- CN208981282U CN208981282U CN201821458918.0U CN201821458918U CN208981282U CN 208981282 U CN208981282 U CN 208981282U CN 201821458918 U CN201821458918 U CN 201821458918U CN 208981282 U CN208981282 U CN 208981282U
- Authority
- CN
- China
- Prior art keywords
- dam
- concrete
- high earthquake
- earthquake territory
- face rockfill
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model relates to a kind of high earthquake territory concrete face rockfill dam dam crest structures.High earthquake territory concrete face rockfill dam dam crest structure simple, easy for construction, securely and reliably that the purpose of the utility model is to provide a kind of structures, to ensure that panel adapts to destruction of the high earthquake territory Seismic Settlement to dam face slab leakage preventing structure to the maximum extent, keep leakage controllable, it is ensured that dam structure is stablized.The technical solution of the utility model is: a kind of high earthquake territory concrete face rockfill dam dam crest structure, it is characterized by: having dam body, armored concrete panel, downstream protection slope and dam crest road surface is respectively set in upstream face, downstream face and the top surface of dam body, bulwark that is upright, being higher by dam crest road surface is poured at the top of armored concrete panel, bulwark and armored concrete panel, which pour, builds up an entirety.The utility model is suitable for water power hydraulic engineering.
Description
Technical field
The utility model relates to a kind of high earthquake territory concrete face rockfill dam dam crest structures, are suitable for water power water conservancy work
Journey.
Background technique
In recent years, concrete face rockfill dam is because it is with good stability against sliding, good osmotic stability, warp
Ji, it is adaptable the advantages that and be widely used in water power hydraulic engineering.In high earthquake territory, concrete face rockfill dam is because of earthquake
Destroyed stop-water seriously threatens dam safety operation between panel damage caused by enrockment settles, panel and bulwark.Therefore, high earthquake
Area's concrete face rockfill dam dam crest structure designs superiority and inferiority, is related to the success or failure of engineering.
Summary of the invention
Technical problem to be solved by the utility model is: providing a kind of structure simple, easy for construction, safe and reliable highland
Earthquake region concrete face rockfill dam dam crest structure, to ensure that panel adapts to high earthquake territory Seismic Settlement to big dam facing to the maximum extent
The destruction of plate leakage preventing structure keeps leakage controllable, it is ensured that dam structure is stablized.
The technical scheme adopted by the utility model is a kind of high earthquake territory concrete face rockfill dam dam crest structure,
Be characterized in that: have dam body, upstream face, downstream face and the top surface of dam body be respectively set armored concrete panel, downstream protection slope and
Dam crest road surface, armored concrete panel top pour bulwark that is upright, being higher by dam crest road surface, bulwark and reinforced concrete
Native panel, which pours, builds up an entirety.
The dam body has stockpile and is set in turn in the Transition Materials and bedding material of stockpile upstream side.
The armored concrete below the panel is equipped with one layer and rolls mortar.
The mortar that rolls is using low-grade rolled mortar, 5~8cm of thickness.
One layer of non-fine concrete bed course is equipped with below the downstream protection slope.
The non-fine concrete bed course thickness 10cm~30cm.
The downstream protection slope embeds cemented rock or cast in place concrete plate using cemented rock slope protection or concrete frame lattice beam.
High 1.2m~the 1.6m of the bulwark wall, wall thickness 0.4m~0.6m.
Sealing is equipped in the panel construction seam of the armored concrete panel, sealing extends to following 5cm at the top of bulwark
~10cm stops.
The beneficial effects of the utility model are: 1, the utility model armored concrete panel and bulwark are done it is integral,
Avoiding structural joint sealing shake between high earthquake territory panel, bulwark and falling into destroy leads to dam body infiltration risk, improves seepage control of dam
Reliability of structure, leakage are controllable;2, the utility model adds non-fine concrete bed course in dam downstream side, protects convenient for downstream side
Slope construction, it is ensured that dam slope draining in downstream avoids dam material and is carried over, improves safety, the durability of engineering.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of embodiment.
Specific embodiment
As shown in Figure 1, the present embodiment is a kind of high earthquake territory concrete face rockfill dam dam crest structure, the Rockfill Dam
With stockpile 5,5 upstream side of stockpile is successively arranged Transition Materials 4 and bedding material 3.Upstream face, downstream face and the top surface of dam body point
Not She Zhi armored concrete panel 1, downstream protection slope 6 and dam crest road surface 8, pour at the top of armored concrete panel 1 be formed with it is upright
, the bulwark 101 for being higher by dam crest road surface 8, bulwark 101 and armored concrete panel 1, which pour, builds up an overall structure.
One layer is equipped with below armored concrete panel 1 and rolls mortar 2, for repairing Po Gupo.Downstream protection slope 6 uses and grouts block
Stone slope protection or concrete frame lattice beam embed the slope protections such as cemented rock or precast concrete block, enhance downstream dam slope stability, avoid
Tumble stone.For convenient for the construction of downstream protection slope 6, it is ensured that one layer of non-fine concrete bed course Gu Po is added in draining below downstream protection slope 6
7。
The high earthquake territory concrete face rockfill dam dam crest structure role of the present embodiment is specific as follows:
A, armored concrete panel 1: armored concrete panel 1 executes existing national standards, and " concrete face rockfill dam is set
Meter specification " (DL/T 5016) related panel construction design relevant regulations.It is made into upright wall at the top of panel, the high 1.2m~1.6m of wall,
Wall thickness 0.4m~0.6m also serves as bulwark 101, and practice of construction wall top is contemplated that beautification of landscape designs.It is set only in panel construction seam
Water, sealing, which extends to following 5cm~10cm at the top of bulwark, to be stopped.For convenient for construction, it is ensured that structure safety, highly resistance earthquake region slope
Plate top thickness preferably takes 0.4m thick, is constructed using landslide;The upright bulwark in top uses formwork erection cast-in-place construction.
B, it rolls mortar 2: using low-grade rolled mortar Gu Po, 5~8cm of thickness.
C, it bedding material 3: executes existing national standards " concrete face rockfill dam design specification " (DL/T5016).
D, it Transition Materials 4: executes existing national standards " concrete face rockfill dam design specification " (DL/T5016).
E, it stockpile 5: executes existing national standards " concrete face rockfill dam design specification " (DL/T5016);According to work
Journey material source feature, adaptation to local conditions carry out dam body enrockment zoning design;Thin layer rolls, and improves dam rockfill anti-seismic performance.
F, downstream protection slope 6: highly resistance earthquake region dam downstream protection slope preferably uses cemented rock to design, or uses concrete frame lattice beam
The embedded forms such as cemented rock or cast in place concrete plate;Suitably slow down downstream level-one dam slope, permanent deformation, which is limited in, to be connect
By in the range of.
G, non-fine concrete bed course 7: adding one layer of non-fine concrete bed course Gu Po below downstream protection slope 6, and bed course is thick
10cm~30cm constructs convenient for downstream protection slope, it is ensured that draining.
H, dam crest road surface 8: face dam width at dam crest generally by the height on dam, dam crest structure, flood prevention management, traffic require and
The combined factors such as construction site requirement determine.High earthquake territory, width at dam crest should be designed not less than 10m;Dam crest road surface is proposed with
Asphalt concrete pavement, the wear-resisting not fugitive dust of damping noise reduction;According to requirement of engineering, the affiliated facilities such as dam crest cable duct, street lamp are added.
Claims (9)
1. a kind of high earthquake territory concrete face rockfill dam dam crest structure, it is characterised in that: have dam body, the upstream face of dam body,
Armored concrete panel (1), downstream protection slope (6) and dam crest road surface (8), armored concrete panel is respectively set in downstream face and top surface
(1) top pours bulwark (101) that is upright, being higher by dam crest road surface (8), bulwark (101) and armored concrete panel
(1) it pours and builds up an entirety.
2. high earthquake territory concrete face rockfill dam dam crest structure according to claim 1, it is characterised in that: the dam body
With stockpile (5) and it is set in turn in the Transition Materials (4) and bedding material (3) of stockpile (5) upstream side.
3. high earthquake territory concrete face rockfill dam dam crest structure according to claim 1 or 2, it is characterised in that: described
One layer, which is equipped with, below armored concrete panel (1) rolls mortar (2).
4. high earthquake territory concrete face rockfill dam dam crest structure according to claim 3, it is characterised in that: described to roll
Mortar (2) uses low-grade rolled mortar, 5~8cm of thickness.
5. high earthquake territory concrete face rockfill dam dam crest structure according to claim 1 or 2, it is characterised in that: described
One layer of non-fine concrete bed course (7) is equipped with below downstream protection slope (6).
6. high earthquake territory concrete face rockfill dam dam crest structure according to claim 5, it is characterised in that: the no sand
Concrete cushion (7) thickness 10cm~30cm.
7. high earthquake territory concrete face rockfill dam dam crest structure according to claim 1, it is characterised in that: the downstream
Slope protection (6) embeds cemented rock or cast in place concrete plate using cemented rock slope protection or concrete frame lattice beam.
8. high earthquake territory concrete face rockfill dam dam crest structure according to claim 1, it is characterised in that: the wave resistance
High 1.2m~the 1.6m of wall (101) wall, wall thickness 0.4m~0.6m.
9. high earthquake territory concrete face rockfill dam dam crest structure according to claim 1, it is characterised in that: the reinforcing bar
Sealing is equipped in the panel construction seam of concrete slab (1), sealing, which extends to following 5cm~10cm at the top of bulwark (101), to be stopped.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821458918.0U CN208981282U (en) | 2018-09-06 | 2018-09-06 | A kind of high earthquake territory concrete face rockfill dam dam crest structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821458918.0U CN208981282U (en) | 2018-09-06 | 2018-09-06 | A kind of high earthquake territory concrete face rockfill dam dam crest structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208981282U true CN208981282U (en) | 2019-06-14 |
Family
ID=66783443
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821458918.0U Active CN208981282U (en) | 2018-09-06 | 2018-09-06 | A kind of high earthquake territory concrete face rockfill dam dam crest structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208981282U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110396992A (en) * | 2019-07-23 | 2019-11-01 | 中国电建集团贵阳勘测设计研究院有限公司 | A kind of Face Slab of Concrete-faced Rockfill anti-crack construction technique |
CN111350165A (en) * | 2019-12-20 | 2020-06-30 | 湖北久树环境科技有限公司 | Integrated special equipment for channel slope protection |
CN113279374A (en) * | 2021-05-20 | 2021-08-20 | 中国电建集团贵阳勘测设计研究院有限公司 | Rockfill dam top earthquake-resistant wave-resistant structure and construction method |
-
2018
- 2018-09-06 CN CN201821458918.0U patent/CN208981282U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110396992A (en) * | 2019-07-23 | 2019-11-01 | 中国电建集团贵阳勘测设计研究院有限公司 | A kind of Face Slab of Concrete-faced Rockfill anti-crack construction technique |
CN110396992B (en) * | 2019-07-23 | 2024-03-19 | 中国电建集团贵阳勘测设计研究院有限公司 | Concrete face rockfill dam face anti-cracking construction process |
CN111350165A (en) * | 2019-12-20 | 2020-06-30 | 湖北久树环境科技有限公司 | Integrated special equipment for channel slope protection |
CN113279374A (en) * | 2021-05-20 | 2021-08-20 | 中国电建集团贵阳勘测设计研究院有限公司 | Rockfill dam top earthquake-resistant wave-resistant structure and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101298782B (en) | Method and system for basement engineering water proof and water drain | |
CN208981282U (en) | A kind of high earthquake territory concrete face rockfill dam dam crest structure | |
CN102434175A (en) | Tunnel lining self waterproof drainage system | |
CN202483588U (en) | Self water-proof drainage system of tunnel lining | |
CN108457249B (en) | Structural design and construction method of composite panel gravel dam | |
CN104120686A (en) | High elastic die cushion type composite dam | |
CN101294447A (en) | Buildings pile underpinning method | |
CN105862662B (en) | A kind of curl arched mole | |
CN107447731B (en) | A kind of mixed dam and its construction method | |
CN206529660U (en) | A kind of water proof road structure | |
CN202440766U (en) | Water-drainage open cut tunnel aqueduct of road cut section | |
CN211080254U (en) | Structure for increasing backfill height of existing high-fill tunnel | |
CN209456974U (en) | A kind of articulated hinge concrete block system | |
CN106120662A (en) | High-modulus rock-faced dam dam, a kind of local | |
CN207228173U (en) | A kind of underground project waterproof structure | |
CN205530142U (en) | Flood control antidetonation rock -fill dam | |
CN205875096U (en) | Enrockment is from dam break | |
CN106120663B (en) | A kind of concrete face rockfill dam | |
CN108547262A (en) | Dam body for blocking mountain channel mountain torrents, mud-rock flow | |
CN211006302U (en) | Stone arch bridge | |
CN209675907U (en) | Structure is protected in the backfill of deep basal pit top high-voltage power pipeline | |
CN207228130U (en) | A kind of city integrated piping lane foundation pit backfill processing combined system | |
CN208251016U (en) | A kind of turnover plate type flood-control wall | |
CN207314485U (en) | A kind of loessial gulch area bridge lower part drainage system | |
CN206667185U (en) | Approach channel shore protection repairs structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |