CN207296486U - A kind of combined type temporary building of Container Reconstruction - Google Patents

A kind of combined type temporary building of Container Reconstruction Download PDF

Info

Publication number
CN207296486U
CN207296486U CN201721106531.4U CN201721106531U CN207296486U CN 207296486 U CN207296486 U CN 207296486U CN 201721106531 U CN201721106531 U CN 201721106531U CN 207296486 U CN207296486 U CN 207296486U
Authority
CN
China
Prior art keywords
container
room
container reconstruction
combined type
temporary building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721106531.4U
Other languages
Chinese (zh)
Inventor
张克胜
沈振
李悦
张增文
张良
杜云峰
王海清
畅欣
曲超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Exchange Fourth Highway Engineering Bureau Co Ltd International Engineering Branch
CCCC Fourth Highway Engineering Co Ltd
Original Assignee
China Exchange Fourth Highway Engineering Bureau Co Ltd International Engineering Branch
CCCC Fourth Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Exchange Fourth Highway Engineering Bureau Co Ltd International Engineering Branch, CCCC Fourth Highway Engineering Co Ltd filed Critical China Exchange Fourth Highway Engineering Bureau Co Ltd International Engineering Branch
Priority to CN201721106531.4U priority Critical patent/CN207296486U/en
Application granted granted Critical
Publication of CN207296486U publication Critical patent/CN207296486U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model belongs to temporary building technical field, a kind of more particularly to combined type temporary building of Container Reconstruction, a temporary building is combined into by multiple Container Reconstruction rooms, including upper strata Container Reconstruction room and lower floor's Container Reconstruction room, lower floor's Container Reconstruction room is arranged on concrete pier base, ceiling is equipped with above the upper strata Container Reconstruction room, Stilt layer is formed between the ceiling and the upper strata Container Reconstruction room, the upper strata Container Reconstruction room and lower floor's Container Reconstruction room both sides are equipped with stair and railing.The utility model comfortable for living, resistance bad weather ability is strong, and it is fast to build speed, high recycling rate, and cost is low.

Description

A kind of combined type temporary building of Container Reconstruction
Technical field
The utility model belongs to temporary building technical field, more particularly to a kind of combined type of Container Reconstruction is built temporarily Build.
Background technology
Construction site is faced to build and is mainly used using light steel as skeleton at present, using battenboard as cladding, with master die number system Row carry out the movable plank house of Spatial Coupling.Bad weather energy force difference is resisted in this house, builds that speed is slow, and recycling rate of waterused is low, It is of high cost.
Utility model content
In order to solve the above technical problems, to be to provide a kind of resistance bad weather ability strong for the purpose of this utility model, repeat Utilization rate is high, the combined type temporary building of the low Container Reconstruction of cost.
The utility model provides a kind of combined type temporary building of Container Reconstruction, is combined by multiple Container Reconstruction rooms Cheng Yidong temporary buildings, including upper strata Container Reconstruction room and lower floor's Container Reconstruction room, lower floor's Container Reconstruction room are arranged on mixed On solidifying knoll platform, ceiling is equipped with above the Container Reconstruction room of upper strata, Stilt layer is formed between ceiling and upper strata Container Reconstruction room, Upper strata Container Reconstruction room and lower floor's Container Reconstruction room both sides are equipped with stair and railing.
Further, Container Reconstruction room in upper strata is connected using local reinforcement welding mode with lower floor's Container Reconstruction room.
Further, lower floor's Container Reconstruction roof face cat ladder platform is equipped with noise-proofing isolation board.
Further, noise-proofing isolation board is assembled by supporting item, isolation board and connector, supporting item and lower floor's packaging The side in case transformation roof face is fixedly connected, and isolation board is connected by connector with supporting item.
Further, lower floor's Container Reconstruction room is connected with ground lead.
Further, ceiling is made of longitudinal bracing, cross-brace, vertical supporting and galvanized iron micromicrowatt, cross-brace and Longitudinal bracing composition planar support support galvanized iron micromicrowatt, vertical supporting are fixed with lower floor's Container Reconstruction room and longitudinal bracing Connection.
Further, the internal partition wall in Container Reconstruction room, interior wall and roof are equipped with wood glue plate or PVC board.
Further, the exterior wall in Container Reconstruction room is brushed with coating.
Further, Container Reconstruction room includes window, and window is connected by U-shaped card slot with Container Reconstruction room, U-shaped card Sealant is equipped between groove and the window.
Further, Container Reconstruction room includes door, and door includes inside door and external door, and inside door uses wood glue plate door, and external door is adopted With container iron sheet door.
According to the above aspect of the present invention, the Container Reconstruction combined type temporary building, resistance bad weather ability is strong, comfortable for living, It is fast to build speed, high recycling rate, cost is low.
Described above is only the general introduction of technical solutions of the utility model, in order to better understand the skill of the utility model Art means, and being practiced according to the content of specification, with the preferred embodiment of the utility model and coordinate attached drawing detailed below Describe in detail bright as after.
Brief description of the drawings
Fig. 1 is a kind of front elevation view of one embodiment of combined type temporary building of Container Reconstruction of the utility model;
Fig. 2 is a kind of side elevational view of the combined type temporary building of Container Reconstruction of the utility model;
Fig. 3 is a kind of layout drawing of the combined type temporary building concrete pier base of Container Reconstruction of the utility model;
Fig. 4 is a kind of one layer plane figure of combined type temporary building of Container Reconstruction of the utility model;
Fig. 5 is a kind of combined type temporary building first floor plan of Container Reconstruction of the utility model;
Fig. 6 is a kind of structure diagram of the heat-insulated ceiling of combined type temporary building of Container Reconstruction of the utility model;
Fig. 7 is a kind of structural representation of the combined type temporary building noise-proofing isolation board of Container Reconstruction of the utility model Figure;
Fig. 8 is a kind of structure diagram of the combined type temporary building railing of Container Reconstruction of the utility model;
Fig. 9 is a kind of scheme of installation of the combined type temporary building window of Container Reconstruction of the utility model.
Figure label:
1- Container Reconstructions room;11- windows;12-;13-U type card slots;14- sealants;
2- concrete pier bases;
3- stair;
4- railings;The first horizontal bars of 41-;The second horizontal bars of 42-;The 3rd horizontal bars of 43-;
5- ceilings;51- galvanized iron micromicrowatts;52- cross-braces;53- longitudinal bracings;54- longitudinal bracings are welded with vertical supporting Contact;Vertical supporting 55;
6- noise-proofing isolation boards;61- supporting items;62- isolation boards;63- connectors;
7- ground leads;
8- wayside pavilions;
Between 9- storings.
Embodiment
With reference to the accompanying drawings and examples, specific embodiment of the present utility model is described in further detail.Below Embodiment is used to illustrate the utility model, but is not intended to limit the scope of the present invention.
Join shown in Fig. 1 to Fig. 9, present embodiments provide that a kind of container changes makes combined type temporary building, this builds temporarily Build and be composed of multiple Container Reconstruction rooms 1, the arrangement of Container Reconstruction room 1 can like according to occupant to be freely combined, the collection The combined type temporary building transformed of casing is mainly several by Container Reconstruction room 1, concrete pier base 2, cat ladder 3, railing 4, ceiling 5 etc. Part forms.
1 room-sized of Container Reconstruction room is divided into two kinds of specifications of 15 ㎡ and 30 ㎡, and 12 rulers and 24 ruler packagings are respectively adopted Case.About overall point two layers of arrangement, outside are sprayed with white paint, blueness paint edging;Inside wood glue plate packaging makes interior wall Air layer is formed between iron sheet, to assign to the effect of heat-insulated, insulation, sound insulation;Internal metope even can be by actual occupant The individual characteies such as wallpaper, coating, paintings decoration is carried out according to personal like;The steel pipe post (vertical supporting 55) of ceiling 5, wooden frame (cross-brace 52), 51 paving of galvanized iron micromicrowatt (can be used in turn), so as to be formed at the top of Container Reconstruction room 1 aerial Layer, can effectively avoid daylight and directly shines, reach the effect of roof insulation;Upper strata Container Reconstruction room is using local reinforcement welding mode It is connected with lower floor's Container Reconstruction room, lower floor's Container Reconstruction room sets ground lead 7, carries out lightning protection;Room window 11 Burglary-resisting window is set, and inside is timber and outside is Theft-proof iron door;Common platform is set between second layer room and exclusively enjoys balcony, both The communication and contacts for keeping individual privacy to be easy to again between colony.
The combined type temporary building of Container Reconstruction makes moulding gracefulness by transforming waste and old container, It is multiple functional, the high-quality building for temporary habitation of livable-in.Meanwhile using the organic assembling between different containers, form enhancement The public space of exchange, promoting the residential environment of temporary building improves.
Specifically, the internal partition wall in Container Reconstruction room 1, interior wall, furred ceiling (roof) are using wood glue plate or PVC decoration board walls Face.Fixed 4*8 flitches frame is followed closely on container using dovetail, wood screw fixes wood glue plate or PVC decorative board in flitch frame On.
Exterior wall uses coating metope.1 wall base cleaning of Container Reconstruction room simultaneously polishes smooth, and brushes (spray) paint coat Twice.
Ceiling 5 uses galvanized iron sheet tiling.50 steel-pipe roof structure systems of Φ (including longitudinal bracing 53, vertical supporting 55), 4*8 Flitch purlin (cross-brace 52), 0.5mm thickness galvanized iron micromicrowatt 51.
Window 11 uses aluminum window, and door 12 is using wood glue plate door (inside door) and container iron sheet door (external door).
Stair 3 are marked time and are assembled by 50 steel pipes of Φ (skeleton and handrail), 4*16 planks;Railing 4 is by 50 steel-pipe weldings of Φ Or fastener is spliced, lower floor's Container Reconstruction roof face cat ladder platform railing is by 50 steel pipes of Φ (the 3rd horizontal bar 43), 8cm wide wood Plate (the second horizontal bar 42), 16cm wide planks (the 3rd horizontal bar 41) form protective fence.
Noise-proofing sound panel 6 is arranged on the cat ladder platform of lower floor's Container Reconstruction roof face, by 50 steel pipes of Φ (supporting item 61) And 4*16 planks (isolation board 62) are assembled by 60mm outer-hexagonals dovetail nail (connector 63), 50 steel pipes of Φ (supporting item 61) It is welded in the side in lower floor's Container Reconstruction roof face.
Distribution system is equal using power supply-overall-each room three-level power distribution protection system in container row room, house interior electric wire Apply to be dark, completed before the completion of interior wall frame, top panel.
Take shelter from the thunder using 10 galvanized steel bars of Φ as ground lead 7, using the zinc-plated band irons of 40*4, buried depth 1m is used as and connects Ground device.
The combined type temporary building of Container Reconstruction provided in this embodiment has the following technical effect that:
1) process, make, dispose simply, the construction period is short.
2) discarded container usage is improved, reduces pollution of the waste to environment;
3) building materials such as ceiling, cat ladder can be used in turn, container house can global transfer secondary use, do not produce Building waste;
4) antitheft, safe effect protrudes, and resistance bad weather ability is strong.
5) can be used repeatedly, energy conservation and environmental protection.
Certain project construction site employs the combined type temporary building of the Container Reconstruction, realizes waste and old container Secondary use, make moulding gracefulness, multiple functional, the high-quality house of livable-in, has saved cost.
The above is only the preferred embodiment of the utility model, is not intended to limit the present invention, it is noted that For those skilled in the art, on the premise of the utility model technical principle is not departed from, can also do Go out some improvement and modification, these improvements and modifications also should be regarded as the scope of protection of the utility model.

Claims (10)

1. the combined type temporary building of a kind of Container Reconstruction, it is characterised in that be combined into temporarily by multiple Container Reconstruction rooms Building, including upper strata Container Reconstruction room and lower floor's Container Reconstruction room, lower floor's Container Reconstruction room are arranged on concrete pier On platform, ceiling is equipped with above the upper strata Container Reconstruction room, is formed between the ceiling and the upper strata Container Reconstruction room Stilt layer, the upper strata Container Reconstruction room and lower floor's Container Reconstruction room both sides are equipped with stair and railing.
A kind of 2. combined type temporary building of Container Reconstruction according to claim 1, it is characterised in that the upper strata collection Vanning transformation room is connected using local reinforcement welding mode with lower floor's Container Reconstruction room.
A kind of 3. combined type temporary building of Container Reconstruction according to claim 1, it is characterised in that lower floor's collection Vanning transformation roof face landing is equipped with noise-proofing isolation board.
A kind of 4. combined type temporary building of Container Reconstruction according to claim 3, it is characterised in that the noise-proofing Isolation board is assembled by supporting item, isolation board and connector, the supporting item and the side in lower floor's Container Reconstruction roof face It is fixedly connected, the isolation board is connected by the connector with the supporting item.
A kind of 5. combined type temporary building of Container Reconstruction according to claim 1, it is characterised in that lower floor's collection Vanning transformation room is connected with ground lead.
A kind of 6. combined type temporary building of Container Reconstruction according to claim 1, it is characterised in that the ceiling by Longitudinal bracing, cross-brace, vertical supporting and galvanized iron micromicrowatt composition, the cross-brace and longitudinal bracing composition planar support Body supports the galvanized iron micromicrowatt, and the vertical supporting is fixedly connected with lower floor's Container Reconstruction room and longitudinal bracing;Plating Zinc metal tile ceiling forms air circulation layer with upper strata container top, plays heat-insulated, cooling effect.
A kind of 7. combined type temporary building of Container Reconstruction according to claim 1, it is characterised in that the container Internal partition wall, interior wall and the roof in transformation room are equipped with wood glue plate or PVC board.
A kind of 8. combined type temporary building of Container Reconstruction according to claim 1, it is characterised in that the container The exterior wall in transformation room is brushed with coating.
A kind of 9. combined type temporary building of Container Reconstruction according to claim 1, it is characterised in that the container Transformation room includes window, and the window is connected by U-shaped card slot with Container Reconstruction room, the U-shaped card slot and the window it Between be equipped with sealant.
A kind of 10. combined type temporary building of Container Reconstruction according to claim 9, it is characterised in that the packaging Case transformation room includes door, and the door includes inside door and external door, and the inside door uses wood glue plate door, and the external door uses container iron Pi Men.
CN201721106531.4U 2017-08-31 2017-08-31 A kind of combined type temporary building of Container Reconstruction Expired - Fee Related CN207296486U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721106531.4U CN207296486U (en) 2017-08-31 2017-08-31 A kind of combined type temporary building of Container Reconstruction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721106531.4U CN207296486U (en) 2017-08-31 2017-08-31 A kind of combined type temporary building of Container Reconstruction

Publications (1)

Publication Number Publication Date
CN207296486U true CN207296486U (en) 2018-05-01

Family

ID=62438349

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721106531.4U Expired - Fee Related CN207296486U (en) 2017-08-31 2017-08-31 A kind of combined type temporary building of Container Reconstruction

Country Status (1)

Country Link
CN (1) CN207296486U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114000736A (en) * 2021-11-17 2022-02-01 广东工业大学 Spherical sea-island living cabin

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114000736A (en) * 2021-11-17 2022-02-01 广东工业大学 Spherical sea-island living cabin

Similar Documents

Publication Publication Date Title
US3775240A (en) Structural building module
CN205444458U (en) Integrated assembled steel construction building
CN105317110A (en) Integrated assembly type steel structure building
CN205153114U (en) Lightweight steel structure modularized residential building
CN104060853B (en) Lightweight steel construction modularization house
CN106320521A (en) Pure part plate combined industrialized house assembling structure which can be rapidly erected
CN102635248B (en) Modularized quickly-assembled house
CN104631857A (en) Mobile house
CN201567688U (en) Light thermal insulation compound board for building
CN203613645U (en) Modular prefabricated movable house
CN207296486U (en) A kind of combined type temporary building of Container Reconstruction
CN202031346U (en) Full-prefabricated GRC (glass-fiber reinforced composite) tent house system
CN108590025B (en) Bamboo green assembled house and construction method thereof
CN201512913U (en) Enhanced polyurethane thermal-insulation decorative sheet
CN206157903U (en) Pure part plate combination industrialization house assembly structure that can build fast
CN112127529A (en) Half unit assembled stone curtain wall structure
US9453344B2 (en) Modular insulated facade
CN204627052U (en) Steel work machine room under a kind of Integral tower
CN208844817U (en) The insulation construction of saddle plate roofing
CN103485538A (en) Construction method of energy-saving insulation waterproof wood-trussed roof system
CN205153595U (en) Movable multi -function vehicle room of simplex bit architecture
CN101603343A (en) Heat-insulation waterproof accessible steel roof
Serrano Limnologen–Experiences from an 8-storey timber building
CN203613646U (en) Prefabricated house convenient for wiring
CN201162277Y (en) Assembly type integrated house component and assembly type integrated house

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180501

Termination date: 20200831