- CN205314595U CN205314595U CN201520801663.3U CN201520801663U CN205314595U CN 205314595 U CN205314595 U CN 205314595U CN 201520801663 U CN201520801663 U CN 201520801663U CN 205314595 U CN205314595 U CN 205314595U
- Authority
- CN
- China
- Prior art keywords
- preventer
- layer
- ground floor
- protector
- utility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
The utility model discloses an elevartor shaft protection frame, including a plurality of first layer protector that install in the elevator well and second floor protector, first layer protector and second floor protector set up in turn, and lie in first second floor protector directly over from last to first first layer protector down, and first layer protector comprises the installing support and the eye net of preventing falling, the utility model discloses it is simple and convenient that the inside level of well prevents falling the net construction, and whole factor of safety improves, and convenient to use is simple, and the fixed point is firm, guarantees operation and constructor safety, and the product design material is for building site common material gathers materials on the spot, simple manufacture, low cost, and the well that extensively is suitable for the various forms is under construction and is satisfied the requirement of construction unit safe operation.
Description
Technical field
This utility model relates to elevator construction safety protection device, specifically a kind of elevator protective frame.
Background technology
For multilayer structure, engineering with elevator hoistways, in hoistway wall body structure work progress, operator will in the internal assembling reinforcement of hoistway, install the construction tasks such as template, narrow and small for hoistway inner space, along with story height increases, to arrange inside hoistway and prevent personnel from falling measure, causing that personnel fall if any dangerous situation, personnel can effectively be caught by the protection in elevator, and the safety of workmen is guaranteed. Common practices is to utilize the bolt eye on body of wall, draws steel wire rope along body of wall surrounding, and horizontal blanket net and surrounding steel wire rope colligation are fixed. Common practices operation is cumbersome, and the human users for hoistway internal Protection of constructing increases potential safety hazard.
Utility model content
The purpose of this utility model is in that to provide a kind of elevator protective frame, with the problem solving to propose in above-mentioned background technology.
For achieving the above object, this utility model provides following technical scheme:
A kind of elevator protective frame, including multiple ground floor preventers being installed in elevator hoistways and second layer preventer, described ground floor preventer and second layer preventer are arranged alternately, and first ground floor preventer is positioned at the surface of first second layer preventer from top to bottom, ground floor preventer is made up of mounting bracket and fall arrest eye net, described mounting bracket includes the center bar keel that many steel pipes through walls are set up, steel pipe through walls is through the hole to be provided in elevator hoistways, and steel pipe through walls is fixed by steel tube fastener and elevator hoistways; Described fall arrest eye net utilizes steel cable colligation on the center bar keel of ground floor preventer; Described second layer preventer is made up of mounting bracket and polylith hard protection plate, and hard protection plate is layed on the center bar keel of second layer preventer.
As further program of the utility model: described hard protection plate adopts plank to make, and the quantity of the hard protection plate on each second layer preventer is 6-8 block.
As this utility model further scheme: the quantity of described ground floor preventer is 2-10, and the quantity of second layer preventer is identical with the quantity of ground floor preventer.
Compared with prior art, the beneficial effects of the utility model are: the anti-fall easy construction of being caught of level within this utility model hoistway, general safety coefficient improves, simple and easy to use, fixing point is firm, ensure operation and workmen's safety, product design material be building site common used material gather materials on the spot, make simple, with low cost, generally applicable various forms of hoistways construction meet unit in charge of construction's safety operation requirement.
Accompanying drawing explanation
Fig. 1 is the structural representation of ground floor preventer in a kind of elevator protective frame of this utility model.
Fig. 2 is the structural representation of second layer preventer in a kind of elevator protective frame of this utility model.
In figure: 1-steel tube fastener, 2-steel pipe through walls, 3-fall arrest eye net, 4-hard protection plate.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is clearly and completely described, it is clear that described embodiment is only a part of embodiment of this utility model, rather than whole embodiments. Based on the embodiment in this utility model, the every other embodiment that those of ordinary skill in the art obtain under not making creative work premise, broadly fall into the scope of this utility model protection.
Refer to Fig. 1~2, in this utility model embodiment, a kind of elevator protective frame, including multiple ground floor preventers being installed in elevator hoistways and second layer preventer, described ground floor preventer and second layer preventer are arranged alternately, and first ground floor preventer is positioned at the surface of first second layer preventer from top to bottom, ground floor preventer is made up of mounting bracket and fall arrest eye net 3, described mounting bracket includes the center bar keel that many steel pipes 2 through walls are set up, hole to be provided in steel pipe 2 through walls traverse elevator hoistways, and steel pipe 2 through walls is fixed by steel tube fastener 1 and elevator hoistways, described fall arrest eye net 3 utilizes steel cable colligation on the center bar keel of ground floor preventer, described second layer preventer is made up of mounting bracket and polylith hard protection plate 4, and hard protection plate 4 is layed on the center bar keel of second layer preventer.
Described hard protection plate 4 adopts plank to make, and the quantity of the hard protection plate 4 on each second layer preventer is 6-8 block.
The quantity of described ground floor preventer is 2-10, and the quantity of second layer preventer is identical with the quantity of ground floor preventer.
Operation principle of the present utility model is: by ground floor preventer the personnel fallen is done and once cushions, can be caught by second layer preventer when ground floor preventer breaks through, reduce single-impact power with this, ensures safety of workers.
It is obvious to a person skilled in the art that this utility model is not limited to the details of above-mentioned one exemplary embodiment, and when without departing substantially from spirit of the present utility model or basic feature, it is possible to realize this utility model in other specific forms. Therefore, no matter from which point, embodiment all should be regarded as exemplary, and be nonrestrictive, scope of the present utility model is limited by claims rather than described above, it is intended that all changes in the implication of the equivalency dropping on claim and scope included in this utility model. Any accompanying drawing labelling in claim should be considered as the claim that restriction is involved.
In addition, it is to be understood that, although this specification is been described by according to embodiment, but not each embodiment only comprises an independent technical scheme, this narrating mode of description is only for clarity sake, description should be made as a whole by those skilled in the art, and the technical scheme in each embodiment through appropriately combined, can also form other embodiments that it will be appreciated by those skilled in the art that.
Claims (3)
1. an elevator protective frame, it is characterized in that, including multiple ground floor preventers being installed in elevator hoistways and second layer preventer, described ground floor preventer and second layer preventer are arranged alternately, and first ground floor preventer is positioned at the surface of first second layer preventer from top to bottom, ground floor preventer is made up of mounting bracket and fall arrest eye net, described mounting bracket includes the center bar keel that many steel pipes through walls are set up, hole to be provided in steel pipe through walls traverse elevator hoistways, and steel pipe through walls is fixed by steel tube fastener and elevator hoistways,Described fall arrest eye net utilizes steel cable colligation on the center bar keel of ground floor preventer; Described second layer preventer is made up of mounting bracket and polylith hard protection plate, and hard protection plate is layed on the center bar keel of second layer preventer.
2. elevator protective frame according to claim 1, it is characterised in that described hard protection plate adopts plank to make, and the quantity of the hard protection plate on each second layer preventer is 6-8 block.
3. elevator protective frame according to claim 1, it is characterised in that the quantity of described ground floor preventer is 2-10, and the quantity of second layer preventer is identical with the quantity of ground floor preventer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520801663.3U CN205314595U (en) | 2015-10-16 | 2015-10-16 | Elevartor shaft protection frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520801663.3U CN205314595U (en) | 2015-10-16 | 2015-10-16 | Elevartor shaft protection frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205314595U true CN205314595U (en) | 2016-06-15 |
Family
ID=56188221
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520801663.3U Expired - Fee Related CN205314595U (en) | 2015-10-16 | 2015-10-16 | Elevartor shaft protection frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205314595U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109235914A (en) * | 2018-11-09 | 2019-01-18 | 中国建筑第八工程局有限公司 | Structure construction protective device is got rid of after a kind of building |
CN110589666A (en) * | 2019-09-04 | 2019-12-20 | 芜湖欣艾特机电有限公司 | Safety goods elevator |
-
2015
- 2015-10-16 CN CN201520801663.3U patent/CN205314595U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109235914A (en) * | 2018-11-09 | 2019-01-18 | 中国建筑第八工程局有限公司 | Structure construction protective device is got rid of after a kind of building |
CN110589666A (en) * | 2019-09-04 | 2019-12-20 | 芜湖欣艾特机电有限公司 | Safety goods elevator |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205077885U (en) | Hydraulic intelligent climbing protection platform for core tube of building | |
CN103206074B (en) | Elevator shaft template construction method, platform and support | |
CN206174437U (en) | Be applied to gallows of super high overlength cantilevered member construction | |
CN104929353A (en) | Detachable stepwise automatic climbing operating platform for elevator shafts | |
CN205314595U (en) | Elevartor shaft protection frame | |
CN204418629U (en) | Integrated form climbs frame | |
CN104291222B (en) | The inner hard protection of a kind of high-rise building Core Walls Structure hangs integrated system with row | |
CN101876209A (en) | Supertall building core tube construction safety fire protection system and device | |
CN206928624U (en) | A kind of heavy ladder cage for high-altitude building | |
CN204570491U (en) | A kind of bridge deck construction hanging basket device | |
CN204139567U (en) | Aerial work platform | |
CN205171979U (en) | Integrated form all steel lift platform | |
CN206053272U (en) | A kind of traveling centering | |
CN204643664U (en) | A kind of building tower crane | |
CN205134921U (en) | Building outer wall concrete constructional column hangs construction platform | |
CN203531354U (en) | Underneath type lifting scaffold for high-rise building | |
CN202441072U (en) | Building construction protective net | |
CN207686334U (en) | A kind of Super High Core Walls Structure wall construction personnel escape climbs cage | |
CN202139007U (en) | Single hanging seat for overhead work | |
CN205894637U (en) | Instrument formula aerial working platform | |
CN205472362U (en) | Superelevation layer construction internal climbing tower crane bottom protective platform with prevent function of toppling | |
CN206000194U (en) | A kind of elevator hoistways soft or hard safeguard structure | |
CN204502166U (en) | A kind of slide bar emergency escape passage with horn mouth tubular anti-drop net | |
CN203441019U (en) | Safe staircase | |
CN203961329U (en) | A kind of safety protection structure for building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160615 Termination date: 20171016 |
|