CN109577277A - A kind of wall-mounted drainage anchor rod barrier wall structure and its construction method - Google Patents

A kind of wall-mounted drainage anchor rod barrier wall structure and its construction method Download PDF

Info

Publication number
CN109577277A
CN109577277A CN201811363039.4A CN201811363039A CN109577277A CN 109577277 A CN109577277 A CN 109577277A CN 201811363039 A CN201811363039 A CN 201811363039A CN 109577277 A CN109577277 A CN 109577277A
Authority
CN
China
Prior art keywords
barricade
stringer
construction
wall structure
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811363039.4A
Other languages
Chinese (zh)
Other versions
CN109577277B (en
Inventor
王俊杰
靳松洋
贾学明
阎宗岭
温辉波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Jiaotong University
Original Assignee
Chongqing Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Jiaotong University filed Critical Chongqing Jiaotong University
Priority to CN201811363039.4A priority Critical patent/CN109577277B/en
Publication of CN109577277A publication Critical patent/CN109577277A/en
Application granted granted Critical
Publication of CN109577277B publication Critical patent/CN109577277B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0225Retaining or protecting walls comprising retention means in the backfill
    • E02D29/0233Retaining or protecting walls comprising retention means in the backfill the retention means being anchors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/76Anchorings for bulkheads or sections thereof in as much as specially adapted therefor
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/23Dune restoration or creation; Cliff stabilisation

Abstract

Invention provides a kind of wall-mounted drainage anchor rod barrier wall structure and its construction method.The barrier wall structure includes the stringer and barricade and anchor pole embedded in bank slope top of the slope.The barricade is arranged in bank slope side near water.The stringer is located at by the inside on protection bridge pile foundation basis.Several crossbeams are connected between the barricade ontology and stringer.The construction method of the barrier wall structure include anchor bolt construction, drainage hole construction, Retaining wall, anchoring pile construction, stringer construction, construction of beam and non-return valve installation and etc..The barrier wall structure can effectively solve the problems, such as large reservoir falling zone bank cheuch area Bored Pile of Bridge protection technique, and technologically advanced, good economy performance.

Description

A kind of wall-mounted drainage anchor rod barrier wall structure and its construction method
Technical field
The present invention relates to Geotechnical Engineering field, in particular to a kind of wall-mounted drainage anchor rod barrier wall structure.
Background technique
River channel below dams are because reservoir level periodicity fluctuation makes reservoir periphery be submerged soil periodicity exposure in the water surface Special area.The falling zone range of large reservoir is often very big, for example the Three Gorges Reservoir engineering built up for 2009 disappears Height of settling in an area reaches 30m, and the falling zone height of Jinsha jiang River white crane beach reservoir engineering built up in 2022 is bigger, reaches 60m.Position Periodical action of soaking, the groundwater seepage effect etc. of library water and underground water, wind are subject in the Rock And Soil of river channel below dams Change effect is stronger, so that riverside rebuilding phenomenon happens occasionally.When library, bank has buildings or structures, riverside rebuilding may be threatened The safety of buildings or structures.
In order to develop reservoir area economy, it is built, build large-scale buildings or structures (as high speed is public building or reservoir periphery will be built Road) often it is necessary, riverside rebuilding is usually unavoidable to the influence problem of buildings or structures safety.For example, Jinsha The beach Jiang Baihe reservoir engineering will be built up in 2022, in order to develop reservoir area and local economy, have a plurality of high-grade highway Or it will be built in reservoir area and the reservoir zone of influence.Due to white crane beach Reservoir region special topography and geomorphology and geological conditions, reservoir area The bridge accounting of high-grade highway is often higher, and bridge foundation mostly uses pile foundation, and is arranged in the cheuch of river channel below dams more In side slope.Although most ditch valleyside slopes rock side slope steep for landform, rock crushing, and it is located at river channel below dams, white After crane beach reservoir builds up operation, a possibility that side slope generation local buckling, is larger on the outside of ditch valleyside slope especially bridge foundation, makes Bored Pile of Bridge is easy exposed, impaired, need to take reasonable measure and Bored Pile of Bridge protected.
The case where reinforcing slopes on the outside of ditch valleyside slope bridge pile foundation, theoretically, adoptable side are only needed for such Slope reinforcement technique is more, can generally be divided into three classes, first is that anchorage technology (such as shotcrete, anchor pole, anchor cable are reinforced), second is that branch Gear technology (such as barricade, friction pile, pile plate wall), third is that presser feet technology (such as slope angle backfills the cubic metre of earth and stone).
The principle of anchorage technology is Rock And Soil with anchor pole, anchor cable etc. that the anchoring in rock and soil of possible unstability is stable in slope On.With here the shortcomings that be that anchor pole (rope) construction may damage Bored Pile of Bridge, anchoring effect of anchor pole (rope) is with library water week The effect of phase property may gradually be lost, and not can effectively prevent the local buckling of reinforcing side slope.
The principle of supporting and retaining system technology is to be limited using the self stability of retaining structure by the deformation of supporting and retaining system Rock And Soil.Barricade is used It is since ditch valleyside slope is steep in the shortcomings that place, barricade area of base is limited, and foundation bearing capacity is smaller, so that barricade homeostasis Property it is insufficient;The shortcomings that friction pile or pile plate wall are used in place is that difficulty of construction is big, and economy is poor.
The principle of presser feet technology is to be limited using the self stability of backfill Rock And Soil by the deformation of protection Rock And Soil.It can For mainly being controlled by landform herein, if orographic condition does not allow, it is not available.
In addition, bank slope Changes in underground water variation caused by reservoir level is gone up and down is also a matter of concern, underground Water lever fluctuating acts on the strength deterioration for not only making bank slope Rock And Soil, but also osmosis of the underground water to outside slope is likely to straight Connecing leads to slopes unstability.
In consideration of it, being easy that part occurs because of Reservoir Water Level for slopes on the outside of reservoir drawdown band ditch valleyside slope bridge pile foundation Unstability and the situation for influencing Bored Pile of Bridge safety, it would be highly desirable to research and develop and a kind of be suitable for large reservoir falling zone bank cheuch area Bridge Pile The engineering technology of basis protection.
Summary of the invention
The object of the present invention is to provide a kind of wall-mounted drainage anchor rod barrier wall structure and its construction methods, to solve existing skill The problem of art.
To realize the present invention purpose and the technical solution adopted is that a kind of such, wall-mounted drainage anchor rod barrier wall structure, Including the stringer and barricade and anchor pole embedded in bank slope top of the slope.
The barricade is arranged in bank slope side near water.The barricade includes barricade ontology.The barricade ontology is moved towards along bank slope Both ends extend carrier into Rock And Soil after wall.
The stringer is located at by the inside on protection bridge pile foundation basis.It is connected between the barricade ontology and stringer several Root crossbeam.The crossbeam and stringer vertical runs.Anchoring pile is additionally provided with below the stringer.
One end of the anchor pole is fixed in barricade ontology, and the other end is mounted in after wall in Rock And Soil.
Barrier wall structure is additionally provided with drainage hole.The drainage hole extends to after wall in Rock And Soil after running through barricade ontology.Institute It states drainage hole and faces upward oblique arrangement.Drainpipe is equipped in the drainage hole.The exit of the drainpipe is provided with non-return valve.
Further, deformation joint is provided in the barricade.Sealing material is filled in the deformation joint.
Further, the upper surface of the stringer is reserved with steel bar stress.
Further, the upper surface of the anchoring pile is reserved with steel bar stress.
Invention additionally discloses a kind of construction method about wall-mounted drainage anchor rod barrier wall structure described in claim 1, packets Include following steps:
1) according to geological mapping data, determine barrier wall structure applies position.
2) it excavates, clear up slope surface Rock And Soil, by design requirement construction anchor pole.By design requirement construction pile foundation.
3) the construction drainage hole in Rock And Soil after wall, and wear drainpipe.Wherein, the exposed certain length of drainpipe.
4) by design requirement construction barricade.
5) by design requirement construction anchoring pile.
6) by design requirement construction stringer.
7) by design requirement construction crossbeam.
8) non-return valve is installed.
The solution have the advantages that unquestionable:
A. large reservoir falling zone bank cheuch area Bored Pile of Bridge protection technique can be effectively solved the problems, such as, And technologically advanced, good economy performance;
B. barrier wall structure can ensure that slope stability on the outside of bridge pile foundation, avoid bridge pile foundation exposed, impaired, while can be significant Reduce the horizontal loading acted on bridge pile foundation because of side slope horizontal distortion;
C. anchoring pile, longitudinal and cross beam solve the problems, such as that barricade foundation bearing is hypodynamic jointly;Barricade and anchor pole prop up jointly It keeps off, strengthen Rock And Soil after wall, efficiently solve the stable problem of Rock And Soil;Barricade encloses Rock And Soil after wall, in addition with inverse The only single slope drainage effect of valve drainage hole, Rock And Soil is impregnated by library water after can effectively avoid wall, significantly reduces reservoir level lifting pair The influence degree that Changes in underground water changes after barricade;
D. non-return valve is mounted at wall surface or barricade inner near surface, easy access and replacement.
Detailed description of the invention
Fig. 1 is barrier wall structure schematic diagram;
Fig. 2 is barrier wall structure top view;
Fig. 3 is barrier wall structure operation schematic diagram.
In figure: barricade 1, barricade ontology 101, carrier 102, anchor pole 2, crossbeam 3, stringer 4, anchoring pile 5, drainpipe 6, check Valve 7, bridge pile foundation basis 8.
Specific embodiment
Below with reference to embodiment, the invention will be further described, but should not be construed the above-mentioned subject area of the present invention only It is limited to following embodiments.Without departing from the idea case in the present invention described above, according to ordinary skill knowledge and used With means, various replacements and change are made, should all include within the scope of the present invention.
Embodiment 1:
The present embodiment discloses a kind of wall-mounted drainage anchor rod barrier wall structure, to solve existing large reservoir falling zone bank ditch The problem of paddy area Bored Pile of Bridge protection technique.Referring to Fig. 1, barrier wall structure includes the stringer 4 embedded in bank slope top of the slope, And barricade 1 and anchor pole 2.
The barricade 1 is arranged in bank slope side near water.The barricade 1 includes barricade ontology 101.101 edge of barricade ontology Extend carrier 102 into Rock And Soil after wall in the both ends of bank slope trend.The effect of the barricade 1 is the rock at supporting and retaining system barricade rear The soil body, and Rock And Soil surface is closed.When the length of barricade is too long, deformation joint can be set in barricade 1, in deformation joint Fill sealing material.
Referring to figs. 2 and 3, the stringer 4 is located at by the inside on protection bridge pile foundation basis 8.101 He of barricade ontology 3 crossbeams 3 are connected between stringer 4.The crossbeam 3 and 4 vertical runs of stringer.One end of the crossbeam 3 and barricade ontology 101 Top securely connects, and the other end is connected firmly with stringer 4.The upper surface of the stringer 4 is reserved with steel bar stress.The stringer 4 Lower section be additionally provided with anchoring pile 5.The upper surface of the anchoring pile 5 is reserved with steel bar stress.The anchoring pile 5 provides downwards to stringer 4 Power.The crossbeam 3, stringer 4 and anchoring pile 5 provide the power upwards and into slope to barricade 1 together, to solve barricade foundation bearing Hypodynamic problem.In actual production, bridge bearing platform is arranged above crossbeam 3.
One end of the anchor pole 4 is fixed in barricade ontology 301, and the other end is mounted in after wall in Rock And Soil.The work of anchor pole 4 With the Rock And Soil for being reinforced retaining wall rear, and barricade 1 and Rock And Soil are connected as entirety.
Barrier wall structure is additionally provided with drainage hole.The drainage hole extends to after wall in Rock And Soil after running through barricade ontology 101. The drainage hole faces upward oblique arrangement.Drainpipe 6 is equipped in the drainage hole.The exit of the drainpipe 6 is provided with non-return valve 7.Water level is lower than non-return valve automatically turns on when water level after barricade before the barricade, the water body after barricade in Rock And Soil is discharged, but works as Non-return valve is automatically closed when water level is higher than water level after barricade before barricade, to prevent after water body is by drainage hole infiltration barricade before barricade In Rock And Soil.
Embodiment 2:
The construction method of the present embodiment provides a kind of wall-mounted drainage anchor rod barrier wall structure described in embodiment 1, including Following steps:
1) according to geological mapping data, determine barrier wall structure applies position.
2) it is first excavated according to design, cleaning slope surface Rock And Soil, according still further to the anchor pole position of design, size, strength grade etc., The suitable construction method construction anchor pole 2 of selection, and ensure the exposed sufficient length of 2 steel bar stress of anchor pole, to be connect with barricade 1.
3) the construction drainage hole in Rock And Soil after wall, and wear drainpipe 6.Wherein, the exposed certain length of drainpipe 6.
4) according to the barricade size of design, strength grade etc., suitable construction method construction barricade 1 is selected, and ensures to keep off Rock And Soil is connected firmly after 1 back side of wall and wall, drainage hole by design requirement passes through barricade 1.Reserved at the top of barricade 1 it is enough by Power reinforcing bar, to be connect with crossbeam 3.
5) according to the anchoring pile position of design, size, strength grade etc., suitable construction method construction anchoring pile 5 is selected, and really The exposed sufficient length of 5 steel bar stress of anchoring pile is protected, to connect with stringer 4.
6) according to the stringer size of design, arrangement of reinforcement, strength grade etc., suitable construction method construction stringer 4 is selected, and really Stringer 4 is protected to be connected firmly with anchoring pile 5.Enough steel bar stresses are reserved in 4 top surface of stringer, to connect with crossbeam 3.
7) according to the crossbeam size of design, arrangement of reinforcement, strength grade etc., suitable construction method construction crossbeam 3 is selected, and really Crossbeam 3 is protected to be connected firmly with barricade 1 and stringer 4.
8) according to the check valve position of design, type etc., select suitable installation method that non-return valve 7 is installed.

Claims (5)

1. a kind of wall-mounted drainage anchor rod barrier wall structure, it is characterised in that: the stringer (4) including being embedded in bank slope top of the slope, and Barricade (1) and anchor pole (2);
The barricade (1) is arranged in bank slope side near water;The barricade (1) includes barricade ontology (101);The barricade ontology (101) carrier (102) are extended at the both ends along bank slope trend into Rock And Soil after wall;
The stringer (4) is located at by the inside of protection bridge pile foundation basic (8);Between the barricade ontology (101) and stringer (4) It is connected with several crossbeams (3);The crossbeam (3) and stringer (4) vertical runs;Anchor is additionally provided with below the stringer (4) Stake (5);
One end of the anchor pole (4) is fixed in barricade ontology (301), and the other end is mounted in after wall in Rock And Soil;
Barrier wall structure is additionally provided with drainage hole;The drainage hole extends to after wall in Rock And Soil after running through barricade ontology (101);Institute It states drainage hole and faces upward oblique arrangement;Drainpipe (6) are equipped in the drainage hole;The exit of the drainpipe (6) is provided with check Valve (7).
2. a kind of wall-mounted drainage anchor rod barrier wall structure according to claim 1, it is characterised in that: in the barricade (1) It is provided with deformation joint;Sealing material is filled in the deformation joint.
3. a kind of wall-mounted drainage anchor rod barrier wall structure according to claim 1, it is characterised in that: the stringer (4) Upper surface is reserved with steel bar stress.
4. a kind of wall-mounted drainage anchor rod barrier wall structure according to claim 1, it is characterised in that: the anchoring pile (5) Upper surface is reserved with steel bar stress.
5. a kind of construction method about wall-mounted drainage anchor rod barrier wall structure described in claim 1, which is characterized in that including with Lower step:
1) according to geological mapping data, determine barrier wall structure applies position;
2) it excavates, clear up slope surface Rock And Soil, construct anchor pole (2) by design requirement;
3) the construction drainage hole in Rock And Soil after wall, and wear drainpipe (6);Wherein, drainpipe (6) exposed certain length;
4) by design requirement construction barricade (1);
5) by design requirement construction anchoring pile (5);
6) by design requirement construction stringer (4);
7) by design requirement construction crossbeam (3);
8) non-return valve (7) are installed.
CN201811363039.4A 2018-11-15 2018-11-15 Wall-mounted drainage anchor rod retaining wall structure and construction method thereof Active CN109577277B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811363039.4A CN109577277B (en) 2018-11-15 2018-11-15 Wall-mounted drainage anchor rod retaining wall structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811363039.4A CN109577277B (en) 2018-11-15 2018-11-15 Wall-mounted drainage anchor rod retaining wall structure and construction method thereof

Publications (2)

Publication Number Publication Date
CN109577277A true CN109577277A (en) 2019-04-05
CN109577277B CN109577277B (en) 2021-01-12

Family

ID=65922617

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811363039.4A Active CN109577277B (en) 2018-11-15 2018-11-15 Wall-mounted drainage anchor rod retaining wall structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN109577277B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109914470A (en) * 2019-04-18 2019-06-21 中冶华天南京工程技术有限公司 A kind of road shoulder barricade and its construction method
CN110397050A (en) * 2019-08-05 2019-11-01 河北工业大学 A kind of light-duty draining barricade of novel beam anchor formula and its construction method
CN111058463A (en) * 2019-12-29 2020-04-24 中铁二院工程集团有限责任公司 Rock steep slope high cantilever slope-collecting reinforcing structure and construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201125354Y (en) * 2007-11-23 2008-10-01 中铁二院工程集团有限责任公司 Steep hill road bed branch block reinforced structure
CN104895088A (en) * 2015-04-07 2015-09-09 中国建筑第六工程局有限公司 A method of reducing foundation pit asymmetrical pressure
CN205242433U (en) * 2015-12-17 2016-05-18 中国建筑第二工程局有限公司 Both ends cantilever type prestressing force is to drawing retaining wall
CN106049348A (en) * 2016-06-15 2016-10-26 中国电建集团成都勘测设计研究院有限公司 Retaining wall structure for sponge city construction
CN207775920U (en) * 2017-12-21 2018-08-28 贵州电力设计研究院 A kind of mountain area electric power pylon strengthening of foundation device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201125354Y (en) * 2007-11-23 2008-10-01 中铁二院工程集团有限责任公司 Steep hill road bed branch block reinforced structure
CN104895088A (en) * 2015-04-07 2015-09-09 中国建筑第六工程局有限公司 A method of reducing foundation pit asymmetrical pressure
CN205242433U (en) * 2015-12-17 2016-05-18 中国建筑第二工程局有限公司 Both ends cantilever type prestressing force is to drawing retaining wall
CN106049348A (en) * 2016-06-15 2016-10-26 中国电建集团成都勘测设计研究院有限公司 Retaining wall structure for sponge city construction
CN207775920U (en) * 2017-12-21 2018-08-28 贵州电力设计研究院 A kind of mountain area electric power pylon strengthening of foundation device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109914470A (en) * 2019-04-18 2019-06-21 中冶华天南京工程技术有限公司 A kind of road shoulder barricade and its construction method
CN110397050A (en) * 2019-08-05 2019-11-01 河北工业大学 A kind of light-duty draining barricade of novel beam anchor formula and its construction method
CN111058463A (en) * 2019-12-29 2020-04-24 中铁二院工程集团有限责任公司 Rock steep slope high cantilever slope-collecting reinforcing structure and construction method
CN111058463B (en) * 2019-12-29 2024-03-22 中铁二院工程集团有限责任公司 Construction method of rock steep slope high cantilever slope-collecting reinforcing structure

Also Published As

Publication number Publication date
CN109577277B (en) 2021-01-12

Similar Documents

Publication Publication Date Title
US10138616B2 (en) Inverse construction method for deep, large and long pit assembling structure of suspension-type envelope enclosure
CN109577365A (en) A kind of pile formula drainage anchor rod barrier wall structure and its construction method
CN101349064B (en) Construction method of hydroelectric power station surge chamber vertical shaft under soft rock geological condition
CN207633352U (en) A kind of slope reinforcement structure for rapid rescue construction
NO318657B1 (en) Procedure for the construction of an underground continuous wall
CN1657711A (en) Rotary spray anchoring pile construction process
CN111139840B (en) Ecological restoration method for tableland slope of fixed ditch in gully region of loess plateau of longdong
CN109577277A (en) A kind of wall-mounted drainage anchor rod barrier wall structure and its construction method
CN111851523B (en) Settlement deviation prevention method for foundation pit construction
CN112576056A (en) Underpinning support system for storey-adding reconstruction of existing building basement and construction method thereof
CN113174958A (en) Construction method for foundation pit of adjacent road under poor ground condition
CN106869138A (en) A kind of load retaining wall Retaining Structure with Double-row Piles and its foundation ditch excavation method
CN101838957A (en) Integral type T-shaped outer cantilever roads and construction method thereof
CN212077981U (en) Combined slope supporting structure
CN205617396U (en) Close on existing railway line construction protection structure
CN109024621A (en) The compound retaining wall supporting construction of embankment high slope tubular pole and its construction method
CN205475266U (en) Side slope reinforcing structure
CN205062744U (en) Half gravity type two -stage view anti -flood wall on half cantilever
CN105569055A (en) Structure for preventing mountain landslide
CN208251016U (en) A kind of turnover plate type flood-control wall
CN204435321U (en) A kind of steam power station water intaking open channel
CN208870637U (en) A kind of high water head rich water tunnel tunnel bottom construction
CN202672165U (en) Grouting water-blocking cofferdam
CN111501423A (en) 400km/h and above high-speed rail strong expansive rock deep cutting integral supporting and retaining structure and construction method
CN201411707Y (en) Tower cane foundation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant