CN207582926U - Builder's jack - Google Patents

Builder's jack Download PDF

Info

Publication number
CN207582926U
CN207582926U CN201721539940.3U CN201721539940U CN207582926U CN 207582926 U CN207582926 U CN 207582926U CN 201721539940 U CN201721539940 U CN 201721539940U CN 207582926 U CN207582926 U CN 207582926U
Authority
CN
China
Prior art keywords
steel
builder
wire rope
connecting sleeve
line shoe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721539940.3U
Other languages
Chinese (zh)
Inventor
谢朝文
刘夏宏
何赟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Original Assignee
First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd filed Critical First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority to CN201721539940.3U priority Critical patent/CN207582926U/en
Application granted granted Critical
Publication of CN207582926U publication Critical patent/CN207582926U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of builder's jack, is related to the realm of building construction, and the builder's jack to solve the problems, such as to occur during construction is difficult to fixed.The builder's jack includes overhanging support steel beam, index bed outrigger, the first connecting sleeve, the second connecting sleeve and steel wire rope, and first connecting sleeve is embedded in second connecting sleeve in wall body structure layer;First connecting sleeve is connected with second connecting sleeve;The index bed erection is in the top of the overhanging support steel beam;One end of the overhanging support steel beam is connected on the wall body structure layer, and the other end of the overhanging support steel beam is connect with one end of the steel wire rope;The other end of the steel wire rope passes through drawknot after first connecting sleeve and second connecting sleeve.The builder's jack is used for construction, to achieve the effect that simply and effectively be fixed on wall body structure layer.

Description

Builder's jack
Technical field
The utility model is related to technical field of building construction, more particularly, to a kind of builder's jack.
Background technology
At present, scaffold is in order to which construction operation needs set up shelf, is on the one hand the vertical of high-altitude construction operation Channel is provided with horizontal transport, on the other hand reliable workbench is provided for working at height personnel, is architectural engineering exterior wall, interior The accessory channel and security protection frame body that the position that portion's finishing can not directly reach is set up.Scaffold is in building engineering construction One vital technical measures, the quality set up is directly related to the safety of subsequent construction, thus is closed by each side Note and attention.
Scaffold is widely used in the scene of construction, with the construction of high-rise building, Building Construction In influenced by place, peripheral environment, traditional console mode scaffold building mode can not adapt to scene construction.For this One problem, is solved in the prior art using builder's jack, and builder's jack can be suitable for constructing using plank sheathing, but When aluminum alloy pattern plate is used to be constructed, since aluminum alloy pattern plate is typified form, can not the pre-buried suspension hook for stretching out wall contour, so nothing Method fixes builder's jack.
In conclusion it is difficult that the builder's jack for effectively solving to occur during construction is difficult in the prior art The problem of fixed.
Utility model content
The purpose of this utility model is to provide a kind of builder's jack, to solve what is occurred during construction Builder's jack is difficult to the problem of fixed.
In order to achieve the above objectives, the technical solution of the utility model is realized in:
Builder's jack provided by the utility model, including:Overhang support steel beam, index bed outrigger, the first connecting sleeve, Second connecting sleeve and steel wire rope, wherein,
First connecting sleeve is embedded in the second connecting sleeve in wall body structure layer;
First connecting sleeve is connected with second connecting sleeve;
The index bed erection is in the top of the overhanging support steel beam;
One end of the overhanging support steel beam is connected on the wall body structure layer, the other end of the overhanging support steel beam It is connect with one end of the steel wire rope;
The other end of the steel wire rope passes through drawknot after first connecting sleeve and second connecting sleeve.
Preferably, the index bed outrigger includes sizing steel plate and multiple boarding wire nets, the sizing steel plate with it is described Overhang support steel beam connection, each boarding wire net enumerates setting from top to bottom, and is respectively positioned on the top of the sizing steel plate.
Preferably, the index bed outrigger includes crossbeam and longeron, the quantity of the crossbeam and the longeron be it is multiple, And connect respectively with boarding wire net multiple described, multiple crossbeams are staggered with multiple longerons.
Preferably, safety guard net is provided with outside the index bed, the safety guard net is located at outside the index bed Side of the frame far from the wall body structure layer.
Preferably, the overhanging support steel beam is I-steel, and one end of the I-steel is connect with the wall body structure layer, One end drawknot of the steel wire rope is in the other end of the I-steel.
Preferably, connection bolt is further included, one end of the overhanging support steel beam is by connecting bolt and the wall knot Structure layer connects.
Preferably, one end of the steel wire rope connection overhanging support steel beam is equipped with lantern ring, wire line shoe and safety Turn of bilge, the quantity of the wire line shoe are four, respectively the first wire line shoe, the second wire line shoe, third wire line shoe with And the 4th wire line shoe, first wire line shoe, second wire line shoe, the third wire line shoe and the described 4th Wire line shoe is arranged at the part of steel wire rope overlapping, the lantern ring be formed in the bending part of the steel wire rope overlapping with Between first wire line shoe, the lantern ring be socketed in it is described overhanging support steel beam one end, first wire line shoe with The distance between described second wire line shoe be 60mm, the distance between second wire line shoe and the third wire line shoe For 60mm, the distance between the third wire line shoe and the 4th wire line shoe are greater than or equal to 140mm, and the safety is curved Portion is formed between the third wire line shoe and the 4th wire line shoe.
Preferably, the steel wire rope is equipped with protective jacket, and the protective cover is located at the outside of the steel wire rope.
Preferably, one end of the steel wire rope connection overhanging support steel beam is equipped with scale.
Preferably, one end that the overhanging support steel beam connects the steel wire rope offers anti-slip decorative pattern.
Relative to the prior art, builder's jack provided by the utility model has the advantage that:
Builder's jack provided by the utility model, during setting up, construction personnel need by the first connecting sleeve with Second connecting sleeve is embedded in wall body structure layer, and the one end for overhanging support steel beam is connected in wall body structure layer, makes it solid It is scheduled in wall body structure layer, and one end of steel wire rope is connect, then the other end by steel wire rope with the overhanging support steel beam other end Drawknot is carried out after being each passed through the first connecting sleeve and the second connecting sleeve, to realize the fixation of builder's jack.Wherein, steel wire Rope has pulling force to overhanging support steel beam, can prevent overhanging support steel beam and outside the index bed above overhanging support steel beam Frame is fallen so that trampling the construction personnel on overhanging support steel beam and the construction personnel in index bed outrigger can obtain Support force is obtained, can be constructed on builder's jack.
When using builder's jack provided by the utility model, construction personnel can stand and be carried out on overhanging support steel beam Construction, can also be climbed on index bed outrigger, be constructed after climbing to desired height.Relative to the prior art, this reality With the builder's jack of novel offer by setting steel wire rope, and by the other end of steel wire rope be each passed through the first connecting sleeve with Drawknot is carried out after second connecting sleeve so that wirerope-winding lives a part for wall body structure layer, so that steel wire rope can Quick drawknot simply and effectively realizes the fixation of builder's jack, and equally convenient for overhanging foot hand on wall body structure layer Frame is fixed on the wall built by laying bricks or stones using aluminum alloy pattern plate.Further, since the other end of steel wire rope be each passed through the first connecting sleeve with Drawknot is carried out after second connecting sleeve, steel wire rope is not easy to be detached from from wall body structure layer so that builder's jack is in wall body structure Fixed effect on layer is more preferable.
Description of the drawings
It, below will be right in order to illustrate more clearly of specific embodiment of the present invention or technical solution of the prior art Specific embodiment or attached drawing needed to be used in the description of the prior art are briefly described, it should be apparent that, it is described below In attached drawing be the utility model some embodiments, for those of ordinary skill in the art, do not paying creativeness Under the premise of labour, other attached drawings are can also be obtained according to these attached drawings.
Fig. 1 is the structure diagram of builder's jack that the utility model embodiment one provides;
Fig. 2 is the structure diagram of builder's jack that the utility model embodiment two provides;
Fig. 3 is enlarged drawing of the builder's jack shown in Fig. 2 at A;
Fig. 4 is the partial schematic diagram of steel wire rope in builder's jack shown in Fig. 2.
Icon:1- overhangs support steel beam;2- index bed outriggers;The first connecting sleeves of 3-;The second connecting sleeves of 4-; 5- steel wire ropes;6- wall body structure layers;7- connection bolts;21- sizing steel plates;22- boarding wire nets;23- security protections Net;51- lantern rings;52- wire line shoes;The safe turn of bilges of 53-;The first wire line shoes of 521-;The second wire line shoes of 522-; 523- third wire line shoes;The 4th wire line shoes of 524-.
Specific embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with attached drawing, it is clear that described Embodiment is the utility model part of the embodiment, instead of all the embodiments.Based on the embodiment in the utility model, sheet Field those of ordinary skill all other embodiments obtained without making creative work, belong to this practicality Novel protected range.
In the description of the present invention, it should be noted that such as occur term " " center ", " on ", " under ", " left side ", " right side ", " vertical ", " level ", " interior ", " outer " etc., indicated by orientation or position relationship be based on orientation shown in the drawings or Position relationship is for only for ease of description the utility model and simplifies description rather than instruction or imply signified device or member Part must have specific orientation, with specific azimuth configuration and operation, therefore it is not intended that limitation to the utility model. In addition, such as there is term " first ", " second ", " third ", description purpose is only used for, and it is not intended that instruction or hint phase To importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, such as there is term " installation ", " connected ", " connection ", should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected or one Connect to body;Can be mechanical connection or electrical connection;It can be directly connected, it can also be indirect by intermediary It is connected, can is the connection inside two elements.For the ordinary skill in the art, on being understood with concrete condition State concrete meaning of the term in the utility model.
Embodiment 1
Fig. 1 is the structure diagram of builder's jack that the utility model embodiment one provides.As shown in Figure 1, this implementation The builder's jack that example one provides, including overhanging support steel beam 1, index bed outrigger 2, the first connecting sleeve 3, the second connecting sleeve 4 and steel wire rope 5.
Wherein, overhanging support steel beam 1 can be made of steel alloy, make it have higher intensity and hardness, can be positioned at Overhanging support steel beam 1 above it provides enough support forces.
In the utility model embodiment one, one end of overhanging support steel beam 1 is connected on wall body structure layer 6, connection side Formula can be the reinforcement welding for being bolted or being equipped with overhanging support steel beam 1 with wall body structure layer 6, and reaching will overhang The purpose that support steel beam 1 is fixedly connected with wall body structure layer 6.The one end of the other end and steel wire rope 5 for overhanging support steel beam 1 connects It connects, one end of steel wire rope 5 can be set in the other end of overhanging support steel beam 1, can also prick system or drawknot in overhanging support steel beam 1 The other end.
In the builder's jack provided in the utility model embodiment one, the first connecting sleeve 3 and the second connecting sleeve 4 are It is embedded in wall body structure layer 6, the first connecting sleeve 3 and the second connecting sleeve 4 can run through wall body structure layer 6, the first connection Casing 3 is connected with the second connecting sleeve 4, so that the steel wire rope 5 for entering the first connecting sleeve 3 can be from the second connecting sleeve 4 Out, drawknot is carried out from the steel wire rope 5 that the second connecting sleeve 4 comes out and itself, to reach steel wire rope 5 and 6 phase of wall body structure layer The purpose to connect.
Index bed outrigger 2 rides upon the top of overhanging support steel beam 1, and index bed outrigger 2 can connect with overhanging support steel beam 1 It connects, for climbing or trampling for construction personnel.
In the builder's jack provided in the utility model embodiment one, the other end of steel wire rope 5 passes through the first connector sleeve Drawknot after 3 and second connecting sleeve 4 of pipe, can pre-buried first connecting tube and the second connecting tube on wall body structure layer 6 in advance, at it In his embodiment, two through-holes can be also opened up on wall body structure layer 6, then by the first connecting sleeve 3 and the second connecting sleeve 4 It is respectively implanted in two through-holes, the other end of steel wire rope 5 can be each passed through the first interconnected connecting sleeve 3 by construction personnel And second carry out drawknot after connecting sleeve 4, and so so that steel wire rope 5 and the connection effect of wall body structure layer 6 greatly enhance, into And so that fixed effect of the builder's jack on wall body structure layer 6 is more preferable.
It should be noted that for the wall built by laying bricks or stones using aluminum alloy pattern plate, aluminum alloy pattern plate can be utilized during building wall The bolt hole being equipped with reserves through-wall bolt hole on wall body structure layer 6, and the first connecting sleeve 3 is installed in through-wall bolt hole Or second connecting sleeve 4, then carried out after the other end of steel wire rope 5 is each passed through the first connecting sleeve 3 and the second connecting sleeve 4 Drawknot.
During builder's jack provided by the utility model is set up, construction personnel is needed the first connecting sleeve 3 It is embedded in wall body structure layer 6 with the second connecting sleeve 4, the one end for overhanging support steel beam 1 is connected in wall body structure layer 6, It is made to be fixed in wall body structure layer 6, and one end of steel wire rope 5 is connect, then with overhanging 1 other end of support steel beam by steel wire rope 5 other end carries out drawknot after being each passed through the first connecting sleeve 3 and the second connecting sleeve 4, to realize consolidating for builder's jack It is fixed.Wherein, steel wire rope 5 has pulling force to overhanging support steel beam 1, can prevent overhanging support steel beam 1 and positioned at overhanging supporting steel The index bed outrigger 2 of the top of beam 1 is fallen so that tramples construction personnel on overhanging support steel beam 1 and outside index bed Construction personnel in frame 2 can obtain support force, can construct on builder's jack.
When using builder's jack provided by the utility model, construction personnel can stand enterprising in overhanging support steel beam 1 Row construction, can also be climbed on index bed outrigger 2, be constructed after climbing to desired height.Relative to the prior art, sheet The builder's jack that utility model provides is each passed through the first connector sleeve by setting steel wire rope 5, and by the other end of steel wire rope 5 Drawknot is carried out after 3 and second connecting sleeve 4 of pipe so that steel wire rope 5 enwinds a part for wall body structure layer 6, so that steel Cord 5 quickly on wall body structure layer 6, simply and effectively can realize the fixation of builder's jack, and equally just by drawknot It is fixed on the wall built by laying bricks or stones using aluminum alloy pattern plate in builder's jack.Further, since the other end of steel wire rope 5 is each passed through first Drawknot is carried out after 3 and second connecting sleeve 4 of connecting sleeve, steel wire rope 5 is not easy to be detached from from wall body structure layer 6 so that overhanging foot Fixed effect of the hand cradle on wall body structure layer 6 is more preferable.
Preferably, index bed outrigger 2 includes sizing steel plate 21 and multiple boarding wire nets 22, sizing steel plate 21 and overhanging branch Support girder steel 1 connects, and connection mode can be to be bolted, and each boarding wire net 22 enumerates setting, and be respectively positioned on from top to bottom The top of sizing steel plate 21.Sizing steel plate 21 can be provided with multiple boarding wire nets 22 for the construction personnel trampled on it Holding power, so that construction personnel constructs to wall using index bed outrigger 2.
It is noted that the opposite sizing steel plate 21 of boarding wire net 22 has a hole, quality also relative orientation steel plate It is relatively low.So set, the weight for layer outrigger 2 that can debase the standard to a certain extent so that the utility model embodiment one carries The gross weight of the builder's jack of confession declines, and the pulling force that steel wire rope 5 is subject to reduces, and improves the stability of builder's jack and reliable Property.
Further, index bed outrigger 2 includes crossbeam and longeron, and the quantity of crossbeam and longeron is multiple, and respectively with Multiple boarding wire nets 22 connect, and multiple crossbeams are staggered with multiple longerons.So set, it can enhance to a certain extent The intensity of index bed outrigger 2, and construction personnel is facilitated to carry out climbing construction on index bed outrigger 2.
The builder's jack that the utility model embodiment one provides further includes connection bolt 7, overhangs one end of support steel beam 1 It is connect by connecting bolt 7 with wall body structure layer 6.One end of overhanging support steel beam 1 can offer connecting screw hole, wall body structure layer Connecting screw hole can be equally offered on 6, the connecting screw hole for overhanging support steel beam 1 is aligned with the connecting screw hole of wall body structure layer 6, Connection bolt 7 is placed in two screw holes again, screws connection bolt 7 so that one end of overhanging support steel beam 1 and wall body structure layer 6 link together.Using the connection connection of bolt 7 overhanging support steel beam 1 and wall body structure layer 6, not only bonding strength is high, effect It is good, and conveniently dismantled after the completion of wall construction.
Further, steel wire rope 5 is equipped with protective jacket, and protective cover is located at the outside of steel wire rope 5.Rubber can be used in protective jacket The materials such as glue, plastics are made so that protective jacket has good wear-resisting property, can play protecting effect to steel wire rope 5, prevent It rubs with 6 grade of wall body structure layer, influences the service life of steel wire rope 5.
It should be noted that one end of overhanging 1 connecting steel wire ropes 5 of support steel beam offers anti-slip decorative pattern.Anti-slip flower The design of line can effectively increase the frictional force between overhanging support steel beam 1 and steel wire rope 5, prevent steel wire rope 5 from being supported from overhanging It is slipped down on girder steel 1.In other embodiments, one end of overhanging 1 connecting steel wire ropes 5 of support steel beam may also set up anti-skidding Protrusion.
Embodiment 2
Fig. 2 is the structure diagram of builder's jack that the utility model embodiment two provides;Fig. 3 is shown in Fig. 2 outstanding Enlarged drawing of the outrigger scaffold at A;Fig. 4 is the partial schematic diagram of steel wire rope in builder's jack shown in Fig. 2.As Fig. 2-4 institute Show, the builder's jack that the present embodiment two provides, including overhanging support steel beam 1, index bed outrigger 2, the first connecting sleeve 3, the Two connecting sleeves 4 and steel wire rope 5, the first connecting sleeve 3 and the second connecting sleeve 4 are embedded in wall body structure layer 6;First Connecting sleeve 3 is connected with the second connecting sleeve 4;Index bed outrigger 2 rides upon the top of overhanging support steel beam 1;Overhang supporting steel One end of beam 1 is connected on wall body structure layer 6, and the other end of overhanging support steel beam 1 is connect with one end of steel wire rope 5;Steel wire rope 5 The other end pass through drawknot after the first connecting sleeve 3 and the second connecting sleeve 4.
During builder's jack provided by the utility model is set up, construction personnel is needed the first connecting sleeve 3 It is embedded in wall body structure layer 6 with the second connecting sleeve 4, the one end for overhanging support steel beam 1 is connected in wall body structure layer 6, It is made to be fixed in wall body structure layer 6, and one end of steel wire rope 5 is connect, then with overhanging 1 other end of support steel beam by steel wire rope 5 other end carries out drawknot after being each passed through the first connecting sleeve 3 and the second connecting sleeve 4, to realize consolidating for builder's jack It is fixed.Wherein, steel wire rope 5 has pulling force to overhanging support steel beam 1, can prevent overhanging support steel beam 1 and positioned at overhanging supporting steel The index bed outrigger 2 of the top of beam 1 is fallen so that tramples construction personnel on overhanging support steel beam 1 and outside index bed Construction personnel in frame 2 can obtain support force, can construct on builder's jack.
When using builder's jack provided by the utility model, construction personnel can stand enterprising in overhanging support steel beam 1 Row construction, can also be climbed on index bed outrigger 2, be constructed after climbing to desired height.Relative to the prior art, sheet The builder's jack that utility model provides is each passed through the first connector sleeve by setting steel wire rope 5, and by the other end of steel wire rope 5 Drawknot is carried out after 3 and second connecting sleeve 4 of pipe so that steel wire rope 5 enwinds a part for wall body structure layer 6, so that steel Cord 5 quickly on wall body structure layer 6, simply and effectively can realize the fixation of builder's jack, and equally just by drawknot It is fixed on the wall built by laying bricks or stones using aluminum alloy pattern plate in builder's jack.Further, since the other end of steel wire rope 5 is each passed through first Drawknot is carried out after 3 and second connecting sleeve 4 of connecting sleeve, steel wire rope 5 is not easy to be detached from from wall body structure layer 6 so that overhanging foot Fixed effect of the hand cradle on wall body structure layer 6 is more preferable.
Preferably, index bed outrigger 2 is equipped with safety guard net 23, and it is separate that safety guard net 23 is located at index bed outrigger 2 The side of wall body structure layer 6.Safety guard net 23 can be made of fire proofing material, such as fire proofing firbre, make it that can not only prevent Personnel fall, also so that the builder's jack that the utility model embodiment one provides plays the role of fireproof to a certain extent.
Further, overhanging support steel beam 1 is I-steel, and one end of I-steel is connect with wall body structure layer 6, steel wire rope 5 One end drawknot I-steel the other end.Using I-steel as overhanging support steel beam 1, not only so that overhanging support steel beam 1 It is more secured with the connection of wall body structure layer 6, but also can prevent steel wire rope 5 from coming off.
It should be noted that steel wire rope 5 connection overhanging support steel beam 1 one end be equipped with lantern ring 51, wire line shoe 52 and Safe turn of bilge 53, the quantity of wire line shoe 52 is four, respectively the first wire line shoe 521, the second wire line shoe 522, third 523 and the 4th wire line shoe 524 of wire line shoe, the first wire line shoe 521, the second wire line shoe 522, third wire line shoe 523 and the 4th wire line shoe 524 be arranged at steel wire rope 5 overlapping part, lantern ring 51 be formed in steel wire rope 5 overlapping bending Between part and the first wire line shoe 521, lantern ring 51 is socketed in one end of overhanging support steel beam 1, the first wire line shoe 521 and the The distance between two wire line shoes 522 are 60mm, and the distance between the second wire line shoe 522 and third wire line shoe 523 are The distance between 60mm, 523 and the 4th wire line shoe 524 of third wire line shoe is greater than or equal to 140mm, and safe turn of bilge 53 is formed Between 523 and the 4th wire line shoe 524 of third wire line shoe.Positioned at two sections of steel wire ropes 5 of the overlapping of safe turn of bilge 53, wherein One section of steel wire rope 5 is in flat, and for another section of steel wire rope 5 in bending, construction personnel can be by comparing sweeping steel wire rope 5 The flexuosity of priority, judges whether wire line shoe 52 fastens steel wire rope 5.
It is noted that one end of the connection overhanging support steel beam 1 of steel wire rope 5 is equipped with scale, construction personnel can be by right Than the corresponding indicating graduation of 5 priority of steel wire rope, judge whether wire line shoe 52 fastens steel wire rope 5, it is simple accurate.
Finally it should be noted that:The above various embodiments is only to illustrate the technical solution of the utility model rather than it is limited System;Although the utility model is described in detail with reference to foregoing embodiments, those of ordinary skill in the art should Understand:It can still modify to the technical solution recorded in foregoing embodiments either to which part or whole Technical characteristic carries out equivalent replacement;And these modifications or replacement, this practicality that it does not separate the essence of the corresponding technical solution are new The range of each embodiment technical solution of type.

Claims (10)

1. a kind of builder's jack, which is characterized in that including:Overhang support steel beam, index bed outrigger, the first connecting sleeve, the Two connecting sleeves and steel wire rope, wherein,
First connecting sleeve is embedded in second connecting sleeve in wall body structure layer;
First connecting sleeve is connected with second connecting sleeve;
The index bed erection is in the top of the overhanging support steel beam;
One end of the overhanging support steel beam is connected on the wall body structure layer, the other end of the overhanging support steel beam and institute State one end connection of steel wire rope;
The other end of the steel wire rope passes through drawknot after first connecting sleeve and second connecting sleeve.
2. builder's jack according to claim 1, which is characterized in that the index bed outrigger includes sizing steel plate and more Boarding wire net is opened, the sizing steel plate is connect with the overhanging support steel beam, and each boarding wire net is enumerated from top to bottom Setting, and it is respectively positioned on the top of the sizing steel plate.
3. builder's jack according to claim 2, which is characterized in that the index bed outrigger includes crossbeam and longeron, The quantity of the crossbeam and the longeron is multiple, and is connect respectively with boarding wire net multiple described, multiple crossbeams It is staggered with multiple longerons.
4. builder's jack according to claim 1, which is characterized in that safety guard net is provided with outside the index bed, The safety guard net is located at side of the index bed outrigger far from the wall body structure layer.
5. builder's jack according to claim 1, which is characterized in that the overhanging support steel beam is I-steel, described One end of I-steel is connect with the wall body structure layer, and one end drawknot of the steel wire rope is in the other end of the I-steel.
6. builder's jack according to claim 1, which is characterized in that further include connection bolt, the overhanging supporting steel One end of beam is connect by connecting bolt with the wall body structure layer.
7. builder's jack according to claim 1, which is characterized in that the steel wire rope connects the overhanging support steel beam One end be equipped with lantern ring, wire line shoe and safe turn of bilge, the quantity of the wire line shoe is four, respectively the first steel wire rope Card, the second wire line shoe, third wire line shoe and the 4th wire line shoe, first wire line shoe, second steel wire rope Card, the third wire line shoe and the 4th wire line shoe are arranged at the part of the steel wire rope overlapping, the lantern ring It is formed between bending part and first wire line shoe of the steel wire rope overlapping, the lantern ring is socketed in the overhanging branch Support girder steel one end, the distance between first wire line shoe and second wire line shoe be 60mm, second steel wire The distance between rope card and the third wire line shoe are 60mm, between the third wire line shoe and the 4th wire line shoe Distance be greater than or equal to 140mm, the safe turn of bilge be formed in the third wire line shoe and the 4th wire line shoe it Between.
8. builder's jack according to claim 1, which is characterized in that the steel wire rope is equipped with protective jacket, the protection Set is located at the outside of the steel wire rope.
9. builder's jack according to claim 1, which is characterized in that the steel wire rope connects the overhanging support steel beam One end be equipped with scale.
10. builder's jack according to claim 1, which is characterized in that the overhanging support steel beam connects the steel wire One end of rope offers anti-slip decorative pattern.
CN201721539940.3U 2017-11-16 2017-11-16 Builder's jack Expired - Fee Related CN207582926U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721539940.3U CN207582926U (en) 2017-11-16 2017-11-16 Builder's jack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721539940.3U CN207582926U (en) 2017-11-16 2017-11-16 Builder's jack

Publications (1)

Publication Number Publication Date
CN207582926U true CN207582926U (en) 2018-07-06

Family

ID=62732245

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721539940.3U Expired - Fee Related CN207582926U (en) 2017-11-16 2017-11-16 Builder's jack

Country Status (1)

Country Link
CN (1) CN207582926U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109505405A (en) * 2018-12-27 2019-03-22 重庆渝建实业集团股份有限公司 A kind of driven hanging basket balance weight mechanism and construction method
CN110043018A (en) * 2019-05-20 2019-07-23 谢兰英 A kind of floor edge scaffold fixed mechanism and its application method
CN110397261A (en) * 2019-08-01 2019-11-01 中天建设集团有限公司 A kind of overhanging eaves gutter Sloping roof hanging basket installation method
CN113668831A (en) * 2021-08-20 2021-11-19 舜元建设(集团)有限公司 Movable overhanging scaffold
CN116005936A (en) * 2023-03-28 2023-04-25 烟台市公路事业发展中心 Suspension for building construction

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109505405A (en) * 2018-12-27 2019-03-22 重庆渝建实业集团股份有限公司 A kind of driven hanging basket balance weight mechanism and construction method
CN110043018A (en) * 2019-05-20 2019-07-23 谢兰英 A kind of floor edge scaffold fixed mechanism and its application method
CN110043018B (en) * 2019-05-20 2023-11-03 广东碧越建筑工程有限公司 Floor edge scaffold fixing mechanism and application method thereof
CN110397261A (en) * 2019-08-01 2019-11-01 中天建设集团有限公司 A kind of overhanging eaves gutter Sloping roof hanging basket installation method
CN113668831A (en) * 2021-08-20 2021-11-19 舜元建设(集团)有限公司 Movable overhanging scaffold
CN116005936A (en) * 2023-03-28 2023-04-25 烟台市公路事业发展中心 Suspension for building construction

Similar Documents

Publication Publication Date Title
CN207582926U (en) Builder's jack
CN104074349B (en) A kind of new-type protection type attachment type raise scaffold
CN105926448B (en) A kind of construction method of the Cable stayed Bridge Main Tower in the double rope faces of the only tower of curve
CN101775907A (en) Space truss structure aerial pairing integral slide installation method
CN102383588A (en) Lifting platform for protecting safety of high-level construction
CN105692470B (en) Inner climbing crane tower and its operating method
CN104481552B (en) Super-huge karst cave hole roof fall stone protection construction method
CN206174437U (en) Be applied to gallows of super high overlength cantilevered member construction
CN112761348A (en) Hanging basket suspension system without counter weight and installation method
CN116136122A (en) Integrated attached type inclined lifting climbing frame system and use method thereof
CN110094051A (en) Indoor ultrahigh large form Bailey beam support system and its construction method are built in a kind of room
CN104131706B (en) The construction method of the two-layer connection structure of vertical reinforcement of concrete frame structure
CN104278828B (en) A kind of concrete chimney dismantling operation platform
CN107816209B (en) The large-scale Roof Truss construction technology of installation is lifted across outer two sides
CN108590170A (en) A kind of rectangle chimney twin-well frame displacement type template integral lifting apparatus and its construction method
CN207157449U (en) A kind of boat scaffold peculiar to vessel
CN208105827U (en) A kind of construction scaffolding structure
CN208563968U (en) A kind of rectangle chimney twin-well frame displacement type template integral lifting apparatus
CN107487423B (en) Marine suspension scaffold and construction method thereof
CN207160599U (en) Overhanging unloading platform
CN115306137A (en) Operation platform structure for mounting suspended ceiling at bottom of overhead corridor and construction method thereof
CN104878966A (en) Prefabricated channel steel multilayer assembling type monitoring parking pavilion
CN112160582A (en) Assembling platform suitable for construction of spoke type cable membrane system
CN108755452B (en) High stability cable formula bridge overhauls device
CN210228927U (en) Safe construction structure for maintenance of clean leather of cement kiln

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180706

Termination date: 20181116