CN201092735Y - Cable support tower concrete timing spraying-pouring conserve and wind-proof device - Google Patents

Cable support tower concrete timing spraying-pouring conserve and wind-proof device Download PDF

Info

Publication number
CN201092735Y
CN201092735Y CNU2007200867553U CN200720086755U CN201092735Y CN 201092735 Y CN201092735 Y CN 201092735Y CN U2007200867553 U CNU2007200867553 U CN U2007200867553U CN 200720086755 U CN200720086755 U CN 200720086755U CN 201092735 Y CN201092735 Y CN 201092735Y
Authority
CN
China
Prior art keywords
water
spray
shutter device
tower concrete
wind shutter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007200867553U
Other languages
Chinese (zh)
Inventor
李宗平
曲洪春
唐启
胡学成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
Original Assignee
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co filed Critical CCCC Second Harbor Engineering Co
Priority to CNU2007200867553U priority Critical patent/CN201092735Y/en
Application granted granted Critical
Publication of CN201092735Y publication Critical patent/CN201092735Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a timing spray curing and wind proof device of cable support tower concrete, which comprises a liftable climbing-frame connected to the cable support tower concrete, an annular spray pipe arranged on the liftable climbing-frame, spray-head or spray holes on the spray pipe and a water supply installation connected and communicated with the spray pipe. A wind proof curtain is arranged beside the annular spray pipe which is fixed on the liftable climbing-frame. The spray curing system completely realizes automatic control, and manufacture and installation of the device are simple, thereby largely reducing labor intensity. The hung wind proof curtain performs well in wind proof function and thermal insulation and moisture retention effect, effectively avoids temperature stress crack and the like, and increases quality of concrete curing in-situ. The annular spray pipe capable of being lifted along with the cable support tower concrete is adaptable to spray curing for various pier-tower constructions.

Description

Cable bent tower concrete timing spray maintenance and wind shutter device
Technical field
The utility model belongs to the engineering construction device, spray maintenance and wind-proof device when being specifically related to a kind of Dun Ta construction.
Background technology
Maintenance during Dun Ta construction now, particularly during the large tracts of land maintenance, according to former maintenance measure, generally be the method that adopts the regularly direct watering maintenance of staffing, be aided with artificial atomizers spray measure in case of necessity, but because labour intensity is big, maintenance frequency height, reasons such as personnel's sense of responsibility, it is untimely to be prone to maintenance, so that influences concrete intensity and presentation quality.
Summary of the invention
The purpose of this utility model is to provide a kind of cable bent tower concrete timing spray maintenance and wind shutter device of automatic spray maintenance, to address the above problem.
The technical solution of the utility model is: cable bent tower concrete timing spray maintenance and wind shutter device comprises the risen climbing frame that connects on the Sarasota concrete, and circular spray tube is arranged on and can rises on the climbing frame, shower upper nozzle or spray orifice, and shower is connected UNICOM with water supply installation.
Described circular spray tube is other to be provided with anti-air curtain, and circular spray tube is fixed on and can rises on the climbing frame.
This spray curing system has been realized automation control fully, equipment making, installs simplely, reduces labour intensity greatly.The anti-air curtain that hangs has played good wind-shielding function and heat and moisture preserving effect, effectively avoids thermal stresses crackle etc., has improved the on-the-spot maintenance quality of concrete.Circular spray tube can raise with the increase of Sarasota concrete construction height, is applicable to the spray maintenance when all kinds of Dun Ta construct.
Description of drawings
Fig. 1 cable bent tower concrete timing spray maintenance and wind shutter device elevational schematic view.
Fig. 2 C place goes out enlarged diagram.
Fig. 3 cable bent tower concrete timing spray maintenance and wind shutter device schematic top plan view.
The specific embodiment
As shown in Figure 1, watered the top of Sarasota concrete 18 and established shower 12, watered to establish on the Sarasota concrete and can rise climbing frame 17.Shower 12 is fixed on and can rises on the climbing frame 17.Connect shower nozzle 15 (Fig. 3) by threeway 11 on the shower 12.Circular spray tube 12 other being provided with are prevented air curtain 13, and anti-air curtain 13 also is fixed on and can rises on the climbing frame 17; Anti-air curtain 13 adopts windproof oilcloth.Circular spray tube 12 is provided with around the Sarasota concrete.Climbing frame 17 can be risen and climbing frame can be risen for hydraulic pressure; When the Sarasota concrete construction highly raise, it can increase.
Circular spray tube 12 is connected UNICOM with water supply installation.As shown in Figure 1, 2, water supply installation comprises water tank 1, is connected the water pump 8 of UNICOM with water tank 1, and water pump 8 connects timer 7.Like this, water pump can be according to the setting-up time automatic shutter.The output of water pump 1 is connected UNICOM with water-supply-pipe 9, and water-supply-pipe 9 is connected UNICOM with shower 12; The vertical section of water-supply-pipe 9 has at least, and two ends connect UNICOM by flange 10.When the working face of Sarasota coagulation raise, water-supply-pipe 9 can connect increased height like this.Establish cooling-water temperature sensor 2 in the water tank 1, cooling-water temperature sensor 2 is connected with heater 3.Establish level sensor 4 in the water tank 1, level sensor 4 connects water level inductive switch 6, and water level inductive switch 6 connects small pump 5.Can control the water temperature and the water yield in the water tank like this.14 is creeping formwork load-bearing channel-section steel.

Claims (8)

1. cable bent tower concrete timing spray maintenance and wind shutter device, it comprises the risen climbing frame that connects on the Sarasota concrete, it is characterized in that circular spray tube is arranged on can rise on the climbing frame, shower upper nozzle or spray orifice, shower is connected UNICOM with water supply installation.
2. cable bent tower concrete timing spray maintenance and wind shutter device according to claim 1 is characterized in that described water supply installation comprises water tank, is connected the water pump of UNICOM with water tank, and the output of water pump is connected UNICOM with water-supply-pipe, and water-supply-pipe is connected UNICOM with shower; Establish cooling-water temperature sensor in the water tank, cooling-water temperature sensor is connected with heater.
3. as cable bent tower concrete timing spray maintenance and wind shutter device as described in the claim 2, it is characterized in that water pump connects timer.
4. as cable bent tower concrete timing spray maintenance and wind shutter device as described in the claim 2, it is characterized in that establishing in the water tank level sensor, level sensor connects the water level inductive switch, and the water level inductive switch connects small pump.
5. cable bent tower concrete timing spray maintenance and wind shutter device according to claim 1 is characterized in that circular spray tube is provided with around the Sarasota concrete.
6. cable bent tower concrete timing spray maintenance and wind shutter device according to claim 1 is characterized in that described circular spray tube is other to be provided with anti-air curtain.
7. as cable bent tower concrete timing spray maintenance and wind shutter device as described in the claim 2, it is characterized in that the vertical transport section of water-supply-pipe connects and composes by at least two sections.
8. cable bent tower concrete timing spray maintenance and wind shutter device according to claim 1 is characterized in that anti-air curtain is located at and can rises on the climbing frame.
CNU2007200867553U 2007-08-30 2007-08-30 Cable support tower concrete timing spraying-pouring conserve and wind-proof device Expired - Fee Related CN201092735Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200867553U CN201092735Y (en) 2007-08-30 2007-08-30 Cable support tower concrete timing spraying-pouring conserve and wind-proof device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200867553U CN201092735Y (en) 2007-08-30 2007-08-30 Cable support tower concrete timing spraying-pouring conserve and wind-proof device

Publications (1)

Publication Number Publication Date
CN201092735Y true CN201092735Y (en) 2008-07-30

Family

ID=39900700

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200867553U Expired - Fee Related CN201092735Y (en) 2007-08-30 2007-08-30 Cable support tower concrete timing spraying-pouring conserve and wind-proof device

Country Status (1)

Country Link
CN (1) CN201092735Y (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101716797A (en) * 2009-12-14 2010-06-02 中铁十八局集团有限公司 Spraying health promotion system of precast beam slab
CN103728890A (en) * 2013-12-19 2014-04-16 河海大学 Control method and system for automatic spraying and water pouring maintenance of concrete walls
CN105756359A (en) * 2016-03-04 2016-07-13 中启胶建集团有限公司 Automatic spraying maintenance system for concrete vertical member employing circulating water supply
CN106284095A (en) * 2016-09-18 2017-01-04 中铁二十局集团第四工程有限公司 Concrete pier automatic spray curing means and using method
CN106758832A (en) * 2016-12-14 2017-05-31 中铁五局集团有限公司 A kind of bridge pier shaft concrete spray maintenance device and its construction method
CN108517778A (en) * 2018-03-23 2018-09-11 中国五冶集团有限公司 Be conducive to the template and application method of bridge pier concrete curing
CN108952191A (en) * 2018-07-06 2018-12-07 中国十七冶集团有限公司 A kind of vertical apparatus for concrete member curing device and maintenance process
CN113152265A (en) * 2021-04-29 2021-07-23 中国葛洲坝集团第一工程有限公司 Automatic spraying maintenance device and maintenance method for high pier of bridge
CN115653334A (en) * 2022-10-25 2023-01-31 中国建筑第二工程局有限公司 Concrete spraying system

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101716797A (en) * 2009-12-14 2010-06-02 中铁十八局集团有限公司 Spraying health promotion system of precast beam slab
CN103728890A (en) * 2013-12-19 2014-04-16 河海大学 Control method and system for automatic spraying and water pouring maintenance of concrete walls
CN103728890B (en) * 2013-12-19 2016-01-13 河海大学 A kind of control method of concrete wall surface auto spraying showering curing and system
CN105756359A (en) * 2016-03-04 2016-07-13 中启胶建集团有限公司 Automatic spraying maintenance system for concrete vertical member employing circulating water supply
CN106284095A (en) * 2016-09-18 2017-01-04 中铁二十局集团第四工程有限公司 Concrete pier automatic spray curing means and using method
CN106758832A (en) * 2016-12-14 2017-05-31 中铁五局集团有限公司 A kind of bridge pier shaft concrete spray maintenance device and its construction method
CN108517778A (en) * 2018-03-23 2018-09-11 中国五冶集团有限公司 Be conducive to the template and application method of bridge pier concrete curing
CN108517778B (en) * 2018-03-23 2023-10-03 中国五冶集团有限公司 Template beneficial to bridge pier concrete maintenance and application method thereof
CN108952191A (en) * 2018-07-06 2018-12-07 中国十七冶集团有限公司 A kind of vertical apparatus for concrete member curing device and maintenance process
CN113152265A (en) * 2021-04-29 2021-07-23 中国葛洲坝集团第一工程有限公司 Automatic spraying maintenance device and maintenance method for high pier of bridge
CN115653334A (en) * 2022-10-25 2023-01-31 中国建筑第二工程局有限公司 Concrete spraying system

Similar Documents

Publication Publication Date Title
CN201092735Y (en) Cable support tower concrete timing spraying-pouring conserve and wind-proof device
CN204482581U (en) A kind of intelligent treegarden irrigation device
CN102729325B (en) Full-automatic monitoring, early warning, temperature control, moisturizing and curing system and method for prefabricated immersed tube sections
CN206941416U (en) A kind of road and bridge high pier automatic concrete spraying curing system
CN108000694A (en) Pretensioning prestressed concrete track board assembly line curing system and its application
CN103660021B (en) Precast beam automatic spray curing system
CN105104010A (en) Water and fertilizer automatic irrigation greening wall
CN206690295U (en) A kind of precasting yard automatic spray health recirculated water utilizes construction system
CN212984267U (en) Assembly type series components for assembling steel structure building wall
CN206646034U (en) The compound curing system of section concrete in being constructed applied to Hanging Basket cantilever pouring
CN104563503B (en) High level and Super high-rise dwelling house cast-in-situ steel reinforced concrete high-altitude automatization method of construction
CN104264995A (en) Automatic spraying conservation system for high-rise building shear wall structure
CN108207400A (en) A kind of skyscraper facade greening device and its construction method
CN204929795U (en) A kind of liquid manure automatic irrigation greening wall
CN205654109U (en) Core section of thick bamboo wall body maintenance system
CN103404385B (en) A kind of modularization can Fast Construction dismounting landscape plant wall system
CN108086161A (en) A kind of continuous beam maintenance structure and maintenance process
CN206024611U (en) Perpendicular wall greening system
CN206428591U (en) A kind of concrete curing device based on Hanging Basket
CN107667828A (en) A kind of crops automatic watering device
CN209397512U (en) Bridge pier shaft concrete sprinkling curing system
CN210470578U (en) Novel watering robot
CN208309395U (en) A kind of climbing formwork for construction pier stud concrete automatic maintenance device
CN218714956U (en) Intelligent climbing frame spraying maintenance circulating system
CN202071196U (en) Automatic concrete maintaining system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: No.3 Engineering Company Ltd. of CCCC Second Harbor Engineering Company

Assignor: China Communications 2nd Navigational Bureau

Contract fulfillment period: 2009.4.10 to 2017.4.10

Contract record no.: 2009320000650

Denomination of utility model: Cable support tower concrete timing spraying-pouring conserve and wind-proof device

Granted publication date: 20080730

License type: Exclusive license

Record date: 20090421

LIC Patent licence contract for exploitation submitted for record

Free format text: EXCLUSIVE LICENSE; TIME LIMIT OF IMPLEMENTING CONTACT: 2009.4.10 TO 2017.4.10; CHANGE OF CONTRACT

Name of requester: ZHONGJIAO ER HANGJU THIRD ENGINEERING CO., LTD.

Effective date: 20090421

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080730

Termination date: 20160830