CN207109598U - A kind of bridge pier shaft model sheetinstallat positioner - Google Patents

A kind of bridge pier shaft model sheetinstallat positioner Download PDF

Info

Publication number
CN207109598U
CN207109598U CN201720930572.9U CN201720930572U CN207109598U CN 207109598 U CN207109598 U CN 207109598U CN 201720930572 U CN201720930572 U CN 201720930572U CN 207109598 U CN207109598 U CN 207109598U
Authority
CN
China
Prior art keywords
pier
retention bar
body formwork
pier body
positioner
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720930572.9U
Other languages
Chinese (zh)
Inventor
章科
苗涛
宋小行
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 11th Bureau Group Co Ltd
Fourth Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd
Original Assignee
China Railway 11th Bureau Group Co Ltd
Fourth Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 11th Bureau Group Co Ltd, Fourth Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd filed Critical China Railway 11th Bureau Group Co Ltd
Priority to CN201720930572.9U priority Critical patent/CN207109598U/en
Application granted granted Critical
Publication of CN207109598U publication Critical patent/CN207109598U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

A kind of bridge pier shaft model sheetinstallat positioner, every layer of pier body formwork(1)The straight line on top at circular arc interface point with being separately installed with retention bar(2), described retention bar(2)One end and pier body formwork(1)It is connected, retention bar(2)On be provided with positioning hole(5), each layer pier body formwork(1)Corresponding retention bar(2)On positioning hole(5)With pier bottom setting-out mark point on a vertical line.Realize to pier body formwork(1)The control of position, avoids pier body formwork(1)The problem of position shifts in installation process.

Description

A kind of bridge pier shaft model sheetinstallat positioner
Technical field
It the utility model is related to a kind of bridge pier shaft model sheetinstallat positioner, more specifically to a kind of bridge pier shaft Model sheetinstallat positioner, belong to bridge substructure technical field of construction.
Background technology
At present, railroad bridge, highway bridge, room are built in load-bearing pillar and other pier shaft engineerings, frequently with big punching block of shaping Plate is constructed.But in pier body formwork work progress, because formwork rigidity and precision are not high enough, frequently result in model sheetinstallat position Put and shift, can not pass through so that template is checked and accepted, it is impossible to carry out concrete construction, and then be delayed construction speed.
The content of the invention
The purpose of this utility model is for frequently resulting in model sheetinstallat during existing bridge pier shaft model sheetinstallat Position shifts, is delayed the problems such as construction speed, there is provided a kind of bridge pier shaft model sheetinstallat positioner.
To achieve the above object, technical solution of the present utility model is:A kind of bridge pier shaft model sheetinstallat positioning dress Put, the straight line on every layer of pier body formwork top with being separately installed with retention bar at circular arc interface point, described retention bar one end with Pier body formwork is connected, and is provided with positioning hole on retention bar, the positioning hole on the corresponding retention bar of each layer pier body formwork With pier bottom setting-out mark point on a vertical line.
The a diameter of 20mm of described positioning hole.
Compared with prior art, the beneficial effects of the utility model are:
1st, the utility model is novel, simple in construction, economic and practical, is easy to manipulate.
2nd, the utility model is separately installed with retention bar at the straight line and circular arc interface point on every layer of pier body formwork top, uses In realizing the control to pier body formwork position, the problem of position shifts in pier body formwork installation process is avoided.
Brief description of the drawings
Fig. 1 is the utility model structure diagram.
Fig. 2 is the utility model horizontal layout schematic diagram.
Fig. 3 is retention bar structural representation in the utility model.
In figure, pier body formwork 1, retention bar 2, vertical line 3, vertical 4 are hung, positioning hole 5.
Embodiment
The utility model is described in further detail below in conjunction with brief description of the drawings and embodiment.
Referring to Fig. 1 to Fig. 3, a kind of bridge pier shaft model sheetinstallat positioner, the straight line and circular arc that every layer of pier body formwork 1 pushes up Retention bar 2 is separately installed with interface point, described one end of retention bar 2 is connected with pier body formwork 1;Generally use is welded Or other mechanical connections so that firm and reliable connection.Positioning hole 5 is provided with retention bar 2, each layer pier body formwork 1 is corresponding Retention bar 2 on positioning hole 5 with pier bottom setting-out mark point on a vertical line.Retention bar 2 generally selects channel-section steel, Retention bar 2 is identical with the rigidity of pier body formwork 1.
Referring to Fig. 1 to Fig. 3, the design of the length combination pier body formwork 1 of retention bar 2 considers:For no slope than straight slope pier, All length of retention bar 2 are 1 outer 50cm of stretching pier body formwork or so;For have slope than change slope pier, bottom pier shaft mould For the length of retention bar 2 of plate 1 to stretch out 1 outer 50cm of pier body formwork or so, the length of retention bar 2 of other layers of pier body formwork 1 should Extended out when according to corresponding segmental height, be specially:L=L1+ hi, wherein L are the length of retention bar 2, L1For bottom pier The length of retention bar 2 of body template 1, H be pier bottom to the height of the position of retention bar 2, i is slope ratio.
Referring to Fig. 3, described 5 a diameter of 20mm of positioning hole.
Referring to Fig. 1 to Fig. 3, the utility model is by the outside of pier body formwork 1 installation retention bar 2, then with hanging vertical line 3 Mode to pier body formwork 1 installation be controlled.Specifically during the installation of pier body formwork 1, vertical line 3 is set to pass through each layer Positioning hole 5 on the corresponding retention bar 2 of pier body formwork 1, make the bottom of vertical line 3 hangs vertical 4 finger in corresponding pier bottom setting-out In mark point, the relative position of observation vertical line 3 and all positioning holes 5, if vertical line 3 is pacified without by the side of positioning hole 5 The template 1 of dress meets the requirements;If vertical line is close to the side of positioning hole 5, the template 1 installed is undesirable, it is necessary to adjust, Whether met the requirements it is achieved thereby that judging that pier body formwork 1 is installed.The light such as laser pen electricity can be used by hanging the method for vertical line 3 herein Sub- equipment replaces.
It may be noted that during the recycling of this positioner, after pier body formwork 1 is removed, it should check that positioning is horizontal in time Whether bar 2 deforms;Retention bar 2 is checked before installation, avoids the change of the positioner caused by personal reason or accident Shape, damage.
Meanwhile the applicant has found by studying, it is fine that this retention bar 2 is used for the installation effect of pier body formwork 1.Such as apply Work field application is proper, and the later stage can directly save pier body formwork 1 and check process.
Above content is to combine specific preferred embodiment further detailed description of the utility model, it is impossible to Assert that specific implementation of the present utility model is confined to these explanations.For the ordinary skill of the utility model art For personnel, without departing from the concept of the premise utility, some simple deduction or replace, said structure can also be made The scope of protection of the utility model should be all considered as belonging to.

Claims (2)

  1. A kind of 1. bridge pier shaft model sheetinstallat positioner, it is characterised in that:Every layer of pier body formwork(1)The straight line on top is handed over circular arc Junction is separately installed with retention bar(2), described retention bar(2)One end and pier body formwork(1)It is connected, retention bar (2)On be provided with positioning hole(5), each layer pier body formwork(1)Corresponding retention bar(2)On positioning hole(5)And pier bottom Setting-out mark point is on a vertical line.
  2. A kind of 2. bridge pier shaft model sheetinstallat positioner according to claim 1, it is characterised in that:Described positioning hole (5)A diameter of 20mm.
CN201720930572.9U 2017-07-28 2017-07-28 A kind of bridge pier shaft model sheetinstallat positioner Active CN207109598U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720930572.9U CN207109598U (en) 2017-07-28 2017-07-28 A kind of bridge pier shaft model sheetinstallat positioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720930572.9U CN207109598U (en) 2017-07-28 2017-07-28 A kind of bridge pier shaft model sheetinstallat positioner

Publications (1)

Publication Number Publication Date
CN207109598U true CN207109598U (en) 2018-03-16

Family

ID=61571993

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720930572.9U Active CN207109598U (en) 2017-07-28 2017-07-28 A kind of bridge pier shaft model sheetinstallat positioner

Country Status (1)

Country Link
CN (1) CN207109598U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110396933A (en) * 2019-07-25 2019-11-01 张卫国 A kind of bridge construction template erection device and erection method
CN116837674A (en) * 2023-09-01 2023-10-03 云南渝霖模板制造有限公司 Quick positioning device and method for ballastless track steel templates

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110396933A (en) * 2019-07-25 2019-11-01 张卫国 A kind of bridge construction template erection device and erection method
CN116837674A (en) * 2023-09-01 2023-10-03 云南渝霖模板制造有限公司 Quick positioning device and method for ballastless track steel templates
CN116837674B (en) * 2023-09-01 2023-11-10 云南渝霖模板制造有限公司 Quick positioning device and method for ballastless track steel templates

Similar Documents

Publication Publication Date Title
CN103031917B (en) A kind of reinforced concrete prefabricated superimposed sheet with truss rib
CN204266590U (en) Sump, hoistway formwork bed die anti-floating system
CN203022024U (en) Integrally-movable formwork for pipe gallery cast-in-situ construction
CN104695337A (en) Self-lifting sliding and turnover construction system and construction method
CN206233102U (en) A kind of packaged type faces side operation work platform
CN104695979B (en) A kind of method using tall and big chassis whole lateral moving high and big die plate
CN207109598U (en) A kind of bridge pier shaft model sheetinstallat positioner
CN104947604B (en) A kind of fast quick change frame construction method of high-speed railway 900t concrete box girders
CN105133754A (en) Prefabricated concrete shear wallboard counterbore guide type mounting device and method
CN103572703A (en) Construction method of outer wrapped concrete obliquely pulling and buckling and ring and section dividing combination method
CN202194071U (en) Adjustable inner die
CN102852095B (en) Prefabricated bridge abutment multifunctional lifting system and construction procedure thereof
CN205367454U (en) Large -size formwork hoisting machine constructs
CN205364159U (en) Prefab production bench formwork
CN202401753U (en) Sliding die device
CN203755678U (en) Upper suspension hoisting type hoisting device for reinforced concrete floor construction
CN202164030U (en) Integrated box girder cradle
CN204039920U (en) A kind of tower crane lifting reeving device
CN203144909U (en) Bridge high pier roller die construction device
CN110344334A (en) Steel reinforced concrete combined bridge construction method is done using two bridgings of dorsal funciculus formula Bridge Erector
CN206940278U (en) A kind of O shapes gantry handling apparatus
CN201614939U (en) Three-dimensional space curved surface steel mould trolley
CN104847090B (en) Construction method of small-section-size ventilating duct
CN208803382U (en) A kind of CFST Arch Bridge intermediate transverse girder promotion positioning apparatus
CN208700020U (en) A kind of punching block grabbing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant