CN202865796U - Bank protection structure with reinforced concrete prefabricated slab piles - Google Patents

Bank protection structure with reinforced concrete prefabricated slab piles Download PDF

Info

Publication number
CN202865796U
CN202865796U CN2012204317464U CN201220431746U CN202865796U CN 202865796 U CN202865796 U CN 202865796U CN 2012204317464 U CN2012204317464 U CN 2012204317464U CN 201220431746 U CN201220431746 U CN 201220431746U CN 202865796 U CN202865796 U CN 202865796U
Authority
CN
China
Prior art keywords
reinforced concrete
concrete prefabricated
prefabricated board
stake
protection structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012204317464U
Other languages
Chinese (zh)
Inventor
虞和定
胡明
虞和登
金望哲
黄秀飞
杜加长
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG DARCH CONSTRUCTION GROUP CO Ltd
HUAHENG CONSTRUCTION GROUP CO Ltd
Original Assignee
ZHEJIANG DARCH CONSTRUCTION GROUP CO Ltd
HUAHENG CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG DARCH CONSTRUCTION GROUP CO Ltd, HUAHENG CONSTRUCTION GROUP CO Ltd filed Critical ZHEJIANG DARCH CONSTRUCTION GROUP CO Ltd
Priority to CN2012204317464U priority Critical patent/CN202865796U/en
Application granted granted Critical
Publication of CN202865796U publication Critical patent/CN202865796U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a bank protection structure with reinforced concrete prefabricated slab piles. The bank protection structure with the reinforced concrete prefabricated slab piles is characterized in that first a lateral side slope close to water of a bunding and old revetments are excavated and restored, the reinforced concrete prefabricated slab piles are struck into the bottom of the lateral side slope, cushion plies, and reinforced concrete slabs are paved on the top of the reinforced concrete prefabricated slab piles are placed, the top portions of the reinforced concrete prefabricated slab piles are inserted into the reinforced concrete slabs, concrete paving is paved on the reinforced concrete slabs, an anti-scour wall is arranged on the top of the concrete paving close to the end of the water side, concrete is backfilled among the old revetments and the anti-scour wall and the concrete paving, concrete cappings with drain pipes are arranged on the top of the anti-scour wall and on the top of the old revetments, and planting soils are backfilled on the top of the old revetments and on the slope lope face close to water of the bunding. Concave-convex grooves and tongues are respectively arranged on two sides of each prefabricated slab pile, ecological holes are formed in one side of the upper end close to water, each pile end is provided with a cutting edge inclined downward, and the anti-scour wall body inclines 5-10 degrees towards the back of the water side. The bank protection structure with the reinforced concrete prefabricated slab piles has the advantages of good stability, manageable quality, good ecological effects and the like.

Description

A kind of reinforced concrete prefabricated board stake bank protection structure
Technical field
The utility model relates to a kind of bank protection structure, and particularly a kind of reinforced concrete prefabricated board stake bank protection structure is applicable to the reconstruction and extension project in river course, navigation channel etc., belongs to municipal administration, water transport, port boat engineering field.
Background technology
Shore protection is to build on the bank slope, take cement, mortar, building stones, concrete and pitch etc. as main constructional materials, makes bunding exempt from the soil-baffling structure of erosion damage.Traditional bank protection structure can be divided into the type of vertical type, ramp type or ramp type and vertical type combination, mostly adopt cemented rock or placed rockfill, cast-in-place or precast concrete, reinforced concrete structure etc., these shore protection type application have well solved soil erosion and ship wave and have washed away and the problems such as ship collision in the engineerings such as bank protection pin, riverbank, seashore.But because bearing capacity of foundation soil is low, differential settlement easily occurs, thereby so that the phenomenons such as cracking even unstability appear in bank protection structure, so having relatively high expectations to ground.
Reasonably the bank protection structure form is built prolonging shore protection application life, reducing, maintenance cost is very important.Sheet pile structure is as one of type of soil-baffling structure, progressively applied in shore protection, harbour, revetment and the deep foundation in coastal and area, inland river engineering, because its main member can be prefabricated in precast yard, therefore have simple in structure, material usage is little, cost is low, easy construction, fireballing characteristics.Lower to the ground requirement for bearing capacity with respect to gravity revetment, more meet the requirement of soft clay area bank revetment reinforcement.
Sheet pile can be divided into timber sheet piling, reinforced concrete sheet pile and steel sheet pile 3 classes by material, and the intensity of timber sheet piling is low, and poor durability, and handy a large amount of timber now seldom adopt.The steel sheet pile quality is light, intensity is high, snap close is tight, sealing is good, pile sinking is easy, is applicable to the larger sea port dock of the depth of water, but higher, the easy-to-rust of steel sheet pile cost need be taked rust preventing.The good endurance of reinforced concrete sheet pile, steel using amount is few, and cost is low, uses more in bank protection structure and sheet-pile wharf structure.There is not tongue and groove or the tongue and groove design is unreasonable, stagnant water effect is poor, set difficulty, its ecological effect of less consideration but at present reinforced concrete sheet pile exists; The reinforced concrete sheet pile shore protection also exist sheet pile and its superstructure switching performance poor, lay particular stress on flood control function and stability, ignore the problems such as ecological effect of shore protection.
Need at present the reinforced concrete prefabricated board stake bank protection structure that invention a kind of good stability, quality are easy to control, ecological effect is good badly.
Summary of the invention
The defective such as the purpose of this utility model is to overcome that the reinforced concrete sheet pile stagnant water effect is poor, sheet pile sets difficulty, cooperative bearing weak effect and ecological effect are poor, and the defective such as reinforced concrete sheet pile shore protection globality is poor, ecological effect is poor, invent the reinforced concrete prefabricated board stake bank protection structure that a kind of structural stability is good, speed of application is fast, ecological effect is good.
To achieve these goals, the utility model has adopted following technical scheme:
A kind of reinforced concrete prefabricated board stake bank protection structure, it is characterized in that excavation finishing bunding near water side slope and old shore protection, set the reinforced concrete prefabricated board stake in bottom, side slope, lay bed course at reinforced concrete prefabricated board stake top, reinforced concrete floor, reinforced concrete prefabricated board stake stake top embeds in the reinforced concrete floor, lay concrete facing at reinforced concrete floor, anti-scour wall is laid in the position of close side end near water at the concrete facing top, old shore protection and anti-scour wall, fill concrete between the concrete facing, anti-scour wall and old shore protection top arrange concrete and bear down on one old shore protection top, bunding is the domatic upper backfill planting soil of skew back near water.
Aforesaid reinforced concrete prefabricated board stake bank protection structure, it is characterized in that reinforced concrete prefabricated board stake pile body both sides arrange semicircle concavo-convex tongue and groove, the male and fomale(M﹠F) of tongue and groove all arranges rubber fastening band, on reinforced concrete prefabricated board stake top near water the side from length is the zone of 500mm-800mm, ecological hole being set downwards apart from the position of the following 300mm-500mm of ordinary water level, the stake lower end is provided with oblique lower stake end cutting edge, stake top embedding reinforced concrete floor 100mm-200mm.
Aforesaid reinforced concrete prefabricated board stake bank protection structure is characterized in that anti-scour wall adopts concrete precast block to pile up and forms, and the wall body rolls oblique 5 ~ 10 ° to backwater.
Aforesaid reinforced concrete prefabricated board stake bank protection structure is characterized in that concrete arranges 1 gutter every 4000mm-8000mm in bearing down on one, and gutter coats the anti-filter geotextiles at the side end that pulls in to shore.
Aforementioned reinforced concrete prefabricated board stake bank protection structure is characterized in that concrete bears down on one to adopt cast-in-place plain concrete to make that thickness is 200 ~ 300mm, and every 4000mm-8000mm the shrinkage joint is set one, fills out the oil immersion cork slab in the seam.
Aforesaid reinforced concrete prefabricated board stake bank protection structure is characterized in that old shore protection top, the bunding domatic upper backfill planting soil of skew back near water, the plantation green vegetation.
The utlity model has following characteristics and beneficial effect:
(1) reinforced concrete prefabricated board stake two sides arrange semicircle concavo-convex tongue and groove, can strengthen cooperative bearing performance under its load action, and the setting of collaborative stake end cutting edge is convenient to it and is set construction, ensures its verticality; The setting of its concavo-convex tongue and groove place rubber fastening band makes it have good stagnant water effect simultaneously.
(2) reinforced concrete prefabricated board stake top near water face ecological hole is set, can nest for aquatic insect, while old shore protection top, bunding be the domatic upper backfill planting soil of skew back near water, the plantation green vegetation, the bank protection structure that the utility model is related to has good ecological effect.
(3) bank protection structure that relates to of the utility model, structure is relatively simple, takes full advantage of old shore protection, and material usage is little, and land expropriation cost is too high to existing, difficult bank revetment reinforcement and the reconstruction and extension project that maybe can't take over the land for use of expropriation of land, and is especially applicable.
Description of drawings
Fig. 1 is the utility model reinforced concrete prefabricated board stake bank protection structure profile;
Fig. 2 is reinforced concrete prefabricated board stake stereogram;
Fig. 3 is adjacent reinforced concrete prefabricated board stake connection diagram.
Among the figure: the semicircle concavo-convex tongue and groove of the stake of 1-reinforced concrete prefabricated board, 2-rubber fastening band, 3-, 4-stake end cutting edge, the ecological hole of 5-, 6-bed course, 7-reinforced concrete floor, 8-concrete facing, 9-anti-scour wall, 10-fill concrete, the old shore protection of 11-, 12-concrete bear down on one, 13-gutter, 14-backfill planting soil, 15-green vegetation, 16-bunding.
Specific embodiment
The type selecting of the prefabricated and technological parameter of the distributed steel requirement of reinforced concrete prefabricated board stake, precasting process, prefabricated section, concrete quality control on construction and green vegetation etc., present embodiment is not repeated, and emphasis is set forth the embodiment that the utility model relates to structure.
Fig. 1 is the utility model reinforced concrete prefabricated board stake bank protection structure profile, reference as shown in Figure 1, a kind of reinforced concrete prefabricated board stake bank protection structure, need digging in-situ finishing bunding 16 near water side slope and old shore protection 11, set reinforced concrete prefabricated board stake 1 in bottom, side slope, lay bed course 6 at reinforced concrete prefabricated board stake 1 top, reinforced concrete floor 7, the length that 1 top of reinforced concrete prefabricated board stake embeds reinforced concrete floor 7 is 100mm, lay concrete facing 8 at reinforced concrete floor 7, anti-scour wall 9 is laid in the position of close side end near water at concrete facing 8 tops, old shore protection 11 and anti-scour wall 9, fill concrete 10 between the concrete facing 8, anti-scour wall 9 and old shore protection 11 tops arrange concrete and bear down on one 12, old shore protection 11 tops, bunding 16 is the domatic upper backfill planting soil 14 of skew back near water.
Bed course 6 adopts hardcore bed, and thickness is 400mm.
Reinforced concrete floor 7 adopts the C25 concrete, and by behind the design arrangement reinforcing bar, cast in situs forms, and thickness is 300mm, and width is 1100mm.
Concrete facing 8 adopts the C20 plain concrete to build and forms, the section parallelogram, and the horizontal direction length of side is 1100mm, and another length of side is 515mm, and its acute angle is 76 °.
Anti-scour wall 9 adopts the C30 concrete precast block to pile up and forms, and the wall body slightly rolls oblique 8 ° to backwater.
Fill concrete 10 adopts C20 sheet stone concretes, and concrete bears down on one and gutter 13 is set in 12, and gutter 13 arranges the anti-filter geotextiles at the side end that pulls in to shore; It is the PVC gutter of 500mm that gutter 13 adopts diameter, establishes one every 4000mm.
Concrete bears down on one and 12 adopts the C25 plain concretes to build to form, and section is rectangular, and the horizontal direction width is 600mm, and thickness is 200mm, every the shrinkage joint that 4000mm establishes the wide 10mm of a seam, fills out the oil immersion cork slab in the seam.
Backfill planting soil 14 adopts the cohesive soil that is conducive to the green plants growth, and plantation green vegetation 15.
Fig. 2 is reinforced concrete prefabricated board stake stereogram, Fig. 3 is adjacent reinforced concrete prefabricated board stake connection diagram, shown in Fig. 2,3, present embodiment, reinforced concrete prefabricated board stake 1 wide 500mm, thick 150mm, the long 5000mm of stake adopts pea gravel concreten to build at precasting yard and forms, reach 70% age strength in its intensity and be transported to the scene and set, its arrangement of reinforcement is arranged by designing requirement.Reinforced concrete prefabricated board stake 1 pile body both sides arrange semicircle concavo-convex tongue and groove 3, and the tongue and groove radius is 60mm, and rubber fastening band 2 is pasted with the silica gel bonding agent by the tongue and groove place; On reinforced concrete prefabricated board stake 1 top near water the side from length is the zone of 500mm-800mm, ecological hole 5 being set downwards apart from the position of the following 300mm-500mm of ordinary water level, the stake lower end is provided with oblique lower stake and holds cutting edge 4, inclined-plane and the ground angle of stake end cutting edge 4 are 60 °, the inclined-plane is 300mm along the height of pile body direction; Rubber fastening band 2 adopts at concavo-convex tongue and groove 3 places.The utility model reinforced concrete prefabricated board stake bank protection structure, its construction sequence is as follows:
(1) according to design size and arrangement of reinforcement, carry out the prefabricated of reinforced concrete prefabricated board stake 1 at precasting yard, after its intensity reaches 70% age strength, paste rubber fastening band 2 at concavo-convex tongue and groove 3 places with cementing agent;
(2) according to design excavation sideline, digging in-situ finishing bunding 16 is side slope and old shore protection 11 near water;
(3) scene vertically sets reinforced concrete prefabricated board stake 1;
(4) the laying compacting of carrying out bed course 6 is constructed;
(5) according to designing requirement installation form, laying arrangement of reinforcement, carry out the pouring construction of reinforced concrete floor 7;
(6) after reinforced concrete floor 7 reaches next procedure construction requirement intensity, carry out concrete facing 8 pouring constructions;
(7) after concrete facing 8 reaches next procedure construction requirement intensity, carry out anti-scour wall 9 constructions;
(8) carry out the fill concrete pouring construction;
(9) according to the designing requirement installation form, lay arrangement of reinforcement, behind rafting water pipe 13, carry out concrete 12 pouring constructions that bear down on one;
(10) carry out 14 constructions of backfill planting soil, and plant green vegetation 15, thereby finish the construction of whole reinforced concrete prefabricated board stake bank protection structure.

Claims (6)

1. reinforced concrete prefabricated board stake bank protection structure, it is characterized in that excavation finishing bunding near water side slope and old shore protection, set the reinforced concrete prefabricated board stake in bottom, side slope, lay bed course at reinforced concrete prefabricated board stake top, reinforced concrete floor, reinforced concrete prefabricated board stake stake top embeds in the reinforced concrete floor, lay concrete facing at reinforced concrete floor, side is laid anti-scour wall near the position of end near water at the concrete facing top, old shore protection and anti-scour wall, fill concrete between the concrete facing, anti-scour wall and old shore protection top arrange concrete and bear down on one old shore protection top, bunding is the domatic upper backfill planting soil of skew back near water.
2. reinforced concrete prefabricated board stake bank protection structure according to claim 1, it is characterized in that reinforced concrete prefabricated board stake pile body both sides arrange semicircle concavo-convex tongue and groove, the tongue and groove male and fomale(M﹠F) all arranges rubber fastening band, on reinforced concrete prefabricated board stake top near water the side from length is the zone of 500mm-800mm, ecological hole being set downwards apart from the position of the following 300mm-500mm of ordinary water level, the stake lower end is provided with oblique lower stake end cutting edge, stake top embedding reinforced concrete floor 100mm-200mm.
3. reinforced concrete prefabricated board stake bank protection structure according to claim 1 is characterized in that anti-scour wall adopts concrete precast block to pile up and forms, and the wall body rolls oblique 5 ~ 10 ° to backwater.
4. reinforced concrete prefabricated board stake bank protection structure according to claim 1 is characterized in that concrete arranges 1 gutter every 4000mm-8000mm in bearing down on one, and gutter arranges the anti-filter geotextiles at the side end that pulls in to shore.
5. described reinforced concrete prefabricated board stake bank protection structure according to claim 1 is characterized in that concrete bears down on one to adopt cast-in-place plain concrete to make that thickness is 200 ~ 300mm, and every 4000mm-8000mm the shrinkage joint is set one, fills out the oil immersion cork slab in the seam.
6. reinforced concrete prefabricated board stake bank protection structure according to claim 1 is characterized in that old shore protection top, the bunding domatic upper backfill planting soil of skew back near water, the plantation green vegetation.
CN2012204317464U 2012-08-29 2012-08-29 Bank protection structure with reinforced concrete prefabricated slab piles Expired - Fee Related CN202865796U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012204317464U CN202865796U (en) 2012-08-29 2012-08-29 Bank protection structure with reinforced concrete prefabricated slab piles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012204317464U CN202865796U (en) 2012-08-29 2012-08-29 Bank protection structure with reinforced concrete prefabricated slab piles

Publications (1)

Publication Number Publication Date
CN202865796U true CN202865796U (en) 2013-04-10

Family

ID=48032527

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012204317464U Expired - Fee Related CN202865796U (en) 2012-08-29 2012-08-29 Bank protection structure with reinforced concrete prefabricated slab piles

Country Status (1)

Country Link
CN (1) CN202865796U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105239530A (en) * 2015-10-29 2016-01-13 上海市政工程设计研究总院(集团)有限公司 Externally bonded landscape flood prevention wall structure
CN106988268A (en) * 2017-05-08 2017-07-28 上海嘉定水务工程设计有限公司 Imitation wood bank protection structure for dredging waterway
CN107401142A (en) * 2017-06-23 2017-11-28 杭州江润科技有限公司 Bank revetment heightening construction method is refuted in active service
CN109168384A (en) * 2018-07-31 2019-01-11 浙江普天园林建筑发展有限公司 It is a kind of to carry out arid and semi-arid lands's prevention and control of soil erosion method using ornamental plant
CN114484075A (en) * 2020-10-23 2022-05-13 中国石油天然气股份有限公司 Pipeline protection device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105239530A (en) * 2015-10-29 2016-01-13 上海市政工程设计研究总院(集团)有限公司 Externally bonded landscape flood prevention wall structure
CN106988268A (en) * 2017-05-08 2017-07-28 上海嘉定水务工程设计有限公司 Imitation wood bank protection structure for dredging waterway
CN107401142A (en) * 2017-06-23 2017-11-28 杭州江润科技有限公司 Bank revetment heightening construction method is refuted in active service
CN107401142B (en) * 2017-06-23 2019-04-12 江苏华苑环境建设有限公司 Bank revetment heightening construction method is refuted in active service
CN109168384A (en) * 2018-07-31 2019-01-11 浙江普天园林建筑发展有限公司 It is a kind of to carry out arid and semi-arid lands's prevention and control of soil erosion method using ornamental plant
CN114484075A (en) * 2020-10-23 2022-05-13 中国石油天然气股份有限公司 Pipeline protection device

Similar Documents

Publication Publication Date Title
CN203603105U (en) Wall plate type ecological retaining wall bank protection structure
CN106801424A (en) A kind of cofferdam construction method
CN202865796U (en) Bank protection structure with reinforced concrete prefabricated slab piles
CN102966072B (en) Construction method for treating widened and heightened engineering joint surfaces of dikes on soft clay foundation
CN111119154A (en) River valley type debris flow ditch waste slag land-making structure and construction method
CN113006144B (en) Permeable structure tunnel structure
CN209854656U (en) Dyke
CN109056762B (en) Construction method of sea island beach dike
CN204676485U (en) A kind of Eco-economic Type bank protection structure
CN207727514U (en) A kind of library basin antiseepage is anti-to lift structure
CN108316237B (en) Revetment retaining wall
CN203821306U (en) Flexible anti-scour protection pad
CN107687155B (en) Anti-seepage and anti-lifting structure of basin and arrangement method
CN102704437A (en) Coal mining subsidence area cultivation water source reconstruction method suitable for complex mountain area
CN113373865B (en) Frame type embankment structure
CN104153350A (en) Octagonal meshed water-stopping rectangular pile of support
CN205062744U (en) Half gravity type two -stage view anti -flood wall on half cantilever
CN211523176U (en) River valley type debris flow ditch waste slag and land making structure
CN211200274U (en) Assembled channel shore protection structure
CN103821106B (en) Small-sized fishing port and channel revetment structure
CN112854131A (en) Ecological revetment for water source protection area and construction method thereof
CN112376593A (en) Gravity type cofferdam and construction method
KR101097055B1 (en) Debris barrier and plastering between rafters constructed by the cast iron panel and method of debris barrier
CN216809739U (en) Existing river channel relocation construction structure in limited area of construction site
CN218204449U (en) Structure for river-crossing pipe burying engineering

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130410

Termination date: 20200829

CF01 Termination of patent right due to non-payment of annual fee