CN203961329U CN201420395330.0U CN201420395330U CN203961329U CN 203961329 U CN203961329 U CN 203961329U CN 201420395330 U CN201420395330 U CN 201420395330U CN 203961329 U CN203961329 U CN 203961329U
Authority
CN
China
Prior art keywords
montant
pulley
fixed
cross bar
protection structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420395330.0U
Other languages
Chinese (zh)
Inventor
揭保如
揭建刚
周双喜
谢洪阳
姚志勇
钱胜
李珏
陈玉春
陶武金
陈川
陈允洪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HSBC Group Limited by Share Ltd
Original Assignee
JIANGXI FENGHE YINGZAO GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGXI FENGHE YINGZAO GROUP CO Ltd filed Critical JIANGXI FENGHE YINGZAO GROUP CO Ltd
Priority to CN201420395330.0U priority Critical patent/CN203961329U/en
Application granted granted Critical
Publication of CN203961329U publication Critical patent/CN203961329U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a kind of safety protection structure, belongs to the realm of building construction.A kind of safety protection structure for building, comprises cross bar, montant, diagonal member, pulley track and wire rope, and described montant is fixed on the outer wall of floor of having built, and cross bar is fixed on bottom and the top of montant, and diagonal member is fixed between montant and cross bar; On the top of described montant, the girder steel for fixed block track is installed, pulley is installed on pulley track; Wire rope one end is through pulley, and the other end ties up on constructor's body.The utlity model has following advantage: 1, reduce the generation of constructor's casualty accident; 2, constructor takes action conveniently.

Description

A kind of safety protection structure for building
Technical field
The utility model relates to a kind of safety protection structure, belongs to the realm of building construction.
Background technology
Because high-supported formwork cave-in accident takes place frequently, serious harm social safety.Although also adopt the safety measures such as safety belt, safety helmet, safety net in building operations; but for work high above the ground, still exist no small potential safety hazard; safety belt is generally fixed on some fixed points; cause the handicapped of constructor in construction, safety helmet and safety net can not well be protected constructor while occurring especially caving in.
Summary of the invention
The purpose of this utility model is to solve problems of the prior art, and casualties, constructor's action safety protection structure for building are easily provided while providing one can effectively control accident generation or occur.
For achieving the above object, the utility model adopts following technical scheme: a kind of safety protection structure for building, comprise cross bar, montant, diagonal member, pulley track and wire rope, described montant is fixed on the outer wall of floor of having built, cross bar is fixed on bottom and the top of montant, and diagonal member is fixed between montant and cross bar; On the top of described montant, the girder steel for fixed block track is installed, pulley is installed on pulley track; Wire rope one end is through pulley, and the other end ties up on constructor's body.
Preferably, described pulley is detachable pulley.
Step is as follows:
1, by installation of embedded parts bottom bar.
2, determine the height of montant according to the design height of building, montant, cross bar and diagonal member are installed.
3, at the top of montant, the girder steel for fixed block track is installed.
4, pulley track is installed on girder steel.
5, in the time of workman's operation, as long as detachable pulley is installed on track, under pulley, hang up Telescopic steel wire rope, wire rope other end hangs over workman can play protective action with it.
Compared with prior art, tool has the following advantages the utility model:
1, reduce the generation of constructor's casualty accident;
2, constructor takes action conveniently.
Brief description of the drawings
Fig. 1 is the utility model example structure schematic diagram;
Fig. 2 is the lateral view of Fig. 1;
Fig. 3 is montant and the connection diagram of the outer wall of floor of having built;
Fig. 4 is the connection diagram between bottom bar and montant.
Detailed description of the invention
Below in conjunction with accompanying drawing 1, 2 pairs of the utility model are further described: a kind of safety protection structure for building, comprise cross bar 3, montant 2, diagonal member 4, pulley track 5 and wire rope 6, expansion bolt is by A-frame, trapezoidal ribs and channel-section steel rest are fixed on the outer wall of floor 1 of having built, described montant 2 is secured by bolts on the horizontal section of A-frame, cross bar 3 is fixed on bottom and the top of montant, between the cross bar 3 of bottom and montant 2, be bolted diagonal brace steel member, diagonal brace steel member is divided into montant both sides, with being connected of firm cross bar and montant, diagonal member 4 is fixed between montant and cross bar, on the top of described montant, the girder steel for fixed block track 5 is installed, pulley is installed on pulley track, wire rope 6 one end are through pulley, and the other end ties up on constructor's body, described pulley is detachable pulley.

Claims (2)

1. a safety protection structure for building, comprise cross bar, montant, diagonal member, pulley track and wire rope, it is characterized in that: described montant is fixed on the outer wall of floor of having built, cross bar is fixed on bottom and the top of montant, and diagonal member is fixed between montant and cross bar; On the top of described montant, the girder steel for fixed block track is installed, pulley is installed on pulley track; Wire rope one end is through pulley, and the other end ties up on constructor's body.
2. safety protection structure according to claim 1, is characterized in that: described pulley is detachable pulley.
CN201420395330.0U 2014-07-17 2014-07-17 A kind of safety protection structure for building Active CN203961329U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420395330.0U CN203961329U (en) 2014-07-17 2014-07-17 A kind of safety protection structure for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420395330.0U CN203961329U (en) 2014-07-17 2014-07-17 A kind of safety protection structure for building

Publications (1)

Publication Number Publication Date
CN203961329U true CN203961329U (en) 2014-11-26

Family

ID=51921930

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420395330.0U Active CN203961329U (en) 2014-07-17 2014-07-17 A kind of safety protection structure for building

Country Status (1)

Country Link
CN (1) CN203961329U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114482589A (en) * 2022-02-11 2022-05-13 上海万科企业有限公司 Elevator shaft protection construction method, device and system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114482589A (en) * 2022-02-11 2022-05-13 上海万科企业有限公司 Elevator shaft protection construction method, device and system

Similar Documents

Publication Publication Date Title
CN205063332U (en) A creeping formwork structure of climbing for wall body variable cross section department
CN204112696U (en) For the electric hoist elevator shaft platform of main building construction
CN204040506U (en) Hydraulic lifting protector
CN204212450U (en) A kind of tool-type safe and convenient passage
CN104291222A (en) Rigid protection and crane integration system inside super high-rise building core tube
CN203961329U (en) A kind of safety protection structure for building
CN203593556U (en) High safety tower crane
CN204112697U (en) A kind of protector carrying raise scaffold turnover panel
CN203983855U (en) A kind of steel tower flex holder
CN203392657U (en) Machine maintenance platform
CN203977300U (en) A kind of attaching protection canopy of cradle construction continuous beam
CN204435833U (en) Operation platform wall-attached supporting seat
CN202467232U (en) Lift well opening protective railing
CN203961330U (en) Job site safe construction protective guard
CN203977844U (en) A kind of for the fixing steel pipe iron wire fastener of building trade
CN205558245U (en) Building support for construction
CN203271165U (en) Protective barrier capable of freely stretching and retracting
CN203514813U (en) Novel overhanging discharging platform
CN202954551U (en) Simple steel reinforcement cage for high-altitude welding
CN206636176U (en) Possesses the scaffold of expenditure installation net pocket frame protection
CN205134920U (en) Simple and easy aerial working platform device of building engineering
CN103669889B (en) A kind of high-altitude safe guardrail for Steel Structure Installation and preparation method thereof
CN204357340U (en) The platform ladder of half space between a kind of band ladder for press
CN204663022U (en) A kind of constructor's safety guard when building outer protective frame body construction
CN204703544U (en) A kind of safe and practical high rise elevator well construction guard system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Safety protective structure for buildings

Effective date of registration: 20151229

Granted publication date: 20141126

Pledgee: Bank of Nanchang Limited by Share Ltd science and Technology Branch

Pledgor: Jiangxi Hefeng Construction Group Co., Ltd.|Jiangxi branch of Limited by Share Ltd

Registration number: 2015990001187

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 1496 No. 331700 Jiangxi province Nanchang Honggutan Feng and Avenue

Patentee after: HSBC Group Limited by Share Ltd

Address before: 1496 No. 331700 Jiangxi province Nanchang Honggutan Feng and Avenue

Patentee before: Jiangxi Fenghe Yingzao Group Co., Ltd.

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20170713

Granted publication date: 20141126

Pledgee: Bank of Jiangxi, Limited by Share Ltd, Nanchang, Binjiang branch

Pledgor: Fenghe construction group, Limited by Share Ltd|Jiangxi,, Limited by Share Ltd

Registration number: 2015990001187

PM01 Change of the registration of the contract for pledge of patent right

Change date: 20170713

Registration number: 2015990001187

Pledgor after: Fenghe construction group, Limited by Share Ltd

Pledgor after: Jiangxi,, Limited by Share Ltd

Pledgor before: Jiangxi Hefeng Construction Group Co., Ltd.

Pledgor before: Jiangxi branch of Limited by Share Ltd

Change date: 20170713

Registration number: 2015990001187

Pledgee after: Bank of Jiangxi, Limited by Share Ltd, Nanchang, Binjiang branch

Pledgee before: Bank of Nanchang Limited by Share Ltd science and Technology Branch

PM01 Change of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Safety protective structure for buildings

Effective date of registration: 20170816

Granted publication date: 20141126

Pledgee: Bank of Jiangxi, Limited by Share Ltd, Nanchang, Binjiang branch

Pledgor: HSBC Group Limited by Share Ltd|Jiangxi Chuangxing Gaoke Co.,Ltd.

Registration number: 2017990000755

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20190826

Granted publication date: 20141126

Pledgee: Bank of Jiangxi, Limited by Share Ltd, Nanchang, Binjiang branch

Pledgor: HSBC Group Limited by Share Ltd

Registration number: 2017990000755