CN208986479U - A kind of safe and efficient formula electricity comb line hanger - Google Patents

A kind of safe and efficient formula electricity comb line hanger Download PDF

Info

Publication number
CN208986479U
CN208986479U CN201821278770.2U CN201821278770U CN208986479U CN 208986479 U CN208986479 U CN 208986479U CN 201821278770 U CN201821278770 U CN 201821278770U CN 208986479 U CN208986479 U CN 208986479U
Authority
CN
China
Prior art keywords
steel
hanger body
hanger
safe
channel steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821278770.2U
Other languages
Chinese (zh)
Inventor
徐朝杰
乔志兵
陈永进
刘贺
秦晓波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Original Assignee
Third Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd filed Critical Third Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Priority to CN201821278770.2U priority Critical patent/CN208986479U/en
Application granted granted Critical
Publication of CN208986479U publication Critical patent/CN208986479U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Floor Finish (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

The utility model discloses a kind of safe and efficient formula electricity comb line hangers, including hanger body, there are two the hanger body is arranged altogether, and joist channel steel is installed between two hanger bodies, protection tube is installed above the joist channel steel, the upper outer wall of the hanger body is equipped with level trough steel cross strut, and warning lamp band is installed in hanger body, the warning lamp band is electrically connected by power supply line and extraneous power supply, the structure of the equipment is simple, its construction site is safely controllable, fashioned iron main body is suspended in midair to determine by mechanics check computation, it is set to electric comb two sides, joist channel steel is welded in bottom in fashioned iron, for bearing the evenly load of electric comb, top is arranged bridging and stablizes, because pipeline surrounding is configured with fashioned iron protection, its compared to process it is numerous move change it is more safe and reliable with traditional suspension protection, its working procedure It is less, the traffic in city will not be affected greatly, the practicality is stronger.

Description

A kind of safe and efficient formula electricity comb line hanger
Technical field
The utility model belongs to deep pit digging technical field, and in particular to a kind of safe and efficient formula electricity row conduit wiring suspension Frame.
Background technique
Electricity channel is a kind of to meet the requirement that substation cable passes in and out line passage and overhead line enters ground, and for along The mating offer power channel of block power supply, electric comb line suspension protection way is solved when pipeline moves and changes difficulty, to ensure chief engineer Reliably a kind of construction method will will cause surrounding enviroment if moving the mode of changing according to traditional with construction safety for phase requirement Larger impact is unfavorable for urban transportation, while working procedure is various, increases construction investment, duration and risk.
Currently, existing conduit wiring suspension protected mode is numerous, quality is irregular, standardize it is lower, when in use can be by To biggish limitation, the practicality is not strong, and structure is complicated for most of equipment, spends greatly applying man-hour requirement user The amount time carries out pipeline to change label cutting operation, and this results in the reduction of work task efficiency, and the practicality is not strong;And mostly The cost of manufacture of number equipment is higher, once breaking down just needs that substantial contribution is spent to overhaul, the lower practicability of economic benefit It is not strong.
Wherein the performance of urban subway station construction period is particularly evident, and electric comb line, which moves, to be changed to surrounding enviroment It influences big, moves that change the period long, the problems such as higher cost, security risk is more, have to be solved.
Utility model content
The purpose of this utility model is to provide a kind of safe and efficient formula electricity comb line hangers, to solve above-mentioned background skill The urban subway station that its is proposed in art electric comb line of constructing moves to change and influences on surrounding enviroment big, moves that change the period long, at The problems such as this is higher, and security risk is more.
To achieve the above object, the utility model provides the following technical solutions: a kind of safe and efficient formula electricity row conduit wiring suspension Frame, including hanger body there are two the hanger body is arranged altogether, and are equipped with joist channel steel, institute between two hanger bodies It states and protection tube is installed above joist channel steel, the upper outer wall of the hanger body is equipped with level trough steel cross strut, and Warning lamp band is installed, the warning lamp band is electrically connected by power supply line and extraneous power supply in hanger body.
Preferably, the hanger body is made of the first I-steel and the second I-steel, the length of first I-steel Numerical value is greater than the length value of the second I-steel, and the first I-steel is welded and fixed with the second I-steel by welding gun.
Preferably, intensive joist channel steel is provided in the hanger body, between joist channel steel described in each adjacent two Equidistant arrangement respectively.
Preferably, the width numerical value of the level trough steel cross strut is greater than the width numerical value of joist channel steel.
Compared with prior art, the utility model has the beneficial effects that the device structure is scientific and reasonable safe and convenient to use, And the structure of the equipment is simple, construction site is safely controllable, and suspention fashioned iron main body is determined by mechanics check computation, is set to electric row Pipe two sides, joist channel steel is welded in bottom in fashioned iron, and for bearing the evenly load of electric comb, top is arranged bridging and stablizes, because Pipeline surrounding be configured with fashioned iron protection, compared to process it is numerous move change it is more safe and reliable with traditional suspension protection, Working procedure is less, will not affect greatly to the traffic in city, the practicality is stronger;And the standard of the equipment is high, suspention Fashioned iron main body surrounding uses warning lamp band and safety sign, while being reliably connected at the fulcrum of two sides with crown beam, cable sleeve bottom Wood glue plate is laid, top covers the net that gathers, clean and tidy salubrious, site safety civilized construction standardization, compared to directly common suspention side Formula more meets construction criteria requirement, not will receive too big limitation when in use, and the practicality is stronger;And the system of the equipment Make at low cost, suspention main body is suspended in midair using fashioned iron, and it is circulation material, reusable, even if failure without Fund maintenance energetically is spent, meanwhile, fashioned iron suspention is not damaged to former pipeline, moves to change compared to pipeline and has saved newly-built cable, power-off Expenses, the economic benefits such as loss, tube seat construction are higher;And which raises construction efficiency, suspension protection measure does not change former pipe Linear state reduces to move to change and is moved and changed and the later period relative to pipeline using encapsulating concrete processing with cutover time, subsequent recovery Recovery the time is greatly saved, improve efficiency, the practicality is stronger.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the vertical view outside drawing of the utility model;
Fig. 3 is the hanger body top view of the utility model.
In figure: 1- hanger body, 2- joist channel steel, 3- protection tube, 4- level trough steel cross strut, 5- warning lamp band.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-3 is please referred to, the utility model provides a kind of technical solution: a kind of safe and efficient formula electricity comb line hanger, Including hanger body 1, there are two the total settings of hanger body 1, and joist channel steel 2, joist slot are equipped between two hanger bodies 1 The top of steel 2 is equipped with protection tube 3, and the upper outer wall of hanger body 1 is equipped with level trough steel cross strut 4, and hanger body 1 On warning lamp band 5 is installed, warning lamp band 5 is electrically connected by power supply line and extraneous power supply.
In the present embodiment, it is preferred that hanger body 1 is made of the first I-steel and the second I-steel, the first I-steel Length value is greater than the length value of the second I-steel, and the first I-steel is welded and fixed with the second I-steel by welding gun, is In order to allow user to select suitable I-steel according to the actual situation when using equipment, may be selected if pipeline is longer by the One I-steel and the welding of the second I-steel are so that the length of hanger body 1 is enough, later using between steel plate two I-steel of reinforcement Weld seam so that the intensity of hanger body 1 is enough, if pipeline is shorter can to select one between the first I-steel and the second I-steel A, because the length value of the first I-steel is larger, therefore equipment can satisfy different Construction Conditions, and the practicality is stronger.
In the present embodiment, it is preferred that be provided with intensive joist channel steel 2, each adjacent two joist channel steel in hanger body 1 Equidistant arrangement respectively, is to be fully welded user equidistantly intensive joist channel steel 2 when installing equipment between 2 In hanger body 1, so that protection tube 3 during installation will not slide 2 be collapsed of joist channel steel, while support at equal intervals Beam channel steel 2 can also increase the stability of equipment after installing, and shake equipment will not arbitrarily.
In the present embodiment, it is preferred that the width numerical value of level trough steel cross strut 4 is greater than the width numerical value of joist channel steel 2, is In order to allow level trough steel cross strut 4 to be welded on by welding gun the upper outer wall of hanger body 1, so that the position of protection tube 3 It sets and is limited by level trough steel cross strut 4 without arbitrarily skidding off, the practicality is stronger, and the width number of level trough steel cross strut 4 Be worth it is larger be in order to enable 4 normal mounting of level trough steel cross strut, once the width numerical value of level trough steel cross strut 4 is smaller, Then level trough steel cross strut 4 can not ride over the upper outer wall of hanger body 1, so that the normal use of equipment is affected.
Working principle: when the utility model is used, user selects suitable hanger body 1 according to the actual situation first, If pipeline is longer to be may be selected to weld in the first I-steel and the second I-steel so that the length of hanger body 1 is enough, use later Steel plate reinforces the weld seam between two I-steel, so that the intensity of hanger body 1 is enough, it can be in the first I-steel if pipeline is shorter One is selected between the second I-steel, because the length value of the first I-steel is larger, therefore equipment can satisfy different apply Work situation, the practicality is stronger, later after hanger body 1 installs, then uses in pipeline two sides and the above earthwork and manually opens It digs, after the completion by above I-steel integral hoisting to crown beam, is reliably connected with the pre-embedded steel slab at the top of crown beam, later again in hanger Joist channel steel 2 in main body 1, every spacing 1m is laid with a channel steel as joist channel steel 2 during installation, and channel steel and I-shaped Steel is fully welded connection, is installing protection tube 3 later, lays wood glue plate in sleeve bottom when installing, and top covers the net that gathers, Level trough steel cross strut 4 is installed in hanger body 1 again later, so that an electric comb line hanger can be obtained, at night Between warning lamp band 5 and extraneous power supply can be made to be electrically connected by power supply line when using, so that warning light is issued, so that equipment Warning it is higher, which improves construction efficiency, and suspension protection measure does not change former pipeline state, reduces to move and changes and cut Connecing the time, subsequent recovery is moved relative to pipeline and is changed and the time is greatly saved in the recovery in later period using encapsulating concrete processing, Efficiency is improved, the practicality is stronger.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (4)

1. a kind of safe and efficient formula electricity comb line hanger, including hanger body (1), it is characterised in that: the hanger body (1) It altogether there are two settings, and is equipped with joist channel steel (2) between two hanger bodies (1), the top installation of the joist channel steel (2) Have protection tube (3), the upper outer wall of the hanger body (1) is equipped with level trough steel cross strut (4), and hanger body (1) On be equipped with warning lamp band (5), the warning lamp band (5) is electrically connected by power supply line and extraneous power supply.
2. a kind of safe and efficient formula electricity comb line hanger according to claim 1, it is characterised in that: the hanger body (1) it is made of the first I-steel and the second I-steel, the length value of first I-steel is greater than the length of the second I-steel Numerical value, and the first I-steel is welded and fixed with the second I-steel by welding gun.
3. a kind of safe and efficient formula electricity comb line hanger according to claim 1, it is characterised in that: the hanger body (1) intensive joist channel steel (2), equidistant arrangement respectively between joist channel steel (2) described in each adjacent two are provided on.
4. a kind of safe and efficient formula electricity comb line hanger according to claim 1, it is characterised in that: the horizontal channel steel The width numerical value of bridging (4) is greater than the width numerical value of joist channel steel (2).
CN201821278770.2U 2018-08-09 2018-08-09 A kind of safe and efficient formula electricity comb line hanger Active CN208986479U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821278770.2U CN208986479U (en) 2018-08-09 2018-08-09 A kind of safe and efficient formula electricity comb line hanger

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821278770.2U CN208986479U (en) 2018-08-09 2018-08-09 A kind of safe and efficient formula electricity comb line hanger

Publications (1)

Publication Number Publication Date
CN208986479U true CN208986479U (en) 2019-06-14

Family

ID=66781150

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821278770.2U Active CN208986479U (en) 2018-08-09 2018-08-09 A kind of safe and efficient formula electricity comb line hanger

Country Status (1)

Country Link
CN (1) CN208986479U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108988193A (en) * 2018-08-09 2018-12-11 中铁十局集团第三建设有限公司 A kind of safe and efficient formula electricity comb line hanger and application method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108988193A (en) * 2018-08-09 2018-12-11 中铁十局集团第三建设有限公司 A kind of safe and efficient formula electricity comb line hanger and application method

Similar Documents

Publication Publication Date Title
CN202881852U (en) Suspension bridge cable installation system
CN207847228U (en) A kind of overturning-preventing concrete wire pole
CN107313360B (en) Sliding cable type support-free support replacing operation platform
CN104195948A (en) Bridge hanging pipeline pushing installation and construction method
CN208986479U (en) A kind of safe and efficient formula electricity comb line hanger
CN204474178U (en) A kind of cable crane
CN204418013U (en) Bridge flange plate is constructed self-propelled cantilever hanging basket
CN106284989B (en) The sliding form bracing system of double track and complete construction method
CN101692548A (en) Tool for live replacing of hanging bottle string of drainage wire
CN204216502U (en) Drag and make Cable holder for distribution
CN204212065U (en) Bridge crossing anticollision barrier punching block erection equipment
CN201817208U (en) Simple lifting machine
CN108988193A (en) A kind of safe and efficient formula electricity comb line hanger and application method
CN204959611U (en) A lifting device for highway construction bridge railing base template
CN202023149U (en) Hanging basket used in construction
CN205474847U (en) Bridge water -drain mast installation platform truck
CN202925471U (en) Hydraulic formwork system for high pier construction
CN209384362U (en) A kind of elevator shelter bridge
CN204676439U (en) A kind of Bailey beam formula can be hung by supertronic tower top
CN203402829U (en) Frame of lifting machine for portable transformer
CN105162043A (en) Line suspension device for spanning line change of distribution aerial circuit, and application thereof
CN208235587U (en) A kind of large-span deep foundation pit underground power house rack assembling construction platform
CN202705932U (en) T-beam reinforced hanger frame structure
CN202401386U (en) Cable bridge for frame bridge
CN205004685U (en) Distribution overhead line stridees across line changing plumb -line device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant