CN110469101A - Construction hanging basket - Google Patents
Construction hanging basket Download PDFInfo
- Publication number
- CN110469101A CN110469101A CN201910812501.2A CN201910812501A CN110469101A CN 110469101 A CN110469101 A CN 110469101A CN 201910812501 A CN201910812501 A CN 201910812501A CN 110469101 A CN110469101 A CN 110469101A
- Authority
- CN
- China
- Prior art keywords
- hanging basket
- fixedly connected
- fixed
- fixed plate
- column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 23
- 230000006378 damage Effects 0.000 description 3
- 230000007774 longterm Effects 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 230000002195 synergetic effect Effects 0.000 description 2
- 208000027418 Wounds and injury Diseases 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 208000014674 injury Diseases 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G3/30—Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G3/30—Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
- E04G3/32—Hoisting devices; Safety devices
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Supports Or Holders For Household Use (AREA)
Abstract
The invention discloses construction hanging baskets, including hanging basket ontology, the first fixed plate is fixedly connected in the middle part of hanging basket ontology front and rear end, and screw column is fixedly installed in one of them first fixed plate plate body, screw column one end is fixedly connected with fixed frame, fixed frame one end offers mounting groove, support wheel is rotatably connected in mounting groove, hanging basket ontology two sides upper end is fixedly connected to the second fixed plate, second fixed plate one end is fixedly connected with U-board, U-board top two sides are fixedly connected to two connection frames, the first fixed column is fixedly connected between two connection frames, first fixed column side wall is rotatably connected to roller, sliding shoe is slidably connected on the inside of connection frame, the second fixed column is fixedly connected between two sliding shoes.The present invention improves the service performance of the hanging basket, can make hanging basket because wirerope folding and unfolding degree caused by inclination processing more, reduce inclined amplitude, the stationarity that staff works on hanging basket can be improved, guarantee the efficiency of work.
Description
Technical field
The present invention relates to Architectural Equipment technical fields, specially construction hanging basket.
Background technique
Hanging basket is that one kind can substitute traditional scaffold, can reduce labor intensity, improves working efficiency, and can repeat to make
Novel high-rise working equipment.Currently, the use of building hanging basket has been increasingly becoming a kind of trend, in high layer multi-layer high building
External wall construction, curtain wall installation, be widely recognized in thermal insulation construction and the maintenance cleaning high altitude operation such as exterior wall.It can be used for simultaneously
The operation of the engineerings such as large tank, bridge and dam.Using this product, scaffolding can be exempted from.Construction cost is substantially reduced, is applied
Expenses of labour is only the 28% of traditional scaffold, and working efficiency greatly improves.Hanging basket flexible operation, displacement are easy, facilitate reality
With, it is safe and reliable.Building hanging basket, which is generally said good-bye, to be moved and electronic two kinds.Building hanging basket is as construction outer wall hanging basket, with wall face
Steel pipe scaffold is completely taken to compare, have set up speed is fast, save a large amount of scaffoldings, save labour, is easy to operate, flexible,
The advantages that technical economic benefit is preferable.
The hanging basket of construction now needs two wirerope to lift hanging basket in use, but is utilizing motor
Driving wirerope slings hanging basket to during, because two wirerope folding and unfolding speed differences cause hanging basket that may generate inclination
The phenomenon that, especially inclined degree is more serious in long-term use, influences staff and works in hanging basket, and is existing
Modern hanging basket can cause to scratch to wall in use, influence the aesthetics of wall.For this purpose, it is proposed that construction hanging basket.
Summary of the invention
The purpose of the present invention is to provide construction hanging baskets, to solve to propose in above-mentioned background technique to utilize motor now
Driving wirerope slings hanging basket to during, because two wirerope folding and unfolding speed differences cause hanging basket that may generate inclination
The phenomenon that, especially inclined degree is more serious in long-term use, influences staff and works in hanging basket, and is existing
The problem of modern hanging basket can cause to scratch, influence the aesthetics of wall to wall in use.
In order to solve the above technical problems, the invention provides the following technical scheme: construction hanging basket, including hanging basket ontology,
It is fixedly connected to the first fixed plate in the middle part of hanging basket ontology front and rear end, and solid in one of them first fixed plate plate body
Dingan County is equipped with screw column, and described screw column one end is fixedly connected with fixed frame, and described fixed frame one end offers mounting groove, described
It is rotatably connected to support wheel in mounting groove, hanging basket ontology two sides upper end is fixedly connected to the second fixed plate, and described second
Fixed plate one end is fixedly connected with U-board, and U-board top two sides are fixedly connected to two connection frames, two companies
It connects and is fixedly connected with the first fixed column between frame, the first fixed column side wall is rotatably connected to roller, the connection frame inside
Sliding shoe is slidably connected, the second fixed column, the second fixed column side wall are fixedly connected between two sliding shoes
It is fixedly connected with support tube, the second fixed column side wall is fixedly connected to fluted disc, and the fluted disc is located at support tube one end, and two
A fluted disc is connected by chain drive, is fixedly connected to support spring between the sliding shoe bottom end and U-board top.
Preferably, described screw column one end is fixedly connected with rotating bar, and the length of rotating bar is 20 centimetres.
Preferably, the support tube side wall is set as tongue and groove, and the support wheel is made of rubber.
Preferably, the first fixed column side wall is fixedly connected with bearing, and first fixed column passes through bearing and roller
Rotation connection.
Preferably, the connection frame inner sidewall offers sliding groove, and the sliding Block- matching is slidably connected at sliding groove
In.
Preferably, hanging basket ontology front and rear end is fixedly connected to two first connecting rods, and two first companies
Extension bar is located at the first fixed plate two sides.
Preferably, hanging basket ontology two sides are fixedly connected to two the second connecting rods, and two the second connecting rods are located at the
Below two fixed plates.
Compared with prior art, the beneficial effects of the present invention are:
1. the present invention, is interspersed between roller and sliding groove by wirerope, wirerope then is driven using driving motor
Folding and unfolding is carried out, for wirerope during folding and unfolding, support spring is supported the sliding shoe in sliding groove, then sliding shoe band
Dynamic second fixed column moves up, and then the second fixed column drives support tube to squeeze wirerope, while logical using chain
It crosses fluted disc and guarantees that two support tubes can preferably alleviate the inclination at wirerope hanging basket both ends during folding and unfolding with synergic rotation
Degree is solved and is now sling hanging basket to during using motor driven wirerope, not because of two wirerope folding and unfolding speed
With the phenomenon that causing hanging basket that may generate inclination, especially inclined degree is more serious in long-term use, influences work people
The technical issues of member is worked in hanging basket, improves the service performance of the construction hanging basket, improves making for the hanging basket
With performance, can make hanging basket because wirerope folding and unfolding degree caused by inclination processing more, reduce inclined amplitude, can be improved
The stationarity that staff works on hanging basket guarantees the efficiency of work.
2. by setting screw column, fixed frame, support wheel and rotating bar, when using construction hanging basket, rotation rotation
Bar drives screw column to be rotated, and then drives fixed frame to be moved under the action of the first fixed plate using screw column, so
After support wheel is supported on wall, wall can preferably be protected, avoid wall damage from influencing beautiful.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the embodiment of the present invention;
Fig. 2 is fixed frame of embodiment of the present invention cross-sectional view;
Fig. 3 is roller of the embodiment of the present invention and support tube side view;
Fig. 4 is enlarged drawing at A in Fig. 1 of the embodiment of the present invention.
In figure: 1, hanging basket ontology;2, the first fixed plate;3, screw column;4, fixed frame;5, mounting groove;6, support wheel;7, turn
Lever;8, the second fixed plate;9, U-board;10, connection frame;11, the first fixed column;12, roller;13, sliding groove;14, it slides
Block;15, the second fixed column;16, support tube;17, fluted disc;18, support spring;19, chain;20, first connecting rod;21, second
Connecting rod.
Specific embodiment
In order to improve the service performance of the hanging basket, can make hanging basket because wirerope folding and unfolding degree caused by inclination processing more
Add, reduce inclined amplitude, the stationarity that staff works on hanging basket can be improved, guarantees that the technology of the efficiency of work is asked
Topic, the embodiment of the invention provides construction hanging baskets.Following will be combined with the drawings in the embodiments of the present invention, implements to the present invention
Technical solution in example is clearly and completely described, it is clear that described embodiment is only that present invention a part is implemented
Example, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creativeness
Every other embodiment obtained, shall fall within the protection scope of the present invention under the premise of labour.
Embodiment 1
Please refer to Fig. 1-4, present embodiments provide construction hanging basket, including hanging basket ontology 1,1 front end of hanging basket ontology with
It is fixedly connected to the first fixed plate 2 in the middle part of rear end, and is fixedly installed with screw column 3 in one of them 2 plate body of the first fixed plate,
3 one end of screw column is fixedly connected with fixed frame 4, and 4 one end of fixed frame offers mounting groove 5, support is rotatably connected in mounting groove 5
Wheel 6,1 two sides upper end of hanging basket ontology is fixedly connected to the second fixed plate 8, and 8 one end of the second fixed plate is fixedly connected with U-board 9,
9 top two sides of U-board are fixedly connected to two connection frames 10, are fixedly connected with the first fixed column between two connection frames 10
11,11 side wall of the first fixed column is rotatably connected to roller 12, and 10 inside of connection frame slidably connects sliding shoe 14, two slidings
The second fixed column 15 is fixedly connected between block 14,15 side wall of the second fixed column is fixedly connected with support tube 16, the second fixed column
15 side walls are fixedly connected to fluted disc 17, and fluted disc 17 is located at 16 one end of support tube, and two fluted discs 17 are sequentially connected by chain 19,
14 bottom end of sliding shoe and U-board are fixedly connected to support spring 18 between 9 top.
In the present embodiment, wirerope is being interspersed between roller 12 and sliding groove 13 first, is then utilizing driving motor
Wirerope is driven to carry out folding and unfolding, for wirerope during folding and unfolding, support spring 18 carries out the sliding shoe 14 in sliding groove 13
Support, then sliding shoe 14 drives the second fixed column 15 to move up, and then the second fixed column 15 drives support tube 16 to steel wire
Rope is squeezed, while guaranteeing that two support tubes 16 can preferably be alleviated with synergic rotation by fluted disc 17 using chain 19
The inclined degree at wirerope hanging basket both ends during folding and unfolding, and rotating bar 7 can be rotated when using hanging basket and drive spiral shell
Roofbolt 3 is rotated, and is then driven fixed frame 4 to be moved under the action of the first fixed plate 2 using screw column 3, is then made
It obtains support wheel 6 to be supported on wall, wall can preferably be protected, avoid wall damage from influencing beautiful.
Embodiment 2
Please refer to Fig. 1-4, be further improved on the basis of embodiment 1: 3 one end of screw column is fixedly connected with rotation
Bar 7, and the length of rotating bar 7 is 20 centimetres;Rotating bar 7 can be rotated, so that rotating bar 7 drives screw column 3 to be rotated,
Then screw column 3 is made to drive support wheel 6 to be supported on wall in the case where carrying out mobile in the first fixed plate 2.Support tube
16 side walls are set as tongue and groove, and support wheel 6 is made of rubber;When support wheel 6 is supported on wall, propped up using made of rubber
Support wheel 6 can weaken the degree of injury to metope, then wirerope preferably can be carried out clamping transmission using support tube 16.
First fixed column, 11 side wall is fixedly connected with bearing, and the first fixed column 11 is rotatablely connected by bearing and roller 12;It is solid first
In the case that fixed column 11 drives roller 12 to rotate through wirerope, then roller 12 is carried out by bearing in 11 outer wall of the first fixed column
Rotation guarantees the performance that roller 12 rotates.10 inner sidewall of connection frame offers sliding groove 13, and the matching of sliding shoe 14 is slidably connected
In sliding groove 13;When support spring 18 is supported sliding shoe 14, sliding shoe 14 is being connected by sliding groove 13
It is moved on the inside of frame 10, guarantees the mobile directive property of sliding shoe 14, avoided sliding shoe 14 from generating track and deviate.Hanging basket ontology 1
Front and rear end is fixedly connected to two first connecting rods 20, and two first connecting rods 20 are located at 2 two sides of the first fixed plate;
It can guarantee the stability of the hanging basket using first connecting rod 20, but also the protection of hanging basket is more in place.1 two sides of hanging basket ontology
Two the second connecting rods 21 are fixedly connected to, and two the second connecting rods 21 are located at 8 lower section of the second fixed plate;Utilize two
Two connecting rods 21 may further ensure that the protection of hanging basket, guarantee that the structure of hanging basket is stronger.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (7)
1. construction hanging basket, including hanging basket ontology (1), it is characterised in that: in the middle part of hanging basket ontology (1) front and rear end
It is fixedly connected with the first fixed plate (2), and is fixedly installed with screw column (3) in one of them the first fixed plate (2) plate body, it is described
Screw column (3) one end is fixedly connected with fixed frame (4), and described fixed frame (4) one end offers mounting groove (5), the mounting groove
(5) it is rotatably connected in support wheel (6), hanging basket ontology (1) the two sides upper end is fixedly connected to the second fixed plate (8), institute
It states the second fixed plate (8) one end to be fixedly connected with U-board (9), U-board (9) the top two sides are fixedly connected to two companies
It connects frame (10), is fixedly connected with the first fixed column (11) between two connection frames (10), the first fixed column (11) side
Wall is rotatably connected to roller (12), is slidably connected sliding shoe (14) on the inside of the connection frame (10), two sliding shoes
(14) it being fixedly connected between the second fixed column (15), the second fixed column (15) side wall is fixedly connected with support tube (16),
Second fixed column (15) side wall is fixedly connected to fluted disc (17), and the fluted disc (17) is located at support tube (16) one end, and two
A fluted disc (17) is sequentially connected by chain (19), fixed between sliding shoe (14) bottom end and U-board (9) top
It is connected with support spring (18).
2. construction hanging basket according to claim 1, it is characterised in that: described screw column (3) one end is fixedly connected with
Rotating bar (7), and the length of rotating bar (7) is 20 centimetres.
3. construction hanging basket according to claim 1, it is characterised in that: support tube (16) side wall is set as concave-convex
Slot, the support wheel (6) are made of rubber.
4. construction hanging basket according to claim 1, it is characterised in that: the first fixed column (11) side wall is fixed to be connected
It is connected to bearing, first fixed column (11) is rotatablely connected by bearing and roller (12).
5. construction hanging basket according to claim 1, it is characterised in that: connection frame (10) inner sidewall offers
Sliding groove (13), sliding shoe (14) matching are slidably connected in sliding groove (13).
6. construction hanging basket according to claim 1, it is characterised in that: hanging basket ontology (1) front and rear end is equal
There are two being fixedly connected first connecting rod (20), and two first connecting rods (20) are located at the first fixed plate (2) two sides.
7. construction hanging basket according to claim 1, it is characterised in that: hanging basket ontology (1) two sides are fixedly connected to
Two the second connecting rods (21), and two the second connecting rods (21) are located at below the second fixed plate (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910812501.2A CN110469101A (en) | 2019-08-30 | 2019-08-30 | Construction hanging basket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910812501.2A CN110469101A (en) | 2019-08-30 | 2019-08-30 | Construction hanging basket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110469101A true CN110469101A (en) | 2019-11-19 |
Family
ID=68514406
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910812501.2A Pending CN110469101A (en) | 2019-08-30 | 2019-08-30 | Construction hanging basket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110469101A (en) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2327670Y (en) * | 1998-02-24 | 1999-07-07 | 无锡通天建筑机械有限公司 | Multifunctional hanging basket safeguard lock |
JP2002129742A (en) * | 2000-10-25 | 2002-05-09 | Tohoku Green Kosan Kk | Gondola device ascending/descending along wall surface |
CN200974728Y (en) * | 2006-04-06 | 2007-11-14 | 韩其顺 | One-machine-multiple-rope foursquare suspension swaying-free nacelle synchronous hoisting mechanism |
CN201367726Y (en) * | 2009-03-03 | 2009-12-23 | 侯秀峰 | Lifter for high operation hanging basket |
CN107476562A (en) * | 2017-09-13 | 2017-12-15 | 许昌学院 | A kind of novel building hanging basket |
CN107700820A (en) * | 2017-11-07 | 2018-02-16 | 吴振明 | A kind of building hanging basket of Anti-inclining |
CN207934429U (en) * | 2017-12-24 | 2018-10-02 | 赵竹 | A kind of construction site high-altitude hanging basket |
CN208122264U (en) * | 2018-02-26 | 2018-11-20 | 广东翔基建设工程有限公司 | A kind of external wall finishing hanging basket |
CN211007605U (en) * | 2019-08-30 | 2020-07-14 | 中国三冶集团有限公司 | Construction hanging basket |
-
2019
- 2019-08-30 CN CN201910812501.2A patent/CN110469101A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2327670Y (en) * | 1998-02-24 | 1999-07-07 | 无锡通天建筑机械有限公司 | Multifunctional hanging basket safeguard lock |
JP2002129742A (en) * | 2000-10-25 | 2002-05-09 | Tohoku Green Kosan Kk | Gondola device ascending/descending along wall surface |
CN200974728Y (en) * | 2006-04-06 | 2007-11-14 | 韩其顺 | One-machine-multiple-rope foursquare suspension swaying-free nacelle synchronous hoisting mechanism |
CN201367726Y (en) * | 2009-03-03 | 2009-12-23 | 侯秀峰 | Lifter for high operation hanging basket |
CN107476562A (en) * | 2017-09-13 | 2017-12-15 | 许昌学院 | A kind of novel building hanging basket |
CN107700820A (en) * | 2017-11-07 | 2018-02-16 | 吴振明 | A kind of building hanging basket of Anti-inclining |
CN207934429U (en) * | 2017-12-24 | 2018-10-02 | 赵竹 | A kind of construction site high-altitude hanging basket |
CN208122264U (en) * | 2018-02-26 | 2018-11-20 | 广东翔基建设工程有限公司 | A kind of external wall finishing hanging basket |
CN211007605U (en) * | 2019-08-30 | 2020-07-14 | 中国三冶集团有限公司 | Construction hanging basket |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201665256U (en) | Self-climbing type multi-functional wall robot | |
CN207892222U (en) | A kind of multi-use architecture hanging basket | |
CN205107544U (en) | A cleaning machine for glass curtain wall | |
CN208122264U (en) | A kind of external wall finishing hanging basket | |
CN110469101A (en) | Construction hanging basket | |
CN211341694U (en) | Lifting scaffold is adhered to in construction | |
CN215948857U (en) | Decoration hanging basket for exterior wall decoration | |
CN201286668Y (en) | Special-shaped suspension platform | |
CN207513142U (en) | A kind of cradle for constructional engineering | |
CN211007605U (en) | Construction hanging basket | |
CN207727956U (en) | A kind of horizontally movable novel hanging basket | |
CN213774423U (en) | Hanging basket suspension device | |
CN208415105U (en) | A kind of highly-safe hanging basket of bridge | |
CN205976118U (en) | Outer decorative aluminum board articulates system | |
CN208883430U (en) | Window cleaning equipment operator is facilitated to hang the door type structure device passed through in ship in work | |
CN208329310U (en) | A kind of environment-friendly type aluminum veneer | |
CN204400568U (en) | Become span hanging basket suspension mechanism | |
CN110562865B (en) | Balanced heavy ladder adjusting device of cantilever crane balanced system | |
CN204040502U (en) | A kind of full glass curtain wall temporary fastening device | |
CN206487128U (en) | A kind of Guiding Support Elevating Scaffold | |
CN208230182U (en) | A kind of Spray For Anti-corrosion of Steel Structures manipulator | |
CN208844913U (en) | A kind of integrated form climbing frame | |
CN208551672U (en) | Facade cleaning device | |
CN219654217U (en) | Masonry and quick assembly disassembly bent for decoration engineering construction | |
CN108468424A (en) | A kind of construction Machines hanging basket |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |