CN104695979B - A kind of method using tall and big chassis whole lateral moving high and big die plate - Google Patents
A kind of method using tall and big chassis whole lateral moving high and big die plate Download PDFInfo
- Publication number
- CN104695979B CN104695979B CN201510085161.XA CN201510085161A CN104695979B CN 104695979 B CN104695979 B CN 104695979B CN 201510085161 A CN201510085161 A CN 201510085161A CN 104695979 B CN104695979 B CN 104695979B
- Authority
- CN
- China
- Prior art keywords
- chassis
- template
- big
- adjustment
- tall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 31
- 238000009415 formwork Methods 0.000 claims abstract description 8
- 229910000831 Steel Inorganic materials 0.000 claims description 6
- 239000010959 steel Substances 0.000 claims description 6
- 238000009434 installation Methods 0.000 claims description 5
- 238000010276 construction Methods 0.000 abstract description 8
- 238000010586 diagram Methods 0.000 description 12
- 239000000463 material Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000007306 turnover Effects 0.000 description 1
- 230000003827 upregulation Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/102—Removable shuttering; Bearing or supporting devices therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/40—Devices or apparatus specially adapted for handling or placing units of linings or supporting units for tunnels or galleries
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
The present invention relates to tunnel construction technical field, provide a kind of method using tall and big chassis whole lateral moving high and big die plate, template is connected with fixing card by the load-sharing girder on chassis, adjusted up or down by the pull bar of the adjustment up and down Control architecture of chassis, the distance between metope of template and wall is adjusted by the horizontal adjustment bar of chassis;Wait after the completion of pouring, mobile trolley used by slide rail, chassis drives formwork integral moving to the second section in tunnel.Method provided by the invention using tall and big chassis whole lateral moving high and big die plate, after one-time-concreting operation is completed, template need to only be unclamped, and mobile trolley used to the next section that pours carries out model sheetinstallat, solution needs to break template in the prior art, assembly is re-started again, the problem of causing workload big.
Description
Technical field
The present invention relates to tunnel construction technical field, more particularly to the construction method of tunnel wall, more specifically relate to
And the method that tall and big chassis whole lateral moving high and big die plate is utilized during tunnel wall construction.
Background technology
In tunnel walls concrete casting process, generally require to apply high and big die plate, such as port Zhuhai and Macao bridge island tunnel engineering
Western man-made island open section, its tunnel wall are high and big die plate more than 15m, used template highly more than 10m, length, and
And there is the characteristics of modular unit is more, i.e. fritter template is more, and large form needs to form by small pieces template spelling.
In the prior art, the general construction method of tunnel wall form is:After the completion of reinforcing bar colligation, risen using crane etc.
Heavy equipment carries out assembled formwork, after the completion of concreting, treats that concrete strength meets to require, that is, utilizes the crane gears such as crane
Form removal, then template is hung into next section with crane needs the scope of operation that pours to carry out again spelling installation, so do for
Mini engineering or small members are practical, but will increase many form removals, shifting formwork, the work for spelling mould to pouring for large-scale component
Amount, not only makes construction working become extremely cumbersome, can also increase the engineering time, reduces operating efficiency, and consume excessive people
Power and material resources.
Therefore, the deficiency for more than, it is desirable to provide one kind need not repeat assembled and form removal, you can in one section of tunnel
The method that wall is moved integrally template after the completion of pouring.
The content of the invention
(1) technical problems to be solved
The technical problem to be solved in the present invention is to provide a kind of method using tall and big chassis whole lateral moving high and big die plate,
After completing one-time-concreting operation, template need to only be unclamped, and mobile trolley used to the next section that pours carries out model sheetinstallat, solves
Need to break template in the prior art, then re-start assembly, the problem of causing workload big.
(2) technical scheme
In order to solve the above-mentioned technical problem, the invention provides a kind of side using tall and big chassis whole lateral moving high and big die plate
Method, comprise the following steps:
S1, slide rail is first installed on tunnel floor, then installation form and reinforced on the wall of the first segment in tunnel,
Chassis is installed on the slide rail of the bottom plate of the second section in tunnel again;
S2, chassis is moved in the first segment in tunnel by slide rail, passes through the load-sharing girder on chassis and fixing card connects
Template is connect, fixing card one end is fixed on load-sharing girder, the other end connection template of fixing card;
S3, adjusted up or down by the pull bar of the adjustment up and down Control architecture of chassis, pass through the horizontal adjustment bar of chassis
The distance between metope of template and wall is adjusted, after the position adjustment of template, starts to pour;
S4, wait after the completion of pouring, mobile trolley used by slide rail, chassis drives formwork integral moving to second section in tunnel
Section.
Preferably, in abovementioned steps S2, after chassis fixes, chassis and ground are fixed using Windproof inhaul cable.
Preferably, in abovementioned steps S3, the method for adjusting upward template is:The first nut below beam will be adjusted to downward
It is whole, then together it is lifted up together with template using the load-sharing girder that the jack on chassis connects, load-sharing girder is promoted to
When at one nut, the second nut adjusted above beam is adjusted downwards, completes adjusting upward for template.
Preferably, in abovementioned steps S3, the method for adjusting template downwards is:The second nut above beam will be adjusted to up-regulation
Whole, then using the load-sharing girder that the jack on chassis connects, together with template, together falls downward, load-sharing girder drop to
When at two nuts, the first nut adjusted below beam is adjusted upward, completes the downward adjustment of template.
Preferably, in abovementioned steps S3, the method for adjustment of distance is between template and metope:By adjusting horizontal adjustment bar
On leakage screw thread length, by adjust beam together with template position carry out horizontal adjustment, its template is zoomed out or press close to metope.
Preferably, in abovementioned steps S3, it is full thread screw to adjust pull bar up and down.
Preferably, in abovementioned steps S2, adjustment beam is welded using Two bors d's oeuveres channel-section steel.
Preferably, foregoing first nut and the second nut are disk nut.
(3) beneficial effect
The above-mentioned technical proposal of the present invention has the following advantages that:
A kind of method using tall and big chassis whole lateral moving high and big die plate provided by the invention, passes through the load-sharing girder on chassis
Template is connected with fixing card, is adjusted up or down by the pull bar of the adjustment up and down Control architecture of chassis, passes through the level of chassis
Adjust the distance between metope of bar adjustment template and wall;Wait after the completion of pouring, chassis band dynamic model mobile trolley used by slide rail
Plate is moved integrally to the second section in tunnel.
The present invention can be moved up and down by adjusting pull bar Control architecture up and down, horizontal adjustment bar Control architecture move left and right with
And steel wheel mobile drive template on slide rail moves forward and backward, and realizes movement of the template on tri- directions of X, Y, Z.
Method provided by the invention tears combination open by gantry crane concept, i.e. formwork jumbo, with template peace, makes template
Peace tears that operation is more convenient, and the peace for simplifying template tears process open open, only need to assemble a template, you can turnover is reciprocal to be used, and is reduced
Plant equipment and it is artificial use, improve operating efficiency.
The height and width of formwork jumbo used in the present invention can according to pour the size of thing, the scale of construction optimizes, with
Adapt to the template construction of the concrete structures of other structures form.
Brief description of the drawings
Fig. 1 is the schematic diagram of template of the present invention and the chassis installation site in tunnel;
Fig. 2 is template of the present invention and chassis connecting portion schematic diagram;
Fig. 3 is the overall structure diagram after template of the present invention is connected with chassis;
Fig. 4 is the template and chassis overall structure diagram after the completion of the present invention reinforces;
Fig. 5 is the schematic diagram that the present invention adjusts upward the template first step;
Fig. 6 is the schematic diagram that the present invention adjusts upward template second step;
Fig. 7 is the schematic diagram that the present invention adjusts upward the step of template the 3rd;
Fig. 8 is the schematic diagram of the template first step of adjustment downwards of the invention;
Fig. 9 is the schematic diagram of the template second step of adjustment downwards of the invention;
Figure 10 is the schematic diagram of the step of template the 3rd of adjustment downwards of the invention;
Figure 11 is the method schematic diagram that the present invention presses close to template and metope;
Figure 12 is of the invention by template and the remote method schematic diagram of metope.
In figure:1:The first segment in tunnel;2:The second section in tunnel;3:Chassis;4:Template;5:Adjust beam;6:Load sharing
Beam;7:Fixing card;8:Adjustment pull bar up and down;9:Horizontal adjustment bar;10:First nut;11:Second nut;12:Slide rail;13:Steel
Wheel;14:Windproof inhaul cable.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention
In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is
The part of the embodiment of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, ordinary skill people
The every other embodiment that member is obtained on the premise of creative work is not made, belongs to the scope of protection of the invention.
Embodiment one
A kind of method using tall and big chassis whole lateral moving high and big die plate provided in an embodiment of the present invention, including following step
Suddenly:
S1, as shown in figure 1, first slide rail is installed on tunnel floor, the material of slide rail is rail, then the first of tunnel
Installation form and to be reinforced respectively on the wall both sides of section, the template is the side template of wall, and two templates are vertically arranged, and
Each parallel to wall, then chassis is installed on the slide rail of the bottom plate of the second section in tunnel, chassis is existed by the steel wheel of its bottom
Moved on slide rail.
S2, chassis is moved in the first segment in tunnel by slide rail, when template is completely covered chassis, by chassis
It is connected with template, as shown in Figure 2,3, template is connected with fixing card by the load-sharing girder on chassis, fixing card one end is fixed on point
In carrier beam, the other end connection template of fixing card;After chassis fixes, Windproof inhaul cable is used in the both sides of chassis by chassis and ground
Face is fixed, as shown in figure 4, Windproof inhaul cable is obliquely arranged between chassis and ground.
S3, adjusted up or down by the pull bar of the adjustment up and down Control architecture of chassis, pass through the horizontal adjustment bar of chassis
The distance between metope of template and wall is adjusted, after the position adjustment of template, starts to pour;
The method for adjusting upward template is:As illustrated in figs. 5-7, the first nut adjusted below beam is adjusted downwards, then
Together it is lifted up together with template using the load-sharing girder that the jack on chassis connects, load-sharing girder is promoted at the first nut
When, the second nut adjusted above beam is adjusted downwards, completes adjusting upward for template.
The method of adjustment template is downwards:As seen in figs. 8-10, the second nut adjusted above beam is adjusted upward, then
Using the load-sharing girder that the jack on chassis connects, together with template, together falls downward, load-sharing girder are drop at the second nut
When, the first nut adjusted below beam is adjusted upward, completes the downward adjustment of template.
The method of adjustment of distance is between template and metope:As shown in Figure 11,12, it is outer on horizontal adjustment bar by adjusting
The length of screw thread is leaked, position of the beam together with template will be adjusted and carry out horizontal adjustment, its template is zoomed out or press close to metope.
S4, wait after the completion of pouring, mobile trolley used by slide rail, chassis drives formwork integral moving to second section in tunnel
Section.
Wherein, adjustment pull bar be full thread screw up and down, adjusts beam and is welded using Two bors d's oeuveres channel-section steel, the first nut and the
Two nuts are disk nut.
Finally it should be noted that:The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although
The present invention is described in detail with reference to the foregoing embodiments, it will be understood by those within the art that:It still may be used
To be modified to the technical scheme described in foregoing embodiments, or equivalent substitution is carried out to which part technical characteristic;
And these modification or replace, do not make appropriate technical solution essence depart from various embodiments of the present invention technical scheme spirit and
Scope.
Claims (8)
- A kind of 1. method using tall and big chassis whole lateral moving high and big die plate, it is characterised in that:Comprise the following steps:S1, slide rail is first installed on tunnel floor, then installation form and reinforced on the wall of the first segment in tunnel, then Chassis is installed on the slide rail of the bottom plate of the second section in tunnel;S2, the chassis is moved in the first segment in tunnel by the slide rail, by the load-sharing girder on the chassis and Fixing card connects the template, and described fixing card one end is fixed on load-sharing girder, and the other end of the fixing card connects the mould Plate;S3, adjusted up or down by the pull bar of the adjustment up and down Control architecture of the chassis, pass through the horizontal tune of the chassis The distance between metope of whole bar adjustment template and wall, after the position adjustment of template, starts to pour;S4, wait after the completion of pouring, the chassis is moved by the slide rail, the chassis drives the formwork integral moving to tunnel The second section in road.
- 2. the method according to claim 1 using tall and big chassis whole lateral moving high and big die plate, it is characterised in that:The step In rapid S2, after the chassis fixes, the chassis is fixed with ground using Windproof inhaul cable.
- 3. the method according to claim 1 using tall and big chassis whole lateral moving high and big die plate, it is characterised in that:The step In rapid S3, the method for adjusting upward the template is:First nut below adjustment beam is adjusted downwards, then using the chassis On the load-sharing girder that connects of jack be together lifted up together with the template, the load-sharing girder is promoted to first spiral shell When at mother, the second nut above the adjustment beam is adjusted downwards, completes adjusting upward for template.
- 4. the method according to claim 1 using tall and big chassis whole lateral moving high and big die plate, it is characterised in that:The step In rapid S3, the method for adjusting the template downwards is:The second nut adjusted above beam is adjusted upward, then using described By the load-sharing girder that jack connects, together with the template, together falls downward, the load-sharing girder drop to described jack on car When at the second nut, the first nut adjusted below beam is adjusted upward, completes the downward adjustment of template.
- 5. the method according to claim 1 using tall and big chassis whole lateral moving high and big die plate, it is characterised in that:The step In rapid S3, the method for adjustment of distance is between the template and metope:By adjusting the leakage screw thread on the horizontal adjustment bar Length, by adjust beam together with the template position carry out horizontal adjustment, template is zoomed out or press close to metope.
- 6. the method according to claim 1 using tall and big chassis whole lateral moving high and big die plate, it is characterised in that:The step In rapid S3, the pull bar of adjustment up and down is full thread screw.
- 7. the method using tall and big chassis whole lateral moving high and big die plate according to any one of claim 3 or 4, its feature It is:In the step S2, the adjustment beam is welded using Two bors d's oeuveres channel-section steel.
- 8. the method using tall and big chassis whole lateral moving high and big die plate according to any one of claim 3 or 4, its feature It is:First nut and the second nut are disk nut.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510085161.XA CN104695979B (en) | 2015-02-16 | 2015-02-16 | A kind of method using tall and big chassis whole lateral moving high and big die plate |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510085161.XA CN104695979B (en) | 2015-02-16 | 2015-02-16 | A kind of method using tall and big chassis whole lateral moving high and big die plate |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104695979A CN104695979A (en) | 2015-06-10 |
CN104695979B true CN104695979B (en) | 2018-03-20 |
Family
ID=53343479
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510085161.XA Active CN104695979B (en) | 2015-02-16 | 2015-02-16 | A kind of method using tall and big chassis whole lateral moving high and big die plate |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104695979B (en) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105951604B (en) * | 2016-06-21 | 2018-05-25 | 王源 | A kind of bridge pier modular system |
CN106013233B (en) * | 2016-07-14 | 2018-09-04 | 中国建筑第八工程局有限公司 | Sliding system and its construction method for underground pipe gallery cast-in-place construction |
CN106988314A (en) * | 2017-03-17 | 2017-07-28 | 中交航局第工程有限公司 | A kind of counter weight type formwork jumbo, counter weight type outrigger platform, and construction method |
CN106930320A (en) * | 2017-03-28 | 2017-07-07 | 江汉大学 | A kind of piping lane support suitable for pouring piping lane |
CN107023011A (en) * | 2017-04-26 | 2017-08-08 | 江汉大学 | A kind of concreting is molded chassis |
CN108798714B (en) * | 2018-05-28 | 2024-06-18 | 广西路建工程集团有限公司 | Portable moving mold trolley for construction of passage wall body and construction method thereof |
CN110792100B (en) * | 2019-11-01 | 2021-05-07 | 海门市帕源路桥建设有限公司 | Installation and correction female die for box-type telescopic inner die telescopic frame |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19509315C1 (en) * | 1995-03-15 | 1996-05-09 | Hermann Ing Grad Breucha | Concrete post-treatment during tunnel concretion |
DE102005028767A1 (en) * | 2005-06-08 | 2006-12-28 | Domesle Schalungs- Und Metallbau Gmbh | Formwork carriage for concrete formwork has two chassis formed as chassis modules whereby first chassis module has steerable, driven wheel and second chassis module has a heavy duty steering roller |
CN101429752B (en) * | 2007-11-05 | 2010-05-12 | 中交一航局第一工程有限公司 | Pier column prefabrication splicing building technology |
CN201553529U (en) * | 2009-10-12 | 2010-08-18 | 中交一航局第二工程有限公司 | Steel pipe combined type caisson mold plate lifting frame |
CN203834373U (en) * | 2014-05-29 | 2014-09-17 | 葛洲坝集团第一工程有限公司 | Lifting movement mold carriage trolley for box culvert side wall formwork |
-
2015
- 2015-02-16 CN CN201510085161.XA patent/CN104695979B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN104695979A (en) | 2015-06-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104695979B (en) | A kind of method using tall and big chassis whole lateral moving high and big die plate | |
CN204640450U (en) | A kind of assembling-type precast box girder integral moving die plate | |
CN103215894B (en) | Portable interim prestressed stretch-draw anchor block | |
CN203188121U (en) | Cast-in-place bridge floor suspending mold of half-through or through arch bridge | |
CN201738443U (en) | Prefabricated concrete double-overlapping beam | |
CN208087078U (en) | A kind of boom hoisting of large span steel reinforced concrete combination beam Bridge Erector | |
CN104695337A (en) | Self-lifting sliding and turnover construction system and construction method | |
CN201666157U (en) | Inverted arch integral type moving die carrier | |
CN103953123A (en) | H-shaped steel frame node with partially restricted beam end and construction method thereof | |
CN109304795A (en) | The hydraulic gliding model of T beam and operating method | |
CN205314542U (en) | Construction liquid die plate device that climbs | |
CN202658529U (en) | Device for integrally hoisting and molding prefabricated reinforced bars for fabricating girders of high-speed rails in situ | |
CN103074871B (en) | Arc-shaped slope concrete sliding and lifting template | |
CN103046743B (en) | A kind of Super High conversion layer steel reinforced concrete crossbeam suspension type form bracing system and construction method | |
CN210713517U (en) | Assembled superposed beam structure | |
CN201942994U (en) | Bridge bearing pad | |
CN203113793U (en) | Large formwork installation system of oblique structure | |
CN202064281U (en) | Slip form frame | |
CN205669313U (en) | A kind of Universal adjustable hangs template system | |
CN102322138A (en) | The modular sliding formwork | |
CN105863261A (en) | Universally-adjustable suspension formwork system | |
CN211517876U (en) | Length-adaptive integrated wall body split connecting piece for steel bar formwork | |
CN202000263U (en) | Descending type movable die frame structure | |
CN212715980U (en) | Whole flip-chip construction system of assembled building | |
CN209836812U (en) | Rail-mounted movable shaping mould frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |