CN218714956U - Intelligent climbing frame spraying maintenance circulating system - Google Patents

Intelligent climbing frame spraying maintenance circulating system Download PDF

Info

Publication number
CN218714956U
CN218714956U CN202223015289.3U CN202223015289U CN218714956U CN 218714956 U CN218714956 U CN 218714956U CN 202223015289 U CN202223015289 U CN 202223015289U CN 218714956 U CN218714956 U CN 218714956U
Authority
CN
China
Prior art keywords
water
wall structure
spray
storage tank
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223015289.3U
Other languages
Chinese (zh)
Inventor
潘康荣
黄锦池
庄小学
陆鸿
李家鑫
潘兆宽
龚鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Huasheng Construction Group Co ltd
Original Assignee
Shenzhen Huasheng Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Huasheng Construction Group Co ltd filed Critical Shenzhen Huasheng Construction Group Co ltd
Priority to CN202223015289.3U priority Critical patent/CN218714956U/en
Application granted granted Critical
Publication of CN218714956U publication Critical patent/CN218714956U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The utility model discloses an intelligence is climbed and is sprayed maintenance circulation system, include wall structure, climb a main part, spray mechanism, water storage tank and retrieve the mechanism, pre-buried temperature measurement subassembly that has in the wall structure, it is in to climb a main part setting the wall structure outside just climb a main part through attaching the wall bearing and installing wall structure is last, it installs to spray the mechanism climb and just spray the outer wall setting of the direction of spraying towards wall structure of mechanism in the main part, the water storage tank sets up at the wall structure inboard just the water storage tank with it links to each other to spray the mechanism, it sets up to retrieve the mechanism wall structure outside bottom and retrieve the mechanism with the water storage tank links to each other. The utility model has the advantages of can real-time supervision, it is big to spray coverage area, and the water spray is even, can be to water recycle.

Description

Intelligent climbing frame spraying maintenance circulating system
Technical Field
The utility model belongs to the technical field of the construction, concretely relates to intelligence is climbed and is sprayed maintenance circulation system.
Background
The intelligent climbing frame is often used in the building construction process, is also called an intelligent lifting frame, can be divided into several main types such as hydraulic type, electric type, manpower hand-pulling type and the like according to the power source, is a novel scaffold system developed in recent years, is mainly applied to a high-rise shear wall type floor, can ascend or descend along a building, and enables the scaffold technology to be completely changed by the system, firstly, the scaffold does not need to be turned over, secondly, the scaffold dismounting and mounting process is avoided, the scaffold can be used till the construction is finished after one-time assembly without being influenced by the limit value of the height of the building, manpower and materials are greatly saved, the traditional scaffold is greatly changed in the safety angle, and the intelligent climbing frame has development advantages in the high-rise building, the intelligent climbing frame mainly comprises a main frame and a frame body framework, an attached supporting device, a lifting system, a control system and the like, wherein the main frame and the frame body framework mainly comprise a frame body vertical rod, a guide rail vertical rod, a triangular inclined strut, a bottom scaffold board, an upper scaffold board, a scaffold board auxiliary board, a turning board, an external vertical net, a horizontal truss, a guide rail and the like, the attached supporting device comprises an attached wall support, a bearing bolt, a gasket and the like, the lifting system comprises an upper lifting point and a lower lifting point, an attached wall hanging seat, an electric block, a block chain wheel set, an adjusting basket bolt, an adjusting spring and the like, the control system comprises a main control box, a sub-control box, a sensor, a remote controller, a mobile phone monitoring terminal and the like, and more intelligent climbing frames are used in the existing building construction process.
The existing wall structures such as concrete and the like manufactured by building construction often need to adopt a manual water spraying mode at a construction site, or keep the outer wall moist, or reduce dust and pollution, for example, the patent application number CN201720178838.9 discloses an intelligent climbing frame spraying dust removal system, which comprises an overhead climbing frame body, wherein a plurality of dovetail grooves are formed in the overhead climbing frame body, a plurality of spray heads are installed on the overhead climbing frame body, and a quick connecting device is installed between the spray heads and the overhead climbing frame body, comprises a matching seat and can be installed on any layer of climbing frame or installed on each layer according to the site requirements, belongs to a new green, environment-friendly and energy-saving technology, and mainly utilizes a dewatering well or a fire pool on a construction site as a water source according to the characteristics of overhead operation of the climbing frame to convey water to atomizing spray heads around the climbing frame body through pressurization, so as to perform overhead spraying, thereby achieving the effects of removing dust and haze at the overhead, maintaining the concrete water at the construction site and preventing fire at the construction site;
however, no matter what the concrete wall structure is maintained by the intelligent climbing frame or by manual water spraying, more manpower and material resources are consumed, the maintenance effect is poor, the 'moisture keeping state' required by the specification is difficult to guarantee, the early-stage maintenance of the concrete is not facilitated, cracks are easily generated on the surface due to drying, even the increase of the strength of the concrete is influenced, water used by manual water spraying and other modes is not recovered in time, water interception measures are not in place to cause maintenance water to flow into floors below, construction is influenced, the existing maintenance spraying dust removal system cannot monitor the temperature of the concrete in real time, the maintenance time is easily missed when the temperature difference between the inside and the outside of the concrete is large and the maintenance measures need to be enhanced, and the concrete defect is caused.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a solve the weak point among the prior art, provide a water of in time retrieving and spraying, real-time supervision's intelligence is climbed and is sprayed maintenance circulation system.
In order to solve the technical problem, the utility model adopts the following technical scheme:
frame spraying maintenance circulation system is climbed to intelligence includes:
the temperature measurement device comprises a wall structure, wherein a temperature measurement assembly is pre-embedded in the wall structure;
the climbing frame main body is arranged on the outer side of the wall structure and is installed on the wall structure through a wall-attached support;
the spraying mechanism is arranged on the climbing frame main body, and the spraying direction of the spraying mechanism faces the outer wall of the wall structure;
the water storage tank is arranged on the inner side of the wall structure and is connected with the spraying mechanism; and
and the recovery mechanism is arranged at the bottom of the outer side of the wall structure and is connected with the water storage tank.
Preferably, still include the switch board, the water storage tank through first water pipe with the mechanism that sprays links to each other, be equipped with solenoid valve and frequency conversion constant pressure pump on the first water pipe, the solenoid valve is located the upstream direction of frequency conversion constant pressure pump, the switch board links to each other with solenoid valve, frequency conversion constant pressure pump and temperature measurement component respectively, the switch board is located between water storage tank and the wall structure.
Preferably, the temperature measurement component comprises a measuring pipe, the measuring pipe is embedded in the wall structure, and the measuring pipe is electrically connected with the control cabinet.
Preferably, the mechanism sprays includes that the feedwater is responsible for and a plurality of water supply branch pipe, the water supply main pipe sets up along vertical direction climb in the frame main part and the feedwater is responsible for and is linked to each other with first water pipe, a plurality of water supply branch pipes set up along left right direction interval from top to bottom climb in the frame main part and a plurality of water supply branch pipes all with the feedwater be responsible for and link to each other, every water supply branch pipe among a plurality of water supply branch pipes all is equipped with a plurality of shower head, the shower head is fan-shaped atomizer, the spray direction of shower head sets up towards wall structure's outer wall.
Preferably, the recovery mechanism comprises a water intercepting tank, the water intercepting tank is fixed at the bottom of the outer wall of the wall structure through a fixing support and is located below the lowest water supply branch pipe in the plurality of water supply branch pipes, and the water intercepting tank is connected with the water storage tank.
Preferably, the fixed support is made of angle steel, the water intercepting tank is made of stainless steel materials, and a glue layer is filled between the water intercepting tank and the outer wall of the wall structure.
Preferably, a water inlet and an overflow pipe are arranged on the water storage tank, and the water inlet and the overflow pipe are both located at the top of the water storage tank.
Adopt above-mentioned technical scheme, the utility model discloses following beneficial effect has:
(1) The utility model discloses be equipped with temperature measurement subassembly, temperature measurement subassembly is pre-buried in wall structure can real-time measurement wall structure in the temperature, is convenient for carry out real-time supervision to wall structure, and temperature measurement subassembly links to each other with the switch board, feeds back to the switch board after being convenient for real-time supervision, can set up alarm value and in time indicate in the switch board the utility model discloses a control personnel in time adjust the maintenance measure;
(2) The utility model is provided with a recovery mechanism, the recovery mechanism comprises a water intercepting groove, the water intercepting groove can recycle the water sprayed by the spraying mechanism, rainwater and the like can be further recovered, and damage caused by poor water use for floor construction is avoided;
(3) The utility model is provided with a spraying mechanism which is arranged on the climbing frame main body, and the spraying head of the spraying mechanism is a fan-shaped atomizing nozzle which can spray water aiming at the wall structure, the water spraying amount is controllable, the water spraying is uniform, and the coverage area is large;
to sum up, the utility model has the advantages of can real-time supervision, it is big to spray coverage area, and the water spray is even, can be to water recycle.
Drawings
Fig. 1 is a schematic structural diagram of the present invention;
FIG. 2 is a schematic view of the wall structure and the main body of the climbing frame of FIG. 1 with the wall structure and the main body removed;
fig. 3 is a schematic structural view of the spraying mechanism of the present invention in another direction;
FIG. 4 is a schematic structural view of the wall structure and the recovery mechanism of the present invention;
fig. 5 is an enlarged view at P in fig. 3.
Detailed Description
The technical solution of the present invention will be described clearly and completely with reference to the accompanying drawings, and obviously, the described embodiments are some, but not all embodiments of the present invention.
The components of the embodiments of the present invention, as generally described and illustrated in the figures herein, may be arranged and designed in a wide variety of different configurations. Thus, the following detailed description of the embodiments of the present invention, presented in the accompanying drawings, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention.
Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Example 1
The intelligence of this embodiment is climbed and is climbed frame spray maintenance circulation system and climb each spare part structure additional on the basis of frame so that current intelligence the utility model discloses can reach more excellent technological effect, when building construction among the prior art, the unable accurate control water pressure of artifical watering maintenance, it is inhomogeneous to drench the water maintenance, cause concrete maintenance blind area easily, the maintenance is asynchronous, the concrete surface that is difficult to make the wall body outside keeps moist state, and the intelligence among the prior art climbs the spraying system who uses on the frame and mainly used the dust fall and use, its shower nozzle that uses is divergent, water pressure is great, long-time injection easily causes the colour difference of obvious water line form on the concrete surface, influence concrete impression quality, the shower nozzle that perhaps uses is the atomizer, the water yield undersize, equally not be applicable to concrete maintenance, and thereby the concrete maintenance water resource maintenance measure of dynamic adjustment of concrete temperature can not real-time measurement among the concrete maintenance process, dust removal sprays the waste of water resource in time recycle of not spouting, the utility model discloses a climbing frame spray maintenance circulation system is proposed based on this design.
As shown in fig. 1, in an embodiment of the present invention, the intelligent climbing frame spraying maintenance circulation system of the present invention comprises a wall structure 1, a climbing frame main body 2, a spraying mechanism, a water storage tank 4, a recycling mechanism, a control cabinet 5, etc., wherein the wall structure 1 is a wall body for building construction in the prior art and the wall structure 1 is mainly a concrete wall structure 1, or is a wall structure 1 formed by mixing concrete on the outer layer of a brick wall structure on the inner layer, wherein a temperature measurement component is embedded in the wall structure 1, the temperature measurement component comprises a measurement pipe 9, the measurement pipe 9 is embedded in the wall structure 1, the measurement pipe 9 is electrically connected with the control cabinet 5, the temperature measurement pipe can be a temperature measurement wire structure for protecting the inside of the pipe from the outside, the temperature measurement pipe is embedded before the construction of the wall structure 1 such as concrete pouring, after concrete is poured, the temperature measuring tube is electrically connected with the control cabinet 5, an electronic temperature measuring instrument can be arranged in the control cabinet 5, the temperature measuring tube can be electrically connected with the electronic temperature measuring instrument specifically so as to measure the temperature of the interior of the concrete, the specific time of temperature measurement is usually that the temperature measurement can be carried out after the concrete is solidified, the temperature measuring frequency is that the temperature measurement is carried out two days before the maintenance of the wall body, the temperature measurement is carried out every two hours, the temperature measurement is carried out every four hours on the 3 rd to 7 th days of maintenance, and the temperature measurement is carried out every 7 th to 14 th days of maintenance, the temperature rise, the internal and external temperature difference and the temperature change speed of the wall body structure 1 formed by concrete pouring due to cement hydration heat are monitored in real time, harmful temperature cracks of the concrete are prevented, a liquid crystal screen and an interface are arranged at the host end of the electronic temperature measuring instrument, the electronic temperature measuring instrument is arranged in the control cabinet 5, the temperature measuring instrument can read on site, and has a temperature alarm function, correspondingly, information can be transmitted to a computer end connected with the control cabinet 5 of the utility model, the alarm critical value of the electronic temperature measuring instrument is that the temperature difference between the internal and external room of the concrete exceeds 25 ℃, after the alarm, the utility model can be used by a user to adjust the maintenance measures in time, if the utility model is started in time, the tested data result can be transmitted to a far end through a wireless transmission module, etc.;
the control cabinet 5 is a set formed by multiple parts, for example, the utility model discloses a temperature control switch, temperature alarm, time relay switch, water pump switch, concrete temperature measurement host, main control panel etc. are installed in the control cabinet 5, wherein temperature control switch, temperature alarm, time relay switch, water pump switch, concrete temperature measurement host etc. all can link to each other with the main control panel, the main control panel carries out corresponding accurate control through temperature control switch, temperature alarm, time relay switch, water pump switch, concrete temperature measurement host, this is current mature technology, concrete temperature measurement host no longer gives details, corresponding the utility model discloses a climb frame main part 2 also is the intelligent frame that climbs among the prior art, climb frame main part 2 sets up in the wall structure 1 outside and climb frame main part 2 and install on the wall structure 1 through attaching wall support 3;
referring to fig. 2, 3 and 5, the spraying mechanism of the present invention is mainly used for maintaining and spraying the wall structure 1, the spraying mechanism is installed on the climbing frame main body 2, and the spraying direction of the spraying mechanism is set towards the outer wall of the wall structure 1, specifically, the spraying mechanism comprises a main water supply pipe 10 and a plurality of branch water supply pipes 11, the main water supply pipe 10 is vertically arranged on the climbing frame main body 2, and the main water supply pipe 10 is connected with a first water pipe 6, the plurality of branch water supply pipes 11 are vertically arranged on the climbing frame main body 2 at intervals along the left-right direction, and the plurality of branch water supply pipes 11 are all connected with the main water supply pipe 10, each branch water supply pipe 11 of the plurality of branch water supply pipes 11 is provided with a plurality of spray heads 12, the spray headers 12 are fan-shaped atomizing spray heads, the spray direction of the spray headers 12 is arranged towards the outer wall of the wall structure 1, the water supply main pipe 10 can adopt a PVC water pipe with the inner diameter of 25mm, the water supply branch pipes 11 can adopt PVC hoses with the inner diameter of 8mm, the outer diameter of 12mm and the wall thickness of 2mm, wherein the distance between the adjacent spray headers 12 is 1M, the distance between the two adjacent layers of water supply branch pipes 11 is 3M, the spray angle of the spray headers 12 can be adjusted according to the actual conditions of the field when the spray headers are used specifically, the mounting positions of the spray headers 12 can be provided with three-way joints, the three-way joints are connected into the water supply branch pipes 11, and the spray headers 12 are connected to the three-way joints in an inserted manner so as to be plugged and pulled out conveniently;
the spray head 12 of the utility model adopts a fan-shaped atomizing spray head, has the characteristics of large water amount, even spraying, large spraying area and the like, and is suitable for concrete spraying and curing;
concrete curing is to ensure the strength of concrete and prevent cracks from being generated on the surface of the concrete due to drying, so that the concrete needs to be cured, and watering is one of the methods for naturally curing the concrete. Within 12 hours after the concrete is poured at normal temperature, the concrete must be covered for heat preservation and maintenance, the ordinary cement is not less than 7 days, if the watering and maintenance of the concrete are neglected, on one hand, the strength of the concrete is reduced, and on the other hand, the concrete cannot supplement water in the hardening process, so that a large amount of water is lacked, and cracks are generated. The concrete can release heat in the solidification process, influences the stability of concrete structure, and the moisture evaporation is too fast in the concrete, can influence the solidification effect of concrete, therefore the concrete maintenance need water. However, concrete water curing is conditional, and if the temperature is lower than 4 ℃, the concrete cannot be cured by watering, because the moisture is slowly evaporated at low temperature, and even the moisture is converted into solid and is not easy to evaporate. If the concrete used is only poured without curing, the quality of the concrete cannot be guaranteed certainly, and the concrete needs to be cured regardless of the season in which the concrete is poured. The maintenance of concrete is important in each building, and in order to make the building exert the maximum value, the steps required in the early construction cannot be reduced, so that the quality of the concrete and the building quality are ensured.
The utility model discloses a water storage tank 4 uses for the water storage mainly as the name implies, water storage tank 4 sets up in wall structure 1 inboard and water storage tank 4 links to each other with the mechanism sprays, wherein, be equipped with water inlet and overflow pipe 16 on water storage tank 4, water inlet and overflow pipe 16 all are located water storage tank 4 top, and the water inlet is used for adding water to water storage tank 4, and the water inlet links to each other with recovery mechanism also promptly cut-off tank 13 links to each other, and overflow pipe 16 mainly guarantees when the water in water storage tank 4 is too much, can overflow away, and overflow pipe 16 can also link to each other with other water storage tank 4 and be used as the construction water or discharge indoor drainage system, and water storage tank 4 links to each other with the mechanism sprays through first water pipe 6, be equipped with solenoid valve 7 and frequency conversion constant pressure pump 8 on first water pipe 6, solenoid valve 7 is located the upstream direction of frequency conversion constant pressure pump 8, switch 5 links to each other with solenoid valve 7, frequency constant pressure pump 8 and temperature measurement subassembly respectively, switch board 5 is located between water storage tank 4 and wall structure 1, and frequency pressure pump 8 can realize that pressure is adjustable, and constant pressure pump 8 can realize the constant pressure, and the final water supply mechanism is supplied to the solenoid valve 6 to the water supply in the water supply tank 4;
specifically, please refer to fig. 4, the utility model discloses a retrieve mechanism mainly used retrieves the water that spills after spraying etc. retrieves the mechanism setting and is in 1 outside bottom of wall structure and retrieve the mechanism with water storage tank 4 links to each other, and is specific, retrieves the mechanism and includes cut-off tank 13, cut-off tank 13 is fixed through fixed bolster 14 wall structure 1's outer wall bottom and cut-off tank 13 are located the below of the water supply branch pipe 11 that is located the downside in a plurality of water supply branch pipes 11, cut-off tank 13 with water storage tank 4 links to each other, fixed bolster 14 is made by the angle steel, cut-off tank 13 is made by stainless steel material, it has glue film 15 to fill between cut-off tank 13 and wall structure 1's the outer wall, and this water receiving tank can choose 80mm 100mm, and thickness is 1 mm's stainless steel U type groove, and fixed bolster 14 is made by the angle steel and surface galvanization, and during concrete installation, can set up one this fixed bolster 14 by interval 2m, and fill glue film 15 between fixed bolster 14 and wall structure 1 and bond, prevent moisture infiltration.
The utility model discloses a concrete use as follows:
the elder generation installation climbs a main part 2, then the installation sprays the mechanism and climbs a main part 2 on, spray the debugging of mechanism after that, then carry out concrete placement, the construction is accomplished wall structure 1 and is installed temperature measuring component in wall structure 1, when retrieving the installation of mechanism, select the starting point on wall structure 1's the outer wall now, then according to the slope requirement bullet line location, cut basin 13 after that, and according to for the bullet line position screw installation fixed bolster 14, then install cut basin 13 on fixed bolster 14, and fill glue film 15 between water receiving tank and wall structure 1's outer wall, then will retrieve the mechanism, spray the mechanism, switch board 5 etc. and all connect the back, normally spray the use, when temperature measuring component monitors temperature variation to critical value and sends out the police dispatch newspaper, the utility model discloses open and spray the maintenance, the utility model discloses can also set up automatic spray according to the demand, the utility model discloses can dismantle after using a period and attach assemblies such as wall support 3, will the utility model discloses a main part 2 removes to continue to use.
The present embodiment is not intended to limit the shape, material, structure, etc. of the present invention in any form, and all of the technical matters of the present invention belong to the protection scope of the present invention to any simple modification, equivalent change and modification made by the above embodiments.

Claims (7)

1. Frame spraying maintenance circulation system is climbed to intelligence, its characterized in that includes:
the temperature measurement device comprises a wall structure, wherein a temperature measurement assembly is pre-embedded in the wall structure;
the climbing frame main body is arranged on the outer side of the wall structure and is installed on the wall structure through a wall-attached support;
the spraying mechanism is arranged on the climbing frame main body, and the spraying direction of the spraying mechanism faces the outer wall of the wall structure;
the water storage tank is arranged on the inner side of the wall structure and is connected with the spraying mechanism; and
and the recovery mechanism is arranged at the bottom of the outer side of the wall structure and is connected with the water storage tank.
2. The intelligent rack-climbing spray maintenance cycle system according to claim 1, characterized in that: still include the switch board, the water storage tank through first water pipe with spray the mechanism and link to each other, be equipped with solenoid valve and frequency conversion constant pressure pump on the first water pipe, the solenoid valve is located the upstream direction of frequency conversion constant pressure pump, the switch board links to each other with solenoid valve, frequency conversion constant pressure pump and temperature measurement component respectively, the switch board is located between water storage tank and the wall structure.
3. The intelligent rack-climbing spray maintenance cycle system according to claim 2, characterized in that: temperature measurement subassembly is including surveying buret, survey buret pre-buried in the wall structure and survey buret and be connected with the switch board electricity.
4. The intelligent rack-climbing spray maintenance cycle system according to claim 3, characterized in that: the spray mechanism is including supplying water and being responsible for and a plurality of water supply branch pipe, the water supply main pipe sets up along vertical direction climb in the frame main part and supply water and be responsible for and link to each other with first water pipe, a plurality of water supply branch pipes set up along left right direction interval from top to bottom climb in the frame main part and a plurality of water supply branch pipes all link to each other with the water supply main pipe, every water supply branch pipe in a plurality of water supply branch pipes all is equipped with a plurality of shower head, the shower head is fan-shaped atomizer, the spray direction of shower head sets up towards wall structure's outer wall.
5. The intelligent rack-climbing spray maintenance cycle system according to claim 4, wherein: the recycling mechanism comprises a water intercepting tank, the water intercepting tank is fixed to the bottom of the outer wall of the wall structure through a fixing support, the water intercepting tank is located below the lowest water supply branch pipe in the water supply branch pipes, and the water intercepting tank is connected with the water storage tank.
6. The intelligent rack-climbing spray maintenance cycle system of claim 5, wherein: the fixed support is made of angle steel, the water intercepting tank is made of stainless steel materials, and a glue layer is filled between the water intercepting tank and the outer wall of the wall structure.
7. The intelligent rack-climbing spray maintenance cycle system according to claim 1, characterized in that: and a water inlet and an overflow pipe are arranged on the water storage tank, and the water inlet and the overflow pipe are both positioned at the top of the water storage tank.
CN202223015289.3U 2022-11-11 2022-11-11 Intelligent climbing frame spraying maintenance circulating system Active CN218714956U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223015289.3U CN218714956U (en) 2022-11-11 2022-11-11 Intelligent climbing frame spraying maintenance circulating system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223015289.3U CN218714956U (en) 2022-11-11 2022-11-11 Intelligent climbing frame spraying maintenance circulating system

Publications (1)

Publication Number Publication Date
CN218714956U true CN218714956U (en) 2023-03-24

Family

ID=85616965

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223015289.3U Active CN218714956U (en) 2022-11-11 2022-11-11 Intelligent climbing frame spraying maintenance circulating system

Country Status (1)

Country Link
CN (1) CN218714956U (en)

Similar Documents

Publication Publication Date Title
CN104264995A (en) Automatic spraying conservation system for high-rise building shear wall structure
CN218714956U (en) Intelligent climbing frame spraying maintenance circulating system
CN220318381U (en) Spraying system for bridge pier maintenance
CN210858069U (en) Concrete curing device for ultrahigh independent structure column
CN210597906U (en) Roof greening layer drainage structure
CN209145020U (en) A kind of assembled beam building roof structure and its height adjusting system
CN216196780U (en) Concrete stand maintenance cover and concrete stand maintenance system
CN218149689U (en) Water collecting and draining device of building climbing frame
CN113898196B (en) Concrete stand maintenance cover and concrete stand maintenance system
CN214353192U (en) Prefabricated T roof beam intelligence sprays maintenance system
CN208815921U (en) A kind of Sarasota climbing form system construction automatic spray curing system
CN108457198A (en) A kind of cantilever construction Cast-in-situ Beam mobile sealing intelligence maintenance construction method
CN211114913U (en) Automatic spraying maintenance system for high-rise building
CN211020363U (en) Water-saving sprinkling irrigation device for landscaping maintenance
CN212614029U (en) A steel-pipe tower structure for monitoring of rainwater condition
CN210714100U (en) Prefabricated assembled prevents hot wall
CN212403965U (en) Tunnel lining curing means
CN205373968U (en) Outer wall water pouring test system
CN221568500U (en) Automatic maintenance device for side wall of cover-excavated reverse-acting subway station
CN110306869A (en) Multi-functional hedgerow enclosing and preparation method thereof
CN204126276U (en) Wall of High-building structure automatic spray curing system
CN218014480U (en) Internet monitoring device
CN219710008U (en) Watering device for concrete curing
CN214500714U (en) Security protection video monitoring equipment
CN215886845U (en) Automatic spraying device of tunnel concrete roof lower surface

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant