CN207243378U - Prefabricated assembled ultra-high overweight inside and outside wall board erecting device - Google Patents

Prefabricated assembled ultra-high overweight inside and outside wall board erecting device Download PDF

Info

Publication number
CN207243378U
CN207243378U CN201721231504.XU CN201721231504U CN207243378U CN 207243378 U CN207243378 U CN 207243378U CN 201721231504 U CN201721231504 U CN 201721231504U CN 207243378 U CN207243378 U CN 207243378U
Authority
CN
China
Prior art keywords
fixed
outside wall
wall board
erecting device
prefabricated assembled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721231504.XU
Other languages
Chinese (zh)
Inventor
辛海京
张春锋
郭剑飞
彭宇
崔广为
武永全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING CONSTRUCTION ENGINEERING GROUP BOHAI CONSTRUCTION Co Ltd
Original Assignee
BEIJING CONSTRUCTION ENGINEERING GROUP BOHAI CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING CONSTRUCTION ENGINEERING GROUP BOHAI CONSTRUCTION Co Ltd filed Critical BEIJING CONSTRUCTION ENGINEERING GROUP BOHAI CONSTRUCTION Co Ltd
Priority to CN201721231504.XU priority Critical patent/CN207243378U/en
Application granted granted Critical
Publication of CN207243378U publication Critical patent/CN207243378U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of prefabricated assembled ultra-high overweight inside and outside wall board erecting device, its key points of the technical solution are that being provided with the base of roller including bottom, being fixed on the strut of base one end and the hoist engine being fixed on base vertically, it is connected with hoist engine around lifting rope of the mandril top for hanging wallboard.The utility model solves the problems, such as that existing large-scale overweight Side fascia is difficult to install.

Description

Prefabricated assembled ultra-high overweight inside and outside wall board erecting device
Technical field
Handling appliance is the utility model is related to, more specifically, it is related to a kind of prefabricated assembled ultra-high overweight inner-outer wall Board mounting assembly.
Background technology
At present, as housing need is continuously increased, the fast development of assembled architecture technical system like the mushrooms after rain is raw The socialization and scale of production require higher and higher, the effect more projecting device of assembled architecture standardization.Develop assembled Building, has precision high, saves template, raise labour productivity, improve product quality, accelerates overall construction speed, comprehensive effect Benefit proves;Prefabrication quality has qualitative leap, and common quality defect greatly reduces;Alien invasion eliminates traditional cast-in-place The polishing of structure, make up a deficiency, external wall plastering, paint process, the direct brush interfacial agents such as exterior coating and can be delivered for use.
Assembled architecture is combined with BIM technology, it is possible to achieve prefabricated inside and outside wallboard, precast floor slab, precast stair, prefabricated After the component Quick Response Code such as air-conditioning plate is scanned through, directly it is lifted into respective storey or prefabricated components and piles up to relevant position, nearby Installation, reduces rehandling, has saved cost, realized assembled architecture intelligent management.If rehandling is improper, easily send out Raw component is damaged, and a large amount of manpowers are lost, lose time.At the same time assembled architecture construction, reduce major project, secondary structure and The building waste of multiple links generation of fitting-out work, reduce energy consumption, reduces construction fugitive dust, reduces haze weather, from And really reduce Amber Alert, the warning red frequency of occurrences, add the number for clear sky occur, reduce construction fugitive dust and Noise pollution, is more conducive to environmental protection, and building energy conservation emission reduction effect is obvious.
Constructed using prefabricated assembled component, for high-rise residential engineering, the Large Construction machine such as tower crane can be cancelled completely Tool.Under normal conditions, for the house of 2700 ~ 2900mm of floor height, its interior wall plate thickness is mostly 90 ~ 100mm, is highly no more than 3000mm, it is mostly 50 ~ 100Kg that it, which is conducted oneself with dignity, and lining installation can be achieved in the small-sized construction equipment of hand fit.Surpass for floor The inside and outside wallboard of assembled of 3000mm is crossed, prefabricated components are very long, rely solely on manpower transport in the construction process, can not Meet the needs of inside and outside wallboard installation, especially Side fascia, go along with sb. to guard him, keep the temperature since it has, preventing fires, the effect such as waterproof, thickness For the autoclave aerated concrete building block of 200mm, dead weight is very big, can not manually move.Therefore there is an urgent need for design one kind to be used for carrying certainly The instrument of the very big inside and outside wallboard of weight.
Utility model content
In view of the deficienciess of the prior art, the purpose of this utility model is to provide a kind of prefabricated assembled ultra-high overweight Inside and outside wall board erecting device, significantly reduces the carrying amount of labour to assembled wallboard, drastically increases construction efficiency.
To achieve the above object, the utility model provides following technical solution:In a kind of prefabricated assembled ultra-high overweight Exterior wall board mounting assembly, including bottom are provided with the base of roller, are fixed on the strut of base one end vertically and are fixed on base On hoist engine, be connected with hoist engine and be used for the lifting rope of hanging wallboard around strut top.
It is by using above-mentioned technical proposal, lifting rope end system is solid on wallboard, start hoist engine work storage lifting rope, then Wallboard is holded up and is supported on strut by lifting rope, and further storing lifting rope makes wallboard and surface separation and be higher by about 1-2cm, mobile Base causes wallboard to be located at rigging position, convenient installation.
The utility model is further arranged to:The reinforcing rib being obliquely installed is fixed between the strut and base.
By using above-mentioned technical proposal, for wall-panels supports when on strut, reinforcing rib plays a supporting role strut, avoids Strut bends deformation because wallboard is heavier.
The utility model is further arranged to:Fixed pulley is installed at the top of the strut, lifting rope is wound on fixed pulley.
By using above-mentioned technical proposal, opposite between lifting rope and strut to roll, frictional force therebetween significantly reduces, It is more laborsaving, in addition, also reducing the abrasion of lifting rope.
The utility model is further arranged to:The strut has two and top is fixed with horizontally disposed cross bar, fixed sliding Wheel is installed in the middle part of cross bar.
By using above-mentioned technical proposal, during lifting rope handling wallboard, lifting rope is located at the middle part of wallboard so that wallboard both sides are protected Maintain an equal level weighing apparatus, reduces wallboard inclined possibility in hoisting process.
The utility model is further arranged to:The lifting rope end is fixed with suspension hook.
By using above-mentioned technical proposal, it can be banded in fastening straps on wallboard, suspension hook is then hooked on fastening straps On, more convenient operation.
The utility model is further arranged to:The hoist engine includes clockwise and anticlockwise motor and reel.
By using above-mentioned technical proposal, hoist engine is Electronic control, easy to operate, motor can rotating, can drive Movable reel folding and unfolding lifting rope.
The utility model is further arranged to:The output shaft of the reel and motor is coaxially connected.
By using above-mentioned technical proposal, hoist engine is light compact, saves space.
The utility model is further arranged to:The motor is electrically connected with control cabinet, and control cabinet is fixed on base.
By using above-mentioned technical proposal, during base handling is promoted, hoist engine can be controlled by control cabinet Work, it is easy to operate.
The utility model is further arranged to:The control cabinet is fixed on the one end of base away from strut.
By using above-mentioned technical proposal, worker station promotes base movement in the one end of base away from strut, and control cabinet is solid This end is scheduled on conveniently to touch.
The utility model is further arranged to:The both sides of the fixed pulley are fixed with anti-off board.
By using above-mentioned technical proposal, during lifting rope is mobile on fixed pulley, anti-off board can effectively prevent from hanging Rope comes off from fixed pulley, improves the security of handling process.
In conclusion the utility model has the advantages that compared with the prior art:
1. the inside and outside wall board of ultra-high overweight can be sling and transported with the device, the amount of labour manually carried is greatlyd save, Improve work efficiency;
2. control cabinet be installed on people promote base one end, such people can one side mobile base on one side control hoist engine hang Play wallboard so that wallboard using one end as fulcrum rotate so as to hold up, and mobile base is more convenient compared to wallboard movement;
3. hoist engine volume is light and handy so that whole device saves space.
Brief description of the drawings
Fig. 1 is the axonometric drawing of the present embodiment working status;
Fig. 2 is the left view of position relationship between display lifting state wainscot sheathing and stent;
Fig. 3 is the front view of position relationship between display fixed pulley and hoist engine and stent;
Fig. 4 is the explosive view that display wallboard passes through fastening straps connection relation with hook.
In figure:1st, stent;11st, support plate;12nd, base;13rd, strut;14th, reinforcing rib;15th, roller;2nd, hoist engine;21、 Motor;22nd, reel;3rd, control cabinet;4th, fixed pulley;41st, anti-off board;5th, lifting rope;51st, suspension hook;6th, wallboard;7th, fastening straps.
Embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings.
Wherein identical parts are presented with like reference characters.It should be noted that word used in the following description Language "front", "rear", "left", "right", "up" and "down" refer to the direction in attached drawing 1, word " bottom surface " and " top surface ", " interior " and " outer " is referred respectively to towards or away from the direction of particular elements geometric center.
Embodiment:A kind of prefabricated assembled ultra-high overweight inside and outside wall board erecting device, as shown in Figure 1, including stent 1, The top of stent 1 is provided with fixed pulley 4, and 1 bottom of stent is provided with hoist engine 2, one end of lifting rope 5 be fixed on hoist engine 2 and The other end bypasses fixed pulley 4, and the control cabinet 3 that control hoist engine 2 works is provided with 1 lower part of stent, and lifting rope 5 passes through fastening straps 7 Wallboard 6 is lifted with, wallboard 6 is sling vertically by hoist engine 2 and is leaned against on stent 1, mobile stent 1 completes the assembling of wallboard 6 Work.
With reference to figure 1 and Fig. 2, stent 1 includes the base 12 of rectangular parallelepiped structure, and 12 height of base can be designed as 0.5m- 1.2m.Two struts 13 are vertically fixed in one end of 12 top surface of base, two struts 13 are located at the two corners of base 12, strut 13 height can be designed as 1.5m-2m, and the top of two struts 13 is fixedly connected by horizontally disposed cross bar.In base 12 The other end of top surface is equipped with two reinforcing ribs 14, and reinforcing rib 14 is in rod-shaped, and one end of reinforcing rib 14 is fixed on base 12 other two On a angle, the other end of reinforcing rib 14 tilts the top for being fixed on strut 13.Strut 13, base 12 and reinforcing rib 14 form triangle Shape structure, adds the stability of strut 13.Stent 1 can use stainless steel to make, and there is sufficiently high intensity to be unlikely to deform. In order to facilitate mobile stent 1, the bottom four corners of base 12 are separately installed with roller 15, and roller 15 can be ten thousand with brake block To wheel, such stent 1 can be fixed after being moved to suitable position.Support plate 11 is installed with base 12, hoist engine 2 can To be bolted in support plate 11.
With reference to figure 3 and Fig. 4, hoist engine 2 includes the motor 21 being fixed in support plate 11 and connects with the output shaft of motor 21 The reel 22 connect, motor 21 are clockwise and anticlockwise motor, and motor 21 is electrically connected with control cabinet 3, and control cabinet 3 is fixed on base 12 away from branch One end of bar 13, so promotes the work that operation control box 3 can be facilitated to control hoist engine 2 during stent 1.It is equipped with control cabinet 3 Earth leakage protective device, plays the role of safeguard protection.Reel 22 can be coaxially disposed with motor 21, light compact, save space. It can be connected by retarder.According to lifting tonnage needs, hoist engine 2 can select the different model of in the market.
With reference to figure 3 and Fig. 4, the both ends of fixed pulley 4 are fixed on cross bar and centrally located, and the both sides of fixed pulley 4 add Equipped with anti-off board 41, prevent lifting rope 5 from deviating from from fixed pulley 4.The end of lifting rope 5 is fixedly connected with suspension hook 51, and lifting rope 5 can be used Steel wire rope or nylon rope, have higher tensile strength, and in order to improve security, the rupture pull force value of lifting rope 5 is 6 gravity of wallboard 3 times.Fastening straps 7 are arranged with height 1/2 on wallboard 6, fastening straps 7 can select nylon material or other tensions strong High material such as PEC, terylene etc. are spent, the both ends of fastening straps 7 can be by snapping connection, and suspension hook 51 is hooked on fastening straps 7.
The application method of the prefabricated assembled ultra-high overweight inside and outside wall board erecting device is as follows:
Fastening straps 7 are set in the middle part of prefabricated wallboard 6 first, is lengthened lifting rope 5 by hoist engine 2, suspension hook 51 is hooked On wallboard 6, control hoist engine 2 to work by control cabinet 3 and store lifting rope 5, the one end of wallboard 6 away from stent 1 is with close to branch One end of frame 1 tilts for fulcrum, with the lower section of wallboard 6 of supporter support pad.
Then suspension hook 51 is removed, mobile stent 1 arrives one end that wallboard 6 tilts, and suspension hook 51 is hooked under wallboard 6 again On the fastening straps 7 of side, hoist engine 2 is controlled to work and store lifting rope 5 by control cabinet 3, as lifting rope 5 shortens, lifting rope 5 is by wallboard 6 prop, and accordingly promote stent 1 close to wallboard 6 in this process so that wallboard 6, which gradually rotates, to be holded up until the bottom of wallboard 6 Portion departs from ground about 1-3cm, and wallboard 6 is close to strut 13 and is set at this time.According to the institute of wallboard 6 position to be mounted, stent 1 is promoted to move Move to designated position, rapid operation.
The above is only the preferred embodiment of the utility model, and the scope of protection of the utility model is not limited merely to Above-described embodiment, all technical solutions belonged under the utility model thinking belong to the scope of protection of the utility model.It should refer to Go out, for those skilled in the art, some improvement under the premise of the utility model principle is not departed from and Retouching, these improvements and modifications also should be regarded as the scope of protection of the utility model.

Claims (10)

  1. A kind of 1. prefabricated assembled ultra-high overweight inside and outside wall board erecting device, it is characterised in that:Roller is installed including bottom (15) base (12), the hoist engine (2) for being fixed on the strut (13) of base (12) one end vertically and being fixed on base (12), It is connected with hoist engine (2) around lifting rope (5) of strut (13) top for hanging wallboard (6).
  2. 2. prefabricated assembled ultra-high overweight inside and outside wall board erecting device according to claim 1, it is characterised in that:The branch The reinforcing rib (14) being obliquely installed is fixed between bar (13) and base (12).
  3. 3. prefabricated assembled ultra-high overweight inside and outside wall board erecting device according to claim 1, it is characterised in that:The branch Fixed pulley (4) is installed at the top of bar (13), lifting rope (5) is wound on fixed pulley (4).
  4. 4. prefabricated assembled ultra-high overweight inside and outside wall board erecting device according to claim 3, it is characterised in that:The branch Bar (13) has two and top is fixed with horizontally disposed cross bar, and fixed pulley (4) is installed on the middle part of cross bar.
  5. 5. prefabricated assembled ultra-high overweight inside and outside wall board erecting device according to claim 1, it is characterised in that:It is described to hang Rope (5) end is fixed with suspension hook (51).
  6. 6. prefabricated assembled ultra-high overweight inside and outside wall board erecting device according to claim 1, it is characterised in that:The volume Raising machine (2) includes clockwise and anticlockwise motor (21) and reel (22).
  7. 7. prefabricated assembled ultra-high overweight inside and outside wall board erecting device according to claim 6, it is characterised in that:The volume Cylinder (22) and the output shaft of motor (21) are coaxially connected.
  8. 8. prefabricated assembled ultra-high overweight inside and outside wall board erecting device according to claim 6, it is characterised in that:The electricity Machine (21) is electrically connected with control cabinet (3), and control cabinet (3) is fixed on base (12).
  9. 9. prefabricated assembled ultra-high overweight inside and outside wall board erecting device according to claim 8, it is characterised in that:The control Case (3) processed is fixed on the one end of base (12) away from strut (13).
  10. 10. prefabricated assembled ultra-high overweight inside and outside wall board erecting device according to claim 4, it is characterised in that:It is described The both sides of fixed pulley (4) are fixed with anti-off board (41).
CN201721231504.XU 2017-09-23 2017-09-23 Prefabricated assembled ultra-high overweight inside and outside wall board erecting device Active CN207243378U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721231504.XU CN207243378U (en) 2017-09-23 2017-09-23 Prefabricated assembled ultra-high overweight inside and outside wall board erecting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721231504.XU CN207243378U (en) 2017-09-23 2017-09-23 Prefabricated assembled ultra-high overweight inside and outside wall board erecting device

Publications (1)

Publication Number Publication Date
CN207243378U true CN207243378U (en) 2018-04-17

Family

ID=61886565

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721231504.XU Active CN207243378U (en) 2017-09-23 2017-09-23 Prefabricated assembled ultra-high overweight inside and outside wall board erecting device

Country Status (1)

Country Link
CN (1) CN207243378U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109110667A (en) * 2018-10-16 2019-01-01 中建八局第建设有限公司 A kind of mobile auxiliary board wall splicing apparatus
CN109702868A (en) * 2019-01-31 2019-05-03 中交二航局第四工程有限公司 A kind of prefabricated box -beam flange plate assembly adjustment device
CN112482710A (en) * 2020-12-10 2021-03-12 江苏省华建建设股份有限公司 ALC wallboard installation lifting device for building decoration engineering and application method thereof
CN113756365A (en) * 2021-09-24 2021-12-07 广东省基础工程集团有限公司 Prefabricated part installation method
CN114197885A (en) * 2021-12-07 2022-03-18 中铁建工集团有限公司 Device convenient to installation secondary structure slat wall
CN114809547A (en) * 2022-04-24 2022-07-29 济南铸诚建筑工程集团有限公司 ALC wallboard mounting process

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109110667A (en) * 2018-10-16 2019-01-01 中建八局第建设有限公司 A kind of mobile auxiliary board wall splicing apparatus
CN109110667B (en) * 2018-10-16 2024-05-17 中建八局第一建设有限公司 Portable supplementary siding wall splicing apparatus
CN109702868A (en) * 2019-01-31 2019-05-03 中交二航局第四工程有限公司 A kind of prefabricated box -beam flange plate assembly adjustment device
CN112482710A (en) * 2020-12-10 2021-03-12 江苏省华建建设股份有限公司 ALC wallboard installation lifting device for building decoration engineering and application method thereof
CN113756365A (en) * 2021-09-24 2021-12-07 广东省基础工程集团有限公司 Prefabricated part installation method
CN114197885A (en) * 2021-12-07 2022-03-18 中铁建工集团有限公司 Device convenient to installation secondary structure slat wall
CN114197885B (en) * 2021-12-07 2022-12-20 中铁建工集团有限公司 Device convenient to installation secondary structure panel wall
CN114809547A (en) * 2022-04-24 2022-07-29 济南铸诚建筑工程集团有限公司 ALC wallboard mounting process
CN114809547B (en) * 2022-04-24 2024-04-16 济南铸诚建筑工程集团有限公司 ALC wallboard mounting process

Similar Documents

Publication Publication Date Title
CN207243378U (en) Prefabricated assembled ultra-high overweight inside and outside wall board erecting device
CN102561744B (en) Integrated base station capable of realizing one-click maintenance without ascending height
CN103086279B (en) Vertical transportation construction method for building construction
CN210313286U (en) Lifting device in light partition wall slat field
CN206942109U (en) One kind is without special bracket and the protection support body of encorbelmenting of off-load industrialization security protection
CN201647834U (en) Device for mounting tower equipment in narrow spaces
CN215248962U (en) Transfer device for building partition plate
CN210635627U (en) Large-scale lifting machine for outer wall decoration
CN207296361U (en) A kind of regularization assembled overhanging protection canopy
CN215626205U (en) Auxiliary crane device for ALC wallboard installation
CN202131060U (en) Movable lift type operating platform for cargo hold of bulk carrier
CN201647900U (en) Manual cargo lifting device of upright-column balcony
CN210885077U (en) Building construction hoisting device
CN210342719U (en) Movable operation frame for quickly installing assembled inner wall plate
CN203594215U (en) High-altitude large-area work platform semi-automatic lifting apparatus
CN107311060B (en) Mechanical whole-course weight-limiting power-off protection device and jack applied by same
CN202017347U (en) Externally-hung discharging platform device
CN2042492U (en) Dual-purpose vertical lift platform for fixing and load-lifting
CN219732674U (en) Noise reduction type building construction platform
CN221073421U (en) Movable operation platform for installing roof beam head plate of storage tank dome
CN219344183U (en) Turnover type light finished product processing shed
CN218539030U (en) Rotation type low house group air material conveyer
CN211078293U (en) High-altitude hoisting prefabricated part symmetrical equipment
CN212715855U (en) Synchronous controller for attached lifting scaffold
CN210528306U (en) Portable manual hoisting accessory of roof photovoltaic power plant

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant