CN207309400U - Door of elevator full-automation production line - Google Patents

Door of elevator full-automation production line Download PDF

Info

Publication number
CN207309400U
CN207309400U CN201721445224.9U CN201721445224U CN207309400U CN 207309400 U CN207309400 U CN 207309400U CN 201721445224 U CN201721445224 U CN 201721445224U CN 207309400 U CN207309400 U CN 207309400U
Authority
CN
China
Prior art keywords
delivery platform
steel plate
air pressure
door
cross reinforcing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201721445224.9U
Other languages
Chinese (zh)
Inventor
陆海祥
陆俊涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Hailu Machinery Manufacturing Co ltd
Original Assignee
Zhejiang Sea Road Machinery Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Sea Road Machinery Manufacturing Co Ltd filed Critical Zhejiang Sea Road Machinery Manufacturing Co Ltd
Priority to CN201721445224.9U priority Critical patent/CN207309400U/en
Application granted granted Critical
Publication of CN207309400U publication Critical patent/CN207309400U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

Door of elevator manufacturing technology field is the utility model is related to, more particularly to a kind of automatic production device of door of elevator.During the full-automatic production line work of the utility model, stainless steel plate is transported on the delivery platform of assembly line by air pressure grabbing device first, punched by being accurately positioned perforating device on the setting position of steel plate, then through bender by longitudinal both sides Edge Bend of steel plate, by assembly welding device by waling and cross reinforcing assembling on stainless steel, finally by mechanical hand by the door of elevator being completed from assembly line loading and unloading material.Whole production process completes sequence of operations by automation equipment, largely saves labour, by the program of setting, improves the technology controlling and process accuracy of links, so as to improve the machining accuracy of product.

Description

Door of elevator full-automation production line
Technical field
It the utility model is related to door of elevator manufacturing technology field, the automated production dress of more particularly to a kind of door of elevator Put.
Background technology
Stainless steel plate is processed into door of elevator by the prior art to be needed by multiple working procedure, and is required to largely per procedure Manual operation, not only increase production cost, and production efficiency is relatively low, and the machining accuracy of product can not be completely secured.
Utility model content
The purpose of the utility model is to overcome the deficiencies in the prior art, there is provided a kind of without a large amount of labours, Neng Gouti The door of elevator full-automation production line of high efficiency and processing precision of products.
In order to achieve the above object, a kind of door of elevator full-automation production line designed by the utility model, it Include air pressure grabbing device successively, be accurately positioned perforating device, bender, assembly welding device and mechanical hand device for discharging;
The air pressure grabbing device includes delivery platform one, and one both sides of delivery platform are provided with steel plate rack, conveying The top of platform one and steel plate rack is equipped with guide rail, and guide rail is equipped with air pressure gripper components;The air pressure gripper components include Transverse shifting frame, and the air pressure crawl hand being vertically set on transverse shifting frame, air pressure capture palmistry on transverse shifting frame Lower movement, the end of air pressure crawl hand are equipped with crawl sucker;
The perforating device that is accurately positioned includes delivery platform two, fixes and sets in two both sides of delivery platform of steel plate input port There are two Multifunctional perforation devices, movable clamp component is equipped with the top of delivery platform two;The Multifunctional perforation device is made It is dual-purpose for perforating device and stationary fixture;The movable clamp component includes movable plate, and is arranged on the folder of movable plate one end Has head, movable clamp component does horizontal reciprocating movement relative to Multifunctional perforation device, when the clamp head of movable clamp component moves To delivery platform two end when, movable clamp component is with respect to two oscilaltion of delivery platform;
The assembly welding device includes delivery platform three, delivery platform four and the delivery platform five continuously set, defeated Send the top of platform three to be equipped with guide rail one, waling grabbing device is provided with guide rail one, the lower section of guide rail one, which is equipped with, indulges To reinforcing rib rack;Two cross reinforcing grabbing devices are equipped with the side of delivery platform four, in the another of delivery platform four Side on cross reinforcing grabbing device opposite position with being respectively equipped with two mash welders;The cross reinforcing grabbing device Including with four vertically disposed cross slide way of delivery platform, be arranged on cross slide way rear by two cross reinforcing grabbing devices A shared longitudinal rail, the longitudinal rail are equipped with two cross reinforcing capture members, and the cross reinforcing is grabbed Component is taken to be moved on longitudinal rail and cross slide way, the lower section of cross reinforcing capture member is placed equipped with cross reinforcing Frame;A two-head spot-welder is additionally provided with the side of delivery platform five.
In order to reduce the steel plate crawl time, improve crawl efficiency, the steel plate rack can opposite delivery platform up and down with Move left and right.
To realize that steel plate rack is moved left and right with respect to delivery platform, slide, steel plate are set in the bottom of steel plate rack Rack moves horizontally on slide.
To realize that steel plate rack is moved up and down with respect to delivery platform, lifting part is set in the bottom of steel plate rack, Lifting part control steel plate rack vertically moves.
During the full-automatic production line work of the utility model, stainless steel plate is transported by air pressure grabbing device first Onto the delivery platform of assembly line, punched by being accurately positioned perforating device on the setting position of steel plate, then through bender By longitudinal both sides Edge Bend of steel plate, waling and cross reinforcing are assembled in by stainless steel plate by assembly welding device On, finally by mechanical hand by the door of elevator being completed from assembly line loading and unloading material.Whole production process is by automation equipment Sequence of operations is completed, largely saves labour, by the program of setting, improves the technology controlling and process accuracy of links, So as to improve the machining accuracy of product.
Brief description of the drawings
Fig. 1 is the overall structure diagram of the utility model.
Fig. 2 is the structure diagram of air pressure grabbing device in the utility model.
Fig. 3 is the structure diagram that perforating device is accurately positioned in the utility model.
Fig. 4 is the structure diagram of assembly welding device in the utility model.
Embodiment
The utility model will be further described below in conjunction with the accompanying drawings.
As Figure 1-Figure 4, a kind of door of elevator full-automation production line of the present embodiment description, it includes successively Air pressure grabbing device 1, be accurately positioned perforating device 2, bender 3, assembly welding device 4 and mechanical hand device for discharging 5;
The air pressure grabbing device includes one 1-1 of delivery platform, and one both sides of delivery platform are provided with steel plate rack 1-2, The top of delivery platform one and steel plate rack is equipped with guide rail 1-3, and guide rail is equipped with air pressure gripper components;The air pressure crawl section Part includes transverse shifting frame 1-4, and the air pressure crawl hand 1-5 being vertically set on transverse shifting frame, air pressure crawl palmistry pair Transverse shifting frame moves up and down, and the end of air pressure crawl hand is equipped with crawl sucker;In the bottom of steel plate rack, slide, steel are set Plate rack moves horizontally on slide, is moved left and right so as to fulfill steel plate rack with respect to delivery platform;In steel plate rack Bottom lifting part is set, lifting part control steel plate rack vertically moves, and is conveyed so as to fulfill steel plate rack is opposite Platform moves up and down;
The perforating device that is accurately positioned includes two 2-1 of delivery platform, consolidates in two both sides of delivery platform of steel plate input port Surely two Multifunctional perforation device 2-2 are equipped with, movable clamp component is equipped with the top of delivery platform two;The multi-functional perforating Device is dual-purpose as perforating device and stationary fixture;The movable clamp component includes movable plate 2-3, and is arranged on movable plate The clamp head 2-4 of one end, movable clamp component do horizontal reciprocating movement relative to Multifunctional perforation device, when movable clamp component When clamp head is moved to the end of delivery platform two, movable clamp component is with respect to two oscilaltion of delivery platform;
The assembly welding device includes three 4-1 of delivery platform, four 4-2 of delivery platform and the delivery platform five continuously set 4-3, one 4-4 of guide rail is equipped with the top of delivery platform three, waling grabbing device 4-5, guide rail are provided with guide rail one One lower section is equipped with waling rack;Two cross reinforcing grabbing device 4-6 are equipped with the side of delivery platform four, Two mash welder 4-7 are respectively equipped with the opposite side and cross reinforcing grabbing device opposite position of delivery platform four;Institute State cross reinforcing grabbing device include with the vertically disposed cross slide way 4-8 of delivery platform four, be arranged on cross slide way rear The longitudinal rail 4-9 shared by two cross reinforcing grabbing devices, the longitudinal rail are equipped with two and laterally strengthen Muscle capture member 4-10, the cross reinforcing capture member move on longitudinal rail and cross slide way, and cross reinforcing is grabbed The lower section of component is taken to be equipped with cross reinforcing rack;A two-head spot-welder 4-11 is additionally provided with the side of delivery platform five.
During the air pressure grabbing device work of the present embodiment, transverse shifting frame is first moved to the top of steel plate rack, air pressure Crawl hand moves vertically downward, and crawl sucker holds steel plate, and then transverse shifting frame is moved to the top of delivery platform one, air pressure Crawl hand down it is dynamic steel plate is placed on delivery platform one, complete whole steel plate crawl process steel plate is delivered to it is accurate fixed Position drilling process.
When being accurately positioned perforating device work of the present embodiment, steel plate is transported on delivery platform two, when steel plate one end is worn When crossing Multifunctional perforation device, movable clamp component is just moved at Multifunctional perforation device, and clamp head opens and clamps steel Plate one end, Multifunctional perforation device designated position carry out punch operation, when only needing a side perforating, opposite side it is multi-functional Perforating device is used as stationary fixture;After completing punch operation, Multifunctional perforation device unclamps steel plate, movable clamp component folder Steel plate to continue to be moved along, when the other end of steel plate is located at Multifunctional perforation device, Multifunctional perforation device fixes steel Plate and the punch operation for completing the other end, so far after the punch operation at completion steel plate both ends, the clamp head on movable clamp component Steel plate is unclamped, and after dropping to below steel plate, steel plate continues to move forward to be conveyed into bending process from movable plate.
During the assembly welding device work of the present embodiment, the waling grabbing device 4-5 first on one 4-4 of guide rail is moved Move to the top of rack, capture the top that three 4-1 of delivery platform is moved to after waling;When the stainless steel after bending When plate moves to delivery platform three, waling is placed on the setting position of stainless steel plate by waling grabbing device On;The first cross reinforcing capture member 4-10-1 on longitudinal rail 4-9 is moved to above rack at the same time, and crawl laterally adds Moved to after strengthening tendons on the cross slide way 4-8-1 of First cross reinforcing grabbing device 4-6-1;When stainless steel plate continues forward When moving to four 4-2 of delivery platform, cross reinforcing is placed on by the first cross reinforcing capture member on the cross slide way On the setting position of stainless steel plate one end;Then the first mash welder 4-7-1 proceeds by spot weld operation, and the transverse direction of this one end is added Strengthening tendons and waling weld together with stainless steel plate;The second cross reinforcing capture member 4- on longitudinal rail at the same time 10-2 is moved to above rack, and the horizontal stroke of second cross reinforcing grabbing device 4-6-2 is moved to after crawl cross reinforcing On direction guiding rail 4-8-2;When the other end of stainless steel plate is moved at second cross reinforcing grabbing device, second laterally adds Cross reinforcing is placed on the setting position of this one end of stainless steel plate by strengthening tendons capture member;Then the second mash welder 4-7-2 Spot weld operation is proceeded by, the cross reinforcing of this one end and waling are welded together with stainless steel plate;Completion group Door of elevator after dress and both ends welding moves forward to thirdly at welding machine 4-11, will be longitudinally reinforced by thirdly welding machine The centre position of muscle is welded further with stainless steel plate.

Claims (4)

1. a kind of door of elevator full-automation production line, it include successively air pressure grabbing device, be accurately positioned perforating device, Bender, assembly welding device and mechanical hand device for discharging;It is characterized in that:The air pressure grabbing device includes delivery platform One, it is provided with steel plate rack in one both sides of delivery platform, the top of delivery platform one and steel plate rack is equipped with guide rail, guide rail It is equipped with air pressure gripper components;The air pressure gripper components include transverse shifting frame, and are vertically set on transverse shifting frame Air pressure crawl hand, air pressure capture palmistry to transverse shifting frame move up and down, air pressure crawl hand end be equipped with crawl sucker;
The perforating device that is accurately positioned includes delivery platform two, and two are fixed with two both sides of delivery platform of steel plate input port A Multifunctional perforation device, movable clamp component is equipped with the top of delivery platform two;The Multifunctional perforation device is used as and beats Aperture apparatus and stationary fixture are dual-purpose;The movable clamp component includes movable plate, and is arranged on the clamp head of movable plate one end, Movable clamp component does horizontal reciprocating movement relative to Multifunctional perforation device, when the clamp head of movable clamp component is moved to conveying During the end of platform two, movable clamp component is with respect to two oscilaltion of delivery platform;
The assembly welding device includes delivery platform three, delivery platform four and the delivery platform five continuously set, flat in conveying The top of platform three is equipped with guide rail one, and waling grabbing device is provided with guide rail one, and the lower section of guide rail one is equipped with longitudinal direction and adds Strengthening tendons rack;Two cross reinforcing grabbing devices are equipped with the side of delivery platform four, in the opposite side of delivery platform four With being respectively equipped with two mash welders on cross reinforcing grabbing device opposite position;The cross reinforcing grabbing device includes With four vertically disposed cross slide way of delivery platform, it is arranged on cross slide way rear and is shared by two cross reinforcing grabbing devices A longitudinal rail, the longitudinal rail is equipped with two cross reinforcing capture members, and the cross reinforcing captures structure Part moves on longitudinal rail and cross slide way, and the lower section of cross reinforcing capture member is equipped with cross reinforcing rack; The side of delivery platform five is additionally provided with a two-head spot-welder.
A kind of 2. door of elevator full-automation production line according to claim 1, it is characterised in that:The steel plate is put Put frame with respect to delivery platform up and down and move left and right.
A kind of 3. door of elevator full-automation production line according to claim 2, it is characterised in that:Placed in steel plate The bottom of frame sets slide, and steel plate rack moves horizontally on slide.
A kind of 4. door of elevator full-automation production line according to claim 2, it is characterised in that:Placed in steel plate The bottom of frame sets lifting part, and lifting part control steel plate rack vertically moves.
CN201721445224.9U 2017-11-02 2017-11-02 Door of elevator full-automation production line Withdrawn - After Issue CN207309400U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721445224.9U CN207309400U (en) 2017-11-02 2017-11-02 Door of elevator full-automation production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721445224.9U CN207309400U (en) 2017-11-02 2017-11-02 Door of elevator full-automation production line

Publications (1)

Publication Number Publication Date
CN207309400U true CN207309400U (en) 2018-05-04

Family

ID=62380372

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721445224.9U Withdrawn - After Issue CN207309400U (en) 2017-11-02 2017-11-02 Door of elevator full-automation production line

Country Status (1)

Country Link
CN (1) CN207309400U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107717483A (en) * 2017-11-02 2018-02-23 浙江海路机械制造有限公司 Door of elevator full-automation production line

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107717483A (en) * 2017-11-02 2018-02-23 浙江海路机械制造有限公司 Door of elevator full-automation production line
CN107717483B (en) * 2017-11-02 2024-01-09 浙江海路机械制造股份有限公司 Full-automatic production line for elevator door panels

Similar Documents

Publication Publication Date Title
CN104759894A (en) Machining production line for sheet metal
CN102642310B (en) Fully-automatic production line for sealing strips of refrigerator doors
CN107717483A (en) Door of elevator full-automation production line
CN103447721B (en) Full-automatic spot-welding equipment
CN102490019A (en) Automatic production line of crown plate of container
CN106180469A (en) The stamping assembling device of body hinge and method
CN104175077A (en) Automatic production line and production process of elevator doors and elevator wallboards
CN103350286A (en) Welding device and method for elevator door plate, wall plate, end plate and reinforcing rib
CN106903431A (en) A kind of automobile chair frame laser welding system
CN109590565A (en) Automatic soldering technique
CN108857421A (en) A kind of bogie frame component quick assembling work station
CN207309400U (en) Door of elevator full-automation production line
CN202573000U (en) Fully automatic refrigerator door sealing strip production line
CN202317673U (en) Automatic production line of container
CN112917035A (en) Automatic assembly welding device and method for embedded part
CN203875673U (en) Double-arm type full-automatic feeding and discharging device
CN203304800U (en) Welding equipment for reinforcing rib sealing heads of door plate and wall plate of lift
CN203401350U (en) An automatic edge-cutting machine for boards
CN108284293A (en) A kind of automatic welding workbench for brake-shoe
CN204657958U (en) A kind of sheet metal machining production line
CN105057411A (en) Machining method for bending board into table top
CN207971633U (en) The full-automatic manufacture assembly line of mechanical Hand supplementary connector
CN206824821U (en) A kind of automobile chair frame laser welding system
CN206435987U (en) A kind of refrigerator reinforcing frame punch welding production line
CN210616510U (en) Automatic clamping and moving device for feeding and discharging of bent pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: Jiaxing City, Zhejiang province 314506 Tongxiang City Fengming street strong industry Road No. 33

Patentee after: Zhejiang Hailu Machinery Manufacturing Co.,Ltd.

Address before: Jiaxing City, Zhejiang province 314506 Tongxiang City Fengming street strong industry Road No. 33

Patentee before: ZHEJIANG HAILU MACHINERY MANUFACTURING CO.,LTD.

CP01 Change in the name or title of a patent holder
AV01 Patent right actively abandoned

Granted publication date: 20180504

Effective date of abandoning: 20240109

AV01 Patent right actively abandoned

Granted publication date: 20180504

Effective date of abandoning: 20240109

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned