CN207277204U - A kind of pier stud automatic spray curing means - Google Patents

A kind of pier stud automatic spray curing means Download PDF

Info

Publication number
CN207277204U
CN207277204U CN201721066348.6U CN201721066348U CN207277204U CN 207277204 U CN207277204 U CN 207277204U CN 201721066348 U CN201721066348 U CN 201721066348U CN 207277204 U CN207277204 U CN 207277204U
Authority
CN
China
Prior art keywords
pier stud
pier
automatic spray
curing means
spray curing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721066348.6U
Other languages
Chinese (zh)
Inventor
曾涛
杨水
付凡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Sixth Group Co Ltd
Beijing Railway Construction Co of China Railway Sixth Group Co Ltd
Original Assignee
China Railway Sixth Group Co Ltd
Beijing Railway Construction Co of China Railway Sixth Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Sixth Group Co Ltd, Beijing Railway Construction Co of China Railway Sixth Group Co Ltd filed Critical China Railway Sixth Group Co Ltd
Priority to CN201721066348.6U priority Critical patent/CN207277204U/en
Application granted granted Critical
Publication of CN207277204U publication Critical patent/CN207277204U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

A kind of pier stud automatic spray curing means.It includes pier top hanger, annular hoisting frame, hoist engine, water pump, control cabinet, horizontal support legs, Level tune angle steel, cross spacing fastening angle steel and elevator machine base;The beneficial effect of pier stud automatic spray curing means provided by the utility model is:Can be under the driving of hoist engine, and at the uniform velocity circulated up and down according to the time set on control cabinet and water is sprayed on the concrete surface of pier stud, increase the contact area of concrete surface and water, improve maintenance quality and positive effect, it can ensure that concrete surface is round-the-clock, the curing requirements moistened entirely, so as to solve the problems, such as that the drawbacks of pier shaft surface maintenance is uneven and concrete surface are cracking, accelerate speed of application, and operating process simple and flexible, security is higher, the quantity and labor intensity of construction personnel in pier shaft maintenance processes can be greatly lowered, and then reduce cost.Further, since the present apparatus is relatively simple for structure, thus cost is extremely low.

Description

A kind of pier stud automatic spray curing means
Technical field
The utility model belongs to construction of railway project equipment technical field, more particularly to a kind of pier stud automatic spray maintenance dress Put.
Background technology
At present, with the rapid development of the national economy, major urban infrastructure construction large area is unfolded, as traffic is transported The rapid development of defeated industry, original railway or highway facilities can not meet requirement, it is therefore desirable to largely add new line Road.
Conventional each unit in charge of construction of railway engineering carries out railway bridge, the pier stud maintenance of highway bridge or the side using artificial watering Method, since this method has the drawbacks of watering is uneven and spray water is lost in, easily causes pier stud concrete surface cracking, from And produce quality problems.Further, since pier stud curing time is grown, quantity is more, this process not only requires a great deal of time And manpower and materials, and this method in the case that construction cost is high, efficiency is low therefore huge in quantities and the duration is nervous It can not meet the requirement of construction speed and quality at all.
Utility model content
To solve the above-mentioned problems, the purpose of this utility model is to provide a kind of simple in structure, swift to operate and can Whole day automatically up and down circulate operation pier stud automatic spray curing means.
In order to achieve the above object, pier stud automatic spray curing means provided by the utility model includes pier top hanger, ring Shape hoisting frame, hoist engine, water pump, control cabinet, horizontal support legs, Level tune angle steel, cross spacing fastening angle steel and hoist engine bottom Seat;The elevator machine base is horizontally disposed rectangular frame;Hoist engine is installed on the middle part of elevator machine base;Pier top hanger It is the flat grid structure being made of two root bottom part crossbeams, two braces and the oblique hanging beams of Duo Gen, wherein the one of two root bottom part crossbeams End is connected to the both ends of elevator machine base, is separately positioned in the middle part of bottom surface on two pieces of pinners of pier stud top surface, and bottom The extending direction of crossbeam is consistent with the long axis direction of pier stud;The lower end of every brace is separately fixed at the outer end of a root bottom part crossbeam Surface, and upper section slants outward is set;More oblique hanging beams are connected between brace and base cross members;It is upper per root bottom part crossbeam It is connected in one end on the two sides at pinner outer end position respectively with a horizontal support legs, the outer end difference of every horizontal support legs One piece of installation carries the Level tune angle steel of screw hole, and is consolidated Level tune angle steel using mode of the bolt downward through screw hole It is scheduled on pinner, for carrying out Level tune to pier top hanger;Weld one block of steel plate in the bottom of every horizontal support legs;Every piece of transverse direction One side on spacing fastening angle steel is fixed on one piece of steel plate bottom surface, and the outer end face of another side and pinner is arranged in parallel and in advance Screw hole is left, and cross spacing fastening angle steel is fixed on pinner outer end face using the bolt horizontal mode through screw hole, To prevent pier top hanger from toppling over;Annular hoisting frame is the annular grid structure being made of steel pipe, is looped around the lateral outer of pier stud, And upper end is formed with multiple apopores;Two steel wire rope outer ends on hoist engine are respectively around being arranged on two jib heads Extend downwardly and be fixed on annular hoisting frame after pulley;Water pump is set on the ground, and water outlet is lifted by hose and annular Frame connects, and water inlet is connected by pipeline with water source;Control cabinet set on the ground, be internally provided with multiple time relays and Automatically control, control, rising, decline and pump switch, and be electrically connected with hoist engine, water pump manually.
The middle part of brace is equipped with limiter on the pier top hanger, and limiter is limitation travel switch, electromechanical with elevator Connection.
The annular hoisting frame is formed by connecting using 3*3cm square tubes, and the rectangular triangle in longitudinal cross-section, one of them is straight The arm of angle is parallel with the side of pier stud, and another right-angle side is located at upper end, and staggeredly has in the square tube of upper end equipped with multiple The apopore of gradient;The distance between medial surface and pier stud side are 10~15cm, and inner side is equipped with multiple spacing pulleys.
The power of the water pump is 2.2kw, lift 40m.
The elevator machine base is welded using channel steel.
Base cross members, brace on the pier top hanger are made of 10*10cm square tubes.
Compared with prior art, the beneficial effect of pier stud automatic spray curing means provided by the utility model is:Can Under the driving of hoist engine, and at the uniform velocity circulate the concrete that water is sprayed to pier stud up and down according to the time set on control cabinet On surface, the contact area of concrete surface and water is increased, improves maintenance quality and positive effect, it is ensured that concrete The curing requirements that surface is round-the-clock, moistens entirely, so as to solve the drawbacks of pier shaft surface maintenance is uneven and concrete surface is opened The problem of splitting, accelerates speed of application, and operating process simple and flexible, and security is higher, and pier shaft maintenance can be greatly lowered During construction personnel quantity and labor intensity, and then reduce cost.Further, since the present apparatus is relatively simple for structure, because And cost is extremely low.
Brief description of the drawings
Fig. 1 is pier stud automatic spray curing means structure top view provided by the utility model;
Fig. 2 is pier stud automatic spray curing means use state stereogram provided by the utility model.
Fig. 3 is pier top hanger stereogram in pier stud automatic spray curing means provided by the utility model.
Embodiment
With reference to the accompanying drawings and examples, specific embodiment of the present utility model is described in further detail.Below Embodiment is used to illustrate the utility model, but is not intended to limit the scope of the present invention.
As shown in Fig. 1-Fig. 3, pier stud automatic spray curing means provided by the utility model includes pier top hanger 1, annular Hoisting frame 2, hoist engine 3, water pump 4, control cabinet 5, horizontal support legs 6, Level tune angle steel 7, cross spacing fastening angle steel 8 and elevator Machine base 15;The elevator machine base 15 is horizontally disposed rectangular frame;Hoist engine 3 is installed in elevator machine base 15 Portion;Pier top hanger 1 is the flat grid structure being made of two root bottom part crossbeams, 11, two braces 14 and the oblique hanging beams 12 of Duo Gen, its In one end of two root bottom part crossbeams 11 be connected to the both ends of elevator machine base 15, being separately positioned on pier stud 13 in the middle part of bottom surface pushes up On two pieces of pinners 10 in face, and the extending direction of base cross members 11 is consistent with the long axis direction of pier stud 13;Every brace 14 Lower end is separately fixed at the outer end face of a root bottom part crossbeam 11, and upper section slants outward is set;More oblique hanging beams 12 connect Between brace 14 and base cross members 11;Respectively with one on the two sides at 10 outer end position of pinner on per root bottom part crossbeam 11 One end of root horizontal support legs 6 is connected, and one block of Level tune angle steel for carrying screw hole is installed in the outer end of every horizontal support legs 6 respectively 7, and Level tune angle steel 7 is fixed on pinner 10 using mode of the bolt downward through screw hole, for pier top hanger 1 Carry out Level tune;Weld one block of steel plate in the bottom of every horizontal support legs 6;One side on every block of cross spacing fastening angle steel 8 It is fixed on one piece of steel plate bottom surface, another side and the outer end face of pinner 10 are arranged in parallel and are reserved with screw hole, and utilize spiral shell Cross spacing fastening angle steel 8 is fixed on 10 outer end face of pinner by the horizontal mode through screw hole of bolt, to prevent pier top hanger 1 from inclining ;Annular hoisting frame 2 is the annular grid structure being made of steel pipe, is looped around the lateral outer of pier stud 13, and upper end is formed There are multiple apopores;Two steel wire rope outer ends on hoist engine 3 are backward around the pulley for being arranged on two 14 upper ends of brace respectively It is lower extension and be fixed on annular hoisting frame 2;Water pump 4 is set on the ground, and water outlet is connected by hose and annular hoisting frame 2 Connect, water inlet is connected by pipeline with water source;Control cabinet 5 is set on the ground, be internally provided with multiple time relays and from Move control, manually control, rising, decline and pump switch, and be electrically connected with hoist engine 3, water pump 4.
The middle part of brace 14 is equipped with limiter 9 on the pier top hanger 1, and limiter 9 is limitation travel switch, with elevator Machine 3 is electrically connected.During the circulation of annular hoisting frame 2 rises, declines, if stroke produces error or mistake occurs in order to control in people By mistake, the control circuit of hoist engine 3 can be cut off when limiter 9 is touched on the top of annular hoisting frame 2, so that hoist engine 3 breaks at once Electricity and stop rising, play the role of protecting pier top hanger 1 and annular hoisting frame 2.
The annular hoisting frame 2 is formed by connecting using 3*3cm square tubes, the rectangular triangle in longitudinal cross-section, one of them Right-angle side is parallel with the side of pier stud 13, and another right-angle side is located at upper end, and staggeredly equipped with multiple in the square tube of upper end Apopore with gradient;The distance between medial surface and 13 side of pier stud are 10~15cm, and inner side is equipped with multiple limits Position pulley.
The power of the water pump 4 is 2.2kw, lift 40m.
The elevator machine base 15 is welded using channel steel.
Base cross members 11, brace 14 on the pier top hanger 1 are made of 10*10cm square tubes.
Now pier stud automatic spray curing means application method provided by the utility model is described below:First by the people that works Member opens the hand control switch on control cabinet 5, then opens rising switch, thus starts hoist engine 3, will using steel wire rope Annular hoisting frame 2 is at the uniform velocity promoted to the top of pier stud 13 from ground, records and rises from opening rising switch to annular hoisting frame 2 To the top of pier stud 13 time as the rise time, the rise time relay being then arranged on the rise time in control cabinet 5 On, will similarly be arranged on fall time relay fall time, and make fall time than rise time shorter 1s, according to circumstances exist Relay sets itself pier top residence time pier top residence time, sets the water pump operation time on the water pump operation time relay For=rise time+fall time+pier top residence time, set and be spaced in the cycle time relay of interval according to weather condition Circulation time.After the completion of above-mentioned time setting, the manual switch on control cabinet 5 is adjusted in automatic switch, makes annular hoisting frame 2 By the circulation even speed movement up and down automatically of the above-mentioned time set under the driving of hoist engine 3, at the same time, starting mode of pump is opened Switch and operate water pump 4, the water from water source is thus supplied to annular hoisting frame 2 by hose, then lifted through annular Apopore on frame 2 is uniformly sprayed on the concrete surface of 13 side of pier stud, to increase the contact surface of concrete surface and water Product, improves maintenance quality and positive effect.
It the above is only the preferred embodiment of the utility model, it is noted that for the ordinary skill people of the art Member for, on the premise of the utility model technical principle is not departed from, some improvement and modification can also be made, these improve and Modification also should be regarded as the scope of protection of the utility model.

Claims (6)

  1. A kind of 1. pier stud automatic spray curing means, it is characterised in that:The pier stud automatic spray curing means includes pier top Hanger (1), annular hoisting frame (2), hoist engine (3), water pump (4), control cabinet (5), horizontal support legs (6), Level tune angle steel (7), cross spacing fastening angle steel (8) and elevator machine base (15);The elevator machine base (15) is horizontally disposed rectangle Frame;Hoist engine (3) is installed on the middle part of elevator machine base (15);Pier top hanger (1) be by two root bottom part crossbeams (11), two The flat grid structure that brace (14) and more oblique hanging beams (12) are formed, wherein one end of two root bottom part crossbeams (11) connects respectively At the both ends of elevator machine base (15), it is separately positioned in the middle part of bottom surface on two pieces of pinners (10) of pier stud (13) top surface, and bottom The extending direction of portion's crossbeam (11) is consistent with the long axis direction of pier stud (13);The lower end of every brace (14) is separately fixed at one The outer end face of base cross members (11), and upper section slants outward is set;More oblique hanging beams (12) are connected to brace (14) and bottom Between portion's crossbeam (11);Per on root bottom part crossbeam (11) on the two sides at pinner (10) outer end position respectively with a level One end of supporting leg (6) is connected, and one block of Level tune angle steel for carrying screw hole is installed in the outer end of every horizontal support legs (6) respectively (7), and using bolt Level tune angle steel (7) is fixed on pinner (10) downward through the mode of screw hole, for pier Top handling attachment (1) carries out Level tune;Weld one block of steel plate in the bottom of every horizontal support legs (6);Every piece of cross spacing fastens angle steel (8) one side on is fixed on one piece of steel plate bottom surface, and the outer end face of another side and pinner (10) is arranged in parallel and is reserved with Screw hole, and cross spacing fastening angle steel (8) is fixed on pinner (10) outer end face using the bolt horizontal mode through screw hole On, to prevent pier top hanger (1) from toppling over;Annular hoisting frame (2) is the annular grid structure being made of steel pipe, is looped around pier stud (13) lateral outer, and upper end is formed with multiple apopores;Two steel wire rope outer ends on hoist engine (3) bypass respectively to be set Put and extend downwardly and be fixed on annular hoisting frame (2) after the pulley of two brace (14) upper ends;Water pump (4) is arranged on ground On, water outlet is connected by hose with annular hoisting frame (2), and water inlet is connected by pipeline with water source;Control cabinet (5) is arranged on On ground, be internally provided with multiple time relays and automatically control, manually control, rise, decline and pump switch, and with Hoist engine (3), water pump (4) are electrically connected.
  2. 2. pier stud automatic spray curing means according to claim 1, it is characterised in that:On the pier top hanger (1) The middle part of brace (14) is equipped with limiter (9), and limiter (9) is limitation travel switch, is electrically connected with hoist engine (3).
  3. 3. pier stud automatic spray curing means according to claim 1, it is characterised in that:The annular hoisting frame (2) It is formed by connecting using 3*3cm square tubes, the rectangular triangle in longitudinal cross-section, one of right-angle side and the side of pier stud (13) are put down OK, another right-angle side is located at upper end, and is staggeredly equipped with multiple apopores with gradient in the square tube of upper end;Inner side The distance between face and pier stud (13) side are 10~15cm, and inner side is equipped with multiple spacing pulleys.
  4. 4. pier stud automatic spray curing means according to claim 1, it is characterised in that:The power of the water pump (4) For 2.2kw, lift 40m.
  5. 5. pier stud automatic spray curing means according to claim 1, it is characterised in that:The elevator machine base (15) It is welded using channel steel.
  6. 6. pier stud automatic spray curing means according to claim 1, it is characterised in that:On the pier top hanger (1) Base cross members (11), brace (14) is made of 10*10cm square tubes.
CN201721066348.6U 2017-08-24 2017-08-24 A kind of pier stud automatic spray curing means Expired - Fee Related CN207277204U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721066348.6U CN207277204U (en) 2017-08-24 2017-08-24 A kind of pier stud automatic spray curing means

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721066348.6U CN207277204U (en) 2017-08-24 2017-08-24 A kind of pier stud automatic spray curing means

Publications (1)

Publication Number Publication Date
CN207277204U true CN207277204U (en) 2018-04-27

Family

ID=61983743

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721066348.6U Expired - Fee Related CN207277204U (en) 2017-08-24 2017-08-24 A kind of pier stud automatic spray curing means

Country Status (1)

Country Link
CN (1) CN207277204U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108487077A (en) * 2018-06-13 2018-09-04 中交路桥建设有限公司 A kind of pier stud automatic spray health promotion system
CN109914272A (en) * 2019-03-07 2019-06-21 惠安县拓丰信息技术有限公司 A kind of pier stud automatic spray maintenance of equipment
CN111778859A (en) * 2020-07-03 2020-10-16 赵振宏 Bridge high mound watering health preserving device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108487077A (en) * 2018-06-13 2018-09-04 中交路桥建设有限公司 A kind of pier stud automatic spray health promotion system
CN109914272A (en) * 2019-03-07 2019-06-21 惠安县拓丰信息技术有限公司 A kind of pier stud automatic spray maintenance of equipment
CN111778859A (en) * 2020-07-03 2020-10-16 赵振宏 Bridge high mound watering health preserving device

Similar Documents

Publication Publication Date Title
CN207277204U (en) A kind of pier stud automatic spray curing means
CN109763652B (en) Building construction working face sprays dust fall heat sink
CN109624024A (en) A kind of interlocking segment process units system for waterway regulation
CN208415968U (en) Hydraulic climbing formwork/slding form operation shaft of high pier intelligence curing system
CN204081539U (en) A kind of overhanging type protection canopy had enough to meet the need
CN105133499A (en) Movable hanging basket trolley for bridge concrete anti-collision guardrail construction
CN204418013U (en) Bridge flange plate is constructed self-propelled cantilever hanging basket
CN103419279A (en) Overall dismantling and longitudinal slipping construction method of T beam formwork
CN108675170A (en) Roofing monorail crane and its construction method
CN203022010U (en) Side slope lining trolley
CN205243051U (en) Quick travel full automatic spray care car
CN208732486U (en) Roofing monorail crane
CN105821883A (en) Rotary type concrete feed divider for round-section vertical shaft
CN204920175U (en) Elevating gear reaches lift scaffold that contains continuous elevating gear in succession
CN205653066U (en) Take gantry crane of windrow dolly linkage
CN214573768U (en) Self-climbing sliding formwork pouring system for second-stage concrete pouring of gate slot
CN206158207U (en) Construction is with platform of unloading
CN204938642U (en) A kind of cable-stayed type material elevator
CN207597263U (en) A kind of concrete bridge deck automatic spray health preserving equipment
CN207522813U (en) A kind of curing means of precast concrete decorative panel
CN207498986U (en) Pipe gallery Quick Release formwork erecting structure
CN210414903U (en) Interlocking block production device system for channel improvement
CN105800473A (en) Gantry crane with material stacking dolly linkage
CN208986479U (en) A kind of safe and efficient formula electricity comb line hanger
CN204000603U (en) The special hitch of a kind of bridge overhauling nacelle

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180427