CN208251016U - A kind of turnover plate type flood-control wall - Google Patents

A kind of turnover plate type flood-control wall Download PDF

Info

Publication number
CN208251016U
CN208251016U CN201820629967.XU CN201820629967U CN208251016U CN 208251016 U CN208251016 U CN 208251016U CN 201820629967 U CN201820629967 U CN 201820629967U CN 208251016 U CN208251016 U CN 208251016U
Authority
CN
China
Prior art keywords
wall
barricade
turnover
flood
turnover panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820629967.XU
Other languages
Chinese (zh)
Inventor
吴金龙
王军
穆方方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Water Engineering Design and Research Institute Co Ltd
Original Assignee
Shanghai Water Engineering Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Water Engineering Design and Research Institute Co Ltd filed Critical Shanghai Water Engineering Design and Research Institute Co Ltd
Priority to CN201820629967.XU priority Critical patent/CN208251016U/en
Application granted granted Critical
Publication of CN208251016U publication Critical patent/CN208251016U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

A kind of turnover plate type flood-control wall disclosed by the utility model, comprising: set the pile foundation at bank line;L-type Cantilever Retaining Wall, the L-type Cantilever Retaining Wall are made of the barricade bottom plate being arranged in the pile foundation and the barricade wall constructed on the barricade bottom plate;And several turnover panels being arranged side by side along bank line direction, the side of each turnover panel are rotatablely connected by the top of a torsion shaft and the barricade wall;When being in the flood passage period, each turnover panel is overturn to vertical state, so that several turnover panels constitute vertical type flood control barricade side by side and overturn each turnover panel to horizontality, when being in the non-flood passage period so that several turnover panels constitute a water balcony side by side.Also ecoscape performance is taken into account while the flood-control wall of the utility model has flood control function.

Description

A kind of turnover plate type flood-control wall
Technical field
The utility model relates to flood-control wall technical field more particularly to a kind of turnover plate type for taking into account flood control and water balcony are anti- Flood wall.
Background technique
Anti-flood wall refers to construction in the wall building for stopping flood to overflow of river two sides, and effect is made with dykes and dams With identical.Since city riverine one has traffic main artery, groups of building are intensive, sometimes because of the limitation of built engineering, or because city is advised The needs of development are drawn, or because native source is limited, had to using anti-flood wall, to reduce land occupation and remove.
Barricade is and to keep out uneven native load structures for supporting side slope soil stabilization.In development process, barricade Structural shape constantly develop optimization with the variation of function and demand, from the Gravity Retaining Wall of most original to simple and practical Cantilever Retaining Wall, counterfort wall, and the reinforced earth formula barricade for special geology operating condition etc..Currently used for water bodys such as river and lakes The barricade pattern of flood control bank section regulation is still based on gravity type, cantilevered.In recent years due to socio-economic development, the people are to ecology The construction demand of civilization further increases, and an important ring of the water landscape as Ecological Civilization Construction increasingly causes the weight of people Depending on.With ecology, environment, landscape require promotion, expedited the emergence of the innovation of barrier wall structure, successively occur with Prefabricated Concrete block, The ecoscape barrier wall structure as materials for wall such as Ecotypic Stone Mesh-box.
The extensive use of concrete technology has been greatly facilitated the development of hydraulic engineering technology, counterfort wall, cantilevered gear The modes such as wall, bolt-spary supports are come into being, these traditional bank patterns improve the stability of side slope, improve soil erosion, Significant facilitation is played in terms of protection environment.
Modern times, the contradiction between the development and flood control of Binjiang Regional City of bordering on the sea, promote flood control wall technology into one Walk perfect, common pattern has bricklaying gravity wall and two kinds of reinforced concrete wall.Weaker in foundation, bearing capacity is poor Soil property bank section or bank after environmental restrictions bank section, it is preferential to select cantilevered reinforced concrete wall.Part below anti-flood wall bottom surface Equal design thinking is used with conventional barricade, arc wave screen can be used to defend coastal waters stormy waves in ground above section, general river, River, loke shore section use stalk.
With the development of economy and society, people's living standard improves, making the life better, it is more urgent to get close to naturally serious hope.For Meets the needs of people get close to the water surface, fixed water balcony comes into being, and largely applies to Landscape River.And city Area, soil space resource is nervous, and fixed water balcony occupies water area, and people, water, the contradiction between space are more prominent.
Above-mentioned state-of-the-art shows that common anti-flood wall structural shape function is relatively single, and advantage focuses mostly in safety Property, construction convenience, ecoscape etc. in some terms, disadvantage is obvious, function integration is not high.In addition, existing anti- Big vast wall construction has not only obstructed the hydrophilic demand of people, but also has obstructed the sight of people, and ecological environment is poor.With urbanization Progress faster, land resource is in short supply, and people require increasingly to be promoted to living environment, it would be highly desirable to develop integrated multi-functional anti-of function Big vast wall construction.For this purpose, the applicant has carried out beneficial exploration and research, result of the above problems is had found, below will The technical solution to be introduced generates in this background.
Utility model content
Technical problem to be solved in the utility model: for existing anti-flood wall, that there are functions is relatively single, ecological The problems such as poor and a kind of turnover plate type flood-control wall for taking into account flood control and water balcony is provided.
The technical issues of the utility model is solved can be realized using following technical scheme:
A kind of turnover plate type flood-control wall, comprising:
Set the pile foundation at bank line;
L-type Cantilever Retaining Wall, the L-type Cantilever Retaining Wall is by the barricade bottom plate that is arranged in the pile foundation and constructs Barricade wall on the barricade bottom plate is constituted;And
The side of several turnover panels being arranged side by side along bank line direction, each turnover panel passes through a torsion shaft and the barricade wall The top of body is rotatablely connected;When being in the flood passage period, each turnover panel is overturn to vertical state, so that several turnover panels structure side by side Each turnover panel is overturn to horizontality, when being in the non-flood passage period so that several turnover panels are simultaneously at vertical type flood control barricade Row constitutes a water balcony.
In a preferred embodiment of the utility model, the wall crest elevation of the barricade wall flushed with status ground and Not less than average of normal water-levels, elevation of top surface of each overturning in overturning to vertical state is not less than elevation of setting up defences.
In a preferred embodiment of the utility model, a plain concrete is provided between the pile foundation and barricade bottom plate Bed course.
In a preferred embodiment of the utility model, the element concrete bed course with a thickness of 100mm.
In a preferred embodiment of the utility model, the L-type Cantilever Retaining Wall is that concrete strength grade is not less than C30 Reinforced concrete barricade.
In a preferred embodiment of the utility model, the width of the barricade bottom plate is not less than 0.7 times of earth-retaining height, Its thickness is not less than 400mm, and the thickness of the barricade wall is not less than 350mm.
In a preferred embodiment of the utility model, the top of the barricade wall is formed with turning over for an outwardly convex Plate rotation seat, the turnover panel are rotatably installed on the turnover panel rotation seat of the barricade wall by the torsion shaft.
In a preferred embodiment of the utility model, each turnover panel is steel turnover panel, and its thickness and intensity should expire Foot keeps out the horizontal water pressure generated when setting up defences high water level.
In a preferred embodiment of the utility model, carried out in the backwater lateral plates of each turnover panel it is anti-skidding processing and Its edge is fixedly installed railing.
In a preferred embodiment of the utility model, at the torsion shaft of each turnover panel and between two pieces of adjacent turnover panels Junction be provided with water sealing structure.
Due to using technical solution as above, the utility model has the beneficial effects that: the utility model is by keeping off Several turnover panels are arranged side by side in wall wall, when being in the flood passage period, each turnover panel are overturn to vertical state, so that several turn over Plate constitutes vertical type flood control barricade side by side and carries out water blocking, and when being in the non-flood passage period, each turnover panel is overturn to horizontal State, so that several turnover panels constitute a water balcony side by side, so that flood-control wall also takes into account ecology while having flood control function Landscape performance.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor Under, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is the section structure diagram of the utility model.
Specific embodiment
In order to be easy to understand the technical means, creative features, achievement of purpose, and effectiveness of the utility model, under Face combines and is specifically illustrating, and the utility model is further described.
Referring to Fig. 1, provided in figure be a kind of turnover plate type flood-control wall, including pile foundation 100, L-type Cantilever Retaining Wall 200 with And several turnover panels 300.
Pile foundation 100 is set at bank line.The optional pile-type of pile foundation 100 has precast reinforced concrete piles, bored concrete pile etc., Stake spacing, stake is long and embedded depth is determined by the factors such as earth-retaining height, geology after wall by stability Calculation.
L-type Cantilever Retaining Wall 200 is by the barricade bottom plate 210 that is arranged in pile foundation 100 and constructs in barricade bottom plate 210 On barricade wall 220 constitute, wherein the wall crest elevation of barricade wall 220 flushes with status ground and not less than the ordinary water that is averaged Position, considers according to degradation degree before wall, the anti-washing structures such as key-wall, slope protection can be arranged on the side near water of barricade wall 220.At this In embodiment, L-type Cantilever Retaining Wall 200 is the reinforced concrete barricade that concrete strength grade is not less than C30, the width of barricade bottom plate 210 Not less than 0.7 times earth-retaining height, thickness are not less than 400mm, and the thickness of barricade wall 220 is not less than 350mm.In barricade wall 220 top is formed with the turnover panel rotation seat 221 of an outwardly convex, and the horizontal plane width of turnover panel rotation seat 221 need to meet turnover panel 300 installation and service requirement.
Several turnover panels 300 are arranged side by side along bank line direction, and the side of each turnover panel 300 is installed by a torsion shaft 310 On the turnover panel rotation seat 221 of barricade wall 220.When being in the flood passage period, each turnover panel 300 is overturn to vertical state, The elevation of top surface of turnover panel 300 is not less than setting up defences elevation at this time so that several turnover panels 300 constitute side by side a vertical type control flood barricade into Row water blocking;When being in the non-flood passage period, each turnover panel 300 is overturn to horizontality, so that several turnover panels 300 are constituted side by side One water balcony.In the present embodiment, each turnover panel 300 is steel turnover panel, and its thickness and intensity should meet and keeps out height of setting up defences The horizontal water pressure generated when water level.Anti-skidding processing is carried out in the backwater lateral plates of each turnover panel 300 and is fixed in its edge It is provided with railing (not shown), is slipped tumble injury or overboard to prevent pedestrian.It is at the torsion shaft 310 of each turnover panel 300 and adjacent Two pieces of turnover panels 300 between junction be provided with water sealing structure (not shown), guarantee that barricade water-stagnating effect is good.
The work progress of the turnover plate type flood-control wall of the utility model is as follows:
1. cofferdam is filled: according to river own characteristic, barrage cofferdam or suitable river cofferdam can be used, by cofferdam and proposed gear River water is drained between wall water front, and drainage measure needs in place;
2. excavation of foundation pit: before excavation of foundation pit, answer lowering of watertable, make it below excavation face 0.5m to 1.0m hereinafter, by 1:1 gradient excavation face, the bottom surface elevation of stage excavation to barricade bottom plate 210;
3. basement process: if natural foundation bearing capacity, foundation stress than or barricade stability against sliding etc. be unsatisfactory for specification than It asks, basement process should be first carried out, wherein it is relatively conventional to set pile foundation;Cast in situs or prefabrication can be used in stake;According to dike Line arrangement and design pilespacing, using waterborne or land piling;
4. pouring L-type Cantilever Retaining Wall 200: the C15 element concrete bed course 400 of a thickness 100mm is poured first, for pile foundation Plinth should carry out broken pile processing to stake top by specification, and main reinforcement does flue, and shuttering pours barricade bottom plate 210 and barricade wall 220;Construction joint between barricade bottom plate 210 and barricade wall 220 should be reserved in 210 or more 300mm~500mm model of barricade bottom plate In enclosing, tang is stayed;
5. the back-filling in layers soil body: using undisturbed soil compaction in layers, being backfilled to the wall crest elevation of barricade wall 220;
6. installing turnover panel 300: turnover panel 300 is customized and is installed by producer, the land side (i.e. trestle operating condition surface layer) of turnover panel 300 Anti-skidding processing should be done, and railing is fixedly installed, is slipped tumble injury or overboard to prevent pedestrian;It is at the torsion shaft 310 of turnover panel 300 and adjacent Two pieces of turnover panels 300 between junction need to do measures of preventing water, guarantee that barricade operating condition wall water seal works well.
The basic principles and main features of the present invention and the advantages of the present invention have been shown and described above.Current row The technical staff of industry is described in above embodiments and description it should be appreciated that the present utility model is not limited to the above embodiments Only illustrate the principles of the present invention, on the premise of not departing from the spirit and scope of the utility model, the utility model is also It will have various changes and improvements, these various changes and improvements fall within the scope of the claimed invention.The utility model Claimed range is defined by the appending claims and its equivalent thereof.

Claims (10)

1. a kind of turnover plate type flood-control wall characterized by comprising
Set the pile foundation at bank line;
L-type Cantilever Retaining Wall, the L-type Cantilever Retaining Wall is by the barricade bottom plate that is arranged in the pile foundation and constructs in institute The barricade wall stated on barricade bottom plate is constituted;And
The side of several turnover panels being arranged side by side along bank line direction, each turnover panel passes through a torsion shaft and the barricade wall Top rotation connection;When being in the flood passage period, each turnover panel is overturn to vertical state, so that several turnover panels constitute one side by side Vertical type barricade of controlling flood overturns each turnover panel to horizontality when being in the non-flood passage period, so that several turnover panels structure side by side At a water balcony.
2. turnover plate type flood-control wall as described in claim 1, which is characterized in that the wall crest elevation of the barricade wall is with status Face flushes and not less than average of normal water-levels, and elevation of top surface of each overturning in overturning to vertical state is not less than elevation of setting up defences.
3. turnover plate type flood-control wall as described in claim 1, which is characterized in that be arranged between the pile foundation and barricade bottom plate There is a plain concrete bed course.
4. turnover plate type flood-control wall as claimed in claim 3, which is characterized in that the element concrete bed course with a thickness of 100mm.
5. turnover plate type flood-control wall as described in claim 1, which is characterized in that the L-type Cantilever Retaining Wall is concrete strength grade Reinforced concrete barricade not less than C30.
6. turnover plate type flood-control wall as claimed in claim 5, which is characterized in that the width of the barricade bottom plate is not less than 0.7 times Earth-retaining height, thickness are not less than 400mm, and the thickness of the barricade wall is not less than 350mm.
7. turnover plate type flood-control wall as described in claim 1, which is characterized in that the top of the barricade wall is formed with one outward The turnover panel rotation seat of protrusion, the turnover panel are rotatably installed on the turnover panel rotation seat of the barricade wall by the torsion shaft.
8. turnover plate type flood-control wall as claimed in claim 7, which is characterized in that each turnover panel be steel turnover panel, and its thickness and Intensity should meet the horizontal water pressure kept out and generated when setting up defences high water level.
9. turnover plate type flood-control wall as claimed in claim 8, which is characterized in that carried out in the backwater lateral plates of each turnover panel anti-skidding It handles and is fixedly installed railing in its edge.
10. turnover plate type flood-control wall as claimed in claim 9, which is characterized in that at the torsion shaft of each turnover panel and adjacent two Junction between block turnover panel is provided with water sealing structure.
CN201820629967.XU 2018-04-28 2018-04-28 A kind of turnover plate type flood-control wall Expired - Fee Related CN208251016U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820629967.XU CN208251016U (en) 2018-04-28 2018-04-28 A kind of turnover plate type flood-control wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820629967.XU CN208251016U (en) 2018-04-28 2018-04-28 A kind of turnover plate type flood-control wall

Publications (1)

Publication Number Publication Date
CN208251016U true CN208251016U (en) 2018-12-18

Family

ID=64634579

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820629967.XU Expired - Fee Related CN208251016U (en) 2018-04-28 2018-04-28 A kind of turnover plate type flood-control wall

Country Status (1)

Country Link
CN (1) CN208251016U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109811718A (en) * 2019-03-31 2019-05-28 李孝兵 A kind of movable bulwark

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109811718A (en) * 2019-03-31 2019-05-28 李孝兵 A kind of movable bulwark

Similar Documents

Publication Publication Date Title
US10138616B2 (en) Inverse construction method for deep, large and long pit assembling structure of suspension-type envelope enclosure
CN102535488B (en) Waterproof construction method for bottom plate of high-water-level basement
CN207760804U (en) A kind of Multi-functional economy dike structure
CN203213095U (en) Underground water supply and drainage building anti-floating structure
NO318657B1 (en) Procedure for the construction of an underground continuous wall
CN212477844U (en) Basement drainage decompression anti-floating structure
CN109577277A (en) A kind of wall-mounted drainage anchor rod barrier wall structure and its construction method
CN202865796U (en) Bank protection structure with reinforced concrete prefabricated slab piles
CN208251016U (en) A kind of turnover plate type flood-control wall
CN202440826U (en) Waterproof system for high-water level basement foundation slabs
CN209854656U (en) Dyke
CN217870559U (en) Inclined wall geomembrane earth-rock cofferdam structure suitable for higher manger plate flood peak of geomembrane
CN204282295U (en) Pile formula case cylinder breakwater structure
CN113373865B (en) Frame type embankment structure
CN103758080B (en) Overhead type disappears unrestrained sightseeing platform structure
CN110331701A (en) Integral prefabricated type sluice chamber structure and its construction method on a kind of soft soil foundation
CN205062744U (en) Half gravity type two -stage view anti -flood wall on half cantilever
CN212477620U (en) Structure for building gravity dam on deep and thick covering layer
CN214245855U (en) Water-proof pressure-control anti-floating structure
CN103821106B (en) Small-sized fishing port and channel revetment structure
CN210507312U (en) Hydraulic engineering slope protection structure
CN211547830U (en) Structure for preventing ground from being wetted
CN108842829B (en) Hydraulic automatic balance anti-floating stabilization structure and method during construction of underground structure
CN203755241U (en) Small fishing port and riverway revetment structure
CN221167687U (en) Wall-penetrating roof pipe culvert gate structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181218

CF01 Termination of patent right due to non-payment of annual fee