CN208844913U - A kind of integrated form climbing frame - Google Patents

A kind of integrated form climbing frame Download PDF

Info

Publication number
CN208844913U
CN208844913U CN201821276544.0U CN201821276544U CN208844913U CN 208844913 U CN208844913 U CN 208844913U CN 201821276544 U CN201821276544 U CN 201821276544U CN 208844913 U CN208844913 U CN 208844913U
Authority
CN
China
Prior art keywords
fixedly connected
semi
circular plate
integrated form
climbing frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821276544.0U
Other languages
Chinese (zh)
Inventor
刘鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Huiteng Century Steel Structure Co Ltd
Original Assignee
Wuhan Huiteng Century Steel Structure Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Huiteng Century Steel Structure Co Ltd filed Critical Wuhan Huiteng Century Steel Structure Co Ltd
Priority to CN201821276544.0U priority Critical patent/CN208844913U/en
Application granted granted Critical
Publication of CN208844913U publication Critical patent/CN208844913U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a kind of integrated form climbing frames, including disassembly case and support rod, the bottom of disassembly case, which is run through, telescopic block, and the bottom of telescopic block inner cavity is fixedly connected with the first spring, the top of first spring is fixedly connected with connecting rod, connecting rod runs through telescopic block far from one end of the first spring and extends to the top of telescopic block, the two sides that telescopic block extends to disassembly box cavity are fixedly connected to kelly, the bottom of kelly is fixedly connected with fixture block, the surface in disassembly bottom portion offers the circular groove being used in combination with telescopic block, the utility model relates to technical field of engineering equipment.The integrated form climbing frame, it can be dismantled, convenient for combination installation, reduces tower crane attachment quantity, avoid the waste of material, construction cost is saved, structure is simple, securely and reliably, improves the working efficiency of worker, first semi-circular plate and the second semi-circular plate keep integrated form climbing frame more stable, avoid worker that accident occurs when using climbing frame.

Description

A kind of integrated form climbing frame
Technical field
The utility model relates to technical field of engineering equipment, specially a kind of integrated form climbing frame.
Background technique
Climbing frame is called hoisting frame, and it is main several to be divided into fluid pressure type, electrodynamic type, manpower hand pulling type etc. according to its power resources Class, it is the new type scaffold system developed in recent years, is mainly used in high-layer shear force wall formula building, it can be past along building Upper soaring or decline, this system make Construction Formwork & Scaffold Technology take on a new look completely, first is that need not translation frame, second is that eliminating tearing open for scaffold Process is filled, construction is used always after primary assembling and finishes, and do not limited by depth of building, be greatly saved manpower and material Material, and have biggish change also for traditional scaffold in security standpoint, great advantages for development, existing in skyscraper Integrated form climbing frame be difficult to be dismantled, be not easy to combination installation.
Traditional integrated form climbing frame, most of is very simple device, it is difficult to be dismantled, be not easy to combination installation, increase Tower crane attachment quantity is added, has increased the waste of material, improve construction cost, structure is complicated, not enough securely and reliably, reduces The working efficiency of worker, general integrated form climbing frame do not have the first semi-circular plate and the second semi-circular plate, it is difficult to make integrated form climbing frame More stable, worker is easy to happen accident when using climbing frame.
Utility model content
In view of the deficiencies of the prior art, the utility model provides a kind of integrated form climbing frame, and it is difficult to solve integrated form climbing frame To be dismantled, be not easy to combination installation and not safe and reliable enough problem.
In order to achieve the above object, the utility model is achieved by the following technical programs: a kind of integrated form climbing frame, including Dismantle case and support rod, the bottom of the disassembly case is through there is a telescopic block, and the bottom of telescopic block inner cavity is fixedly connected with the One spring, the top of first spring are fixedly connected with connecting rod, and the connecting rod runs through far from one end of the first spring stretches Contracting block and the top for extending to telescopic block, the two sides that the telescopic block extends to disassembly box cavity are fixedly connected to kelly, institute The bottom for stating kelly is fixedly connected with fixture block, and the surface in the disassembly bottom portion offers the circle being used in combination with telescopic block Slot, and the two sides of circular groove offer the arc groove being used in combination with kelly, the surface in the disassembly bottom portion and is located at The side of arc groove offers the card slot being used in combination with fixture block, and dismantles and be fixedly connected with fixation at the top of box cavity Block.
Preferably, the two sides of the fixed block bottom are connected with motion bar, and the motion bar is far from fixed block One end is connected with pulley.
Preferably, the basal sliding of the pulley is connected with fixed plate, and is fixedly connected between described two motion bars Two springs.
Preferably, the two sides of the support rod are fixedly connected to the first semi-circular plate, and the both ends of the first semi-circular plate are logical It crosses screw and is fixedly connected with the second semi-circular plate for being matched therewith and using.
Preferably, the side of first semi-circular plate and the side of the second semi-circular plate are fixedly connected to telescopic rod, and Telescopic rod is fixedly connected with fixed arc plate far from one end of the first semi-circular plate and the second semi-circular plate.
Preferably, the surface of the telescopic rod and it is located at the side of the first semi-circular plate and the second semi-circular plate and fixed arc plate Between be fixedly connected to spring, be connected with support column between the inside of two fixed arc plates.
Beneficial effect
The utility model provides a kind of integrated form climbing frame.Have it is following the utility model has the advantages that
(1), the integrated form climbing frame is fixedly connected to kelly by the two sides that telescopic block extends to disassembly box cavity, blocks The bottom of bar is fixedly connected with fixture block, and the surface in disassembly bottom portion offers the circular groove being used in combination with telescopic block, and circle The two sides of slot offer the arc groove being used in combination with kelly, dismantle the surface in bottom portion and open positioned at the side of arc groove It equipped with the card slot being used in combination with fixture block, and dismantles and is fixedly connected with fixed block at the top of box cavity, can be dismantled, just It is installed in combination, reduces tower crane attachment quantity, avoid the waste of material, saved construction cost, structure is simple, safely may be used It leans on, improves the working efficiency of worker.
(2), the integrated form climbing frame is fixedly connected to the first semi-circular plate, and the first semicircle by the two sides of support rod The both ends of plate are fixedly connected with the second semi-circular plate for being matched therewith and using by screw, the side of the first semi-circular plate and the second half The side of plectane is fixedly connected to telescopic rod, and telescopic rod is far from the fixed company in one end of the first semi-circular plate and the second semi-circular plate It is connected to fixed arc plate, the first semi-circular plate and the second semi-circular plate keep integrated form climbing frame more stable, worker avoided to climb in use Accident occurs when frame.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the cross-sectional view that the utility model dismantles case and flexible block structure;
Fig. 3 is the top view that the utility model dismantles case bottom structure;
Fig. 4 is the top view of the first semi-circular plate of the utility model and the second semi-circular plate structure.
In figure: fast, 8 circular grooves, 9 circles are blocked in 1 disassembly case, 2 support rods, 3 telescopic blocks, 4 first springs, 5 connecting rods, 6 kellies, 7 Arc slot, 10 card slots, 11 fixed blocks, 12 motion bars, 13 pulleys, 14 fixed links, 15 second springs, 16 first semi-circular plates, 17 screws, 18 second semi-circular plates, 19 telescopic rods, 20 fixed arc plates, 21 fastening springs, 22 support columns.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-4 is please referred to, the utility model provides a kind of technical solution: a kind of integrated form climbing frame, including disassembly case 1 and branch Strut 2,2 number of support rod are 4, dismantle case 1 and telescopic block 3 and are rotatablely connected by movable block and support rod 2, dismantle case 1 Bottom through there is a telescopic block 3, the bottom of telescopic block 3 and the top of movable block are by turntable rotation connection, and in telescopic block 3 The bottom of chamber is fixedly connected with the first spring 4, and the top of the first spring 4 is fixedly connected with connecting rod 5, and connecting rod 5 is far from first One end of spring 4 runs through telescopic block 3 and extends to the top of telescopic block 3, and the two sides that telescopic block 3 extends to disassembly 1 inner cavity of case are equal It is fixedly connected with kelly 6, the bottom of kelly 6 is fixedly connected with fixture block 7, and the surface of disassembly 1 bottom of case offers and 3 phase of telescopic block The circular groove 8 being used cooperatively, and the two sides of circular groove 8 offer the arc groove 9 being used in combination with kelly 6, dismantle 1 bottom of case Surface and be located at the side of arc groove 9 and offer the card slot 10 being used in combination with fixture block 7, and dismantle the top of 1 inner cavity of case Portion is fixedly connected with fixed block 11, and the two sides of 11 bottom of fixed block are connected with motion bar 12, and motion bar 12 is far from fixed One end of block 11 is connected with pulley 13, and the basal sliding of pulley 13 is connected with fixed link 14, consolidates between two motion bars 12 Surely it is connected with second spring 15, the two sides of support rod 2 are fixedly connected to the first semi-circular plate 16, and the two of the first semi-circular plate 16 End is fixedly connected with the second semi-circular plate 18 for being matched therewith and using, the first semi-circular plate 16 and the second semi-circular plate 18 by screw 17 Keep integrated form climbing frame more stable, avoids worker that accident, the side and second of the first semi-circular plate 16 occurs when using climbing frame The side of semi-circular plate 18 is fixedly connected to telescopic rod 19, and telescopic rod 19 is far from the first semi-circular plate 16 and the second semi-circular plate 18 One end be fixedly connected with fixed arc plate 20, the surface of telescopic rod 19 and be located at the first semi-circular plate 16 and the second semi-circular plate 18 with Fastening spring 21 is fixedly connected between the side of fixed arc plate 20, activity connects between the inside of two fixed arc plates 20 It is connected to support column 22.
When work, user is pressed down against disassembly case 1, then dismantles case 1 and moves downward, connecting rod 5 is moved downward and squeezed Press the first spring 4, be that object of reference telescopic block 3 moves upwards to dismantle case 1, however kelly 6 moves upwards, fixture block 7 also therewith to Upper movement, fixture block 7 come out out of card slot 10, at this moment rotate telescopic block 3, when arc groove 9 turns to fixture block 7 by 3 pine of telescopic block It opens, such fixture block 7 comes out from arc groove 9, and then dismantles case 1 and move upwards, and at this moment telescopic block 3 and disassembly case 1 separate, thus The purpose of disassembly is played, otherwise operation can be by disassembly case 1 and the combination installation of telescopic block 3, and user can justify fixed 20 sets of the arc plate surfaces in support column 22, then reinforce screw 17, and screw 17 can be by the first semi-circular plate 16 and the second half after reinforcing Plectane 18 is fixed, and support column 22 can squeeze fixed arc plate 20 in fixation procedure, and then squeeze telescopic rod 19, then Fastening spring 21 can deformation occurs generates elastic force, thus can preferably be fixed to fixed arc plate 20.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of integrated form climbing frame, including disassembly case (1) and support rod (2), it is characterised in that: the bottom of disassembly case (1) Through having telescopic block (3), and the bottom of telescopic block (3) inner cavity is fixedly connected with the first spring (4), first spring (4) Top be fixedly connected with connecting rod (5), the one end of the connecting rod (5) far from the first spring (4) is through telescopic block (3) and prolonging The top of telescopic block (3) is extended to, the two sides that the telescopic block (3) extends to disassembly case (1) inner cavity are fixedly connected to kelly (6), the bottom of the kelly (6) is fixedly connected with fixture block (7), and the surface of described disassembly case (1) bottom offers and telescopic block (3) circular groove (8) being used in combination, and the two sides of circular groove (8) offer the arc groove being used in combination with kelly (6) (9), the surface of described disassembly case (1) bottom and it is located at the side of arc groove (9) and offers the card being used in combination with fixture block (7) Slot (10), and dismantle and be fixedly connected with fixed block (11) at the top of case (1) inner cavity.
2. a kind of integrated form climbing frame according to claim 1, it is characterised in that: the two sides of fixed block (11) bottom are equal It is connected with motion bar (12), the motion bar (12) is connected with pulley (13) far from the one end of fixed block (11).
3. a kind of integrated form climbing frame according to claim 2, it is characterised in that: the basal sliding of the pulley (13) connects Have fixed link (14), is fixedly connected with second spring (15) between described two motion bars (12).
4. a kind of integrated form climbing frame according to claim 1, it is characterised in that: the two sides of the support rod (2) are fixed It is connected with the first semi-circular plate (16), and the both ends of the first semi-circular plate (16) are fixedly connected with by screw (17) and are matched therewith The second semi-circular plate (18) used.
5. a kind of integrated form climbing frame according to claim 4, it is characterised in that: the side of first semi-circular plate (16) and The side of second semi-circular plate (18) is fixedly connected to telescopic rod (19), and telescopic rod (19) far from the first semi-circular plate (16) and One end of second semi-circular plate (18) is fixedly connected with fixed arc plate (20).
6. a kind of integrated form climbing frame according to claim 5, it is characterised in that: the surface of the telescopic rod (19) and be located at Fastening spring is fixedly connected between first semi-circular plate (16) and the second semi-circular plate (18) and the side of fixed arc plate (20) (21), support column (22) are connected between the inside of two fixed arc plates (20).
CN201821276544.0U 2018-08-09 2018-08-09 A kind of integrated form climbing frame Expired - Fee Related CN208844913U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821276544.0U CN208844913U (en) 2018-08-09 2018-08-09 A kind of integrated form climbing frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821276544.0U CN208844913U (en) 2018-08-09 2018-08-09 A kind of integrated form climbing frame

Publications (1)

Publication Number Publication Date
CN208844913U true CN208844913U (en) 2019-05-10

Family

ID=66353686

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821276544.0U Expired - Fee Related CN208844913U (en) 2018-08-09 2018-08-09 A kind of integrated form climbing frame

Country Status (1)

Country Link
CN (1) CN208844913U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111258388A (en) * 2020-01-20 2020-06-09 北京韬盛科技发展有限公司 Intelligent main control box special for climbing frame

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111258388A (en) * 2020-01-20 2020-06-09 北京韬盛科技发展有限公司 Intelligent main control box special for climbing frame
CN111258388B (en) * 2020-01-20 2021-03-30 北京韬盛科技发展有限公司 Intelligent main control box special for climbing frame

Similar Documents

Publication Publication Date Title
CN209272188U (en) A kind of bending machine of easy-unloading
CN206753001U (en) A kind of scaffold of moveable belt track
CN211600148U (en) Green construction monitoring device convenient to installation
CN208844913U (en) A kind of integrated form climbing frame
CN208454342U (en) A kind of safety of tower crane platform and standard knot install conjoined device
CN209082970U (en) A kind of climbing frame platform board
CN209468994U (en) A kind of scaffold connecting structure for building
CN209082697U (en) A kind of large-scale disjunctor steel construction that shock resistance is strong
CN208534317U (en) A kind of aluminum alloy slide window with shock-absorbing function
CN209429513U (en) A kind of building structure strengthening attachment device
CN208363574U (en) A kind of convenient clamping type climbing frame limit safety lock
CN207177339U (en) A kind of easy-disassembling-assembling Construction of Civil Engineering Support bracket
CN208788385U (en) A kind of positioning fixture in reinforcing bar smelting process
CN208415105U (en) A kind of highly-safe hanging basket of bridge
CN209163517U (en) A kind of easy to operate civil construction support frame
CN207440624U (en) A kind of explosiveproof isolation formula guard grating convenient for adjusting height
CN208137825U (en) A kind of construction site protective door being easily installed
CN208236767U (en) A kind of improved front guard plate for centrifugal slurry pump
CN208598536U (en) A kind of medical hoist tower being easily installed
CN215165486U (en) Hydraulic engineering foundation pile
CN109323220A (en) A kind of large size pendent lamp assembling installation equipment
CN220811554U (en) Hoisting mechanism for water conservancy construction
CN209323391U (en) A kind of underground engineering concrete support beam
CN209716303U (en) A kind of building bar apparatus for bending
CN208105814U (en) Construction scaffold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190510

Termination date: 20210809

CF01 Termination of patent right due to non-payment of annual fee