CN207314485U - A kind of loessial gulch area bridge lower part drainage system - Google Patents
A kind of loessial gulch area bridge lower part drainage system Download PDFInfo
- Publication number
- CN207314485U CN207314485U CN201721211336.8U CN201721211336U CN207314485U CN 207314485 U CN207314485 U CN 207314485U CN 201721211336 U CN201721211336 U CN 201721211336U CN 207314485 U CN207314485 U CN 207314485U
- Authority
- CN
- China
- Prior art keywords
- loaded filter
- gutter
- drainage system
- cobble
- concrete cushion
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model belongs to bridge maintenance technical field of construction, it particularly relates to arrive a kind of loessial gulch area bridge lower part drainage system.Including gutter, concrete cushion, flexible porous tube, cobble loaded filter, coarse sand loaded filter and diversion pipe.Build gutter on concrete cushion by laying bricks or stones;On concrete cushion flexible porous tube is laid with along gutter;Cobble loaded filter is set on flexible porous tube;Diversion pipe is buried in the cobble loaded filter altitude range of gutter both sides;It is coarse sand loaded filter on cobble loaded filter;On coarse sand loaded filter loess is tamped for top layer.Compared with prior art, drainage system operation in bridge lower part described in the utility model is reliable, prevents bridge substructure from washing away damaged or destroyed by flood, and whole system construction is quick, and durability is good, ensures bridge substructure safety.
Description
Technical field
The utility model belongs to bridge maintenance technical field of construction, it particularly relates to arrive a kind of loessial gulch area bridge
Lower part drainage system.
Background technology
The Bridges in Mountainous Areas of standard span is used in Hinterland of Huangtu Plateau, due to the steep ditch depth in loessial gulch area slope, its underpart
Following characteristics are often presented in structure:Bridge pier is laid along side slope height, changes the equilibrium condition of original stability of slope, bridge pier platform
Side slope is the even high steep slope in high abrupt slope;Soil erosion or pile foundation ground avalanche nearby cause effective length insufficient;Operation phase bridge
Pile foundation soft rock-soil nearby is easily washed away in face central drainage.
Such as heavy showers, at the highway central drainage and bridge pier under directly the washing away of spilled water hole rainwater, the draining of bridge lower part
The ditch periphery soil body is easily peeled off, collapsed.Direct impact failure is caused to substructure, serious peace is brought to bridge substructure
Full hidden danger.
The content of the invention
In order to solve the above technical problems, the utility model provides a kind of loessial gulch area bridge lower part drainage system, can fit
For ensuring the normal operation and structure safety of bridge substructure.
Loessial gulch area bridge substructure drainage system described in the utility model, the drainage system include gutter
1st, basic unit 2, concrete cushion 3, flexible porous tube 4, cobble loaded filter 5, coarse sand loaded filter 6, surface layer loess 7, diversion pipe 8;Institute
State and be equipped with surface layer loess 7, coarse sand loaded filter 6, cobble loaded filter 5 and concrete outside the two side in gutter 1 successively from top to bottom
Bed course 3;The part intersection of the cobble loaded filter 5 and concrete cushion 3 is equipped with flexible porous tube 4 along the longitudinal direction of gutter 1;
The concrete cushion 3 also extends the underface in gutter 1, and on basic unit 2;1 two side of gutter is in ovum
Diversion pipe 8 is buried in 5 altitude range of stone loaded filter.
Loessial gulch area bridge substructure drainage system described in the utility model, the diversion pipe 8, which tilts, to be buried, low
End is located at 1 side of gutter.
When in use, can carry out in accordance with the following steps:1) compaction in layers basic unit loess;2) concrete is set on basic unit
Bed course;3) pulping line up the drain is started on concrete cushion;4) on concrete cushion flexible porous tube is longitudinally laid with along gutter;
5) cobble loaded filter is set on flexible porous tube, and in gutter both sides, the tilted embedded bilayer of cobble loaded filter altitude range is led
Flow tube;6) coarse sand loaded filter is laid with cobble loaded filter, the processing of coarse sand loaded filter is closely knit;7) top layer is covered on coarse sand loaded filter
Loess, surface layer loess compacting.
Compared with prior art, drainage system operation in bridge lower part described in the utility model is reliable, prevents bridge lower part
Structure washes away damaged or destroyed by flood, ensures bridge substructure safety, and whole system construction is quick, and late maintaining maintenance cost is low, economical
Rationally, durability is good.
Brief description of the drawings
Fig. 1:Loessial gulch area bridge lower part drainage system schematic diagram;1- gutters, 2- basic units, 3- concrete cushions, 4-
Flexible porous tube, 5- cobbles loaded filter, 6- coarse sands loaded filter, 7- surface layer loess, 8- diversion pipes.
Embodiment
Loessial gulch area bridge lower part described in the utility model drainage system is done with reference to specific embodiment into
One step illustrates, but the scope of protection of the utility model is not limited to this.
Embodiment 1
Loessial gulch area bridge substructure drainage system described in the utility model, the drainage system include gutter
1st, basic unit 2, concrete cushion 3, flexible porous tube 4, cobble loaded filter 5, coarse sand loaded filter 6, surface layer loess 7, diversion pipe 8;Institute
State and be equipped with surface layer loess 7, coarse sand loaded filter 6, cobble loaded filter 5 and concrete outside the two side in gutter 1 successively from top to bottom
Bed course 3;The part intersection of the cobble loaded filter 5 and concrete cushion 3 is equipped with flexible porous tube 4 along the longitudinal direction of gutter 1;
The concrete cushion 3 also extends the underface in gutter 1, and on basic unit 2;1 two side of gutter is in ovum
Diversion pipe 8 is buried in 5 altitude range of stone loaded filter.The diversion pipe 8, which tilts, to be buried, and low side is located at 1 side of gutter.
When in use, can carry out in accordance with the following steps:1) compaction in layers basic unit loess;2) concrete is set on basic unit
Bed course;3) pulping line up the drain is started on concrete cushion;4) on concrete cushion flexible porous tube is longitudinally laid with along gutter;
5) cobble loaded filter is set on flexible porous tube, and in gutter both sides, the tilted embedded bilayer of cobble loaded filter altitude range is led
Flow tube;6) coarse sand loaded filter is laid with cobble loaded filter, the processing of coarse sand loaded filter is closely knit;7) top layer is covered on coarse sand loaded filter
Loess, surface layer loess compacting.
Compared with prior art, drainage system operation in bridge lower part described in the utility model is reliable, prevents bridge lower part
Structure washes away damaged or destroyed by flood, ensures bridge substructure safety, and whole system construction is quick, and late maintaining maintenance cost is low, economical
Rationally, durability is good.
Claims (2)
1. a kind of loessial gulch area bridge substructure drainage system, it is characterised in that the drainage system includes gutter
(1), basic unit (2), concrete cushion (3), flexible porous tube (4), cobble loaded filter (5), coarse sand loaded filter (6), surface layer loess
(7), diversion pipe (8);It is equipped with surface layer loess (7), coarse sand loaded filter outside the two side of the gutter (1) successively from top to bottom
(6), cobble loaded filter (5) and concrete cushion (3);The cobble loaded filter (5) and the part intersection of concrete cushion (3)
Longitudinally flexible porous tube (4) is equipped with along gutter (1);The concrete cushion (3) also extend gutter (1) just under
Side, and on basic unit (2);Diversion pipe is buried in cobble loaded filter (5) altitude range in gutter (1) two side
(8)。
2. loessial gulch area bridge substructure drainage system according to claim 1, it is characterised in that the diversion pipe
(8) tilt and bury, low side is located at gutter (1) side.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721211336.8U CN207314485U (en) | 2017-09-20 | 2017-09-20 | A kind of loessial gulch area bridge lower part drainage system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721211336.8U CN207314485U (en) | 2017-09-20 | 2017-09-20 | A kind of loessial gulch area bridge lower part drainage system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207314485U true CN207314485U (en) | 2018-05-04 |
Family
ID=62383376
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721211336.8U Expired - Fee Related CN207314485U (en) | 2017-09-20 | 2017-09-20 | A kind of loessial gulch area bridge lower part drainage system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207314485U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109811612A (en) * | 2019-03-07 | 2019-05-28 | 中交第二航务工程局有限公司 | Coombe processing is faced forever in conjunction with sidewalk structure and its construction method |
-
2017
- 2017-09-20 CN CN201721211336.8U patent/CN207314485U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109811612A (en) * | 2019-03-07 | 2019-05-28 | 中交第二航务工程局有限公司 | Coombe processing is faced forever in conjunction with sidewalk structure and its construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109610435B (en) | Loess high fill valley foundation drainage structure and laying method thereof | |
CN109797769B (en) | Collapsible loess area underground comprehensive pipe gallery foundation structure and construction method thereof | |
CN110056000B (en) | Construction method and structure of counter weight type retaining wall | |
CN110306565B (en) | Road ecological slope protection system and construction method | |
CN103046565A (en) | Draining method for ultra-deep batholith deep foundation pit | |
CN203498721U (en) | Three-dimensional drainage roadbed structure preventing damage by water of road in cold region | |
CN102518052A (en) | Submerged flexible draining structure on road side slope | |
CN105200881A (en) | Construction method for comprehensive treatment structure for subgrade frost damage in high cold region | |
CN108222060A (en) | High-speed railway, highway pile foundation joist buttress type pallet subgrade support retainer structure | |
CN208981282U (en) | A kind of high earthquake territory concrete face rockfill dam dam crest structure | |
CN111648383A (en) | Internal drainage method for loess high-fill side slope | |
CN205134342U (en) | Large -tonnage list double -walled combines steel cofferdam | |
CN207314485U (en) | A kind of loessial gulch area bridge lower part drainage system | |
US20120269573A1 (en) | Systems and Methods for Diverting Sub-surface Water | |
CN207452609U (en) | A kind of hassock layer Foam lightweight soil road structure in deep soft foundation section | |
CN106192880B (en) | The box harbour of L-type and its method of construction | |
CN202194048U (en) | Pavement structure for joining part of new and old roads | |
CN105672364A (en) | Post-cast strip of basement floor | |
CN210529482U (en) | Bridge expansion joint drainage structures | |
CN103898824B (en) | The method that Cold And Frozen-soil Regions roadbed processes substrate with plastic draining board | |
CN212052626U (en) | Concrete panel rock-fill dam with multiple anti-seepage structure | |
CN210658236U (en) | Slag stacking structure | |
CN208072453U (en) | High-speed railway, highway pile foundation joist buttress type pallet subgrade support retainer structure | |
RU2516603C1 (en) | Road structure | |
CN208039146U (en) | A kind of Eco-hydrological connectivity structure for wetland both sides of the road shallow-layer water body |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180504 Termination date: 20180920 |
|
CF01 | Termination of patent right due to non-payment of annual fee |