CN208415968U - Hydraulic climbing formwork/slding form operation shaft of high pier intelligence curing system - Google Patents
Hydraulic climbing formwork/slding form operation shaft of high pier intelligence curing system Download PDFInfo
- Publication number
- CN208415968U CN208415968U CN201821104288.7U CN201821104288U CN208415968U CN 208415968 U CN208415968 U CN 208415968U CN 201821104288 U CN201821104288 U CN 201821104288U CN 208415968 U CN208415968 U CN 208415968U
- Authority
- CN
- China
- Prior art keywords
- climbing formwork
- hydraulic climbing
- sealing
- platform
- maintenance
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model belongs to high pier field of bridge construction, to realize the real-time maintenance during pier shaft pouring construction, the utility model provides a kind of hydraulic climbing formwork/slding form operation shaft of high pier intelligence curing system, including by water tank, water supply pump, water supply pipe, spray pipeline is sequentially connected the maintenance circuit of composition, maintenance circuit is installed in sealing device, sealing device is by being formed by connecting around several sealing plates of pier shaft hydraulic climbing formwork periphery installation, Sealing formboard includes inside and outside two layers of template, outer layer constitutes the control platform in maintenance circuit, internal layer constitutes modification platform, each Sealing formboard passes through vertical bar, horizontal slide rail and hydraulic climbing formwork hang platform vertical bar, platform beams are hung to be correspondingly connected with and can be with hydraulic climbing formwork synchronization lifting.The influence that wind evaporates moisture is reduced always as the relatively stable of care environments in sealing device, is guaranteed in maintenance circuit, and sealing device can be gone up and down with hydraulic climbing formwork, guarantee one section of construction, one section of maintenance.
Description
Technical field
The utility model belongs to high pier field of bridge construction, and in particular to a kind of hydraulic climbing formwork/slding form operation shaft of high pier
Intelligent curing system.
Background technique
With the rapid development of high-speed railway, highway, Bridges in Mountainous Areas quantity is significantly increased, and high pier shaft bridge is also wide
General use, shaft of high pier later concrete maintenance problem become increasingly conspicuous, and existing majority Construction of High Pier is without pier shaft concrete
, often there is the problems such as pier shaft surface crack, pier shaft Concrete intensity insufficient in maintenance.Shaft of high pier concrete construction how is solved to support
Difficult problem is protected, is a difficult problem come in face of unit in charge of construction.Therefore propose a kind of hydraulic climbing formwork/slding form operation shaft of high pier
Intelligent curing system can in time conserve pier shaft concrete, ensure that the construction quality of concrete, reduce the pier shaft later period
The expense of processing, the construction method is easy to operate, and component and equipment turnover rate are high.
Summary of the invention
The utility model is the real-time maintenance realized during pier shaft pouring construction, so provide a kind of hydraulic climbing formwork/
Slding form operation shaft of high pier intelligence curing system.
The utility model adopts the following technical solution:
A kind of hydraulic climbing formwork/slding form operation shaft of high pier intelligence curing system, including by water tank, water supply pump, confession
Water lines, spray pipeline are sequentially connected the maintenance circuit of composition, and water supply pipe and spray pipeline are equipped with solenoid valve and speed regulation becomes
Frequency device, solenoid valve and speed regulation frequency converter are circumscribed with PLC and distribution system, and the maintenance circuit is installed in sealing device, sealing
Device is by being formed by connecting around several sealing plates of pier shaft hydraulic climbing formwork periphery installation, and Sealing formboard includes inside and outside two layers of mould
Plate, outer layer constitute maintenance circuit control platform, internal layer constitute modification platform, each Sealing formboard by vertical bar, horizontal slide rail with
Hydraulic climbing formwork hangs platform vertical bar, hangs platform beams and be correspondingly connected with and can be with hydraulic climbing formwork synchronization lifting.Conserve circuit always extremely
In in sealing device, and sealing device can be gone up and down with hydraulic climbing formwork, guarantee one section of construction, one section of maintenance.
The upper and lower side of the Sealing formboard is placed in corresponding sliding rail, and can be pushed open outward along sliding rail, convenient for pier
Body concrete surface is modified.
Temperature sensor and humidity sensor be installed in the sealing device, monitors the temperature in sealed maintenance space and wet
Degree, temperature sensor and the external PLC of humidity sensor provide spray foundation for intelligence maintenance spray, realize according to concrete reality
When ambient conditions carry out spray maintenance.
The utility model prior art is compared, and the care environments of relative closure can be provided by having, and equipment operation is simple, and peace is torn open
Convenient, equipment and component are used in turn rate height;The rising of curing means is realized by climbing form system, construction efficiency is high, and saving of labor saves
When, it is safe and reliable, economic and practical.Therefore it has good value for applications.
Detailed description of the invention
Fig. 1 is water supply pipe sealing structure cross-section diagram;
Fig. 2 is the elevation of water supply pipe;
Fig. 3 is connected schematic diagram with creeping formwork for hydraulic climbing formwork/slding form operation shaft of high pier intelligence curing system;
In figure: 1-spray pipeline;2-water supply bye-passes;3-cystosepiment sealing plates;4-hang platform vertical bar;5-hang it is flat
Platform crossbeam;6-hydraulic platform crossbeams;7-water tanks;8-water supply pumps;9-vibration means for main pipe for supplying water roads.
Specific embodiment
In conjunction with attached drawing, specific embodiment of the present utility model is described further:
The utility model is the promotion that intelligent curing system is realized using hydraulic climbing formwork structure, and primary structural member is by pier shaft
Four corners water tank, water supply pump, water supply pipe, solenoid valve, speed regulation frequency converter, PLC and distribution system, temperature humidity detection
Device, Sealing formboard etc. are constituted.Wherein water supply pipe is divided into lateral vibration means for main pipe for supplying water road and vertical spray pipeline forms, and is all made of steel pipe
It is made, connection is easy to disassemble using the connection such as threeway.
Hydraulic control platform four corners facility water tank is being utilized, platform space is being occupied less, construction environment influences small.
Water tank uses diameter for 60cm, the round clinker bucket of the polythene material of height 120cm;Water supply pump uses four small function
Rate centrifugal pump;Water supply pipe is divided into main line, bye-pass and spray tube, and main line is made of DN32 steel pipe, and bye-pass uses
The production of DN25 steel pipe, spray tube are made of DN15 steel pipe, spray head are wherein arranged on spray tube, spray head spacing is 50cm, each to manage
Led between road using threeway or two and connect, realized detachably being used in turn for pipeline, improve the utilization rate of material;Solenoid valve, tune
Fast frequency converter, PLC etc. realize that the timing of curing system sprays maintenance;Temperature humidity detector monitors the temperature in sealed maintenance space
Degree and humidity provide spray foundation for intelligence maintenance spray, realize and carry out spray maintenance according to concrete real time environment situation;It is close
Template is sealed, is made of light foam plate, cystosepiment is having a size of 1.2m × 4m × 8cm, and two layers of template installation point, one layer is hydraulic
Control platform, another layer are modification platform, rely on hydraulic platform and modification platform vertical bar respectively, and template sliding rail is laterally arranged, sliding
Every layer of rail divides upper slide rails and bottom sliding rail again, and template installation is directly clamped among on sliding rail, and every layer of template pier shaft separates among every side,
It can be pushed open outward along sliding rail, convenient for modifying pier shaft concrete surface, while realize that the sealing to pier shaft concrete is supported
Shield guarantees the relatively stable of care environments, reduces the influence that wind evaporates moisture.
The curing system can be promoted with hydraulic climbing formwork, guarantee the timely maintenance of the every segment of shaft of high pier, while guarantee high pier
Pier shaft concrete construction quality.
Using light foam board member, fixes, formed by the hydraulic control platform and modification platform upright bar of climbing form system
Fencing lawn space guarantees the relatively stable of care environments;Cystosepiment is openable at modification platform, does not influence to pier shaft concrete
Modification.
Claims (3)
1. a kind of hydraulic climbing formwork/slding form operation shaft of high pier intelligence curing system, including by water tank, water supply pump, water supply
Pipeline, spray pipeline are sequentially connected the maintenance circuit of composition, and water supply pipe and spray pipeline are equipped with solenoid valve and speed regulation frequency conversion
Device, solenoid valve and speed regulation frequency converter are circumscribed with PLC and distribution system, it is characterised in that: the maintenance circuit is installed on sealing dress
In setting, sealing device is by being formed by connecting around several sealing plates of pier shaft hydraulic climbing formwork periphery installation, and Sealing formboard includes interior
Outer two layers of template, outer layer constitute the control platform in maintenance circuit, and internal layer constitutes modification platform, and each Sealing formboard passes through vertical bar, cross
Hanging platform vertical bar, hang platform beams and be correspondingly connected with and can be with hydraulic climbing formwork synchronization lifting to sliding rail and hydraulic climbing formwork.
2. hydraulic climbing formwork according to claim 1/slding form operation shaft of high pier intelligence curing system, it is characterised in that: institute
The upper and lower side for stating Sealing formboard is placed in corresponding sliding rail, and can be pushed open outward along sliding rail.
3. hydraulic climbing formwork according to claim 2/slding form operation shaft of high pier intelligence curing system, it is characterised in that: institute
It states and temperature sensor and humidity sensor is installed in sealing device, temperature sensor and the external PLC of humidity sensor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821104288.7U CN208415968U (en) | 2018-07-12 | 2018-07-12 | Hydraulic climbing formwork/slding form operation shaft of high pier intelligence curing system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821104288.7U CN208415968U (en) | 2018-07-12 | 2018-07-12 | Hydraulic climbing formwork/slding form operation shaft of high pier intelligence curing system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208415968U true CN208415968U (en) | 2019-01-22 |
Family
ID=65126602
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821104288.7U Active CN208415968U (en) | 2018-07-12 | 2018-07-12 | Hydraulic climbing formwork/slding form operation shaft of high pier intelligence curing system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208415968U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110241739A (en) * | 2019-06-28 | 2019-09-17 | 中铁七局集团有限公司 | Hydraulic climbing formwork digital intelligent control platform |
CN114134815A (en) * | 2021-11-19 | 2022-03-04 | 中化学交通建设集团有限公司 | Intelligent maintenance device for high pier of bridge |
CN115653334A (en) * | 2022-10-25 | 2023-01-31 | 中国建筑第二工程局有限公司 | Concrete spraying system |
CN115894076A (en) * | 2022-12-23 | 2023-04-04 | 中铁二局第一工程有限公司 | Intelligent spraying maintenance system and method for thin-wall hollow high pier |
-
2018
- 2018-07-12 CN CN201821104288.7U patent/CN208415968U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110241739A (en) * | 2019-06-28 | 2019-09-17 | 中铁七局集团有限公司 | Hydraulic climbing formwork digital intelligent control platform |
CN114134815A (en) * | 2021-11-19 | 2022-03-04 | 中化学交通建设集团有限公司 | Intelligent maintenance device for high pier of bridge |
CN115653334A (en) * | 2022-10-25 | 2023-01-31 | 中国建筑第二工程局有限公司 | Concrete spraying system |
CN115894076A (en) * | 2022-12-23 | 2023-04-04 | 中铁二局第一工程有限公司 | Intelligent spraying maintenance system and method for thin-wall hollow high pier |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208415968U (en) | Hydraulic climbing formwork/slding form operation shaft of high pier intelligence curing system | |
CN103485283B (en) | Hanging bracket supporting system of side-span cast-in-place section and implementation method thereof | |
CN201648977U (en) | Slant legged rigid frame bracket system of cast-in-place prestressed concrete continuous beam at bridge site | |
CN202611713U (en) | Second liner conservation dust removing construction trolley for tunnel | |
CN202017346U (en) | Late poured band hanging formwork structure | |
CN201943045U (en) | Automatic-moving hydraulic cantilever gantry concrete placement device for wave wall | |
CN203903834U (en) | Internal-climbing tower crane | |
CN208294567U (en) | A kind of fixation device for the soft mould pocket type mold pouring walling suitable for underground | |
CN106808578A (en) | A kind of prefabricated piping lane of two-piece unit formula and method for prefabricating | |
CN204097864U (en) | A kind of bridge prefabrication hollow pier stud delay-pour joint structure | |
CN103572703A (en) | Construction method of outer wrapped concrete obliquely pulling and buckling and ring and section dividing combination method | |
CN201648978U (en) | Tied arch support of bridge location cast-in-situ prestressed concrete continuous beam | |
CN206551186U (en) | A kind of section box girder automatic sprinkler fire-extinguishing system | |
CN206298830U (en) | Cast-in-Situ Continuous Beam automatic spray curing system | |
CN206928326U (en) | A kind of fabricated construction mobile formwork | |
CN108951699B (en) | Festival segmentation removal centre form and support of utility tunnel | |
CN204101553U (en) | A kind of Large stone body frost heaving performance testing device | |
CN103469734B (en) | Negative bending moment bellows hole path pressure grouting construction method | |
CN206233115U (en) | A kind of supporting bracket of bridge construction | |
CN103171052B (en) | The disposable prefabricated construction engineering method of twin columns wave-breaking body | |
CN207109598U (en) | A kind of bridge pier shaft model sheetinstallat positioner | |
CN108457198A (en) | A kind of cantilever construction Cast-in-situ Beam mobile sealing intelligence maintenance construction method | |
CN205310501U (en) | Apparatus for producing of precast concrete decking | |
CN104847090B (en) | A kind of small cross-sectional size ventilation shaft construction method | |
CN209228386U (en) | A kind of lining of tunneling Subway Tunnel big cross section stop line two new type formwork trolley |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |