CN108487077A - A kind of pier stud automatic spray health promotion system - Google Patents

A kind of pier stud automatic spray health promotion system Download PDF

Info

Publication number
CN108487077A
CN108487077A CN201810608325.6A CN201810608325A CN108487077A CN 108487077 A CN108487077 A CN 108487077A CN 201810608325 A CN201810608325 A CN 201810608325A CN 108487077 A CN108487077 A CN 108487077A
Authority
CN
China
Prior art keywords
pier stud
spray
health promotion
transmission shaft
hoist engine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810608325.6A
Other languages
Chinese (zh)
Inventor
王志强
陈松洲
李志文
吴曼
张华武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Middle Cross-Channel Bridge South Engineering Co Ltd
Road and Bridge International Co Ltd
Original Assignee
Middle Cross-Channel Bridge South Engineering Co Ltd
Road and Bridge International Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Middle Cross-Channel Bridge South Engineering Co Ltd, Road and Bridge International Co Ltd filed Critical Middle Cross-Channel Bridge South Engineering Co Ltd
Priority to CN201810608325.6A priority Critical patent/CN108487077A/en
Publication of CN108487077A publication Critical patent/CN108487077A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Spray Control Apparatus (AREA)

Abstract

The present invention provides a kind of pier stud automatic spray health promotion system, a holder and a hoist engine are set at the top of pier stud, a spraying rack is set around pier stud, multiple nozzles are set on spraying rack, hoist engine traction rope draws spraying rack by the pulley blocks being arranged on holder and moves up and down to pier stud progress spraying health promotion.The present invention is used for performance of concrete column confined spray maintenance, it can be achieved that automatic operating, device is reusable, and uniform spraying is good to the maintenance effect of pier stud.

Description

A kind of pier stud automatic spray health promotion system
Technical field
The present invention relates to the concrete curing technical fields in bridge construction, and in particular to a kind of automatic spray of bridge pier column Drench health promotion system.
Background technology
It is at present that pier stud is wrapped up using plastic film to the health-preserving method of performance of concrete column confined in bridge construction, on pier stud top Place bucket drip irrigation method health in face.The method has the following problems:First, plastic film pastes closely with pier stud surface part Conjunction makes water that can not permeate, and part is caused to cannot get health;Second, if there is precipitation or impurity and may all cause trickle irrigation system in water quality It unites unsmooth or blocks, can not ensure the uniformity of health;Third, plastic film are used only once, and " white " is caused to pollute, Not environmentally.
Invention content
It is an object of the invention to be directed to the health of current thin film trickle irrigation there are the problem of, a kind of pier stud automatic spray is provided and is supported Raw system, ensures the health uniformity of performance of concrete column confined, improves health quality.
Technical scheme is as follows:
A kind of pier stud automatic spray health promotion system, it is characterised in that:Including support system, trailer system, spray system and Hydroelectric system;
The support system includes the holder of a rectangle being arranged at the top of pier stud, and the holder includes according to four, rectangle Angle setting four columns, be located at each rectangular edges of holder on two root posts between pass through at least two horizontally disposed connections Bar connects;The centre of a connecting rod in each rectangular edges of holder is fixedly connected with one and is horizontally disposed with and hangs down with connecting rod Straight cantalever rod, the rear end of the cantalever rod are welded with the connecting rod, and front end extends to except the side wall of pier stud;
The trailer system includes a hoist engine and four pulley blocks;The hoist engine is mounted at the top of pier stud, hoist engine Equipped with horizontal output shaft, transmission cross box and vertical transmission shaft, the front end of the output shaft is equipped with the first bevel type gear And in transmission cross box, the lower end of the transmission shaft is equipped with the second bevel type gear and in transmission cross box, described the One bevel type gear is engaged with the second bevel type gear, and four traction ropes are connected on the transmission shaft;Each pulley blocks respectively include One fixed pulley and a movable pulley, four fixed pulleys are separately fixed at the front end of four cantalever rods of the support system, four Movable pulley is separately positioned below four movable pulleys, and each movable pulley bottom is equipped with suspension hook, and four traction ropes of hoist engine are distinguished Be wrapped on the transmission shaft, every traction rope one end is fixedly connected with the transmission shaft, the other end around one group of fixed pulley and It is fixedly connected with the front end of cantalever rod after movable pulley;
The spray system includes a spraying rack for surrounding pier stud periphery, and the spraying rack is equipped with around pier stud periphery and head Tail is connected the spray tube being closed, and is placed equidistant with multiple nozzles on the spray tube, and each nozzle is towards pier stud outer wall and and pier stud Outer wall has certain distance;The suspension hook of the movable pulley bottom of the trailer system is hooked on the spray tube;
The hydroelectric system includes one water tank on ground being arranged, and water pump is equipped in the water tank, the water outlet of water pump connects A delivery hose is connect, the delivery hose is connected to the spray tube of spray system;The hydroelectric system further include for hoist engine and The external power supply of water pump power supply.
The present invention has the following advantages:
1, system structure stress it is clear, it is reasonable, from heavy and light, can be factory produced.
2, spraying health promotion operation is influenced small, it can be achieved that automation by environment, execution conditions.
3, health process is environment friendly and pollution-free, and equipment is reusable, reduces cost.
4, uniform spraying is good to the maintenance effect of pier stud.
Description of the drawings
Fig. 1 is the vertical view of the present invention;
Fig. 2 be the present invention along Fig. 1 A-A to elevation;
Fig. 3 is the elevation of present invention B-B direction along Fig. 1;
Fig. 4 is the overlooking structure diagram of the spraying rack of the present invention.
Fig. 5 is the enlarged structure schematic diagram of hoist engine;
Fig. 6 is the set-up mode schematic diagram of pulley blocks;
Fig. 7 is the cross-sectional view of truss-like spraying rack;
Fig. 8 is the socket structure schematic diagram of spray tube;
Fig. 9 is the gag lever post structural schematic diagram on spraying rack.
Specific implementation mode
The invention mainly comprises support system, trailer system, spray system and hydroelectric systems.
As shown in Figure 1, Figure 2, Figure 3 shows, the support system includes the holder 2 of a rectangle being arranged at the top of pier stud 1, described Holder 2 includes the four columns 21 being arranged according to four angles of rectangle, is located between the two root posts 21 in each rectangular edges of holder It is connected by least two horizontally disposed connecting rods 22;The centre of a connecting rod 22 in each rectangular edges of holder, Gu Surely a horizontally disposed and cantalever rod 3 vertical with connecting rod, the rear end of the cantalever rod 3 and the connecting rod 22 are connected Welding, front end extends to except the side wall of pier stud 1.
The trailer system includes a hoist engine 4 and four pulley blocks.The hoist engine 4 is mounted on 1 top of pier stud, rectangle Inside holder 2.
The structure of hoist engine 4 is as shown in figure 5, equipped with horizontal output shaft 41, transmission cross box 42 and vertical transmission The front end of axis 43, the output shaft 41 is equipped with the first bevel type gear 44 and in transmission cross box 42, the transmission shaft 43 Lower end is equipped with the second bevel type gear 45 and in transmission cross box 42, first bevel type gear, 44 and second bevel type gear 43 It engages, four traction ropes 46 is wound on the transmission shaft 43.The first bevel type gear that hoist engine 4 passes through horizontal output shaft end 44 drive the second bevel type gear 45 rotation of vertical transmission shaft to draw four traction ropes 46 to make vertical transmission shaft 43 rotate Folding and unfolding.
The structures of the pulley blocks is as shown in fig. 6, each pulley blocks respectively include a fixed pulley 5 and a movable pulley 6, four Fixed pulley 5 is separately fixed at the front end of four cantalever rods 3 of the support system, and four movable pulleys 6 are separately positioned on four 5 lower section of movable pulley, 6 bottom of each movable pulley are equipped with suspension hook 7, and four traction ropes 46 of hoist engine are rotating around in the transmission shaft 43 On, every 46 one end of traction rope is fixedly connected with the transmission shaft 43, the other end around after one group of fixed pulley 5 and movable pulley 6 with The front end of cantalever rod 3 is fixedly connected.
As shown in Figure 2, Figure 3, Figure 4, the spray system includes a spraying rack 8 for surrounding pier stud periphery, the spraying rack 8 Equipped with the spray tube 81 around pier stud periphery and the closure that joins end to end, multiple nozzles 82 are set on the spray tube 81, it is each to spray First 82 have certain distance towards 1 outer wall of pier stud and with 1 outer wall of pier stud;The suspension hook 7 of the movable pulley bottom of the trailer system hooks On the spray tube 81.
As shown in Figure 2 and Figure 3, the hydroelectric system includes one water tank 9 on ground being arranged, and water is equipped in the water tank 9 The water outlet of pump, water pump connects a delivery hose 10, and the delivery hose 10 is connected to the spray tube 81 of spray system;Water delivery is soft Pipe 10 reserves sufficient length, is moved up and down along pier stud convenient for spray system.The hydroelectric system further includes for hoist engine and water pump The external power supply 11 of power supply.
As shown in Figure 1, Figure 2, Figure 3 shows, as a kind of embodiment, two of each side of rectangle support of the support system are vertical It is connected by 4 horizontally disposed connecting rods 22 between column, wherein one is connected to two columns, 21 upper end, one is connected to two and stands 21 lower end of column, another two are connected between two columns 21 and upper-lower height is different.
In the above-described embodiments, to ensure 2 sound construction of holder, can connect on 2 one sides of rectangle support of support system Connect two the upper end of the column horizontal brace rod 22 and remaining side connect two column lower ends horizontal brace rod 22 between hound is set 23 connections.
In the above-described embodiments, four cantalever rods 3 of the support system are connected on four sides of rectangle support In the connecting rod 22 of different height.Since four traction ropes 46 of hoist engine are supported by four cantalever rods 3 respectively, four outstanding 3 height difference of arm sunpender can interfere with each other to avoid four traction ropes 46.
In the above-described embodiments, to avoid four traction ropes from interfering, 5 pieces of setting is axially fixed on transmission shaft 43 Circular bulkheads 47 have certain intervals, 5 pieces of circular bulkheads to form 4 intervals, elevator on transmission shaft between two adjacent partition boards 47 Four traction ropes 46 of machine are rotating around in 4 intervals formed by 5 pieces of partition boards 47 on transmission shaft.
As shown in Figure 1, Figure 2, Figure 3 shows, a kind of embodiment as the present invention, to ensure 8 structure of the spraying rack jail of leaching system Gu can set spraying rack 8 to rectangular frame structure, each side of rectangular frame is truss structure.As shown in figure 8, spray It is truss structure to drench 8 each side of frame, and two top booms and two lower booms of truss structure are made of spray tube 81, between spray tube 81 It is connected by lateral 83 and diagonal brace 84, nozzle 82 is set on the spray tube 81 on the inside of spraying rack.
Further, in the above-described embodiments, the spray tube 81 of the spraying rack is all made of sleeve type structure, is sprayed by more Pipe is connected with each other.Specific connection structure is as shown in figure 9, one end of two spray tubes 81 is plugged on the two of sleeve 85 respectively The connection of two spray tubes is realized at end.Spray tube end can be spirally connected with casing 85, can also use grafting, be set in casing splicing position Gask-O-Seal.Above structure can arbitrarily adjust the length of spray tube, to adapt to different pier stud sizes.
In high pier maintenance work, under the action of wind load, spraying rack can be swung with the wind.As shown in figure 4, to prevent from spraying First 82 hit and are damaged on pier stud, and an at least horizontally disposed gag lever post can be fixedly connected on 8 each side of the spraying rack 12, every 12 one end of gag lever post is fixedly connected with the spray tube 81 of spraying rack, and the other end connects a rubber roll 13, the rubber Idler wheel 13 is supported on 1 side wall of pier stud.The structure of gag lever post is as shown in Figure 9.Rubber roll 13, can when spraying rack moves up and down Along 1 wall sliding of pier stud, spraying rack is kept to stablize, while can avoid damaging pier stud.
Further, as shown in figure 9, for buffer limit bar to the impact force of pier stud, avoid damaging pier stud, can also will Rubber roll 13 is connect with 12 end of the gag lever post by spring 14.14 one end of spring is fixedly connected with 12 end of gag lever post, One end is fixedly connected with the rolling wheel support of rubber roll.It can be quickly sleeved on when can also spraying rack be made to install using the elasticity of spring 14 On pier stud 1.
Support system, the spray system of the present invention can be factory produced, and common small winch can be used in hoist engine.Make Used time installs support system and hoist engine successively at the top of pier stud, and four traction ropes of hoist engine are bypassed four cantilevers respectively Then spraying rack is sleeved on pier stud with loop wheel machine above pier stud by the fixed pulley under sunpender and movable pulley, movable pulley bottom is hung Hook hooks the spray tube of spray system, and the water tank on ground connects spray tube by hose, connects the power supply of water pump and hoist engine, Traction spray tube is rotated and reverse by hoist engine output shaft to move back and forth up and down, water tank is continuously spray tube water supply, spray tube Interior water is sprayed by nozzle on pier stud outer wall, is realized to pier stud spraying health promotion.

Claims (10)

1. a kind of pier stud automatic spray health promotion system, it is characterised in that:Including support system, trailer system, spray system and water Electric system;
The support system includes the holder of a rectangle being arranged at the top of pier stud, and the holder includes being set according to four angles of rectangle The four columns set are located between the two root posts in each rectangular edges of holder and are connected by least two horizontally disposed connecting rods It connects;The centre of a connecting rod in each rectangular edges of holder, be fixedly connected one it is horizontally disposed and vertical with connecting rod Cantalever rod, the rear end of the cantalever rod are welded with the connecting rod, and front end extends to except the side wall of pier stud;
The trailer system includes a hoist engine and four pulley blocks;The hoist engine is mounted at the top of pier stud, and hoist engine is equipped with Horizontal output shaft, transmission cross box and vertical transmission shaft, the front end of the output shaft are equipped with the first bevel type gear and position In in transmission cross box, the lower end of the transmission shaft is equipped with the second bevel type gear and in transmission cross box, first umbrella Type gear is engaged with the second bevel type gear, and four traction ropes are connected on the transmission shaft;Each pulley blocks respectively include centainly Pulley and a movable pulley, four fixed pulleys are separately fixed at the front end of four cantalever rods of the support system, four dynamic cunnings Wheel is separately positioned below four movable pulleys, and each movable pulley bottom is equipped with suspension hook, and four traction ropes of hoist engine are wound respectively On the transmission shaft, every traction rope one end is fixedly connected with the transmission shaft, and the other end is around one group of fixed pulley and dynamic cunning It is fixedly connected with the front end of cantalever rod after wheel;
The spray system includes a spraying rack for surrounding pier stud periphery, and the spraying rack is equipped with around pier stud periphery and head and the tail phase Connect the spray tube being closed, multiple nozzles is set on the spray tube, each nozzle has one towards pier stud outer wall and with pier stud outer wall Set a distance;The suspension hook of the movable pulley bottom of the trailer system is hooked on the spray tube;
The hydroelectric system includes one water tank on ground being arranged, and water pump, the water outlet connection one of water pump are equipped in the water tank Delivery hose, the delivery hose are connected to the spray tube of spray system;The hydroelectric system further includes for hoist engine and water pump The external power supply of power supply.
2. pier stud automatic spray health promotion system according to claim 1, it is characterised in that:The rectangle branch of the support system It is connected by 4 horizontally disposed connecting rods between the two root posts on each side of frame, wherein one is connected to two the upper end of the column, one Root is connected to two column lower ends, and another two are connected between two columns and upper-lower height is different.
3. pier stud automatic spray health promotion system according to claim 2, it is characterised in that:The rectangle branch of the support system One, frame while the upper horizontal brace rod for connecting two the upper end of the column and remaining while connect and lead between the horizontal brace rods of two column lower ends Cross hound connection.
4. pier stud automatic spray health promotion system according to claim 2, it is characterised in that:Four of the support system are outstanding Arm sunpender is connected on four sides of rectangle support in the connecting rod of different height.
5. pier stud automatic spray health promotion system according to claim 1, it is characterised in that:It is solid in an axial direction on the transmission shaft 5 pieces of circular bulkheads are set surely, have certain intervals, 5 pieces of circular bulkheads to be formed between 4 on transmission shaft between two adjacent partition boards Every, hoist engine four traction ropes rotating around in 4 intervals formed by 5 pieces of partition boards on transmission shaft.
6. pier stud automatic spray health promotion system according to claim 1, it is characterised in that:The spraying rack of the spray system Each side for rectangular frame structure, rectangular frame is truss structure, and two top booms and two lower booms of truss structure are by spraying Shower pipe is constituted, and nozzle is arranged in the spray tube on the inside of frame.
7. pier stud automatic spray health promotion system according to claim 6, it is characterised in that:The spray tube of the spraying rack is Sleeve type structure is mutually socketed to form by more pipe spray tubes.
8. pier stud automatic spray health promotion system according to claim 7, it is characterised in that:Every two pipes being mutually socketed Between sleeve is set, the end of two spray tubes is spirally connected respectively with the both ends of described sleeve pipe or grafting.
9. pier stud automatic spray health promotion system according to claim 1, it is characterised in that:It is solid on each side of spraying rack A fixed connection at least horizontally disposed gag lever post, every gag lever post one end and two top booms or two lower booms on the outside of spraying rack It is fixedly connected, the other end is equipped with rubber roll, and the rubber roll is supported on pier stud side wall.
10. pier stud automatic spray health promotion system according to claim 9, it is characterised in that:The rubber roll with it is described Limit boom end is connected by spring.
CN201810608325.6A 2018-06-13 2018-06-13 A kind of pier stud automatic spray health promotion system Pending CN108487077A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810608325.6A CN108487077A (en) 2018-06-13 2018-06-13 A kind of pier stud automatic spray health promotion system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810608325.6A CN108487077A (en) 2018-06-13 2018-06-13 A kind of pier stud automatic spray health promotion system

Publications (1)

Publication Number Publication Date
CN108487077A true CN108487077A (en) 2018-09-04

Family

ID=63342799

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810608325.6A Pending CN108487077A (en) 2018-06-13 2018-06-13 A kind of pier stud automatic spray health promotion system

Country Status (1)

Country Link
CN (1) CN108487077A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109403207A (en) * 2018-12-17 2019-03-01 乔丽霞 Concrete bridge pier spray curing means
CN109914272A (en) * 2019-03-07 2019-06-21 惠安县拓丰信息技术有限公司 A kind of pier stud automatic spray maintenance of equipment
CN110820748A (en) * 2019-10-21 2020-02-21 中电建十一局工程有限公司 Temperature control device for roller compacted concrete and manufacturing method thereof
CN111236086A (en) * 2020-03-18 2020-06-05 周泽辉 Automatic spraying and curing device for concrete bridge pier
CN111305072A (en) * 2020-02-21 2020-06-19 宁波交通工程建设集团有限公司 Automatic spraying and maintaining device for high pier of bridge
CN114351587A (en) * 2021-11-25 2022-04-15 无锡交通建设工程集团有限公司 Pier stud automatic spray curing means
CN115093246A (en) * 2022-07-22 2022-09-23 中铁六局集团呼和浩特铁路建设有限公司 High mound sprays maintenance control system and drenches and spouts device thereof
CN115500184A (en) * 2022-09-01 2022-12-23 中国一冶集团有限公司 Maintenance cover device suitable for vase mound

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200426008Y1 (en) * 2006-06-29 2006-09-12 주식회사 광명산업기계 Switchgear for a floodgate by using a two way wire drum
CN205433550U (en) * 2016-02-24 2016-08-10 重庆明珠环保工程有限公司 Window wiping machine
CN105887694A (en) * 2016-05-20 2016-08-24 中交第航务工程局有限公司 Bridge capping beam bottom formwork demounting device
CN106284095A (en) * 2016-09-18 2017-01-04 中铁二十局集团第四工程有限公司 Concrete pier automatic spray curing means and using method
CN106758832A (en) * 2016-12-14 2017-05-31 中铁五局集团有限公司 A kind of bridge pier shaft concrete spray maintenance device and its construction method
CN106836002A (en) * 2017-04-11 2017-06-13 中国中铁航空港建设集团有限公司 A kind of sprinkling equipment with high ferro bridge pier automatic maintenance function
CN107724340A (en) * 2017-11-02 2018-02-23 株洲时代新材料科技股份有限公司 A kind of anticollision device of pier
CN107841956A (en) * 2017-12-27 2018-03-27 河南省亚欧起重设备有限公司 A kind of pier shaft conserves spray equipment
CN207277204U (en) * 2017-08-24 2018-04-27 中铁六局集团有限公司 A kind of pier stud automatic spray curing means
CN207468504U (en) * 2017-09-29 2018-06-08 中交四航局第一工程有限公司 A kind of mobile spray curing system of pier stud
CN208618270U (en) * 2018-06-13 2019-03-19 中交路桥建设有限公司 A kind of pier stud automatic spray health promotion system

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200426008Y1 (en) * 2006-06-29 2006-09-12 주식회사 광명산업기계 Switchgear for a floodgate by using a two way wire drum
CN205433550U (en) * 2016-02-24 2016-08-10 重庆明珠环保工程有限公司 Window wiping machine
CN105887694A (en) * 2016-05-20 2016-08-24 中交第航务工程局有限公司 Bridge capping beam bottom formwork demounting device
CN106284095A (en) * 2016-09-18 2017-01-04 中铁二十局集团第四工程有限公司 Concrete pier automatic spray curing means and using method
CN106758832A (en) * 2016-12-14 2017-05-31 中铁五局集团有限公司 A kind of bridge pier shaft concrete spray maintenance device and its construction method
CN106836002A (en) * 2017-04-11 2017-06-13 中国中铁航空港建设集团有限公司 A kind of sprinkling equipment with high ferro bridge pier automatic maintenance function
CN207277204U (en) * 2017-08-24 2018-04-27 中铁六局集团有限公司 A kind of pier stud automatic spray curing means
CN207468504U (en) * 2017-09-29 2018-06-08 中交四航局第一工程有限公司 A kind of mobile spray curing system of pier stud
CN107724340A (en) * 2017-11-02 2018-02-23 株洲时代新材料科技股份有限公司 A kind of anticollision device of pier
CN107841956A (en) * 2017-12-27 2018-03-27 河南省亚欧起重设备有限公司 A kind of pier shaft conserves spray equipment
CN208618270U (en) * 2018-06-13 2019-03-19 中交路桥建设有限公司 A kind of pier stud automatic spray health promotion system

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109403207A (en) * 2018-12-17 2019-03-01 乔丽霞 Concrete bridge pier spray curing means
CN109914272A (en) * 2019-03-07 2019-06-21 惠安县拓丰信息技术有限公司 A kind of pier stud automatic spray maintenance of equipment
CN110820748A (en) * 2019-10-21 2020-02-21 中电建十一局工程有限公司 Temperature control device for roller compacted concrete and manufacturing method thereof
CN111305072A (en) * 2020-02-21 2020-06-19 宁波交通工程建设集团有限公司 Automatic spraying and maintaining device for high pier of bridge
CN111236086A (en) * 2020-03-18 2020-06-05 周泽辉 Automatic spraying and curing device for concrete bridge pier
CN114351587A (en) * 2021-11-25 2022-04-15 无锡交通建设工程集团有限公司 Pier stud automatic spray curing means
CN114351587B (en) * 2021-11-25 2022-10-28 无锡交通建设工程集团有限公司 Pier stud automatic spray curing means
CN115093246A (en) * 2022-07-22 2022-09-23 中铁六局集团呼和浩特铁路建设有限公司 High mound sprays maintenance control system and drenches and spouts device thereof
CN115500184A (en) * 2022-09-01 2022-12-23 中国一冶集团有限公司 Maintenance cover device suitable for vase mound

Similar Documents

Publication Publication Date Title
CN108487077A (en) A kind of pier stud automatic spray health promotion system
CN110052350B (en) Unmanned automatic rust removing and spraying device for inner wall of storage tank
CN109853389B (en) Vibrating equipment and concrete pouring and vibrating method for tall special-shaped stand column
CN104429826B (en) A kind of automatic extended position sprinkling truck
CN211909972U (en) Electric reel type sprinkler
CN108207578A (en) A kind of self-suction hydraulic sprinkler with reel
CN204443455U (en) A kind of extended position sprinkling truck automatically
CN101773058A (en) Movable support type irrigation device
EP1577550B1 (en) Method for provisioning a winch on a wind energy plant and device for carrying out this method
CN203977422U (en) Building pile foundation holing with slurry wall protection sediment treating apparatus
CN208618270U (en) A kind of pier stud automatic spray health promotion system
CN212897417U (en) Outer wall spraying device
CN206676869U (en) A kind of suspension type storage tank automatic high pressure water washing device
CN108552025A (en) A kind of application method of self-suction hydraulic sprinkler with reel
CN104671141A (en) Portable obstacle surmounting lifting appliance of building external wall surface cleaning robot
CN214390722U (en) Rope mechanism for specially coating finished oil tanker
CN104005568A (en) Climbing construction device
CN203867214U (en) Climbing construction device
CN209003845U (en) External wall of high-rise building air pressure blow wash machine
CN207417437U (en) A kind of collecting apparatus for photovoltaic electrification component
CN112452582B (en) Rope mechanism for finished oil tanker
CN109914264B (en) Automatic maintenance instrument for bridge pier
CN209599509U (en) A kind of spraying trolley of portable assembly concrete T-shaped beam maintenance
CN209836816U (en) Automatic maintenance appearance of pier
CN209861849U (en) Sprinkler system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination