CN207157449U - A kind of boat scaffold peculiar to vessel - Google Patents
A kind of boat scaffold peculiar to vessel Download PDFInfo
- Publication number
- CN207157449U CN207157449U CN201721052514.7U CN201721052514U CN207157449U CN 207157449 U CN207157449 U CN 207157449U CN 201721052514 U CN201721052514 U CN 201721052514U CN 207157449 U CN207157449 U CN 207157449U
- Authority
- CN
- China
- Prior art keywords
- operating platform
- group
- boat
- supporting member
- peculiar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Movable Scaffolding (AREA)
Abstract
It the utility model is related to a kind of boat scaffold peculiar to vessel, including some flexible cables and at least one set of operating platform group, operating platform group is detachably secured on boat deck by flexible cable, several operating platform groups can be arranged in the longitudinal direction in a parallel manner, and the operating platform of multiple uneven height can also be set in each operating platform group.Boat scaffold peculiar to vessel of the present utility model is not only installed, convenient disassembly, and has higher security, can be built from top to bottom from hull, solve the problems, such as that at sea scaffold is difficult to build, take less, quantities is small, saving expense, with by the scope of operation to be bonded sense more preferable.
Description
Technical field
Shipbuilding field is the utility model is related to, more particularly to boat scaffold peculiar to vessel.
Background technology
In the production of current ship or repairing ship, operation is carried out if desired in profile, in general way is to take
Build scaffold, generally use button steel pipe scaffold, this button steel pipe scaffold structure form be from hull side from lower and
On build (this is similar with the scaffold building method of skyscraper), steel net plate is then laid on scaffold, so as to complete to grasp
Make building for platform.
There is the defects of many in this method for building scaffold and scaffold, be that time-consuming first, and cost is high, particularly
For ship in the case of lying up, the construction of the side position of stem two, such as the construction of the recessed position such as anchor recess are carried out, if several
100000 tons of large ship, button steel pipe scaffold are up built from dock bottom, and quantities is very big, the cycle length built, expense
It is high;Secondly, the scaffold built from bottom to top, it, which builds the building materials of scaffold, needs reciprocal transport in the air, climate and height
The influence of empty tired operation, the workmen of scaffold and neighbouring operating personnel all suffer from certain danger;Again, when ship exists
When operation is needed on ocean, this building method and button steel pipe scaffold from bottom to top is also impossible to realize, and for institute
When the ship of repairing is rested on harbour, the reconditioning work for carrying out the outboards such as outside plate in advance, this button steel pipe scaffold
Also it is helpless.
Utility model content
Based on this, the purpose of this utility model is, there is provided a kind of boat scaffold peculiar to vessel, not only installs, dismantles
It is convenient, and there is higher security, when needing in operation on ship, it can from top to bottom build, solved in sea from hull
The problem of upper scaffold is difficult to build, take less, quantities is small, saves expense, and the transport of building materials is convenient, it is not necessary to employ each
Kind of hanging device, it is bonded that sense is more preferable with by the scope of operation, is provided more convenience for the maintenance and operation of profile etc..
The utility model is achieved through the following technical solutions:
A kind of boat scaffold peculiar to vessel, it is characterised in that including some flexible cables and at least one set of operating platform group,
Code is hung in the fixation that every flexible cable one end is detachably secured on boat deck, and the other end is detachably secured to wherein one operation
Platform group;Each operating platform group includes the operating platform of at least one tabular that is square, the operating platform including with it is described
Two supporting members and be layed on the supporting member and connect the pedal of described two supporting members that flexible cable connects, each supporting
The both ends of part are connected with flexible cable respectively, and the pedal is spliced by some pieces of supporting plates are parallel, the both ends of every piece of supporting plate
Respectively with two supporting member detachable connections.
Boat scaffold peculiar to vessel of the present utility model, due to the effect of flexible cable, make scaffold more easy to attach by operation
Face, facility is provided for hull operation and maintenance, the detachable connection of multiple supporting plates and supporting member causes the pin hand of the application
Frame easy installation and removal, it can be needed to build operating platform group according to real work and determine the quantity of operating platform, in addition, this Shen
Support frame please not be need, it is only necessary to using between supporting member and the detachable connection and supporting member and supporting plate of flexible cable
Detachable connection can fix scaffold, the material built is simple, is not required to employ large scale equipment, saves expense;And due to
The scaffold of the application is down hung from boat deck, can flexibly be selected according to by the situation of the scope of operation, it is not necessary to from the bottom up
Build, reduce substantial amounts of quantities, application is very flexible.
As a kind of embodiment, the flexible cable is chain.In various embodiments, can according to needed for operation,
The chain of different length is selected, to adapt to the operation of different height and to accommodate the operating platform of varying number.
Further, the supporting member in a tubular form, and two supporting members be parallel to each other and with the length side of the supporting plate
To vertical.
As a kind of embodiment, the supporting member is steel pipe, and the supporting plate is plank, and the both ends of every piece of supporting plate are divided
Rope detachable connection is not passed through with two supporting members.Make supporting plate from plank, it is possible to increase coefficient of friction, be further ensured that
The stability and security of boat scaffold, under different job requirements, the supporting plate of different length can be selected, to take
Different size of boat scaffold is built up, with the detachable fixed support plate of rope and supporting member, is readily disassembled.
Further, every group of operating platform group includes two or more operating platform, and each operation of same operating platform group is put down
Platform is lower in the height direction to be arranged.
Further, the operating platform group has a two or more, detachable in the longitudinal direction between each operating platform group
Formula connects.Typically code can be hung provided with multiple fixations in deck in ship structure, each fixation is arranged at intervals between hanging code, for multigroup operation
The boat scaffold peculiar to vessel of platform group, different groups of operating platform group can be hung on different fixations and hang code.
Further, the operating platform positioned at sustained height of adjacent two operating platforms group is detachable in the longitudinal direction
Connection, and share a supporting member.
Preferably, at least one operating platform of same operating platform group is provided with manhole and ladder.Such setting is easy to
Operating personnel walks in the operating platform of different layers.
As a kind of embodiment, described boat scaffold peculiar to vessel, in addition to U-shaped shackle and wire loop, it is described every
Bar flexible cable passes sequentially through U-shaped shackle, wire loop and supporting member detachable connection, and is fixed by rope.
Preferably, the operating platform group is provided with dropproof guardrail and/or safety net.Guardrail and/or safety net can be with
The side of operating platform group is located at, more sides can also be located at.
Boat scaffold peculiar to vessel of the present utility model, has the advantages that:
(1) boat scaffold peculiar to vessel of the present utility model, it can from top to bottom build, not only solved in sea from hull
The problem of upper scaffold is difficult to build, compared with traditional method built upwardly from ground, also saves building materials, save the time,
Quantities is small, saves expense, and the transport of building materials is convenient, it is not necessary to employ various hanging devices;
(2) boat scaffold peculiar to vessel of the present utility model, convenient and swift, efficiency high is mounted and dismounted, can also be advance
It is partially assembled, then carries out at the scene assembled as needed;And it is also more flexible when dismantling, both can progressively it remove, can also
In case of emergency using loop wheel machine, disposably lifting is pulled down, very quickness and high efficiency;
(3) boat scaffold peculiar to vessel of the present utility model, needed to select the flexible cable of different length according to engineer operation,
Can easily changes height of the operating platform apart from boat deck, while also because flexible cable length difference can be controlled simply often
The operating platform number of individual operating platform group;In addition, in same group of operating platform group, can also operation as needed position selection
Property build the position of each operating platform, it is very flexibly and convenient;
(4) boat scaffold peculiar to vessel of the present utility model, especially in ship berthing in the positions such as harbour, progress stem two
During the construction of side position, such as anchor recess recessed position, in the situation that the devices such as steel pipe scaffold can not be used implement operation
Under, the operation of the utility model normal construction can be used and more facilitated;
(5) boat scaffold peculiar to vessel of the present utility model, compared to traditional button steel pipe scaffold, because its flexibility is outstanding
It the selection of suspension member, can more be bonded by the scope of operation, such as profile, be more convenient the operation and operation of workmen, security is more
It is good.
In order to more fully understand and implement, the utility model is described in detail below in conjunction with the accompanying drawings.
Brief description of the drawings
Fig. 1 is the boat scaffold schematic diagram peculiar to vessel of embodiment 1;
Fig. 2 is enlarged drawing of the flexible cable with supporting member connected mode of the boat scaffold part A peculiar to vessel of embodiment 1;
Fig. 3 is the boat scaffold part A enlarged diagram peculiar to vessel of embodiment 1;
Fig. 4 is the boat scaffold schematic diagram peculiar to vessel of embodiment 2;
Fig. 5 is the boat scaffold schematic diagram peculiar to vessel of embodiment 3;
Fig. 6 is the boat scaffold schematic diagram peculiar to vessel of embodiment 4.
1- the first operating platform groups, the operating platforms of 11- first, 111- supporting members, 112- pedals, 1121- supporting plates, 12-
Second operating platform, the operating platforms of 13- the 3rd, 14- safety nets, 2- the second operating platform groups, the operating platforms of 21- first, 22-
Two operating platforms, the operating platforms of 23- the 3rd, the operating platform groups of 3- the 3rd, the operating platforms of 31- first, the operating platforms of 32- second,
The operating platforms of 33- the 3rd, the operating platform groups of 4- the 4th, the operating platforms of 41- first, the operating platforms of 42- second, 43- the 3rd are operated
Platform, 44- manholes, 45- ladders, 5- flexible cables, 6- ropes, 7-U type shackles, 8- wire loops, 9- boat decks, 91- are fixed and are hung code,
The scope of operation needed for 10-.
Embodiment
Embodiment 1
As shown in Figures 1 to 3, the boat scaffold peculiar to vessel of the present embodiment, including four operating platforms of flexible cable 5 and first
Code 91 is hung in group 1, the fixation that every one end of flexible cable 5 is detachably secured on boat deck 9, and the other end is detachably secured to the
One operating platform group 1.First operating platform group 1 includes the first operating platform 11 of the tabular that is square, the first operating platform
11 include two supporting members 111 be connected with flexible cable 5 and are layed on supporting member and the described two supporting members 111 of connection are stepped on
Plate 112, the both ends of each supporting member 111 are flat by five pieces of supporting plates 1121 with the detachable connection of flexible cable 5, pedal 112 respectively
Row is spliced, and in other embodiment, the quantity of supporting plate 1121 can be determined according to the length of supporting member 111 or be actually needed,
The both ends of every piece of supporting plate 1121 respectively with two detachable connections of supporting member 111.
In the present embodiment, flexible cable 5 is chain, and supporting member 111 is steel pipe, two supporting members 111 be parallel to each other and with it is every
The length direction of individual supporting plate 1121 is vertical, and supporting plate 1121 is plank, the both ends of every piece of supporting plate 1121 respectively with two branch
Bearing member 111 is the rope made of hemp by the detachable connection of rope 6 (such as Fig. 3), rope 6, and playing preferably prevents skidding from acting on.
In the present embodiment, the detachable connection mode of flexible cable 5 and supporting member 111 passes through U-shaped shackle 7 and wire loop 8
To realize, U-shaped shackle 7 includes a U-shaped part and a bolt, and the both ends of U-shaped part have a screwed hole, and bolt can laterally inserted described two
It is fixed in individual screwed hole;When flexible cable 5 is fixed with supporting member 111, the U-shaped part of U-shaped shackle first can be inserted in flexible cable 5, simultaneously
Wire loop is penetrated with bolt, bolt is inserted in U-shaped part and fastened, you can is connected flexible cable 5 with wire loop 8, supporting member 111 is worn
Enter in wire loop 8, detachable connection can be realized with supporting member 111 by 6 detachable fixation of rope, such flexible cable 5, such as
Shown in Fig. 2.
In other embodiments, above-mentioned " detachable connection " or " detachable fixation " can also be used commonly used in the art
Other detachable connections realize.
Embodiment 2
As shown in figure 4, the boat scaffold peculiar to vessel of the present embodiment, including six flexible cables 5 and two operating platform groups,
It is the first operating platform group 1, the second operating platform group 2 respectively.Every the one end of flexible cable 5 is detachably secured on boat deck 9
Fixation hang code 91, the other end is detachably secured to the first operating platform group 1 or the second operating platform group 2.First operation is flat
The structure of platform group 1 is the same as embodiment 1.The structure of second operating platform group 2 is the same as the first operating platform group 1.
Two operating platform groups of the present embodiment are adjacent operator platform group, and the first operation of the first operating platform group 1 is flat
First operating platform 21 of the operating platform group 2 of platform 11 and second is located at sustained height, and detachable connection in the longitudinal direction,
And a supporting member is shared, such as the right side of the first operating platform 21 of the second operating platform group 2 and the first operating platform group 11
Supporting member detachable connection.
Embodiment 3
As shown in figure 5, the boat scaffold peculiar to vessel of the present embodiment, including four operating platform groups of flexible cable 5 and first
1.Code 91 is hung in the fixation that every one end of flexible cable 5 is detachably secured on boat deck 9, and the other end is detachably secured to first
Operating platform group 1.
First operating platform group 1 includes three operating platforms, is the first operating platform 11, the and of the second operating platform 12 respectively
3rd operating platform 13, the first operating platform 11 of the structure of each operating platform with embodiment 1.First operating platform 11,
Two operating platforms 12 and the 3rd operating platform 13 are lower in the height direction to be arranged, with four detachable connections of flexible cable 5.
In the present embodiment, the first operating platform group 1 also includes safety net 14, is layed in each operating platform in the outer part one
Face, in network structure.In other embodiments, safety net 14 can also surround the multiaspect setting of each operating platform.
Embodiment 4
As shown in fig. 6, the boat scaffold peculiar to vessel of the present embodiment, including ten flexible cables 5 and four groups of operating platform groups,
It is the first operating platform group 1, the second operating platform group 2, the 3rd operating platform group 3 and the 4th operating platform group 4 respectively.Every soft
Code 91 is hung in the fixation that the one end of sex cords 5 is detachably secured on boat deck 9, and the other end is detachably secured to one of operation
Platform group.
Each operating platform group includes three operating platforms, and the first operating platform group 1 includes the first operating platform 11, second
The operating platform 13 of operating platform 12 and the 3rd, the second operating platform group 2 include the first operating platform 21, the and of the second operating platform 22
3rd operating platform 23, the 3rd operating platform group 3 include the first operating platform 31, the second operating platform 32 and the 3rd operating platform
33, the 4th operating platform group 4 includes the first operating platform 41, the second operating platform 42 and the 3rd operating platform 43.It is wherein each
Operating platform group structure is the same as the first operating platform group 1 in embodiment 3.
First operating platform of above-mentioned each operating platform group is located at sustained height, and company detachable in the longitudinal direction
Connect, and share a supporting member;In the same manner, the second operating platform of each operating platform group is located at sustained height, and in length
Detachable connection on direction, and share a supporting member;3rd operating platform of each operating platform group is located at sustained height,
And detachable connection, and share a supporting member in the longitudinal direction.
In the present embodiment, a manhole 44 is opened up on the second operating platform 42 of the 4th operating platform group 4, in the first behaviour
Make to place ladder 45 between the operating platform 42 of platform 41 and second, in order to which operating personnel are above and below the operating platform of different layers.
It can typically be determined whether to open up manhole 44 according to actual conditions or open up multiple manholes 44.
In other embodiments, operating platform group can have N number of, and every group of operating platform group can include M operating platform,
Wherein, N, M are the natural number more than 1.The operating platform structure of each of which operating platform group is similar to Example 1, each
M operating platform lower arrangement, and with being located at same height in adjacent operator platform group in the height direction in operating platform group
The operating platform of degree detachable connection in the longitudinal direction.
In description of the present utility model, it is to be understood that term " " center ", " longitudinal direction ", " transverse direction ", " on ", " under ",
The orientation or position relationship of the instruction such as "front", "rear", "left", "right", " vertical ", " level ", " top ", " bottom ", " interior ", " outer " are
Based on orientation shown in the drawings or position relationship, it is for only for ease of description the utility model and simplifies description, rather than instruction
Or imply that signified device or element must have specific orientation, with specific azimuth configuration and operation, therefore be not understood that
For to limitation of the present utility model.In description of the present utility model, unless otherwise indicated, " multiple " are meant that two or two
More than individual.
Embodiment described above only expresses several embodiments of the present utility model, and its description is more specific and detailed,
But therefore it can not be interpreted as the limitation to utility model patent scope.It should be pointed out that the common skill for this area
For art personnel, without departing from the concept of the premise utility, various modifications and improvements can be made, these are belonged to
The scope of protection of the utility model.
Claims (10)
1. a kind of boat scaffold peculiar to vessel, it is characterised in that including some flexible cables and at least one set of operating platform group, often
Code is hung in the fixation that bar flexible cable one end is detachably secured on boat deck, and it is flat that the other end is detachably secured to wherein one operation
Platform group;Each operating platform group includes the operating platform of at least one tabular that is square, the operating platform including with it is described soft
Two supporting members and be layed on the supporting member and connect the pedal of described two supporting members, each supporting member that sex cords connects
Both ends be connected respectively with flexible cable, the pedal is spliced by some pieces of supporting plates are parallel, the both ends of every piece of supporting plate point
Not with two supporting member detachable connections.
2. boat scaffold peculiar to vessel according to claim 1, it is characterised in that the flexible cable is chain.
3. boat scaffold peculiar to vessel according to claim 1, it is characterised in that the supporting member in a tubular form, and two
Supporting member is parallel to each other and vertical with the length direction of the supporting plate.
4. boat scaffold peculiar to vessel according to claim 1, it is characterised in that the supporting member is steel pipe, the branch
Fagging is plank, and the both ends of every piece of supporting plate pass through rope detachable connection with two supporting members respectively.
5. boat scaffold peculiar to vessel according to claim 1, it is characterised in that every group of operating platform group include two with
Upper operating platform, each operating platform of same operating platform group is lower in the height direction to be arranged.
6. boat scaffold peculiar to vessel according to claim 5, it is characterised in that the operating platform group have two with
On, detachable connection in the longitudinal direction between each operating platform group.
7. boat scaffold peculiar to vessel according to claim 6, it is characterised in that being located at for adjacent two operating platforms group is same
The operating platform of one height detachable connection, and share a supporting member in the longitudinal direction.
8. boat scaffold peculiar to vessel according to claim 5, it is characterised in that same operating platform group it is at least one
Operating platform is provided with manhole and ladder.
9. boat scaffold peculiar to vessel according to claim 1, it is characterised in that also including U-shaped shackle and wire loop, institute
State every flexible cable and pass sequentially through U-shaped shackle, wire loop and supporting member detachable connection, and fixed by rope.
10. boat scaffold peculiar to vessel according to claim 1, it is characterised in that the operating platform group is provided with anti-fall
The guardrail and/or safety net fallen.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721052514.7U CN207157449U (en) | 2017-08-21 | 2017-08-21 | A kind of boat scaffold peculiar to vessel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721052514.7U CN207157449U (en) | 2017-08-21 | 2017-08-21 | A kind of boat scaffold peculiar to vessel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207157449U true CN207157449U (en) | 2018-03-30 |
Family
ID=61717395
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721052514.7U Active CN207157449U (en) | 2017-08-21 | 2017-08-21 | A kind of boat scaffold peculiar to vessel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207157449U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108532671A (en) * | 2018-04-27 | 2018-09-14 | 柳州柳工挖掘机有限公司 | Excavator foot pedal apparatus |
CN112478102A (en) * | 2020-11-27 | 2021-03-12 | 中船澄西船舶修造有限公司 | Ship floating repairing suspension scaffold assembly |
-
2017
- 2017-08-21 CN CN201721052514.7U patent/CN207157449U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108532671A (en) * | 2018-04-27 | 2018-09-14 | 柳州柳工挖掘机有限公司 | Excavator foot pedal apparatus |
CN112478102A (en) * | 2020-11-27 | 2021-03-12 | 中船澄西船舶修造有限公司 | Ship floating repairing suspension scaffold assembly |
CN112478102B (en) * | 2020-11-27 | 2022-02-08 | 中船澄西船舶修造有限公司 | Ship floating repairing suspension scaffold assembly |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107905116B (en) | Construction method of large-span through type rigid tied steel arch bridge | |
CN207582926U (en) | Builder's jack | |
CN107055347B (en) | A kind of Tower crane disassembly structures and methods of high-rise installation | |
CN106049293B (en) | Stiffening girder of suspension bridge installation method and used shifting system is swung on navigable river | |
CN107345427A (en) | Large span bolt-ball net frame and its modularization installation method | |
CN206569235U (en) | A kind of ship hanger bracket and boat scaffold | |
CN207157449U (en) | A kind of boat scaffold peculiar to vessel | |
CN101487234B (en) | Construction method for transverse beam hoisting in-position of arch first and beam late tied-arch bridge | |
CN105586832A (en) | Suspension type catwalk surface net mounting system | |
CN204822025U (en) | Marine construction platform | |
CN204675621U (en) | A kind of shackle for rapid unhooking in tubing string lifting | |
CN113335475B (en) | Deck bottom fixed pulley sliding platform dismantling process | |
CN209873584U (en) | Hang basket template and demolish device | |
CN107487423A (en) | A kind of boat scaffold peculiar to vessel and its method of construction | |
US3524520A (en) | Traveling scaffold | |
CN208393602U (en) | It is a kind of for detecting the diving cage of operation under water | |
CN108286257A (en) | A kind of dress sandbox body deep water weir system | |
CN104404931B (en) | The experimental tank frame of power station Diversion Tunnel gate slot submarine inspection and construction method | |
CN110820555A (en) | Bridge maintenance vehicle and method for avoiding bridge pier by maintenance platform | |
CN102953391A (en) | Rectangular caisson lifting and launching device and method | |
CN109555257A (en) | Combined support derrick type furred ceiling and construction method | |
CN110886214B (en) | Mounting and dismounting method of maintenance platform for bridge maintenance vehicle | |
CN106194053A (en) | The buffer unit of ocean platform jumper hose joint | |
CN205209377U (en) | Device of adobe blasting cartridge bag is put in to mechanized batch under water | |
JP3568157B2 (en) | Scaffolding construction method for liquid storage tanks on ships |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |