CN208981282U - A kind of high earthquake territory concrete face rockfill dam dam crest structure - Google Patents

A kind of high earthquake territory concrete face rockfill dam dam crest structure Download PDF

Info

Publication number
CN208981282U
CN208981282U CN201821458918.0U CN201821458918U CN208981282U CN 208981282 U CN208981282 U CN 208981282U CN 201821458918 U CN201821458918 U CN 201821458918U CN 208981282 U CN208981282 U CN 208981282U
Authority
CN
China
Prior art keywords
dam
concrete
high earthquake
earthquake territory
face rockfill
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821458918.0U
Other languages
Chinese (zh)
Inventor
赵琳
黄维
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Huadong Engineering Corp Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN201821458918.0U priority Critical patent/CN208981282U/en
Application granted granted Critical
Publication of CN208981282U publication Critical patent/CN208981282U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a kind of high earthquake territory concrete face rockfill dam dam crest structures.High earthquake territory concrete face rockfill dam dam crest structure simple, easy for construction, securely and reliably that the purpose of the utility model is to provide a kind of structures, to ensure that panel adapts to destruction of the high earthquake territory Seismic Settlement to dam face slab leakage preventing structure to the maximum extent, keep leakage controllable, it is ensured that dam structure is stablized.The technical solution of the utility model is: a kind of high earthquake territory concrete face rockfill dam dam crest structure, it is characterized by: having dam body, armored concrete panel, downstream protection slope and dam crest road surface is respectively set in upstream face, downstream face and the top surface of dam body, bulwark that is upright, being higher by dam crest road surface is poured at the top of armored concrete panel, bulwark and armored concrete panel, which pour, builds up an entirety.The utility model is suitable for water power hydraulic engineering.

Description

A kind of high earthquake territory concrete face rockfill dam dam crest structure
Technical field
The utility model relates to a kind of high earthquake territory concrete face rockfill dam dam crest structures, are suitable for water power water conservancy work Journey.
Background technique
In recent years, concrete face rockfill dam is because it is with good stability against sliding, good osmotic stability, warp Ji, it is adaptable the advantages that and be widely used in water power hydraulic engineering.In high earthquake territory, concrete face rockfill dam is because of earthquake Destroyed stop-water seriously threatens dam safety operation between panel damage caused by enrockment settles, panel and bulwark.Therefore, high earthquake Area's concrete face rockfill dam dam crest structure designs superiority and inferiority, is related to the success or failure of engineering.
Summary of the invention
Technical problem to be solved by the utility model is: providing a kind of structure simple, easy for construction, safe and reliable highland Earthquake region concrete face rockfill dam dam crest structure, to ensure that panel adapts to high earthquake territory Seismic Settlement to big dam facing to the maximum extent The destruction of plate leakage preventing structure keeps leakage controllable, it is ensured that dam structure is stablized.
The technical scheme adopted by the utility model is a kind of high earthquake territory concrete face rockfill dam dam crest structure, Be characterized in that: have dam body, upstream face, downstream face and the top surface of dam body be respectively set armored concrete panel, downstream protection slope and Dam crest road surface, armored concrete panel top pour bulwark that is upright, being higher by dam crest road surface, bulwark and reinforced concrete Native panel, which pours, builds up an entirety.
The dam body has stockpile and is set in turn in the Transition Materials and bedding material of stockpile upstream side.
The armored concrete below the panel is equipped with one layer and rolls mortar.
The mortar that rolls is using low-grade rolled mortar, 5~8cm of thickness.
One layer of non-fine concrete bed course is equipped with below the downstream protection slope.
The non-fine concrete bed course thickness 10cm~30cm.
The downstream protection slope embeds cemented rock or cast in place concrete plate using cemented rock slope protection or concrete frame lattice beam.
High 1.2m~the 1.6m of the bulwark wall, wall thickness 0.4m~0.6m.
Sealing is equipped in the panel construction seam of the armored concrete panel, sealing extends to following 5cm at the top of bulwark ~10cm stops.
The beneficial effects of the utility model are: 1, the utility model armored concrete panel and bulwark are done it is integral, Avoiding structural joint sealing shake between high earthquake territory panel, bulwark and falling into destroy leads to dam body infiltration risk, improves seepage control of dam Reliability of structure, leakage are controllable;2, the utility model adds non-fine concrete bed course in dam downstream side, protects convenient for downstream side Slope construction, it is ensured that dam slope draining in downstream avoids dam material and is carried over, improves safety, the durability of engineering.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of embodiment.
Specific embodiment
As shown in Figure 1, the present embodiment is a kind of high earthquake territory concrete face rockfill dam dam crest structure, the Rockfill Dam With stockpile 5,5 upstream side of stockpile is successively arranged Transition Materials 4 and bedding material 3.Upstream face, downstream face and the top surface of dam body point Not She Zhi armored concrete panel 1, downstream protection slope 6 and dam crest road surface 8, pour at the top of armored concrete panel 1 be formed with it is upright , the bulwark 101 for being higher by dam crest road surface 8, bulwark 101 and armored concrete panel 1, which pour, builds up an overall structure.
One layer is equipped with below armored concrete panel 1 and rolls mortar 2, for repairing Po Gupo.Downstream protection slope 6 uses and grouts block Stone slope protection or concrete frame lattice beam embed the slope protections such as cemented rock or precast concrete block, enhance downstream dam slope stability, avoid Tumble stone.For convenient for the construction of downstream protection slope 6, it is ensured that one layer of non-fine concrete bed course Gu Po is added in draining below downstream protection slope 6 7。
The high earthquake territory concrete face rockfill dam dam crest structure role of the present embodiment is specific as follows:
A, armored concrete panel 1: armored concrete panel 1 executes existing national standards, and " concrete face rockfill dam is set Meter specification " (DL/T 5016) related panel construction design relevant regulations.It is made into upright wall at the top of panel, the high 1.2m~1.6m of wall, Wall thickness 0.4m~0.6m also serves as bulwark 101, and practice of construction wall top is contemplated that beautification of landscape designs.It is set only in panel construction seam Water, sealing, which extends to following 5cm~10cm at the top of bulwark, to be stopped.For convenient for construction, it is ensured that structure safety, highly resistance earthquake region slope Plate top thickness preferably takes 0.4m thick, is constructed using landslide;The upright bulwark in top uses formwork erection cast-in-place construction.
B, it rolls mortar 2: using low-grade rolled mortar Gu Po, 5~8cm of thickness.
C, it bedding material 3: executes existing national standards " concrete face rockfill dam design specification " (DL/T5016).
D, it Transition Materials 4: executes existing national standards " concrete face rockfill dam design specification " (DL/T5016).
E, it stockpile 5: executes existing national standards " concrete face rockfill dam design specification " (DL/T5016);According to work Journey material source feature, adaptation to local conditions carry out dam body enrockment zoning design;Thin layer rolls, and improves dam rockfill anti-seismic performance.
F, downstream protection slope 6: highly resistance earthquake region dam downstream protection slope preferably uses cemented rock to design, or uses concrete frame lattice beam The embedded forms such as cemented rock or cast in place concrete plate;Suitably slow down downstream level-one dam slope, permanent deformation, which is limited in, to be connect By in the range of.
G, non-fine concrete bed course 7: adding one layer of non-fine concrete bed course Gu Po below downstream protection slope 6, and bed course is thick 10cm~30cm constructs convenient for downstream protection slope, it is ensured that draining.
H, dam crest road surface 8: face dam width at dam crest generally by the height on dam, dam crest structure, flood prevention management, traffic require and The combined factors such as construction site requirement determine.High earthquake territory, width at dam crest should be designed not less than 10m;Dam crest road surface is proposed with Asphalt concrete pavement, the wear-resisting not fugitive dust of damping noise reduction;According to requirement of engineering, the affiliated facilities such as dam crest cable duct, street lamp are added.

Claims (9)

1. a kind of high earthquake territory concrete face rockfill dam dam crest structure, it is characterised in that: have dam body, the upstream face of dam body, Armored concrete panel (1), downstream protection slope (6) and dam crest road surface (8), armored concrete panel is respectively set in downstream face and top surface (1) top pours bulwark (101) that is upright, being higher by dam crest road surface (8), bulwark (101) and armored concrete panel (1) it pours and builds up an entirety.
2. high earthquake territory concrete face rockfill dam dam crest structure according to claim 1, it is characterised in that: the dam body With stockpile (5) and it is set in turn in the Transition Materials (4) and bedding material (3) of stockpile (5) upstream side.
3. high earthquake territory concrete face rockfill dam dam crest structure according to claim 1 or 2, it is characterised in that: described One layer, which is equipped with, below armored concrete panel (1) rolls mortar (2).
4. high earthquake territory concrete face rockfill dam dam crest structure according to claim 3, it is characterised in that: described to roll Mortar (2) uses low-grade rolled mortar, 5~8cm of thickness.
5. high earthquake territory concrete face rockfill dam dam crest structure according to claim 1 or 2, it is characterised in that: described One layer of non-fine concrete bed course (7) is equipped with below downstream protection slope (6).
6. high earthquake territory concrete face rockfill dam dam crest structure according to claim 5, it is characterised in that: the no sand Concrete cushion (7) thickness 10cm~30cm.
7. high earthquake territory concrete face rockfill dam dam crest structure according to claim 1, it is characterised in that: the downstream Slope protection (6) embeds cemented rock or cast in place concrete plate using cemented rock slope protection or concrete frame lattice beam.
8. high earthquake territory concrete face rockfill dam dam crest structure according to claim 1, it is characterised in that: the wave resistance High 1.2m~the 1.6m of wall (101) wall, wall thickness 0.4m~0.6m.
9. high earthquake territory concrete face rockfill dam dam crest structure according to claim 1, it is characterised in that: the reinforcing bar Sealing is equipped in the panel construction seam of concrete slab (1), sealing, which extends to following 5cm~10cm at the top of bulwark (101), to be stopped.
CN201821458918.0U 2018-09-06 2018-09-06 A kind of high earthquake territory concrete face rockfill dam dam crest structure Active CN208981282U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821458918.0U CN208981282U (en) 2018-09-06 2018-09-06 A kind of high earthquake territory concrete face rockfill dam dam crest structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821458918.0U CN208981282U (en) 2018-09-06 2018-09-06 A kind of high earthquake territory concrete face rockfill dam dam crest structure

Publications (1)

Publication Number Publication Date
CN208981282U true CN208981282U (en) 2019-06-14

Family

ID=66783443

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821458918.0U Active CN208981282U (en) 2018-09-06 2018-09-06 A kind of high earthquake territory concrete face rockfill dam dam crest structure

Country Status (1)

Country Link
CN (1) CN208981282U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110396992A (en) * 2019-07-23 2019-11-01 中国电建集团贵阳勘测设计研究院有限公司 A kind of Face Slab of Concrete-faced Rockfill anti-crack construction technique
CN111350165A (en) * 2019-12-20 2020-06-30 湖北久树环境科技有限公司 Integrated special equipment for channel slope protection
CN113279374A (en) * 2021-05-20 2021-08-20 中国电建集团贵阳勘测设计研究院有限公司 Rockfill dam top earthquake-resistant wave-resistant structure and construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110396992A (en) * 2019-07-23 2019-11-01 中国电建集团贵阳勘测设计研究院有限公司 A kind of Face Slab of Concrete-faced Rockfill anti-crack construction technique
CN110396992B (en) * 2019-07-23 2024-03-19 中国电建集团贵阳勘测设计研究院有限公司 Concrete face rockfill dam face anti-cracking construction process
CN111350165A (en) * 2019-12-20 2020-06-30 湖北久树环境科技有限公司 Integrated special equipment for channel slope protection
CN113279374A (en) * 2021-05-20 2021-08-20 中国电建集团贵阳勘测设计研究院有限公司 Rockfill dam top earthquake-resistant wave-resistant structure and construction method

Similar Documents

Publication Publication Date Title
CN101298782B (en) Method and system for basement engineering water proof and water drain
CN208981282U (en) A kind of high earthquake territory concrete face rockfill dam dam crest structure
CN102434175A (en) Tunnel lining self waterproof drainage system
CN202483588U (en) Self water-proof drainage system of tunnel lining
CN108457249B (en) Structural design and construction method of composite panel gravel dam
CN104120686A (en) High elastic die cushion type composite dam
CN101294447A (en) Buildings pile underpinning method
CN105862662B (en) A kind of curl arched mole
CN107447731B (en) A kind of mixed dam and its construction method
CN206529660U (en) A kind of water proof road structure
CN202440766U (en) Water-drainage open cut tunnel aqueduct of road cut section
CN211080254U (en) Structure for increasing backfill height of existing high-fill tunnel
CN209456974U (en) A kind of articulated hinge concrete block system
CN106120662A (en) High-modulus rock-faced dam dam, a kind of local
CN207228173U (en) A kind of underground project waterproof structure
CN205530142U (en) Flood control antidetonation rock -fill dam
CN205875096U (en) Enrockment is from dam break
CN106120663B (en) A kind of concrete face rockfill dam
CN108547262A (en) Dam body for blocking mountain channel mountain torrents, mud-rock flow
CN211006302U (en) Stone arch bridge
CN209675907U (en) Structure is protected in the backfill of deep basal pit top high-voltage power pipeline
CN207228130U (en) A kind of city integrated piping lane foundation pit backfill processing combined system
CN208251016U (en) A kind of turnover plate type flood-control wall
CN207314485U (en) A kind of loessial gulch area bridge lower part drainage system
CN206667185U (en) Approach channel shore protection repairs structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant