CN112127529A - Half unit assembled stone curtain wall structure - Google Patents
Half unit assembled stone curtain wall structure Download PDFInfo
- Publication number
- CN112127529A CN112127529A CN202011048061.7A CN202011048061A CN112127529A CN 112127529 A CN112127529 A CN 112127529A CN 202011048061 A CN202011048061 A CN 202011048061A CN 112127529 A CN112127529 A CN 112127529A
- Authority
- CN
- China
- Prior art keywords
- steel
- curtain wall
- galvanized steel
- main
- sign indicating
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
- E04B2/96—Curtain walls comprising panels attached to the structure through mullions or transoms
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Load-Bearing And Curtain Walls (AREA)
Abstract
The invention discloses a semi-unit assembled stone curtain wall structure which comprises two main keels, wherein the main keels are connected through galvanized steel back plates; each main keel is provided with a channel steel adaptor, and the tail end of each main keel is provided with a steel core sleeve; the lower part of channel-section steel adaptor is provided with vertical zinc-plated steel angle sign indicating number, and the junction of vertical zinc-plated steel angle sign indicating number and main joist is provided with the insulating rubber pad, is provided with horizontal zinc-plated steel angle sign indicating number on the vertical zinc-plated steel angle sign indicating number, and the upper portion of horizontal zinc-plated steel angle sign indicating number is connected with one section of zinc-plated angle steel fossil fragments, and another section of zinc-plated angle steel fossil fragments is provided with a plurality of back of the body bolt group, is provided with the rock wool strip between each main joist. The invention effectively reduces the field construction workload and shortens the construction period. Not only reduces the potential safety hazards of processing and installation operation of the semi-unit assembly type stone curtain wall component, but also fundamentally stops the pollution to the surrounding environment, and achieves environmental protection and green construction.
Description
Technical Field
The invention relates to a stone curtain wall structure, in particular to a semi-unit assembly type stone curtain wall structure.
Background
In recent years, assembly type buildings are vigorously pushed in China, and the main bodies and decoration construction of the buildings are developed towards the industrialization, standardization and modularization of structural parts. The stone curtain wall is a building coated with stone coat, so that the stone curtain wall is beautiful, elegant, stable and durable. The traditional stone curtain wall construction has the advantages of large field construction amount, longer period, easy occurrence of fire, high falling, object striking, mechanical injury and other safety production accidents in the installation process. The operations of stone polishing, keel welding, paint coating and the like on the construction site can cause pollution to the surrounding environment.
Therefore, technical personnel in the field are dedicated to research and develop a semi-unit assembled stone curtain wall structure to solve the problems of long construction period and high quality safety risk in the existing stone curtain wall construction process.
Disclosure of Invention
In view of the above defects in the prior art, the technical problem to be solved by the present invention is to develop a half-unit assembled stone curtain wall structure to solve the problems of long construction period and high quality safety risk in the existing stone curtain wall construction process.
In order to achieve the purpose, the invention provides a semi-unit assembled stone curtain wall structure which comprises two main keels, wherein the main keels are connected through galvanized steel back plates;
each main keel is provided with a channel steel adaptor, and the tail end of each main keel is provided with a steel core sleeve; the lower part of channel-section steel adaptor is provided with vertical zinc-plated steel angle sign indicating number, vertical zinc-plated steel angle sign indicating number with the junction of main joist is provided with the insulating rubber pad, be provided with horizontal zinc-plated steel angle sign indicating number on the vertical zinc-plated steel angle sign indicating number, the upper portion and one section of zinc-plated angle steel keel of horizontal zinc-plated steel angle sign indicating number are connected, another section of zinc-plated angle steel keel is provided with a plurality of back of the body bolt group, and each stone material panel respectively through each back of the body bolt group with zinc-plated angle steel keel connects, each be provided with the rock wool strip between the main joist.
Preferably, the channel steel adaptor is detachably connected with the main keel through the first bolt.
Preferably, flanges are arranged on two sides of the galvanized steel back plate, and the galvanized steel back plate is connected with the main keels through the flanges respectively.
Preferably, each flanging is respectively connected with each main keel through a plurality of first screws.
Preferably, the longitudinal galvanized steel angle bracket is connected with the main keel through a second screw.
Preferably, the transverse galvanized steel angle bracket is horizontally welded on the upper part of the longitudinal galvanized steel angle bracket.
Preferably, the galvanized angle steel keel is connected with the back bolt group through a second bolt, and the back bolt group is made of stainless steel.
Preferably, the external corner part between each two adjacent stone panels is fixed by installing a stainless steel pin, and a weather-proof sealant is arranged.
Preferably, the number of the groups of the stone panels is three, and each stone panel is connected with the galvanized angle steel keel through each back bolt group.
The invention has the beneficial effects that: the invention effectively reduces the field construction workload and shortens the construction period. Not only reduces the potential safety hazards of processing and installation operation of the semi-unit assembly type stone curtain wall component, but also fundamentally stops the pollution to the surrounding environment, and achieves environmental protection and green construction.
Drawings
Fig. 1 is a schematic top view of the present invention.
Fig. 2 is a side view of the present invention.
Detailed Description
The invention is further illustrated by the following examples in conjunction with the accompanying drawings:
as shown in fig. 1 to 2, a half-unit assembled stone curtain wall structure comprises two main joists 1, wherein the main joists 1 are connected through a galvanized steel back plate 8, in the embodiment, the main joists 1 are aluminum profile main joists;
each main keel 1 is provided with a channel steel adaptor 7, the tail end of each main keel 1 is provided with a steel core sleeve 12, and the steel core sleeve 12 is connected with the main keel 1 in a welding mode in the embodiment; the utility model discloses a galvanized steel angle keel, including channel-section steel adaptor 7, vertical galvanized steel angle sign indicating number 4 is provided with in the below of channel-section steel adaptor 7, vertical galvanized steel angle sign indicating number 4 with the junction of main joist 1 is provided with insulating cushion 13, be provided with horizontal galvanized steel angle sign indicating number 3 on the vertical galvanized steel angle sign indicating number 4, the upper portion and one section of galvanized steel angle fossil fragments 5 of horizontal galvanized steel angle sign indicating number 3 are connected, another section of galvanized steel angle fossil fragments 5 is provided with a plurality of back of the body bolt group 6, and each stone material panel 2 passes through each respectively back of the body bolt group 6 with galvanized steel angle fossil fragments 5 are connected, fill in rock wool strip 9 between two aluminium alloy main joist 1 afterwards, and the welding position is brushed the anti-rust paint. The external corner part between each two adjacent stone panels 2 is fixed by installing a stainless steel pin 11, and weather-proof sealant is arranged, so that a semi-unit assembly type stone curtain wall component is finally formed.
The channel steel adaptor 7 is detachably connected with the main keel 1 through the first bolt 16.
The galvanized steel back plate 8 is provided with flanges on two sides, and the galvanized steel back plate 8 is connected with the main keels 1 through the flanges.
Each of the flanges is connected to each of the main runners 1 by a plurality of first screws 10. And the longitudinal galvanized steel angle bracket 4 is connected with the main keel 1 through a second screw. The transverse galvanized steel angle brace 3 is horizontally welded on the upper part of the longitudinal galvanized steel angle brace 4. The galvanized angle steel keel 5 is connected with the back bolt group 6 through a second bolt, and the back bolt group 6 is made of stainless steel.
The number of the stone panels 2 is three, and each stone panel 2 is connected with the galvanized angle steel keel 5 through each back bolt group 6.
In the field construction process, the rear embedded part 15 is fixed to a reliable structure through a chemical anchor bolt 14, the half-unit assembly type stone curtain wall component is sleeved with the lower-layer aluminum section main keel 1 through a steel core sleeve 12, and after the correction and the positioning are carried out, the channel steel adapter 7 and the rear embedded part 15 are welded and fixed.
The invention also has the following characteristics:
1. through batch purchase, modular design, industrial production and integrated installation, the standardization and the high-efficiency energy conservation of the stone curtain wall component are realized.
2. Through the deepening design, can produce the stone material curtain component of processing multiple stone material kind, specification and dimension, additional function in the mill, extensive applicability.
3. The height of the single stone curtain wall component is the height of a floor, and the single stone curtain wall component can be directly hung on a floor embedded part and is convenient and fast to install. The plate can be disassembled and is convenient to replace.
4. The factory intensively processed stone curtain wall component can be synchronously constructed with the main body structure, safety protection is well done, vertical cross operation is easy, the whole building construction period is shortened, the labor efficiency is improved, and the labor cost is saved.
5. The unit plate is hoisted integrally, the installation speed is high, the on-site construction period is short, the finished product protection is convenient, and the economic benefit and the social benefit are obvious.
6. The factory processes the curtain wall component of stone material concentratedly, from the selective purchase of the raw materials, the splice of fossil fragments to the last panel mounting have the special messenger to go on, the process is checked and accepted, conceals and checks and accepts, keeps close layer upon layer for the product precision is high, the matching degree is high between each component, and engineering quality obtains guaranteeing.
7. Dust removal and noise reduction equipment is arranged in a professional factory, so that the air pollution and the noise pollution caused by stone polishing, rock wool strip installation and welding operation can be greatly reduced; and fire-fighting facilities such as dry powder extinguishers, fire hydrants and the like are arranged according to fire-fighting specifications, so that potential safety hazards such as fire, explosion and the like are greatly reduced, and the green construction requirement is met.
The foregoing detailed description of the preferred embodiments of the invention has been presented. It should be understood that numerous modifications and variations could be devised by those skilled in the art in light of the present teachings without departing from the inventive concepts. Therefore, the technical solutions available to those skilled in the art through logic analysis, reasoning and limited experiments based on the prior art according to the concept of the present invention should be within the scope of protection defined by the claims.
Claims (9)
1. The utility model provides a half unit assembled stone material curtain wall construction, characterized by: the steel keel comprises two main keels (1), wherein the main keels (1) are connected through galvanized steel back plates (8);
a channel steel adaptor (7) is arranged on each main keel (1), and a steel core sleeve (12) is arranged at the tail end of each main keel (1); the steel channel adapter (7) is provided with a longitudinal galvanized steel angle sign indicating number (4) below, the longitudinal galvanized steel angle sign indicating number (4) with the junction of main joist (1) is provided with insulating rubber mat (13), be provided with horizontal galvanized steel angle sign indicating number (3) on the longitudinal galvanized steel angle sign indicating number (4), the upper portion and the one section of galvanized steel angle fossil fragments (5) of horizontal galvanized steel angle sign indicating number (3) are connected, another section of galvanized steel angle fossil fragments (5) is provided with a plurality of back bolt group (6), each stone material panel (2) respectively through each back bolt group (6) with galvanized steel angle fossil fragments (5) are connected, each be provided with rock wool strip (9) between main joist (1).
2. The half-unit fabricated stone curtain wall structure of claim 1, wherein: the channel steel adaptor (7) is detachably connected with the main keel (1) through the first bolt (16).
3. The half-unit fabricated stone curtain wall structure of claim 1, wherein: flanges are arranged on two sides of the galvanized steel back plate (8), and the galvanized steel back plate (8) is connected with the main keels (1) through the flanges.
4. The half-unit fabricated stone curtain wall structure of claim 3, wherein: each flanging is respectively connected with each main keel (1) through a plurality of first screws (10).
5. The half-unit fabricated stone curtain wall structure of claim 3, wherein: and the longitudinal galvanized steel angle bracket (4) is connected with the main keel (1) through a second screw.
6. The half-unit fabricated stone curtain wall structure of claim 1, wherein: the transverse galvanized steel angle brace (3) is horizontally welded on the upper part of the longitudinal galvanized steel angle brace (4).
7. The half-unit fabricated stone curtain wall structure of claim 1, wherein: the galvanized angle steel keel (5) is connected with the back bolt group (6) through a second bolt, and the back bolt group (6) is made of stainless steel.
8. The half-unit fabricated stone curtain wall structure of claim 1, wherein: the external corner part between each two adjacent stone panels (2) is fixed by installing a stainless steel pin (11) and is provided with weather-proof sealant.
9. The half-unit fabricated stone curtain wall structure of any one of claims 1 to 8, wherein: the number of the stone panels (2) is three, and each stone panel (2) is connected with the galvanized angle steel keel (5) through each back bolt group (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011048061.7A CN112127529A (en) | 2020-09-29 | 2020-09-29 | Half unit assembled stone curtain wall structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011048061.7A CN112127529A (en) | 2020-09-29 | 2020-09-29 | Half unit assembled stone curtain wall structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112127529A true CN112127529A (en) | 2020-12-25 |
Family
ID=73844612
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011048061.7A Pending CN112127529A (en) | 2020-09-29 | 2020-09-29 | Half unit assembled stone curtain wall structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112127529A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113417387A (en) * | 2021-06-17 | 2021-09-21 | 深圳海外装饰工程有限公司 | Assembled steel through piece metal curtain wall structure and construction method |
CN115233836A (en) * | 2022-09-05 | 2022-10-25 | 中国十七冶集团有限公司 | Construction method of curtain wall steel upright post node |
-
2020
- 2020-09-29 CN CN202011048061.7A patent/CN112127529A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113417387A (en) * | 2021-06-17 | 2021-09-21 | 深圳海外装饰工程有限公司 | Assembled steel through piece metal curtain wall structure and construction method |
CN115233836A (en) * | 2022-09-05 | 2022-10-25 | 中国十七冶集团有限公司 | Construction method of curtain wall steel upright post node |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2017076070A1 (en) | Integrated-assembly steel structure building | |
CN205444458U (en) | Integrated assembled steel construction building | |
CN110792203B (en) | Aerated concrete composite heat-insulation wallboard system and construction method thereof | |
CN112127529A (en) | Half unit assembled stone curtain wall structure | |
CN204282709U (en) | Diatom veneer rock wool composite wall | |
CN112112418B (en) | Construction method of high-rise building aluminum formwork climbing frame combined system | |
CN203891255U (en) | Industrial factory building external wall | |
CN210369561U (en) | Fireproof and decorative integrated steel beam | |
CN112482779B (en) | Integral hoisting construction method for cornice bucket arch of antique building | |
CN117449545B (en) | Assembled type track traffic station entrance and exit awning and construction method | |
CN213653929U (en) | Half unit assembled stone curtain wall structure | |
CN206205151U (en) | A kind of prefabricated integral assembling formula movable plank house | |
CN115198878A (en) | Environment-friendly wall assembled building and construction method thereof | |
CN210316204U (en) | Assembled corrugated steel structure for wallboard of house and workshop | |
CN2318328Y (en) | Light movable hosue | |
CN113585541A (en) | Fast-assembling type indoor partition wall and construction method thereof | |
CN207296486U (en) | A kind of combined type temporary building of Container Reconstruction | |
CN111173310A (en) | Non-stop large steel structure roof reinforcing construction method | |
CN220868735U (en) | Modularized unit for cleaning factory building and overhauling channel | |
CN215290792U (en) | Assembled shaped steel combination bearing wall | |
CN211200704U (en) | A L C wallboard bearing house | |
CN219364920U (en) | Building steel structure with reinforced structure | |
CN211871124U (en) | Modularized panel for steel frame elevator door wall | |
CN109339448A (en) | Low-rise building lightweight steel construction metope connect engineering method with metope node | |
CN214941473U (en) | Energy-saving and environment-friendly keel shared by two curtain walls |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |