CN207200162U - A kind of prefabricated assembled FRP tendons pervious concrete cable duct bank - Google Patents

A kind of prefabricated assembled FRP tendons pervious concrete cable duct bank Download PDF

Info

Publication number
CN207200162U
CN207200162U CN201721039087.9U CN201721039087U CN207200162U CN 207200162 U CN207200162 U CN 207200162U CN 201721039087 U CN201721039087 U CN 201721039087U CN 207200162 U CN207200162 U CN 207200162U
Authority
CN
China
Prior art keywords
cable duct
duct bank
cable
pervious concrete
frp tendons
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721039087.9U
Other languages
Chinese (zh)
Inventor
王少杰
侯凯
焦裕钊
花邦杰
刘福胜
杜善梁
钱铭
钱一铭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Agricultural University
Original Assignee
Shandong Agricultural University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Agricultural University filed Critical Shandong Agricultural University
Priority to CN201721039087.9U priority Critical patent/CN207200162U/en
Application granted granted Critical
Publication of CN207200162U publication Critical patent/CN207200162U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

It the utility model is related to a kind of prefabricated assembled FRP tendons pervious concrete cable duct bank, the hollow cable comb passed through by current supply cable forms, 50mm is stretched out in longitudinal side FRP tendons of cable duct bank, as spacing tenon, opposite side is retracted 50mm, as spacing blind mortise, 2 FRP lifting muscle are provided with the radial direction side of cable duct bank, the groove for lifting muscle insertion is provided with the side for setting lifting muscle opposite.The utility model saves electric energy, high-durability energy, quick Fabrication and assembly performance, meets that the infiltration of sponge city requires.

Description

A kind of prefabricated assembled FRP tendons pervious concrete cable duct bank
Technical field
Utility model of the present invention is related to cable duct bank field, more particularly to one kind is applied to city pavement and other light-duty roads The cable duct bank structure of prefabricated assembled FRP tendons pervious concrete under road.
Background technology
Power circuit cabling is typically using built on stilts installation, cable tray, cable duct bank, cable duct, underground pipe gallery(Or The special piping lane of cable)Etc. several ways, wherein built on stilts installation, cable tray is easily affected by environment compared with cable is installed in underground, And unsightly.Underground pipe gallery(Or the special piping lane of cable)Invest huge;Cable duct bank is small with its low cost, occupation of land, and electricity The advantages that cable protection measure is improved, it is widely used in cable run construction.
Cable duct bank is typically built using cast in situs mode at present, although it has operation flexible, is constructed simple etc. excellent Point, but there is also the shortcomings of operation side is big, the cycle is long.The also easy contaminated site environment of job mix simultaneously.Cable is arranged at present Pipe typically uses armored concrete material, and reinforcing bar is perishable, and then destroys concrete, and reinforcing bar has electromagnetism sense with transmission line of electricity Should be so as to producing power consumption;Compared with pervious concrete, normal silicate concrete permeable poor performance, sponge city is unsatisfactory for Permeable requirement.
Patent 201410750042.7 is related to " a kind of pre-fabricated electric cables comb ", including multiple upper half-round slots and lower half circular groove one Body formed is upper groove body and lower groove, and upper and lower cell body is spliced to form pre-fabricated electric cables comb.Though this cable duct bank is easy for construction, It is repeatable to utilize, but when cabling quantity lays underaction less than when accommodating minimum number, the scope of operation is single, so should With scope by a definite limitation.It is related to " assembled cable duct bank mounting structure " for this point patent 201621081538.0, Including being provided with the spacing tenon of outer protrusion and the groove for its insertion with hollow cable protection pipe, cable protection pipe side.Should Though invention can use mechanized construction, can not meet the permeable requirement in sponge city also can not avoid reinforcing bar electromagnetic induction from being made Into power consumption.
Patent 2012220120088.7 is related to " a kind of split type cable duct bank ", including a kind of split type cable duct bank by Long Ω types semi-circular tube and short Ω types semi-circular tube are formed, and the utility model is applied due to being to be connected by screw between comb and comb Work requires high, and this connected mode easily seeps water, corrosion.Now need badly it is a kind of it is easy for construction, repeatable utilize, save electric energy, Meet the prefabricated assembled cable comb that the infiltration of sponge city requires.
The content of the invention
The purpose of utility model of the present invention be to provide a kind of industrialized production, save electric energy, alleviate municipal drainage pressure, into The prefabricated assembled FRP tendons pervious concrete cable duct bank that quality is good, speed of production is fast, using factory floor equipment and skill Art advantage, product quality is improved on the premise of cost is not significantly improved, improve the water penetration of cable duct bank and improve durability.
To achieve these goals, technical scheme is used by utility model of the present invention:
A kind of prefabricated assembled FRP tendons pervious concrete cable duct bank, it is characterised in that:The hollow electricity passed through by current supply cable Cable comb forms, and stretches out 50mm in longitudinal side FRP tendons of cable duct bank, and as spacing tenon, opposite side is retracted 50mm, as Spacing blind mortise, 2 FRP lifting muscle are provided with the radial direction side of cable duct bank, is provided with and supplies in the side for setting lifting muscle opposite Lift the groove of muscle insertion.
Section outside cable duct bank of the present invention is integrally rectangular, the cable duct bank be superimposed by multi-layer cable protection pipe and Into in spacing FRP sheet material of the both sides of cable duct bank provided with limitation cable duct bank lateral movement of the bottom, the cable of the bottom The lower end of protection pipe is rested the head on provided with road, and road pillow is placed on blotter.
Each angle of each cable duct bank of the present invention is equipped with chamfering, the star-like breach shape that adjacent four combs are formed Into a reserved passageway.
The cable duct bank junction diameter increase 10mm that the present invention is connected.
The FRP tendons that the longitudinal direction of the prefabricated assembled FRP tendons pervious concrete mounting structure of the present invention is 4 10 ~ 16mm of diameter The tensile capacity of FRP tendons can be made full use of strong and corrosion resistance characteristic, effectively solution pervious concrete structural strength are low, easy to crack The problems such as, the durability of this pervious concrete cable duct bank is fully improved, after longitudinal stress muscle colligation terminates, carries out stirrup 3 colligation, after pouring pervious concrete in mould, conserve 28 days, finished product dispatches from the factory.
Beneficial effects of the present invention and advantage is compared with prior art:Save electric energy, high-durability energy, quick Fabrication With assembly performance, meet sponge city infiltration require etc..
Brief description of the drawings
Fig. 1 is the cross-sectional structure schematic diagram of the present invention;
Fig. 2 is the profile of individual cable protection pipe of the present invention;
Fig. 3 is the longitudinal schematic diagram of the present invention;
Fig. 4 is junction schematic diagram of the present invention.
Embodiment
For the present invention is described in further detail, its embodiment is as follows:
The invention production process is:Among being first molded longitudinal FRP tendons and stirrup colligation and be fixed on template, after will be permeable Concreting wherein, conserves 28 days, finished product dispatches from the factory.
The invention installation process is:First excavate cable duct bank ditch, rubble is uniformly mated formation bottom of trench, laying road pillow, after general Bottom prefabricated assembled cable comb is positioned at bottom of trench, is then correspondingly arranged on upper strata cable duct bank on lower floor's cable duct bank; I.e. completion is installed after burying soil.
According to Fig. 1, Fig. 2, in specific implementation, a kind of prefabricated assembled FRP tendons pervious concrete cable duct bank mounting structure, Muscle 2, stirrup 4, lifting muscle 3 are indulged including FRP;Including the cable protection pipe 1 of the hollow structure passed through with current supply cable, cable row Section generally rectangular configuration outside pipe, it is spacing recessed in lifting FRP tendons, opposite side built in the side of cable protection pipe Groove, the cable duct bank mounting structure are formed by stacking by multi-layer cable protection pipe, each layer cable protection pipe can be set it is multiple, at most bottom The both sides of the cable protection pipe of layer are provided with the spacing FRP sheet materials 5 of limitation cable duct bank lateral movement, on road pillow 7, road pillow 7 It is placed on blotter 8.Described each cable duct bank has star-like breach 6, and adjacent gap forms a reserved passageway.
In order to facilitate transporting and constructing, the length of prefabricated assembled cable comb is no more than 12m.Front and rear comb linking Place is filled using rubber washer, outer layer covers mackintosh, and adhesive plaster parcel scope is no less than comb seam each side 300mm and should not be less than 3 layers.
Data below describes in detail the present invention and ordinary reinforced concrete cable duct bank porosity, 28 days pressure resistances Difference between degree, coefficient of permeability, induction loss.
Pervious concrete 1:42.5 grades of Portland cements of cement, percentage by weight 10%-15%;Ballast grain sizes are 16mm-25mm discontinuous gradation rubble, weight ratio are 35%-48%;Gangue particle diameter is 16mm-25mm discontinuous gradation stone Limestone rubble, weight ratio are 32%-42%;Water is running water, percentage by weight 2%-5%.
Pervious concrete 2:42.5 grades of Portland cements of cement, percentage by weight 9%-13%;Ballast grain sizes are 20mm-30mm discontinuous gradation rubble, weight ratio are 35%-48%;Gangue particle diameter is 16mm-25mm discontinuous gradation stone Limestone rubble, weight ratio are 32%-42%;Water is running water, percentage by weight 2%-5%.
The porosity of above two pervious concrete and normal concrete, 28 days compression strength, coefficients of permeability are compareed and are shown in Table 1。
The pervious concrete of table 1 and the normal concrete coefficient of permeability table of comparisons
Porosity(%) 28 days compression strength(MPa) Coefficient of permeability(mm/s)
Pervious concrete 1 20.6 30.6 7.6
Pervious concrete 2 34.8 20.3 23.0
Normal concrete 1.0 40.0 0.5
During one cable protection pipe, AC resistance is 2.23 × 10-5(Ω/m), corresponding core loss during curent change, FRP tendons induction loss, reinforcing bar induction loss are shown in Table 2.
Fibre core loss, induction loss corresponding to the curent change of table 2

Claims (4)

  1. A kind of 1. prefabricated assembled FRP tendons pervious concrete cable duct bank, it is characterised in that:The hollow cable passed through by current supply cable Comb forms, and stretches out 50mm in longitudinal side FRP tendons of cable duct bank, as spacing tenon, opposite side retraction 50mm, as limit Position blind mortise, 2 FRP lifting muscle are provided with the radial direction side of cable duct bank, are provided with the side for setting lifting muscle opposite for hanging Fill the groove of muscle insertion.
  2. A kind of 2. prefabricated assembled FRP tendons pervious concrete cable duct bank according to claim 1, it is characterised in that:Should Section outside cable duct bank is integrally rectangular, and the cable duct bank is formed by stacking by multi-layer cable protection pipe, in the electricity of the bottom The both sides of cable comb are provided with the spacing FRP sheet materials of limitation cable duct bank lateral movement, and the lower end of the cable protection pipe of the bottom is set There is pillow, road pillow is placed on blotter.
  3. A kind of 3. prefabricated assembled FRP tendons pervious concrete cable duct bank according to claim 1 or 2, it is characterised in that: Each angle of described each cable duct bank is equipped with chamfering, and the star-like breach that adjacent four combs are formed forms a reserved passageway.
  4. A kind of 4. prefabricated assembled FRP tendons pervious concrete cable duct bank according to claim 2, it is characterised in that:Phase Cable duct bank one end diameter increase 10mm of connection, other end diameter are constant.
CN201721039087.9U 2017-08-18 2017-08-18 A kind of prefabricated assembled FRP tendons pervious concrete cable duct bank Expired - Fee Related CN207200162U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721039087.9U CN207200162U (en) 2017-08-18 2017-08-18 A kind of prefabricated assembled FRP tendons pervious concrete cable duct bank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721039087.9U CN207200162U (en) 2017-08-18 2017-08-18 A kind of prefabricated assembled FRP tendons pervious concrete cable duct bank

Publications (1)

Publication Number Publication Date
CN207200162U true CN207200162U (en) 2018-04-06

Family

ID=61794282

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721039087.9U Expired - Fee Related CN207200162U (en) 2017-08-18 2017-08-18 A kind of prefabricated assembled FRP tendons pervious concrete cable duct bank

Country Status (1)

Country Link
CN (1) CN207200162U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108832563A (en) * 2018-08-30 2018-11-16 建华建材(中国)有限公司 A kind of pre-fabricated electric cables comb and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108832563A (en) * 2018-08-30 2018-11-16 建华建材(中国)有限公司 A kind of pre-fabricated electric cables comb and its construction method

Similar Documents

Publication Publication Date Title
CN105625298B (en) Using the continuous underground wall structure and its construction method of glass fiber-reinforced polymer lap joint sleeve milling
CN107370097A (en) A kind of prefabricated assembled FRP tendons pervious concrete cable duct bank
CN104410030A (en) Light concrete laminated slab assembly type cable trench and forming method thereof
CN104631674A (en) Composite floor slab and construction method thereof
CN207200162U (en) A kind of prefabricated assembled FRP tendons pervious concrete cable duct bank
CN204185845U (en) A kind of water-proof pile board wall supporting and protection structure
CN205444201U (en) Reinforced concrete waist rail structure
CN205399399U (en) Underground continuous wall structure that adoption glass fiber reinforced overlap joint cover mills
CN207829371U (en) Whole paving marble floor structure on a kind of raised flooring
CN204243699U (en) A kind of light concrete superimposed sheet assembly type cable slot
CN203603407U (en) Hard heat preservation building roof
CN110685234B (en) Construction method of corrugated steel pipe culvert
CN201024584Y (en) Water heating ground heat pipeline pavement template
CN207504539U (en) A kind of cable trough with cable protection external member
CN204238264U (en) A kind of sole plate post-poured strip structure
CN206495401U (en) A kind of building block
CN206099263U (en) Assembled cable duct bank mounting structure
CN211285692U (en) Corrugated steel pipe gallery based on prestressed tendons
CN204491947U (en) A kind of laminated floor slab
CN107152034A (en) A kind of pipe gallery and its construction method
CN206521838U (en) A kind of secondary anti-leakage structure in toilet
CN211901889U (en) Concrete-plastic composite pipe
CN204435658U (en) A kind of fibre-cement pipe brick and body of wall
CN207846771U (en) A kind of light partition wall
CN208782449U (en) A kind of cable duct bank

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180406