CN104278828B - A kind of concrete chimney dismantling operation platform - Google Patents
A kind of concrete chimney dismantling operation platform Download PDFInfo
- Publication number
- CN104278828B CN104278828B CN201410523134.1A CN201410523134A CN104278828B CN 104278828 B CN104278828 B CN 104278828B CN 201410523134 A CN201410523134 A CN 201410523134A CN 104278828 B CN104278828 B CN 104278828B
- Authority
- CN
- China
- Prior art keywords
- door frame
- tie
- protection network
- platform
- hanger
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Movable Scaffolding (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
A kind of concrete chimney dismantling operation platform, belongs to the structures such as xoncrete structure chimney, water tower and implements the technical field of high-altitude manual demolition.Including door frame, tie-beam, base plate and protection network.Door frame includes channel-section steel support body, angle steel railing and hanger, and support body, railing vertical rod, hanger, type of attachment is welding.Connecting with tie-beam bolt between door frame, base plate paving direction is vertical with tie-beam, smooth laying, has laid rear upper berth asbestos pad.Guardrail upright pole cross bar in top connects, and cross bar is connected with vertical rod chien shih, and bottom hanger hangs double layer security protection network, one layer of big eye net, one layer of close mesh protection network.Advantage is, by the door frame form of simple structure, assembled configuration one removes platform, low cost, safe and efficient, and can adjust in real time.It is applicable to special area, has inflammable and explosive danger or surrounding enviroment, close on the factors such as residential block and must use the chimney demolition engineering of manual demolition.
Description
Technical field
The invention belongs to the structures such as xoncrete structure chimney, water tower and implement the technical field of high-altitude manual demolition, spy
Not there is provided a kind of concrete chimney dismantling operation platform, be safe and stable in the manual demolition of a kind of high-altitude
Operating platform, by low cost, high efficiency and the security reliability of door frame dismountable constitution realization high-altitude dismantling.
Background technology
The xoncrete structure structures such as chimney, water tower are because it is the highest, remove the features such as danger is big, Chang Cai at present
With directional blasting technology, and for special area, have inflammable and explosive danger or surrounding enviroment, close on residential block etc.
Factor must use manual demolition, practicality again, the one-tenth while of how accomplishing safe and reliable for safety prevention measure
This is low is a big technical barrier, and the present invention is by constructing high-altitude operation platform with door frame erection method, it is achieved high-altitude
Safe and stable property.
Summary of the invention
It is an object of the invention to provide a kind of concrete chimney dismantling operation platform, being technically characterized in that of solution:
By the component of simple portal-framed structure by assembled configuration one high-altitude dismantling operating platform.The present invention provides a kind of
Simple and reasonable, it is possible to effectively the danger of high-altitude manual work to be protected, ensured, meet high-altitude artificial
The requirement removed.
The present invention includes door frame (for many Pin door frame), tie-beam, base plate and protection network.Described door frame is unified chi
Very little, including channel-section steel support body, angle steel railing and hanger, support body, railing vertical rod, hanger, type of attachment is welding.
Door frame support body is ∏ shape, uses the welding of 14# channel-section steel, and door frame bottom is L-shaped hanger, uses 50 angle steel, and bolt is even
Connect, easy disassembly.Door frame top is guardrail upright pole, uses 50 angle steel, and bolt connects.During Demolition Construction, with 12
Pin door frame is angularly distributed on chimney wall, and door frame is connected with chimney wall jackscrew bar.Tie-beam spiral shell is used between door frame
Tethering and connect, tie-beam uses 14# channel-section steel to make.The process at the position that tie-beam is mainly connected with door frame, connection side
Formula uses high-strength bolt to be aided with quantity and the boundary of works area of steel wire rope scalable door frame.Hold according to loading angle, load
The feature of weight, typically uses the door frame quantity such as 6,9,12 to carry out assembly, notes order and connected mode in assembly,
In construction, the increase along with barrel diameter is adjusted by the form that is flexible coupling of steel wire rope, it is ensured that platform stabilization.
After connecting, upper berth platform floor, base plate uses the wooden scaffold board of specification 250mm*50mm, lays direction and company
Connect beam vertical, smooth laying, lay rear upper berth asbestos pad.Top guardrail upright pole with cross bar connect, cross bar with
Vertical rod chien shih is connected with, high 1.5 meters, and twice cross bar is brushed with the paint at red white interval on railing.Bottom hangs
Frame hangs double layer security protection network, one layer of big eye net, one layer of close mesh protection network.
(1) door frame: girder selects 14a channel-section steel notch vertical, and its cross section property is:
Area: A=18.51cm2
Inertia is away from Iy=53.2cm4
Rotary inertia: Wy=13.01cm3
The radius of gyration: iy=1.7cm
Sectional dimension: b=58mm, h=140mm, t=9.5mm
(2) tie-beam: select material identical with door frame girder, the channel-section steel of specification.For connecting platform center
The support of platform floor.
(3) platform floor: select the wooden scaffold board (Masson Pine, Lignum seu Ramulus Cunninghamiae Lanceolatae) that building site is conventional, specification 250mm*50mm.
(4) protection network: use double layer security net, 100 square centimeters of one layer of big eye protection network 800 mesh, one layer of close mesh
Safety net 2000 mesh/100 square centimeter.Thus rubble can be stopped, the falling of the object such as fragment of brick, splash.
The form component that the present invention utilizes door frame, tie-beam to use bolt, steel wire rope to connect by certain angle is torn open
Except operation platform, can be effectively improved safety and the efficiency of construction of high-altitude manual demolition, this platform has simple in construction
Rationally, assemble in operation, design margin evaluation height and easily operated feature of constructing, it is adaptable to high-altitude coagulation
The manual demolition construction of soil chimney.
Accompanying drawing explanation
Fig. 1 is door frame detail drawing schematic diagram.Wherein, railing 1, door frame support body 2, jackscrew 3, hanger 4
Fig. 2 is operating platform schematic diagram.Wherein, tie-beam 5, chimney wall 6, double-deck close mesh protection network 7, base plate
8。
Fig. 3 is operating platform generalized section.Wherein, video monitoring 9, discharging rod 10, door frame guardrail 1, door frame
2, base plate 8, jackscrew 3, steel wire rope 11.
Detailed description of the invention
The present invention includes door frame (for many Pin door frame), tie-beam, base plate and protection network.Described door frame is unified chi
Very little, including channel-section steel support body, angle steel railing and hanger, support body, railing vertical rod, hanger, type of attachment is welding.
Below in conjunction with the accompanying drawings, the present invention is described in further detail.
(1) assemble shown in schematic diagram such as Fig. 2 operating platform, the making of this operating platform, installation, predominantly door frame
Assemble, be generally 6,9,12 Pin according to the rational quantity of the diameter matches of chimney, angularly assembled, connected mode
For connecting with tie-beam and steel wire rope, bottom boarding two-layer.
(2) as shown in Fig. 3 operating platform profile, door frame holds out against fixing with jackscrew bar with chimney wall when assembling, as
Shown in Fig. 1 door frame detail drawing, above door frame, 50 angle steel are the support of platform guardrail, connect into 1.5 with angle steel bolt above
The high guardrail of rice.Door frame lower outer is 50 angle steel hangers, end boarding, plug-in close mesh protection network, prevents falling rocks.
Top dress discharging rod and supervising device.
(3), during barrel Demolition Construction, when diameter becomes big with the reduction of barrel, font door frame should be increased open,
Increasing operating platform simultaneously, during in order to ensure to increase door frame, make the stability of whole platform, its measure is for utilizing group
During dress, the hole of φ 50 in the middle of former door frame cross-arm, wears the steel wire rope of three road φ 14, first unclamps two therein, another
Root, as safety rope, treats that two steel wire ropes stay enough scopes, by two fag end lockings, then unclamps as insurance
Restrict one and utilize same method by tight for this cord lock.Then the door frame of addition is evenly arranged along barrel girth, and will
Operating platform scaffold board is completed, is tied, various equipment, check and accept on inspection after can come into operation.
Specific embodiment described herein is only to present invention spirit explanation for example.Technology belonging to the present invention
Described specific embodiment can be made various amendment or supplements or use similar by the technical staff in field
Mode substitutes, but without departing from the spirit of the present invention or surmount scope defined in appended claims.
Although the most more employing the term such as door frame, tie-beam, but it is not precluded from using the probability of other term.
Use these terms to be only used to more easily to describe and explain the essence of the present invention;It is construed as any one
It is all contrary with spirit of the present invention for planting additional restriction.
Claims (3)
1. a concrete chimney dismantling operation platform, it is characterised in that include door frame, door frame tie-beam, base plate and protection network;Door frame includes that channel-section steel support body, angle steel railing and hanger, support body, railing vertical rod, hanger type of attachment are welding;Door frame support body is ∏ shape, uses the welding of 14# channel-section steel, and door frame bottom is L-shaped hanger, uses 50 angle steel, and bolt connects;Door frame top is guardrail upright pole, uses 50 angle steel, and bolt connects;During Demolition Construction, being angularly distributed on chimney wall with 12 Pin door frames, door frame is connected with chimney wall jackscrew bar;Connect with tie-beam bolt between door frame;According to loading angle, the feature of load load-bearing, using the door frame quantity such as 6,9,12 to carry out assembly, in construction, the increase along with barrel diameter is adjusted by the form that is flexible coupling of steel wire rope, it is ensured that platform stabilization;After connecting, upper berth base plate, base plate uses the wooden scaffold board of specification 250mm*50mm, and laying direction is vertical with tie-beam, and rear upper berth asbestos pad has been laid in smooth laying;Guardrail upright pole cross bar in top connects, and cross bar is connected with vertical rod chien shih, twice cross bar, and bottom hanger hangs double layer security protection network, one layer of big eye net, one layer of close mesh protection network;
Described door frame selects 14a channel-section steel notch vertical, and its cross section is:
Area: A=18.51cm2
Inertia is away from Iy=53.2cm4
Rotary inertia: Wy=13.01cm3
The radius of gyration: iy=1.7cm
Sectional dimension: b=58mm, h=140mm, t=9.5mm;
Described tie-beam selects material identical with door frame girder, the channel-section steel of specification;Support for connecting platform center platform floor.
Platform the most according to claim 1, it is characterised in that described base plate: select wooden scaffold board Masson Pine or Lignum seu Ramulus Cunninghamiae Lanceolatae, specification 250mm*50mm.
Platform the most according to claim 1, it is characterised in that described protection network uses double layer security net, 100 square centimeters of one layer of big eye protection network 800 mesh, one layer of close mesh safety net 2000 mesh/100 square centimeter, rubble can be stopped, the falling of fragment of brick object, splash.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410523134.1A CN104278828B (en) | 2014-09-30 | 2014-09-30 | A kind of concrete chimney dismantling operation platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410523134.1A CN104278828B (en) | 2014-09-30 | 2014-09-30 | A kind of concrete chimney dismantling operation platform |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104278828A CN104278828A (en) | 2015-01-14 |
CN104278828B true CN104278828B (en) | 2016-08-24 |
Family
ID=52254129
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410523134.1A Active CN104278828B (en) | 2014-09-30 | 2014-09-30 | A kind of concrete chimney dismantling operation platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104278828B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108979199A (en) * | 2018-10-04 | 2018-12-11 | 司风兵 | A kind of safe construction device for cylinder-shaped building manual demolition |
CN109518972A (en) * | 2018-12-29 | 2019-03-26 | 中建局集团第建筑有限公司 | Construction method for soft platform of daylighting roof |
CN110512945A (en) * | 2019-09-05 | 2019-11-29 | 上海建工二建集团有限公司 | Vertical rod fixing device and installation method of safety protection railing |
CN114278113A (en) * | 2021-12-29 | 2022-04-05 | 北京首钢建设集团有限公司 | Construction method for dismantling reinforced concrete chimney in complex environment |
CN116163506B (en) * | 2023-04-18 | 2023-06-30 | 山西建设投资集团有限公司 | Movable construction operation platform for removing chimney |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4960185A (en) * | 1988-06-30 | 1990-10-02 | GESTA Gesellschaft fur Stahlrohrgeruste mbH | Movable cradle |
JP2001032522A (en) * | 1999-07-27 | 2001-02-06 | Kitaken:Kk | Construction of tower body |
CN202055502U (en) * | 2011-03-31 | 2011-11-30 | 胜利油田胜利工程建设(集团)有限责任公司 | Basket-type operating platform for construction of high-rise building construction |
CN202755634U (en) * | 2012-08-07 | 2013-02-27 | 中建三局建设工程股份有限公司 | Suspension type operational platform |
CN103470093A (en) * | 2013-09-24 | 2013-12-25 | 中国二十二冶集团有限公司 | Concrete chimney dismantling device and dismantling method |
-
2014
- 2014-09-30 CN CN201410523134.1A patent/CN104278828B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4960185A (en) * | 1988-06-30 | 1990-10-02 | GESTA Gesellschaft fur Stahlrohrgeruste mbH | Movable cradle |
JP2001032522A (en) * | 1999-07-27 | 2001-02-06 | Kitaken:Kk | Construction of tower body |
CN202055502U (en) * | 2011-03-31 | 2011-11-30 | 胜利油田胜利工程建设(集团)有限责任公司 | Basket-type operating platform for construction of high-rise building construction |
CN202755634U (en) * | 2012-08-07 | 2013-02-27 | 中建三局建设工程股份有限公司 | Suspension type operational platform |
CN103470093A (en) * | 2013-09-24 | 2013-12-25 | 中国二十二冶集团有限公司 | Concrete chimney dismantling device and dismantling method |
Also Published As
Publication number | Publication date |
---|---|
CN104278828A (en) | 2015-01-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104278828B (en) | A kind of concrete chimney dismantling operation platform | |
CN202324571U (en) | Overhanging type double-row scaffold | |
CN204782031U (en) | Interior climbing tower hangs entrance to a cave from promoting safety protection platform | |
CN207392716U (en) | A kind of tool-type suspension scaffold | |
CN101397844A (en) | Construction method of special section steel concrete composite structure inclined wall mould base engineering | |
CN201420385Y (en) | Overhanging type unloading platform for building construction | |
CN106150057A (en) | A kind of split blade type hydraulic pressure lift climbing frame | |
CN207728025U (en) | A kind of safety climbing ladder for bridge construction | |
CN203008256U (en) | Fast-assemble type fire-fighting outdoor evacuation stair | |
CN205116768U (en) | Superelevation layer instrument formula protection platform of encorbelmenting | |
CN203499259U (en) | Tool type cantilevered unloading platform | |
CN104746863B (en) | A kind of concrete chimney Demolition Construction platform | |
CN104612412B (en) | A kind of construction method of steel construction escape way | |
CN206289988U (en) | Overhanging unloading platform and material transfer device | |
CN205314595U (en) | Elevartor shaft protection frame | |
CN206016300U (en) | Construction of prevention work structure in a kind of tool-type elevator | |
CN205134921U (en) | Building outer wall concrete constructional column hangs construction platform | |
CN204326488U (en) | The building operations overhanging unloading platform that a kind of safety is high | |
CN211215111U (en) | Fire fighting access based on building outer wall | |
CN207776478U (en) | Outer climbing frame protective device | |
CN206955504U (en) | One kind can have enough to meet the need people's escape way on regularization tower crane | |
CN102817464B (en) | Construction device for painting anti-corrosion and fireproof paint of building | |
CN212562595U (en) | Shed is prevented pounding by outer scaffold frame | |
CN207144440U (en) | A kind of integrated Construction of Supporting security platform | |
CN220644165U (en) | Four-leg small-sized wellhead A-type platform assembly suitable for Bohai sea area standardization |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |