibrations in the air, damping spring can absorb vibrations, avoid the direct collision of hanging basket and wall,
It ensure that hanging basket will not be knocked and damage.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the side view of the utility model.
Fig. 3 is the vertical view of the utility model hanging basket ontology.
In figure:1- is anti-pound top, 2- fixed frames, 3- guardrails, 4- guardrails mounting bracket, 5- mounting posts, 6- pulling apparatus mounting bracket,
7- idler wheels, 8- steel wires, 9- mounting rods, 10- hanging baskets ontology, 11- damping springs, 12- partition boards, 13- water channels, 14- leakage holes,
15- workbins.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
The every other embodiment obtained, shall fall within the protection scope of the present invention.
Please refer to Fig.1~3, in the utility model embodiment, a kind of construction site high-altitude hanging basket, including hanging basket ontology
10, the face of top four of hanging basket ontology 10 is fixed with guardrail mounting bracket 4, and column mounting bracket 4 is protected for installing guardrail 3 and steel wire 8
The lower inside of column mounting bracket 4 is provided with steel wire 8, and steel wire 8 is used to stop that the tool inside hanging basket is fallen, steel wire 8
It is fixedly arranged above mounting rod 9, mounting rod 9 is fixedly arranged above guardrail 3, and the corner of top four of guardrail mounting bracket 4 is fixed
There are mounting post 5, mounting post 5 to be fixedly arranged above inclined fixed frame 2, the inside of fixed frame 2, which is fixed with, prevents pounding top 1, anti-to pound top 1
For stopping that falling from high altitude object pounds staff, four corners of the guardrail mounting bracket 4 close to a side of wall are solid
There are damping spring 11, side of the damping spring 11 far from guardrail mounting bracket 4 to be fixed with partition board 12, damping spring 11 can be inhaled surely
Vibrations are received, are provided with water channel 13 among the inside upper surface of hanging basket ontology 10, water can be from 13 leak of water channel.
The top of workbin 15 is hinged with lid.
The both sides of guardrail mounting bracket 4 are fixed with pulling apparatus mounting bracket 6.
The inner homogeneous of water channel 13 is provided with 12 leakage holes 14.
The anti-angle of inclination for pounding top 1 is 15 degree.
The corner of lower section four of hanging basket ontology 10 is respectively and fixedly provided with idler wheel 7.
Side of the inside of hanging basket ontology 10 far from damping spring 11 is fixed with workbin 15.
The operation principle of the utility model is:After the utility model installs, pulling apparatus is fixed on pulling apparatus
It on mounting bracket 6, is pulled upwardly, people stands in the inside of hanging basket ontology 10, works, it would be desirable to which the tool used is placed on zero
The inside of part box 15, when work, anti-top 1 of pounding can stop that falling from high altitude object pounds the staff on hanging basket, when due to wind or
When person is that other factors hanging basket generates vibration, damping spring 11 can play the role of damping, and partition board 12 is close to metope, steel wire
8 articles that can be stopped in hanging basket ontology 10 fall, and when having water inside hanging basket, water can be leaked from water channel 13 and leakage hole 14
Go out, avoid hanging basket ponding, when transporting the present apparatus, the present apparatus can be pushed so that idler wheel 7 rotates, and can drive the present apparatus
It is mobile, conveniently moving.
It is obvious to a person skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and
And without departing substantially from the spirit or essential attributes of the utility model, it can realize that this practicality is new in other specific forms
Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this practicality is new
The range of type is indicated by the appended claims rather than the foregoing description, it is intended that containing in the equivalent requirements of the claims will be fallen
All changes in justice and range are embraced therein.Any reference numeral in claim should not be considered as limitation
Involved claim.
Claims (7)
1. a kind of construction site high-altitude hanging basket, including hanging basket ontology (10), it is characterised in that:The hanging basket ontology (10) it is upper
Four faces in side are fixed with guardrail mounting bracket (4), and the lower inside of the guardrail mounting bracket (4) is provided with steel wire (8), the steel
Silk screen (8) is fixedly arranged above mounting rod (9), and the mounting rod (9) is fixedly arranged above guardrail (3), the guardrail mounting bracket
(4) the corner of top four is respectively and fixedly provided with mounting post (5), and the mounting post (5) is fixedly arranged above inclined fixed frame
(2), the inside of the fixed frame (2), which is fixed with, prevents pounding top (1), and the guardrail mounting bracket (4) is close to a side of wall
Four corners are respectively and fixedly provided with damping spring (11), and side of the damping spring (11) far from guardrail mounting bracket (4) is fixed with
Partition board (12) is provided with water channel (13) among the inside upper surface of the hanging basket ontology (10).
2. a kind of construction site high-altitude hanging basket according to claim 1, it is characterised in that:The guardrail mounting bracket (4)
Both sides be fixed with pulling apparatus mounting bracket (6).
3. a kind of construction site high-altitude hanging basket according to claim 1, it is characterised in that:The inside of the water channel (13)
It is evenly provided with 12 leakage holes (14).
4. a kind of construction site high-altitude hanging basket according to claim 1, it is characterised in that:It is described to prevent pounding inclining for top (1)
Rake angle is 15 degree.
5. a kind of construction site high-altitude hanging basket according to claim 1, it is characterised in that:The hanging basket ontology (10)
The corner of lower section four is respectively and fixedly provided with idler wheel (7).
6. a kind of construction site high-altitude hanging basket according to claim 1, it is characterised in that:The hanging basket ontology (10)
The internal side far from damping spring (11) is fixed with workbin (15).
7. a kind of construction site high-altitude hanging basket according to claim 6, it is characterised in that:The workbin (15) it is upper
Side is hinged with lid.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721822759.3U CN207934429U (en) | 2017-12-24 | 2017-12-24 | A kind of construction site high-altitude hanging basket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721822759.3U CN207934429U (en) | 2017-12-24 | 2017-12-24 | A kind of construction site high-altitude hanging basket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207934429U true CN207934429U (en) | 2018-10-02 |
Family
ID=63646646
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721822759.3U Expired - Fee Related CN207934429U (en) | 2017-12-24 | 2017-12-24 | A kind of construction site high-altitude hanging basket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207934429U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109809132A (en) * | 2019-04-03 | 2019-05-28 | 南昌汇达知识产权有限公司 | A kind of construction site ingredient conveyor |
CN110469101A (en) * | 2019-08-30 | 2019-11-19 | 中国三冶集团有限公司 | Construction hanging basket |
CN116104286A (en) * | 2023-04-13 | 2023-05-12 | 山西省宏图建设集团有限公司 | High-stability scaffold and construction method thereof |
-
2017
- 2017-12-24 CN CN201721822759.3U patent/CN207934429U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109809132A (en) * | 2019-04-03 | 2019-05-28 | 南昌汇达知识产权有限公司 | A kind of construction site ingredient conveyor |
CN110469101A (en) * | 2019-08-30 | 2019-11-19 | 中国三冶集团有限公司 | Construction hanging basket |
CN116104286A (en) * | 2023-04-13 | 2023-05-12 | 山西省宏图建设集团有限公司 | High-stability scaffold and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207934429U (en) | A kind of construction site high-altitude hanging basket | |
CN207920039U (en) | A kind of building hanging basket with buffer protection function | |
CN206667719U (en) | A kind of building hanging basket | |
CN201486124U (en) | Outer wall engineering suspended basket net protective device | |
CN201437634U (en) | Exterior wall engineering net protecting device with horizontally-movable hanging basket | |
CN214615310U (en) | Supporting platform with protection function for construction | |
CN207484937U (en) | A kind of high-altitude hanging basket safety device | |
CN210976670U (en) | Safety protection device for high-rise curtain wall air construction | |
CN207405974U (en) | Construction hanging basket | |
CN204676865U (en) | A kind of building scaffold | |
CN208137399U (en) | A kind of building hanging basket | |
CN108678353A (en) | External wall workbench | |
CN207260550U (en) | A kind of optimization device of construction hanging basket platform | |
CN206375636U (en) | A kind of construction vertical lift device | |
CN217106090U (en) | Protective device for bottom of overhanging type scaffold | |
CN207110423U (en) | Architectural engineering high safety factor hanging basket | |
CN108455503A (en) | A kind of construction safety hanging cradle | |
CN212866799U (en) | Attached scaffold main body for constructional engineering | |
CN208494837U (en) | A kind of glass curtain wall gluing protective device | |
CN106760468A (en) | The suspension platform that a kind of construction site uses | |
CN208605120U (en) | It is a kind of to use stable aerial ladder | |
CN207597842U (en) | It is a kind of can transported material scaffold | |
CN207122123U (en) | A kind of construction suspension bracket | |
CN207903817U (en) | Immersible pump raising and protective device | |
CN207224302U (en) | A kind of construction wall drilling equipment free of surface defects |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181002 Termination date: 20191224 |