CN115653334A CN202211314913.1A CN202211314913A CN115653334A CN 115653334 A CN115653334 A CN 115653334A CN 202211314913 A CN202211314913 A CN 202211314913A CN 115653334 A CN115653334 A CN 115653334A
Authority
CN
China
Prior art keywords
platform
spray
concrete
climbing
spraying
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202211314913.1A
Other languages
Chinese (zh)
Other versions
CN115653334B (en
Inventor
周琴
李日荣
郭俊才
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN202211314913.1A priority Critical patent/CN115653334B/en
Publication of CN115653334A publication Critical patent/CN115653334A/en
Application granted granted Critical
Publication of CN115653334B publication Critical patent/CN115653334B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/10Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
    • Y02A40/22Improving land use; Improving water use or availability; Controlling erosion

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention discloses a concrete spraying system, which is characterized by comprising: a plurality of climbing touch frames; the climbing frame comprises a first spraying section and a second spraying section; the first spraying section comprises a main platform and a hydraulic platform; the second spraying section comprises a top platform and an overhanging platform; the second spraying section is fixedly arranged above the first spraying section; the main platform and the overhanging platform are both provided with a horizontal detachable water pipe and a plurality of spray headers connected into the water pipe; the hydraulic platform is provided with a hydraulic climbing formwork device and is used for climbing the climbing formwork; the main platform is provided with a controller and a monitoring module; the monitoring module is used for acquiring environmental information and weather information in real time and sending the environmental information and the weather information to the controller; the controller is used for receiving and processing the environmental information and the weather information sent by the monitoring module, thereby controlling the work of each spray header.

Description

Concrete spraying system
Technical Field
The invention relates to the technical field of buildings, in particular to a concrete spraying system.
Background
With the development of the current building technology, tower structure systems of high-rise buildings are mostly frame core tube structure systems. The core tube is constructed by adopting an internal and external full-climbing hydraulic creeping formwork, the construction period of each layer of wall is seven to ten days, the strength increasing period of the first stage is seven days after concrete pouring is completed, the concrete curing work is extremely important, and the early strength of the wall concrete is related to the climbing safety of the creeping formwork and a movable arm tower crane and the construction safety of a main body structure.
At present, the concrete of the super high-rise core tube wall is maintained by adopting manual watering, the maintenance frequency and the maintenance degree are not controllable, the instability and uncertainty caused by manual work are caused, and after climbing formwork climbing, the lower-layer wall body is difficult to implement maintenance work, so that the early strength of the concrete can not be effectively improved, and the construction safety and the structure construction quality can not be guaranteed.
Therefore, a concrete spraying system capable of reducing instability and uncertainty caused by manpower and effectively improving early strength of concrete is needed.
Disclosure of Invention
The invention provides a concrete spraying system, which aims to solve the technical problems of instability and uncertainty caused by manual spraying and low early strength of concrete in the prior art.
In order to solve the above technical problem, an embodiment of the present invention provides a concrete spraying system, including: a plurality of climbing touch frames; the crawling frame comprises a first spraying section and a second spraying section; the first spraying section comprises a main platform and a hydraulic platform; the second spraying section comprises a top platform and an overhanging platform; the second spraying section is fixedly arranged above the first spraying section;
the main platform and the overhanging platform are both provided with a horizontal detachable water pipe and a plurality of spray headers connected into the water pipe; the top platform and the hydraulic platform are provided with vertical water supply pipelines which are connected with the water pipe through hoses;
the hydraulic platform is provided with a hydraulic climbing formwork device and is used for climbing the climbing formwork;
the main platform is provided with a controller and a monitoring module; the monitoring module is used for acquiring environmental information and weather information in real time and sending the environmental information and the weather information to the controller; the controller is used for receiving and processing the environmental information and the weather information sent by the monitoring module, so that the work of each spray header is controlled.
As a preferred scheme, the controller of the main platform is also connected with a hydraulic climbing formwork device of the hydraulic platform;
the controller is also used for recording the working time of the spray header and generating and sending a creeping formwork signal to the hydraulic creeping formwork device when the working time reaches a preset value;
and the hydraulic climbing formwork device is used for climbing work or climbing and descending work after receiving the climbing formwork signal so as to enable the climbing formwork to ascend or descend.
As a preferred scheme, the first spraying section further comprises a hanging platform, and the hanging platform is arranged at the bottom of the first spraying section; the hanging platform is provided with a spray header.
As a preferred scheme, the controller is configured to receive and process the environmental information and the weather information sent by the monitoring module, so as to control the operation of each shower head, specifically:
the controller is used for receiving the environmental information and the weather information sent by the monitoring module; wherein the environmental information includes air particle data, humidity, and temperature; the weather information comprises sunny days, cloudy days and rainy days;
controlling a spray header arranged on the hanging platform to work according to air particle data, humidity and temperature in the environment information;
and according to the current weather information and the current environment information, carrying out work control on the main platform and the spray header on the cantilever platform.
As a preferred scheme, according to air particle data, humidity and temperature in the environmental information, the work of the spray header arranged on the hanging platform is controlled, and the method specifically comprises the following steps:
judging air particle data in the environmental information, and if the air particle data is larger than a particle density preset value, generating a first starting signal; if the air particle data is smaller than a particle density preset value, generating a first closing signal;
judging the humidity in the environment information, and if the humidity is less than the preset humidity, generating a second opening signal; if the dry humidity is greater than a dry humidity preset value, generating a second closing signal;
judging the temperature in the environment information, and if the temperature is greater than a preset temperature, generating a third opening signal; if the temperature is less than the preset temperature value, generating a third closing signal;
if any one of a first opening signal, a second opening signal or a third opening signal is generated, a spray header on the hanging platform is opened to work; and if the first closing signal, the second closing signal and the third closing signal are generated at the same time, controlling the spray header on the hanging platform to close so as to stop the spray header.
As a preferred scheme, according to current weather information and environmental information, to main platform with the shower head on the platform of encorbelmenting carries out work control, specifically does:
if the current weather information is sunny, controlling spray heads on the main platform and the overhanging platform to reach the maximum opening degree, and carrying out spraying work;
if the current weather information is cloudy, controlling spray heads on the main platform and the overhanging platform to reach a medium opening degree according to the temperature and the humidity in the environment information, and carrying out spraying work;
and if the current weather information is rainy, controlling the spray headers on the main platform and the cantilever platform to reach a low opening degree according to the temperature and the humidity in the environmental information, and carrying out spray work or stopping spray.
As a preferred scheme, the bottom of the second spraying section is also provided with a transition platform, and the transition platform is used for improving the overall structural rigidity of the second spraying section and the climbing formwork.
As a preferred scheme, the spray header of the cantilever platform is used for providing primary concrete curing for the covered concrete area; the shower head of main platform is used for climbing after touching the frame and rising, right the platform of encorbelmenting carries out the concrete maintenance for the first time in the concrete region of concrete maintenance, carries out secondary concrete maintenance.
As a preferred scheme, horizontal sliding track grooves are formed in the cantilever platform and the main platform; the spray headers are all installed in the horizontal sliding track grooves, so that the spray headers can move in a plane position, and the concrete of the wall body can be completely covered in the horizontal direction.
Compared with the prior art, the embodiment of the invention has the following beneficial effects:
according to the technical scheme, the wall body is automatically sprayed for the first time and sprayed for the second time through the plurality of climbing frames and the first spraying section and the second spraying section on the climbing frames, instability and uncertainty caused by manpower are reduced, concrete curing of the wall body is achieved, real-time curing of concrete is effectively guaranteed, water is saved for green construction, automatic climbing is achieved through climbing of the hydraulic platform, workload of construction workers in a construction site is reduced, monitoring of environment information and weather information is achieved through the controller and the monitoring module on the main platform, work of each spraying head is controlled, surface cracking of concrete super high-rise projects due to incomplete concrete curing is avoided, early-stage strength of concrete is effectively improved, and construction safety and structure construction quality are guaranteed.
Drawings
FIG. 1: the concrete spraying system provided by the embodiment of the invention has a schematic structural diagram;
FIG. 2 is a schematic diagram: the top view of the hydraulic platform provided by the embodiment of the invention;
FIG. 3: a top view of a main platform provided by an embodiment of the invention;
FIG. 4: the top view of the cantilever platform provided by the embodiment of the invention;
FIG. 5: a top view of a top platform provided by an embodiment of the invention;
wherein the reference numbers of the drawings in the specification are as follows:
the device comprises a climbing frame 10, a first spraying section 01, a main platform 11, a hydraulic platform 12, a hanging platform 13, a second spraying section 02, a top platform 21, an overhanging platform 22 and a transition platform 23.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be obtained by a person skilled in the art without inventive step based on the embodiments of the present invention, are within the scope of protection of the present invention.
Example one
Referring to fig. 1, a concrete spraying system provided in an embodiment of the present invention includes: a plurality of climbing touch frames 10; the climbing frame 10 comprises a first spraying section 01 and a second spraying section 02; the first spraying section 01 comprises a main platform 11 and a hydraulic platform 12; the second spray section 02 comprises a top platform 21 and an overhanging platform 22; the second spraying section 02 is fixedly arranged above the first spraying section 01.
It should be noted that the second spraying section 02 and the first spraying section 01, which are fixedly installed above the first spraying section 01, can implement maintenance of concrete areas of the two areas, thereby avoiding the problems that manual watering and the existing maintenance method are difficult to perform secondary maintenance on a wall body and difficult to perform maintenance on a lower-layer wall body, and ensuring the construction safety and the structure construction quality.
Referring to fig. 2 and 4, the main platform 11 and the overhanging platform 22 are both provided with a horizontal detachable water pipe and a plurality of spray headers connected to the water pipe; referring to fig. 3 and 5, the top platform 21 and the hydraulic platform 12 are provided with vertical water supply pipes, and the vertical water supply pipes are connected with the water pipes through hoses.
As a preferable scheme of this embodiment, the overhanging platform 22 and the main platform 11 are both provided with horizontal sliding rail grooves; the spray headers are all installed in the horizontal sliding rail grooves, so that the spray headers can move in a plane position, and the concrete of the wall can be completely covered in the horizontal direction.
By arranging the shower head and the water pipe in a wide range, the main platform 11 and the cantilever platform 22 can maintain the concrete of the wall in a full coverage manner. Preferably, the interval of each shower head is 1000mm, and the platform of encorbelmenting 22 adopts 1m hose and horizontal water supply pipe connection with the shower head of main platform 11 for the shower head can spray the wall body on the slide rail uniformly, has avoided being fixed in the shower head on a point under the different spray aperture, and is different to the maintenance degree of local region concrete, makes concrete structure intensity inhomogeneous, has the problem of structure construction quality and security.
The hydraulic platform 12 is provided with a hydraulic climbing formwork device for climbing the climbing formwork 10.
As a preferable solution of this embodiment, the spray header of the overhanging platform 22 is used to provide the first concrete curing for the covered concrete area; the shower head of the main platform 11 is used for carrying out secondary concrete curing in the concrete area where the overhanging platform 22 is firstly used for carrying out concrete curing after the climbing frame 10 rises.
It should be noted that, through setting up hydraulic pressure creeping formwork device on hydraulic pressure platform 12 for hydraulic pressure creeping formwork device can drive holistic climbing and descend touching frame 10 through supporting hydraulic pressure platform 12, so that climbing and touching frame 10 and follow hydraulic pressure creeping formwork device and climb, thereby cover each construction operation layer, and then realized concrete spraying system's full automation, reduce building site constructor's work load, improved the efficiency of construction.
As a preferable solution of this embodiment, the controller of the main platform 11 is further connected to the hydraulic climbing device of the hydraulic platform 12;
the controller is also used for recording the working time of the spray header and generating and sending a creeping formwork signal to the hydraulic creeping formwork device when the working time reaches a preset value; and the hydraulic climbing formwork device is used for climbing work or climbing and descending work after receiving the climbing formwork signal so as to enable the climbing formwork frame 10 to ascend or descend.
It should be noted that, for example, the preset value reached by the working time is seven days. In this embodiment, the shortest period of the whole climbing formwork platform moving and climbing is seven days, so that a seven-day curing period of the concrete layer and a curing period of the concrete after climbing which is fourteen days are formed, the strength of the concrete of the core tube wall body is fully increased, and the construction safety and the structure construction quality are ensured.
As a preferable scheme of this embodiment, the first spray segment 01 further includes a hanging platform 13, and the hanging platform 13 is disposed at the bottom of the first spray segment 01; the hanging platform 13 is provided with a spray header.
As a preferable scheme of this embodiment, a transition platform 23 is further disposed at the bottom of the second spraying section 02, and the transition platform is used for improving the overall structural rigidity of the second spraying section 02 and the climbing frame 10.
In this embodiment, the structural support pipes are further provided in the creeper 10 to ensure the structural strength of the entire creeper 10, and the structural stability among the top platform 21, the overhanging platform 22, the transition platform 23, the main platform 11, the hydraulic platform 12, and the hanging platform 13 is improved by the arrangement among the platforms and the support provided.
The main platform 11 is provided with a controller and a monitoring module; the monitoring module is used for acquiring environmental information and weather information in real time and sending the environmental information and the weather information to the controller; the controller is used for receiving and processing the environmental information and the weather information sent by the monitoring module, so that the work of each spray header is controlled.
It should be noted that, preferably, the controller may be a Central Processing Unit (CPU), other general purpose processors, a Digital Signal Processor (DSP), an Application Specific Integrated Circuit (ASIC), a Field-Programmable Gate Array (FPGA) or other Programmable logic devices, discrete Gate or transistor logic devices, discrete hardware components, etc., and the general purpose Processor may be a microprocessor or the controller may also be any conventional Processor, etc. In the present embodiment, the monitoring module includes, but is not limited to, a temperature sensor, a humidity sensor, an air particle monitor, and the like.
As a preferred scheme of this embodiment, the controller is configured to receive and process the environmental information and the weather information sent by the monitoring module, so as to control the operation of each shower head, specifically:
the controller is used for receiving the environmental information and the weather information sent by the monitoring module; wherein the environmental information includes air particle data, humidity, and temperature; the weather information comprises sunny days, cloudy days and rainy days; controlling a spray header arranged on the hanging platform 13 to work according to air particle data, humidity and temperature in the environmental information; and according to the current weather information and the current environment information, carrying out work control on the main platform 11 and the spray headers on the cantilever platform 22.
It can be understood that the centralized controller is arranged on the main platform 11, and the spraying system is automatically turned on and off at regular time according to weather conditions, so that manpower and water are effectively saved. Wherein the air monitering intelligent object of project wisdom building site management platform passes through real-time supervision and gathers the environment real-time condition, controls the automatic dust fall of shower head of hanging platform 13.
As a preferred scheme of this embodiment, the controlling of the spray header disposed on the hanging platform 13 according to the air particle data, the humidity and the temperature in the environmental information specifically includes:
judging air particle data in the environmental information, and if the air particle data is larger than a particle density preset value, generating a first starting signal; if the air particle data is smaller than a particle density preset value, generating a first closing signal; judging the humidity in the environment information, and if the humidity is less than the preset humidity, generating a second opening signal; if the dry humidity is greater than a dry humidity preset value, generating a second closing signal; judging the temperature in the environmental information, and if the temperature is greater than a preset temperature, generating a third starting signal; if the temperature is less than the preset temperature value, generating a third closing signal; if any one of a first opening signal, a second opening signal or a third opening signal is generated, a spray header on the hanging platform 13 is opened to work; and if the first closing signal, the second closing signal and the third closing signal are generated at the same time, controlling the spray header on the hanging platform 13 to close so as to stop the spray header.
It will be appreciated that the shower heads on the platform 13 are controlled by the air particle data, humidity and temperature of the environmental information. Illustratively, when air particle contamination is severe, for example: dust condition and the like occur, and the dust can be settled by controlling the spray header; when the ambient air is too dry and is not beneficial to the curing of concrete, the spray header is controlled to increase the air humidity; when high temperature weather appears, the condition of local caking of concrete can lead to easily to too high temperature to destroy the structural rigidity of concrete, reduced the structural strength of concrete, consequently need the shower head to carry out the spraying of water, with the hypothermia. In addition, in order to avoid sending the condition that the control of the spray header is disordered, the work of the basin spray header is closed and stopped only when a first closing signal, a second closing signal and a third closing signal occur simultaneously, namely the environmental information conforms to the maintenance of the concrete.
As a preferred scheme of this embodiment, the work control of the main platform 11 and the spray header on the overhanging platform 22 is performed according to the current weather information and environmental information, and specifically includes:
if the current weather information is sunny, controlling spray heads on the main platform 11 and the overhanging platform 22 to reach the maximum opening degree, and performing spraying work; if the current weather information is cloudy, controlling spray heads on the main platform 11 and the cantilever platform 22 to reach a medium opening degree according to the temperature and the humidity in the environment information, and carrying out spraying work; if the current weather information is rainy days, controlling the spray headers on the main platform 11 and the cantilever platform 22 to reach low opening degree according to the temperature and the humidity in the environmental information, and spraying or stopping spraying.
It should be noted that, in this embodiment, the maximum opening degree of the spray header is the maximum spraying capacity of the spray header, and if the current weather information is on a fine day, the spray header can be maintained in the working state of the maximum opening degree to perform maintenance work on the concrete, and preferably, in an actual situation, in a fine day, the opening degree of the spray header is further determined according to the temperature and humidity in the fine day environment; if the current weather information is cloudy, the spray header works at a medium opening degree, preferably, the medium opening degree of the spray header is 30% -80% of the maximum opening degree, and the temperature and humidity in the environment are different from those in a sunny day, so that the optimal opening degree of the spray header for maintaining concrete needs to be determined according to the temperature and humidity conditions, specifically, the opening degree condition corresponding to the temperature and humidity data can be determined in a manual experiment mode according to a preset cloudy opening degree reference value comparison table, and then the controller judges the medium opening degree by obtaining the opening degree reference value comparison table; if the current weather information is rainy, the spray header works at a low opening degree, wherein the low opening degree is 0% -30% of the maximum opening degree, the optimal spray header opening degree for maintaining concrete in a rainy day environment needs to be determined according to the temperature and humidity conditions similar to the specific opening degree control condition of the spray header in a cloudy day, and the controller can judge and control according to a preset rainy day opening degree reference value comparison table; further, when the shower head is at a low opening degree and is operated while maintaining 0% of the maximum opening degree, the controller controls the shower heads on the cantilever stage 22 and the main stage 11 to stop operating.
The above embodiment is implemented, and has the following effects:
according to the technical scheme, the wall body is automatically sprayed for the first time and sprayed for the second time through the plurality of climbing frames and the first spraying section and the second spraying section on the climbing frames, instability and uncertainty caused by manpower are reduced, concrete curing of the wall body is achieved, real-time curing of concrete is effectively guaranteed, water is saved for green construction, automatic climbing is achieved through climbing of the hydraulic platform, workload of construction workers in a construction site is reduced, monitoring of environment information and weather information is achieved through the controller and the monitoring module on the main platform, work of each spraying head is controlled, surface cracking of concrete super high-rise projects due to incomplete concrete curing is avoided, early-stage strength of concrete is effectively improved, and construction safety and structure construction quality are guaranteed.
The above-mentioned embodiments are provided to further explain the objects, technical solutions and advantages of the present invention in detail, and it should be understood that the above-mentioned embodiments are only examples of the present invention and are not intended to limit the scope of the present invention. It should be understood that any modifications, equivalents, improvements and the like, which come within the spirit and principle of the invention, may occur to those skilled in the art and are intended to be included within the scope of the invention.

Claims (9)

1. A concrete spray system, comprising: a plurality of uniform crawling frames; the crawling frame comprises a first spraying section and a second spraying section; the first spraying section comprises a main platform and a hydraulic platform; the second spraying section comprises a top platform and an overhanging platform; the second spraying section is fixedly arranged above the first spraying section;
the main platform and the overhanging platform are both provided with a horizontal detachable water pipe and a plurality of spray headers connected into the water pipe; the top platform and the hydraulic platform are provided with vertical water supply pipelines which are connected with the water pipe through hoses;
the hydraulic platform is provided with a hydraulic climbing formwork device and is used for climbing the climbing formwork;
the main platform is provided with a controller and a monitoring module; the monitoring module is used for acquiring environmental information and weather information in real time and sending the environmental information and the weather information to the controller; the controller is used for receiving and processing the environmental information and the weather information sent by the monitoring module, so that the work of each spray header is controlled.
2. The concrete spray system as recited in claim 1 wherein the controller of said main platform is further connected to a hydraulic climbing device of said hydraulic platform;
the controller is also used for recording the working time of the spray header and generating and sending a creeping formwork signal to the hydraulic creeping formwork device when the working time reaches a preset value;
and the hydraulic climbing formwork device is used for climbing work or climbing and descending work after receiving the climbing formwork signal so as to enable the climbing formwork to ascend or descend.
3. The concrete spray system of claim 1, wherein the first spray section further comprises a hanging platform disposed at a bottom of the first spray section; the hanging platform is provided with a spray header.
4. The concrete spraying system of claim 3, wherein the controller is configured to receive and process environmental information and weather information transmitted by the monitoring module, so as to control the operation of each spray header, specifically:
the controller is used for receiving the environmental information and the weather information sent by the monitoring module; wherein the environmental information includes air particle data, humidity, and temperature; the weather information comprises sunny days, cloudy days and rainy days;
controlling a spray header arranged on the hanging platform to work according to air particle data, humidity and temperature in the environment information;
and according to the current weather information and the current environmental information, carrying out work control on the main platform and the spray header on the overhanging platform.
5. The concrete spraying system of claim 4, wherein the operation of the spray header arranged on the hanging platform is controlled according to air particle data, humidity and temperature in the environmental information, and specifically comprises:
judging air particle data in the environmental information, and if the air particle data is larger than a particle density preset value, generating a first starting signal; if the air particle data is smaller than a particle density preset value, generating a first closing signal;
judging the humidity in the environmental information, and if the humidity is smaller than the preset humidity, generating a second opening signal; if the dry humidity is greater than a dry humidity preset value, generating a second closing signal;
judging the temperature in the environment information, and if the temperature is greater than a preset temperature, generating a third opening signal; if the temperature is less than the preset temperature value, generating a third closing signal;
if any one of a first opening signal, a second opening signal or a third opening signal is generated, a spray header on the hanging platform is opened to work; and if the first closing signal, the second closing signal and the third closing signal are generated at the same time, controlling the spray header on the hanging platform to close so as to stop working of the spray header.
6. The concrete spraying system of claim 4, wherein the work control of the spray headers on the main platform and the overhanging platform is performed according to current weather information and environmental information, and specifically comprises:
if the current weather information is sunny, controlling spray heads on the main platform and the overhanging platform to reach the maximum opening degree, and carrying out spraying work;
if the current weather information is cloudy, controlling spray heads on the main platform and the overhanging platform to reach a medium opening degree according to the temperature and the humidity in the environment information, and carrying out spraying work;
and if the current weather information is rainy, controlling the spray headers on the main platform and the cantilever platform to reach a low opening degree according to the temperature and the humidity in the environment information, and spraying or stopping spraying.
7. A concrete spray system as claimed in claim 1 wherein the bottom of said second spray section is further provided with a transition platform for increasing the overall structural rigidity of said second spray section and said creeper.
8. A concrete spray system as claimed in claim 1, wherein the spray headers of the cantilever platform are adapted to provide primary concrete curing of the covered concrete area; the shower head of main platform is used for climbing after touching the frame and rising, right the platform of encorbelmenting carries out the concrete maintenance for the first time in the concrete region of concrete maintenance, carries out secondary concrete maintenance.
9. The concrete spraying system as claimed in claim 1, wherein horizontal sliding rail grooves are formed on both the overhanging platform and the main platform; the spray headers are all installed in the horizontal sliding track grooves, so that the spray headers can move in a plane position, and the concrete of the wall body can be completely covered in the horizontal direction.
CN202211314913.1A 2022-10-25 2022-10-25 Concrete spraying system Active CN115653334B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211314913.1A CN115653334B (en) 2022-10-25 2022-10-25 Concrete spraying system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211314913.1A CN115653334B (en) 2022-10-25 2022-10-25 Concrete spraying system

Publications (2)

Publication Number Publication Date
CN115653334A true CN115653334A (en) 2023-01-31
CN115653334B CN115653334B (en) 2023-05-12

Family

ID=84991023

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211314913.1A Active CN115653334B (en) 2022-10-25 2022-10-25 Concrete spraying system

Country Status (1)

Country Link
CN (1) CN115653334B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201092735Y (en) * 2007-08-30 2008-07-30 中交第二航务工程局有限公司 Cable support tower concrete timing spraying-pouring conserve and wind-proof device
CN203701604U (en) * 2013-12-04 2014-07-09 北京六建集团有限责任公司 Automatic spray curing system for construction of creeping formwork system of super-high-rise core tube wall body
CN204531431U (en) * 2015-03-27 2015-08-05 中国核工业第五建设有限公司 A kind of sprinkling curing system of concrete structure
CN108276024A (en) * 2018-04-02 2018-07-13 中建八局第三建设有限公司 A kind of climbing form system adhesion type intelligence spray maintenance device and its maintenance process
CN208415968U (en) * 2018-07-12 2019-01-22 中铁三局集团有限公司 Hydraulic climbing formwork/slding form operation shaft of high pier intelligence curing system
CN110987057A (en) * 2019-09-30 2020-04-10 中交天津港湾工程研究院有限公司 Hydraulic pressure is automatic monitoring system in high in clouds for creeping formwork
CN113622692A (en) * 2021-09-18 2021-11-09 湖南工学院 Concrete spraying maintenance control system and high-rise building concrete beam plate maintenance method
CN215561990U (en) * 2021-08-05 2022-01-18 中交投资南京有限公司 Creeping formwork spraying system suitable for cable-stay bridge pylon concrete health preserving

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201092735Y (en) * 2007-08-30 2008-07-30 中交第二航务工程局有限公司 Cable support tower concrete timing spraying-pouring conserve and wind-proof device
CN203701604U (en) * 2013-12-04 2014-07-09 北京六建集团有限责任公司 Automatic spray curing system for construction of creeping formwork system of super-high-rise core tube wall body
CN204531431U (en) * 2015-03-27 2015-08-05 中国核工业第五建设有限公司 A kind of sprinkling curing system of concrete structure
CN108276024A (en) * 2018-04-02 2018-07-13 中建八局第三建设有限公司 A kind of climbing form system adhesion type intelligence spray maintenance device and its maintenance process
CN208415968U (en) * 2018-07-12 2019-01-22 中铁三局集团有限公司 Hydraulic climbing formwork/slding form operation shaft of high pier intelligence curing system
CN110987057A (en) * 2019-09-30 2020-04-10 中交天津港湾工程研究院有限公司 Hydraulic pressure is automatic monitoring system in high in clouds for creeping formwork
CN215561990U (en) * 2021-08-05 2022-01-18 中交投资南京有限公司 Creeping formwork spraying system suitable for cable-stay bridge pylon concrete health preserving
CN113622692A (en) * 2021-09-18 2021-11-09 湖南工学院 Concrete spraying maintenance control system and high-rise building concrete beam plate maintenance method

Also Published As

Publication number Publication date
CN115653334B (en) 2023-05-12

Similar Documents

Publication Publication Date Title
CN102814858B (en) Intelligent cement concrete curing system and curing method thereof
CN104772816A (en) Automatic control and spray system and method for concrete curing
CN115653334A (en) Concrete spraying system
CN110887399A (en) Air island of power plant is with high-efficient water-saving cleaning system of full intelligence
CN201704345U (en) Sealed slag sealing device
CN107903083A (en) Pier stud concrete curing structure and pier stud construction system
CN210773661U (en) Full-intelligent efficient water-saving cleaning system for air cooling island of power plant
CN112518968A (en) Intelligent maintenance method and system for cement concrete precast beam
CN216574776U (en) Dust collecting device for casting
KR20180038759A (en) Sluice gate drive unit and the driving method thereof
CN108068206B (en) Spraying pipe network supporting device for concrete curing and automatic curing system thereof
CN214472975U (en) Side slope dam nondestructive test device
CN105269668A (en) Wind power generation and intelligent fog curing device for attached scaffold and construction method of wind power generation and intelligent fog curing device
CN111317394A (en) Curtain wall glass cleaning method without hoisting
CN205270212U (en) According to electrified belt cleaning device who washs ambient temperature automatically regulated cleaner quantity
CN204604561U (en) Concrete curing automatic control spraying and sprinkling system
CN112033606A (en) Gable wall water spraying test device and operation method thereof
CN209836015U (en) Concrete intelligence curing means that waters
CN208309395U (en) A kind of climbing formwork for construction pier stud concrete automatic maintenance device
CN214680803U (en) A intelligent watering device for environmental protection trade
CN220828722U (en) Monitoring equipment for pump house
CN216358908U (en) Sand stone heap dustproof spray set
CN108309135A (en) A kind of external wall intelligent cleaning method
CN214338049U (en) Building construction supervision device based on BIM technology
CN220319170U (en) Indoor automatic spraying maintenance device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant