CN206624612U - A kind of construction high-altitude hanging basket - Google Patents

A kind of construction high-altitude hanging basket Download PDF

Info

Publication number
CN206624612U
CN206624612U CN201720294830.9U CN201720294830U CN206624612U CN 206624612 U CN206624612 U CN 206624612U CN 201720294830 U CN201720294830 U CN 201720294830U CN 206624612 U CN206624612 U CN 206624612U
Authority
CN
China
Prior art keywords
hanging basket
shadoof
bottom plate
fixed
spring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720294830.9U
Other languages
Chinese (zh)
Inventor
胡伟良
余中明
陈�峰
胡怡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CONSTRUCTION GROUP Co Ltd
Original Assignee
CONSTRUCTION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CONSTRUCTION GROUP Co Ltd filed Critical CONSTRUCTION GROUP Co Ltd
Priority to CN201720294830.9U priority Critical patent/CN206624612U/en
Application granted granted Critical
Publication of CN206624612U publication Critical patent/CN206624612U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Purses, Travelling Bags, Baskets, Or Suitcases (AREA)

Abstract

The utility model discloses a kind of construction high-altitude hanging basket, including bottom plate, sidebar, pull bar, shadoof, bearing, instrument cases, spring and buffer board, the relative both sides of the bottom plate are fixed with the sidebar being vertically arranged, multiple pull bars for being fixedly connected with two sidebars are correspondingly provided between the both sides of described two sidebars, the upper part of the pull bar of the topmost is fixed with shadoof, the bottom of the shadoof is fixed with bearing, the opposite side of described two sidebars is correspondingly provided with instrument cases, the bottom of the bottom plate is balanced to be provided with multiple springs being vertically arranged, the lower end of the spring is connected with buffer board, compared with prior art, the security of high-altitude hanging basket can be strengthened, enrich the function of high-altitude hanging basket, brought great convenience for construction.

Description

A kind of construction high-altitude hanging basket
【Technical field】
Technical field of building construction is the utility model is related to, particularly a kind of construction high-altitude hanging basket.
【Background technology】
Substantial amounts of high-altitude installation and repairing operation be present in engineering construction scene, with cradling it is time saving, save work(, save expense, and Conveniently moving, it is safe to use, labor strength is significantly reduced, improves construction speed, existing high-altitude hanging basket and lifting rope All it is fixedly connected, so causes that the frictional force of lifting rope and high-altitude hanging basket is very big, and lifting rope easily breaks over time, therefore exists Very big potential safety hazard, in addition, the bottom of existing high-altitude hanging basket is all hard, when high-altitude hanging basket is encountered in the engineering of decline Violent shake can occur for barrier, and existing high-altitude barrel structure is simple, and function is single, and the instrument that worker uses all is direct It is placed on bottom plate, fetches very inconvenient.
【Utility model content】
The purpose of this utility model is exactly to solve the problems of the prior art, proposes a kind of construction high-altitude hanging basket, The security of high-altitude hanging basket can be strengthened, the function of high-altitude hanging basket is enriched, brought great convenience for construction.
To achieve the above object, the utility model proposes a kind of construction high-altitude hanging basket, including bottom plate, sidebar, Pull bar, shadoof, bearing, instrument cases, spring and buffer board, the relative both sides of the bottom plate are fixed with the side being vertically arranged Column, multiple pull bars for being fixedly connected with two sidebars, the drawing of the topmost are correspondingly provided between the both sides of described two sidebars The upper part of bar is fixed with shadoof, and the bottom of the shadoof is fixed with bearing, and the opposite side of described two sidebars is correspondingly set There are instrument cases, the bottom of the bottom plate is balanced to be provided with multiple springs being vertically arranged, and the lower end of the spring is connected with buffer board.
Preferably, the sidebar includes two columns and several are connected to connecting rod between two columns, the work Tool box is fixedly connected with connecting rod, and the bottom for the framework that four columns are surrounded is fixed with breast board, the breast board for one week Bottom and the closed connection of bottom plate.
Preferably, the shadoof designs in inverted " v ", the bearing fixes the inner side for the lower angle for being located at shadoof and axle Hold and be generally aligned in the same plane with shadoof.
Preferably, the quantity of the spring is the bottom of 4 and balanced four angles for being arranged in bottom plate, the spring Both ends to be fixedly connected.
The beneficial effects of the utility model:The utility model is fixed with by the relative both sides in bottom plate and is vertically arranged Sidebar, multiple pull bars for being fixedly connected with two sidebars are correspondingly provided between the both sides of two sidebars, in the drawing of topmost The upper part of bar is fixed with shadoof, and bearing is fixed with the bottom of shadoof, and work is correspondingly provided with the opposite side of two sidebars Has box, equilibrium is provided with multiple springs being vertically arranged in the bottom of bottom plate, buffer board is connected with the lower end of spring, due to carrying Bar is provided with bearing, and lifting rope directly can be connected with bearing, reduces frictional force between lifting rope and high-altitude hanging basket, and worker uses Instrument can be placed directly in instrument cases, conveniently fetch, the working material of worker is placed directly on bottom plate to be blocked by breast board It is not easy to drop, has effectively prevented the danger of falling object from high altitude, when barrier is encountered in its bottom to hanging basket in the engineering of decline, buffering Plate can take the lead in encountering barrier, and spring can compress, and can reduce impulsive force when high-altitude hanging basket encounters barrier, improve hanging basket Security, compared with prior art, the security of high-altitude hanging basket can be strengthened, enrich the function of high-altitude hanging basket, for building Construction brings great convenience.
Feature and advantage of the present utility model will be described in detail by embodiment combination accompanying drawing.
【Brief description of the drawings】
Fig. 1 is a kind of structural representation of construction high-altitude hanging basket of the utility model.
Fig. 2 is a kind of structural side view of construction high-altitude hanging basket of the utility model.
In figure:1- bottom plates, 2- sidebars, 21- columns, 22- connecting rods, 3- pull bars, 4- shadoofs, 5- bearings, 6- instrument cases, 7- bullets Spring, 8- buffer boards, 9- breast boards.
【Embodiment】
Refering to Fig. 1 and 2, a kind of the utility model construction high-altitude hanging basket, including bottom plate 1, sidebar 2, pull bar 3, carry Bar 4, bearing 5, instrument cases 6, spring 7 and buffer board 8, the relative both sides of the bottom plate 1 are fixed with the sidebar being vertically arranged 2, multiple pull bars 3 for being fixedly connected with two sidebars 2 are correspondingly provided between the both sides of described two sidebars 2, the topmost The upper part of pull bar 3 is fixed with shadoof 4, and the bottom of the shadoof 4 is fixed with bearing 5, the opposite side of described two sidebars 2 Instrument cases 6 are correspondingly provided with, the bottom of the bottom plate 1 is balanced to be provided with multiple springs 7 being vertically arranged, and the lower end of the spring 7 connects It is connected to buffer board 8, the sidebar 2 includes two columns 21 and several are connected to connecting rod 22 between two columns 21, described Instrument cases 6 are fixedly connected with connecting rod 22, and the bottom for the framework that four columns 21 are surrounded is fixed with breast board 9 in one week, The bottom of the breast board 9 and 1 closed connection of bottom plate, the shadoof 4 design in inverted " v ", and the bearing 5 is fixed and is located at shadoof The inner side of 4 lower angle and bearing 5 is generally aligned in the same plane with shadoof 4, the quantity of the spring 7 is 4 and balanced is arranged in The bottom at four angles of bottom plate 1, the both ends of the spring 7 are to be fixedly connected.
Utility model works process:
A kind of construction of the utility model with high-altitude hanging basket in the course of the work, due to being provided with bearing 5 on shadoof 4, Lifting rope directly can be connected with bearing 5, reduce frictional force between lifting rope and high-altitude hanging basket, and the instrument that worker uses can be straight Connecing and be placed in instrument cases 6, conveniently fetch, the working material of worker is placed directly on bottom plate 1 to be blocked by breast board 9 and is not easy to drop, The danger of falling object from high altitude is effectively prevented, when barrier is encountered in its bottom to hanging basket in the engineering of decline, buffer board 8 can take the lead in Encounter barrier, spring 7 can compress, and can reduce impulsive force when high-altitude hanging basket encounters barrier, improve the safety of hanging basket Property, compared with prior art, the security of high-altitude hanging basket can be strengthened, enrich the function of high-altitude hanging basket, be construction band Very big facility is carried out.
Above-described embodiment be to explanation of the present utility model, be not to restriction of the present utility model, it is any new to this practicality Scheme after type simple transformation belongs to the scope of protection of the utility model.

Claims (4)

  1. A kind of 1. construction high-altitude hanging basket, it is characterised in that:Including bottom plate (1), sidebar (2), pull bar (3), shadoof (4), Bearing (5), instrument cases (6), spring (7) and buffer board (8), the relative both sides of the bottom plate (1), which are fixed with, to be vertically arranged Sidebar (2), be correspondingly provided with multiple pull bars for being fixedly connected with two sidebars (2) between the both sides of described two sidebars (2) (3), the upper part of the pull bar (3) of the topmost is fixed with shadoof (4), and the bottom of the shadoof (4) is fixed with bearing (5), the opposite side of described two sidebars (2) is correspondingly provided with instrument cases (6), and the bottom of the bottom plate (1) is balanced to be provided with multiple erect The spring (7) directly set, the lower end of the spring (7) are connected with buffer board (8).
  2. A kind of 2. construction high-altitude hanging basket as claimed in claim 1, it is characterised in that:The sidebar (2) includes two Column (21) and several be connected to connecting rod (22) between two columns (21), the instrument cases (6) are fixed with connecting rod (22) Connection, the bottom for the framework that four columns (21) are surrounded are fixed with breast board (9) for one week, under the breast board (9) Portion and bottom plate (1) closed connection.
  3. A kind of 3. construction high-altitude hanging basket as claimed in claim 1, it is characterised in that:The shadoof (4) is in inverted " v " Design, the bearing (5) fixes the inner side for the lower angle for being located at shadoof (4) and bearing (5) is generally aligned in the same plane with shadoof (4).
  4. A kind of 4. construction high-altitude hanging basket as claimed any one in claims 1 to 3, it is characterised in that:
    The quantity of the spring (7) is the bottom of 4 and balanced four angles for being arranged in bottom plate (1), the two of the spring (7) Hold to be fixedly connected.
CN201720294830.9U 2017-03-24 2017-03-24 A kind of construction high-altitude hanging basket Active CN206624612U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720294830.9U CN206624612U (en) 2017-03-24 2017-03-24 A kind of construction high-altitude hanging basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720294830.9U CN206624612U (en) 2017-03-24 2017-03-24 A kind of construction high-altitude hanging basket

Publications (1)

Publication Number Publication Date
CN206624612U true CN206624612U (en) 2017-11-10

Family

ID=60209950

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720294830.9U Active CN206624612U (en) 2017-03-24 2017-03-24 A kind of construction high-altitude hanging basket

Country Status (1)

Country Link
CN (1) CN206624612U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108726447A (en) * 2018-04-23 2018-11-02 连超强 A kind of adhesion type lifting highrise operation device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108726447A (en) * 2018-04-23 2018-11-02 连超强 A kind of adhesion type lifting highrise operation device

Similar Documents

Publication Publication Date Title
CN207920039U (en) A kind of building hanging basket with buffer protection function
CN206624612U (en) A kind of construction high-altitude hanging basket
CN209626903U (en) A kind of combined type convex heavy punch piece
CN209193068U (en) A kind of transport frame for glass sheets used for glass processing with safeguard function
CN207228326U (en) A kind of strong antidetonation formed steel construction
CN207405974U (en) Construction hanging basket
CN206408535U (en) A kind of protecting collision-prevention wall device of convenient transfer
CN204609259U (en) A kind of traveling stage
CN204199535U (en) Can the log cabin trusses of effective load-bearing
CN209620608U (en) A kind of assemble type overhanging unloading platform for building
CN207003985U (en) A kind of Architectural Equipment hanging basket being moved easily
CN202953755U (en) Novel anti-climbing safety device for tower crane
CN204386631U (en) A kind of Portable protective net
CN208119692U (en) A kind of multi-functional bar precast shear wall support frame
CN207017506U (en) A kind of building glass cladding glass installation fixing device
CN205571556U (en) Plate shearing machine concertina type material feeding unit
CN204252818U (en) A kind of rope ladder ground fixer with anti-thorn
CN206903567U (en) A kind of electric power overhaul engineering frame
CN206957253U (en) A kind of alloy safety net
CN206122390U (en) A supplementary wheelset for wire rod receive and releases
CN205116767U (en) Safety device for construction
CN204979517U (en) Remove packing frame
CN213950323U (en) Railway freight container lifting appliance
CN211849943U (en) High altitude vestibule construction platform
CN204454195U (en) A kind of hanging basket

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant