CN109555257A - Combined support derrick type furred ceiling and construction method - Google Patents

Combined support derrick type furred ceiling and construction method Download PDF

Info

Publication number
CN109555257A
CN109555257A CN201910027369.4A CN201910027369A CN109555257A CN 109555257 A CN109555257 A CN 109555257A CN 201910027369 A CN201910027369 A CN 201910027369A CN 109555257 A CN109555257 A CN 109555257A
Authority
CN
China
Prior art keywords
sunpender
buried
plate
structure roof
tie
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910027369.4A
Other languages
Chinese (zh)
Other versions
CN109555257B (en
Inventor
王新泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SICHUAN YAOSHUN CONSTRUCTION GROUP Co.,Ltd.
Original Assignee
Hangzhou Jiangrun Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Jiangrun Technology Co Ltd filed Critical Hangzhou Jiangrun Technology Co Ltd
Priority to CN201910027369.4A priority Critical patent/CN109555257B/en
Publication of CN109555257A publication Critical patent/CN109555257A/en
Application granted granted Critical
Publication of CN109555257B publication Critical patent/CN109555257B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/35Extraordinary methods of construction, e.g. lift-slab, jack-block
    • E04B1/3511Lift-slab; characterised by a purely vertical lifting of floors or roofs or parts thereof
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/18Means for suspending the supporting construction
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/18Means for suspending the supporting construction
    • E04B9/183Means for suspending the supporting construction having a lower side adapted to be connected to a channel of the supporting construction
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/162Handles to carry construction blocks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to a kind of combined support derrick type furred ceiling and construction method, combined support derrick type furred ceiling includes: pre-buried sunpender ruggedized construction, structure roof water sealing structure, pre-buried sunpender shoulder, structure roof downside sunpender;Portion connecting structure under portion connecting structure, hog frame brace on structure roof downside sunpender, hog frame brace;Connection structure system, the main joist hanging piece structure, secondary joist mounting structure of inter-tie and lower sunpender;Main haulage cable sliding system, symmetrically time sliding system of haulage cable, structure roof preformed hole sealing of hole.The present invention efficiently solves furred ceiling deformation, derrick type furred ceiling has that construction is complicated, also deformation, security-hidden trouble, the problems such as stability is poor, construction efficiency is low, and work progress is simple and easy, substantially increases construction efficiency.Applied to preferable technical economic benefit can be obtained in Practical Project.

Description

Combined support derrick type furred ceiling and construction method
Technical field
The present invention relates to a kind of combined support derrick type furred ceiling and construction methods, belong to building engineering field.
Background technique
The speedup development in public building space at present, large space decoration is greatly paid attention to therewith, due to equipment in furred ceiling It is continuously increased, the span of the ceiling void is increasing, and height is higher and higher, and the furred ceiling engineering of large span large space is also increasingly More, the technical issues of ceiling construction occurred therewith, is also more and more.When furred ceiling is by upward thrust or in the work of negative wind pressure Under, due to the too long insufficient rigidity of hangs muscle, certain bending deformation will be generated, it is upwardly-deformed so as to cause entire ceiling system Or transversely deforming, formed " dome ", be easy to cause ceiling system is unbalance, cause ceiling surface uneven in addition bury safety it is hidden The problems such as suffering from.
Requirement of the Current specifications to large space furred ceiling: when length of boom is greater than 1.5m, counter support should be set, then without other Design or construction requirement, it is seen that the regulation of specification is fuzzy, general.Ceiling support, which is arranged, in designing unit is also not enough familiar with, The design of setting in to(for) ceiling support is unreasonable or relatively conservative, and there are biggish design defect, and do without corresponding atlas Guidance, operability is not strong, causes the setting of current ceiling support more chaotic.Large space ceiling support current practice is also to deposit In various problem, such as when support setting spacing is bigger than normal or support type selecting is too small, it will result in furred ceiling and deform larger, office Portion is unstable etc., and so as to cause the deformation of entire ceiling suspension system, cracking, the maintenance cost that will result in the later period is relatively high.And it supports If it is less than normal that spacing is arranged, constructing operation faciostenosis will result in, be unfavorable for installation operation, schedule delays, and the use of steel It measures excessive, causes very big waste.
Summary of the invention
The purpose of the present invention is to provide a kind of combined support derrick type furred ceiling, stability is good, work progress is simply easy Row, can be greatly improved construction efficiency.
The object of the invention is also to provide a kind of construction methods of combined support derrick type furred ceiling.
In order to achieve the above object, major technique solution of the invention is to provide a kind of combined support derrick type furred ceiling, hang In structure roof, including reinforced combined type hanging rod structure and combined type sunpender steel joist suspended ceiling system;
The reinforced combined type hanging rod structure, including pre-buried sunpender, pre-buried sunpender ruggedized construction and hog frame brace, institute The upper end for stating pre-buried sunpender is fixed in structure roof, and it is pre- for reinforcing that the pre-buried sunpender ruggedized construction is located at structure roof Bury sunpender;The top of the hog frame brace is connect with pre-buried sunpender ruggedized construction, the lower part of the hog frame brace with it is pre-buried The lower end of sunpender connects;Multiple hog frame braces are symmetrical arranged by center line of pre-buried sunpender;
The combined type sunpender steel joist suspended ceiling system, including lower sunpender, inter-tie, main joist, secondary joist, tie-rod Shelve chamber, big hanging piece, Skeleton hanging part and Thistle board;The lower sunpender is equipped with lower sunpender part mantle fiber, the lower sunpender It is arranged with supporting plate band silk braid cylinder on local mantle fiber, tie-rod fastening supporting plate is connected on the supporting plate band silk braid cylinder, the tie-rod is tight Gu supporting plate is equipped with tie-rod and shelves chamber, the tie-rod shelves chamber and tie-rod fastening supporting plate is sleeved on lower sunpender, the tie-rod Fastening supporting plate is shelved chamber with tie-rod and is fixed by screw, and the inter-tie shelves the cavity of chamber through tie-rod;The main joist It is connect with lower sunpender by big hanging piece, one end of the big hanging piece is connect with lower sunpender, the other end of the big hanging piece and main dragon Bone connection;Secondary joist is connect with main joist by secondary joist pendant;Thistle board, the paper are connected on the secondary joist Plasterboard is connect with secondary joist by self-tapping screw;
The lower end of the pre-buried sunpender is connect with the upper end of lower sunpender.
Further, the pre-buried sunpender ruggedized construction includes the horizontal platform sling of band peg, hangs stud frame, vertical pull rod, drawing Rod end plate, end plate peg and flexible isolating block, the horizontal platform sling of band peg between upper plate main reinforcement and lower roof plate main reinforcement, The upper end of the pre-buried sunpender is connect with the horizontal platform sling of peg, and the horizontal platform sling of band peg is by hanging stud frame and upper plate Main reinforcement connection, the both ends with the horizontal platform sling of peg pass through peg and are connected separately with vertical pull rod, the vertical pull rod Bottom is connected with pull rod end plate, and the pull rod end plate is connect with lower roof plate main reinforcement, and the pull rod end plate is equipped with end plate peg;Institute The top for stating hog frame brace is connect with end plate peg.
Further, the lower end of the pre-buried sunpender is arranged with that brace opening boxes out bottom circumferential lamella and mobile hog frame is put Plate, brace opening boxes out bottom circumferential lamella and mobile hog frame shelf is fixed by fixing bolt, the movable type hog frame Shelf is fixed on pre-buried sunpender by nut, is equipped with steel plate washer between the movable type hog frame shelf and nut.
Further, the lower end of the pre-buried sunpender is zinc-plated threaded screw rod, is equipped on the outside of the zinc-plated threaded screw rod Galvanized steel casing.
The construction method of combined support derrick type furred ceiling, comprising the following steps:
Step 1: mounting structure roof plate template, pre-buried sunpender is arranged in structure roof template and pre-buried sunpender reinforces knot Structure;
Step 2: with concrete pouring structure roof plate template, after structure roof molding, dismounting structure roof plate template;Institute Stating structure roof, there are structure roof preformed holes;
Step 3: installing hog frame brace, the hog frame brace between pre-buried sunpender and pre-buried sunpender ruggedized construction Top connect with pre-buried sunpender ruggedized construction, the lower part of the hog frame brace is connect with the lower end of pre-buried sunpender;
Step 4: lifting combined type sunpender steel joist suspended ceiling body by the whole sliding system of spelling in derrick type furred ceiling ground System;
Derrick type furred ceiling ground is whole to spell sliding system, and using structure roof as support frame, including main haulage cable is sliding Rise structure and the symmetrical sliding structure of haulage cable;
The sliding structure of main haulage cable includes main haulage cable, main haulage cable fixation steel plate, hoist engine With hoist engine regularization bracket;It is set in the structure roof there are two structure roof preformed hole, one of structure roof is reserved It is equipped with left side wirerope in hole and is oriented to steel pipe, is equipped with right side wirerope in another structure roof preformed hole and is oriented to steel pipe;It is described Main haulage cable fixation steel plate is located at structure roof upper end;Described main haulage cable one end passes through left side wirerope and is oriented to steel Guan Houyu main haulage cable fixation steel plate connection, the main haulage cable other end pass through after right side wirerope guiding steel pipe with volume Machine connection is raised, the hoist engine is mounted on hoist engine regularization bracket, and the hoist engine regularization bracket is arranged in structural slab The top of top plate;The symmetrical sliding structure of haulage cable includes hanging a liter balancing stand, and described hang is evenly equipped on liter balancing stand Several symmetrical haulage cables are connected with regularization suspension hook on each symmetrical haulage cable;The left side steel wire A liter balancing stand is hung in main haulage cable connection between rope guiding steel pipe and right side wirerope guiding steel pipe;
The regularization suspension hook is for hooking combined type sunpender steel joist suspended ceiling system;
Step 5: the lower end of the lower sunpender upper end of combined type sunpender steel joist suspended ceiling system and the pre-buried sunpender Connection;
Step 6: removing, derrick type furred ceiling ground is whole to spell sliding system;
Step 7: structure roof preformed hole is with concrete come sealing of hole.
The beneficial effects of the present invention are:
(1) present invention uses the pre-buried fixing end of sunpender monoblock type, and pre-buried structure top and the suspention of top plate main reinforcement connect, lower part Setting erects ledges, has greatly reinforced the stability and safety and the globality with structure roof of boom end;
(2) the pre-buried fixed section of the present invention pre-buried sunpender peripheral hardware band silk braid cylinder, flexible collar, it is ensured that during structure roof pours The integrality of pre-buried sunpender sets the waterproof performance that steel plate for sealing water effectively increases top plate in structure roof, is conducive to pre-buried sunpender The structural stability and safety of fixing end;
(3) the pull rod end plate of the pre-buried sunpender flank connection of the present invention and end plate peg peripheral hardware flexible isolating are fast, are effectively ensured The integrality of structure roof casting process end plates and end plate peg is blocked after the completion of the connection of diagonal brace top with same label mortar The planarization that ensure that structure roof bottom effectively increases the anti-corrosion ability of diagonal brace connecting portion;
(4) furred ceiling sunpender of the present invention reinforces reinforced combined type sunpender using the support of two sides diclinic, and bilateral counter support structure is big The ability to bear and stability of furred ceiling are improved greatly, and eliminates welding using bolt connection type, improves construction efficiency;
(5) present invention spells structural system using sunpender suspended light steel keel fastly, and inter-tie and sunpender are shelved by tie-rod Chamber, tie-rod fastening supporting plate, sleeve and screw are fixedly connected, and effectively increase construction efficiency, so as to form lightgage steel joist it is fast Spelling system good integrity;
(6) present invention spells sliding system using derrick type furred ceiling ground is whole, and on ground, whole spelling light gauge steel structure was constructed Journey is simple and easy, substantially increases light gauge steel structure assembly efficiency, save the cost;
(7) present invention is integrally rolled up using the form of hoist engine haulage cable and draws the whole spelling system of lightgage steel joist, is effectively improved Furred ceiling efficiency and speed, save manpower, and constructing operation is simple and easy.
Detailed description of the invention
Fig. 1 is the pre-buried fixing end of middle hanger monoblock type of the embodiment of the present invention and reinforced combined type support construction schematic diagram;
Fig. 2 is that lightgage steel joist spells architectural schematic fastly in the embodiment of the present invention;
Fig. 3 is the enlarged diagram of A in Fig. 2;
Fig. 4 is keel and hanging piece mounting structure schematic diagram in the embodiment of the present invention;
Fig. 5 is the whole structural schematic diagram for spelling sliding system in middle hanger formula furred ceiling of embodiment of the present invention ground;
Fig. 6 is the structural schematic diagram of structure roof sealing of hole in the embodiment of the present invention.
In figure: 1- structure roof, 2- upper plate main reinforcement, 3- erect ledges, and 4- hangs stud frame, the 5- band horizontal platform sling of peg, 6- band silk braid cylinder, 7- flexible collar, the vertical pull rod of 8-, 9- pull rod end plate, 10- steel plate for sealing water, 11- end plate peg, 12- flexibility every From block, 13- is blocked with label mortar, 14- galvanized steel casing, the zinc-plated threaded screw rod of 15-, 16- nut, 17- steel sleeve local sleeve Silk, 18- movable type hog frame shelf, 19- fixing bolt, 20- hog frame brace, 21- brace opening are boxed out bottom circumferential lamella, and 22- is oblique Bar upper plate, 23- screw rod sliding slot, 24- main joist, 25- secondary joist, the big hanging piece of 26-, 27- sunpender nut, 28- steel plate washer, 29- Lower sunpender, 30- main joist fastening bolt, 31- secondary joist pendant, 32- Thistle board, sunpender part mantle fiber under 33-, 34- system Bar shelves chamber, and 35- tie-rod fastens supporting plate, 36- supporting plate band silk braid cylinder, and 37- supporting plate is to tight screw, 38- structure roof preformed hole, The main haulage cable of 39-, the main haulage cable fixation steel plate of 40-, 41- wirerope are oriented to steel pipe, 42- steel plate preformed hole, 43- steel Plate banking pin, 44- hoist engine, 45- hoist engine regularization bracket, 46- hang a liter balancing stand, the symmetrical secondary haulage cable of 47-, 48- Main traction steel wire rope clamp, 49- regularization suspension hook, 50- is with concrete sealing of hole, the pre-buried sunpender of 51-, 52- lightgage steel joist The whole spelling system in face, the main haulage cable fixing end of 53-, 54- self-tapping screw, 55- inter-tie.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art's every other embodiment obtained belong to what the present invention protected Range.
It will be understood by those skilled in the art that in exposure of the invention, term " longitudinal direction ", " transverse direction ", "upper", The orientation of the instructions such as "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom" "inner", "outside" or position are closed System is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of description of the present invention and simplification of the description, without referring to Show or imply that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore above-mentioned art Language is not considered as limiting the invention.
It is understood that term " one " is interpreted as " at least one " or " one or more ", i.e., in one embodiment, The quantity of one element can be one, and in a further embodiment, the quantity of the element can be it is multiple, term " one " is no It can be interpreted as the limitation to quantity.
Referring to Fig. 1 to Fig. 6, a kind of combined support derrick type furred ceiling is lifted in structure roof, including reinforced combined type Hanging rod structure and combined type sunpender steel joist suspended ceiling system.
The reinforced combined type hanging rod structure, including pre-buried sunpender, pre-buried sunpender ruggedized construction and hog frame brace, institute The upper end for stating pre-buried sunpender is fixed in structure roof, and it is pre- for reinforcing that the pre-buried sunpender ruggedized construction is located at structure roof Bury sunpender;The top of the hog frame brace is connect with pre-buried sunpender ruggedized construction, the lower part of the hog frame brace with it is pre-buried The lower end of sunpender connects;Multiple hog frame braces are symmetrical arranged by center line of pre-buried sunpender.
The combined type sunpender steel joist suspended ceiling system, including lower sunpender (29), inter-tie (55), main joist (24), secondary joist (25), tie-rod shelve chamber (34), big hanging piece (26), Skeleton hanging part (31) and Thistle board (32);Under described Sunpender is equipped with lower sunpender part mantle fiber (33), and supporting plate band silk braid cylinder (36) is arranged on the lower sunpender part mantle fiber (33), Tie-rod fastening supporting plate (35) is connected on supporting plate band silk braid cylinder (36), tie-rod fastening supporting plate (35) is put equipped with tie-rod It sets chamber (34), the tie-rod shelves chamber (34) and tie-rod fastening supporting plate (35) is sleeved on lower sunpender (29), and the tie-rod is tight Gu supporting plate (35) is shelved chamber (34) with tie-rod and fixed by screw, the inter-tie (55) shelves the sky of chamber (34) through tie-rod Chamber;The main joist (24) is connect with lower sunpender (29) by big hanging piece (26), one end of the big hanging piece (26) and lower sunpender (29) it connects, the other end of the big hanging piece (26) is connect with main joist (24);Secondary joist (25) and main joist (24) pass through secondary Skeleton hanging part (31) connection;Be connected with Thistle board (32) on the secondary joist (25), the Thistle board (32) and time Keel (25) are connected by self-tapping screw (54).
The lower end of the pre-buried sunpender is connect with the upper end of lower sunpender (29).
The pre-buried sunpender ruggedized construction includes the horizontal platform sling of band peg, hangs stud frame, vertical pull rod, pull rod end plate, end Plate peg and flexible isolating block, the horizontal platform sling of band peg is located between upper plate main reinforcement (2) and lower roof plate main reinforcement, described pre- The upper end for burying sunpender is connect with the horizontal platform sling of peg, and the horizontal platform sling of band peg is connected by hanging stud frame and upper plate main reinforcement It connects, the both ends with the horizontal platform sling of peg pass through peg and are connected separately with vertical pull rod, and the bottom of the vertical pull rod connects It is connected to pull rod end plate, the pull rod end plate is connect with lower roof plate main reinforcement, and the pull rod end plate is equipped with end plate peg;The reinforcement The top of frame brace is connect with end plate peg.
The lower end of the pre-buried sunpender is arranged with brace opening and boxes out bottom circumferential lamella and mobile hog frame shelf, it is described tiltedly Bar opening boxes out bottom circumferential lamella and mobile hog frame shelf is fixed by fixing bolt, and the movable type hog frame shelf passes through spiral shell Mother is fixed on pre-buried sunpender, is equipped with steel plate washer between the movable type hog frame shelf and nut.
Derrick type furred ceiling ground is whole to spell sliding system, and using structure roof as support frame, including main haulage cable is sliding Rise structure and the symmetrical sliding structure of haulage cable;The sliding structure of main haulage cable includes main haulage cable, master Haulage cable fixation steel plate, hoist engine and hoist engine regularization bracket;Structure roof is pre- there are two setting in the structure roof It boxes out, left side wirerope is equipped in one of structure roof preformed hole and is oriented to steel pipe, is set in another structure roof preformed hole There is right side wirerope guiding steel pipe;The main haulage cable fixation steel plate is located at structure roof upper end;The main traction steel wire Rope one end is connect after passing through left side wirerope guiding steel pipe with main haulage cable fixation steel plate, and the main haulage cable other end is worn It is connect after crossing right side wirerope guiding steel pipe with hoist engine, the hoist engine is mounted on hoist engine regularization bracket, the volume Raise the top that structural slab top plate is arranged in machine regularization bracket;The symmetrical sliding structure of haulage cable includes hanging peaceful weighing apparatus Frame, described hang are evenly equipped with several symmetrical haulage cables, connect on each symmetrical haulage cable on liter balancing stand There is regularization suspension hook;Main haulage cable between the left side wirerope guiding steel pipe and right side wirerope guiding steel pipe connects Hang a liter balancing stand;The regularization suspension hook is for hooking combined type sunpender steel joist suspended ceiling system.
The construction method of combined support derrick type furred ceiling, comprising the following steps:
Step 1: mounting structure roof plate template, pre-buried sunpender is arranged in structure roof template and pre-buried sunpender reinforces knot Structure;
Step 2: with concrete pouring structure roof plate template, after structure roof molding, dismounting structure roof plate template;Institute Stating structure roof, there are structure roof preformed holes;
Step 3: installing hog frame brace, the hog frame brace between pre-buried sunpender and pre-buried sunpender ruggedized construction Top connect with pre-buried sunpender ruggedized construction, the lower part of the hog frame brace is connect with the lower end of pre-buried sunpender;
Step 4: lifting combined type sunpender steel joist suspended ceiling body by the whole sliding system of spelling in derrick type furred ceiling ground System;
Step 5: the lower end of the lower sunpender upper end of combined type sunpender steel joist suspended ceiling system and the pre-buried sunpender Connection;
Step 6: removing, derrick type furred ceiling ground is whole to spell sliding system;
Step 7: structure roof preformed hole is with concrete come sealing of hole.
Specifically, combined support derrick type ceiling construction method includes following construction procedure:
Step 1: structure roof (1) template is installed: carrying out formwork construction, corresponding position structure top to floor structure top plate The installation of plate preformed hole (38) template.
Step 2: auxiliary processing device: auxiliary accessories and device needed for workshop processing screw rod, casing etc. at the construction field (site).
Step 3: assembling reinforcement, the fixed device of pre-buried sunpender monoblock type: after the installation of inspection structure top plate (1) template is errorless, Assembling reinforcement construction is carried out to structure roof (1), and pre-buried sunpender monoblock type fixing end pre-buried structure is constructed.In design requirement position The installation band horizontal platform sling of peg (5) is set, is connected under the band horizontal platform sling of peg (5) at the top of pre-buried sunpender (51), stud frame hangs in upper company (4), downside and pre-buried sunpender two sides, which are set, erects ledges (3), and band silk braid cylinder (6), band silk braid cylinder (6) are set on the outside of pre-buried sunpender (51) Peripheral hardware flexible collar (7);The band horizontal platform sling of peg (5) top and upper plate main reinforcement (2) lower part set steel plate for sealing water (10);Band bolt It follows closely horizontal platform sling (5) two sides to connect vertical pull rod (8) by peg, vertical pull rod (8) bottom connecting rod end plate (9), pull rod It is set on end plate (9) end plate peg (11), sets flexible isolating block (12) on the outside of pull rod end plate (9) and end plate peg (11).
Step 4: casting concrete: after the installation of structure roof (1) template, reinforcing bar help bundle and installation of embedded parts inspection errorless Structure roof (1) concrete pouring construction is carried out, and casting concrete is conserved.
Step 5: derrick type ceiling support is constructed: reaching design requirement to structure roof (1) casting concrete curing strength Afterwards, the symmetrical bilateral counter support construction of derrick type furred ceiling is carried out.Sunpender uses zinc-plated threaded screw rod (15) on the downside of structure roof (1), In zinc-plated threaded screw rod (15) peripheral hardware galvanized steel casing (14);The band horizontal platform sling of peg (5) two sides connect vertical draw by peg Bar (8), vertical pull rod (8) bottom connecting rod end plate (9) set end plate peg (11) on pull rod end plate (9), pull rod end plate (9) It is fixedly connected by screw rod sliding slot (23) with end plate peg (11) with the brace upper plate (22) of hog frame brace (20), is finally used (13) are blocked with label mortar;Hog frame brace (20) lower part bracing diagonal opening is boxed out bottom circumferential lamella (21), and brace opening is boxed out Bottom circumferential lamella (21) covers on zinc-plated threaded screw rod (15), brace opening box out bottom circumferential lamella (21) box out with movable type hog frame put Plate (18) is fixed by fixing bolt (19), and galvanized steel casing (14) local ambient applies steel sleeve part mantle fiber (17), in steel bushing Mobile hog frame shelf (18), galvanized steel casing under mobile hog frame shelf (18) are set in pipe part mantle fiber (17) range (14) housing steel plate washer (28), steel plate washer (28) divide into nut (16).
Step 6: steel joist suspended ceiling system is constructed: carrying out the whole spelling of steel joist suspended ceiling system ground piecemeal as requested Construction, comprising: installation sunpender and inter-tie (55), main joist (24) installation, secondary joist (25) installation, paper stone Cream plate (32) installation.Supporting plate band silk braid cylinder (36) is covered on lower sunpender part mantle fiber (33), is filled on supporting plate band silk braid cylinder (36) Tie-rod fastening supporting plate (35) and tie-rod are shelved chamber (34) and are fixed by supporting plate to tight screw (37), and inter-tie (55) passes through tie-rod Shelve chamber (34) cavity;Big hanging piece (26) suspention main joist (24), big hanging piece (26) are fastened using main joist fastening bolt (30) Main joist (24), big hanging piece (26) top are fastenedly connected lower sunpender (29) by steel plate washer (28) and sunpender nut (27);Secondary dragon Bone (25) is connect with main joist (24) by secondary joist pendant (31), and Thistle board (32), paper stone are connected under secondary joist (25) Cream plate (32) reinforces connection with self-tapping screw (54).
Step 7: installation furred ceiling is whole to spell sliding auxiliary device and the whole sliding construction of spelling of furred ceiling: being reserved on structure roof (1) Perforative structure roof preformed hole (38), structure roof preformed hole (38) is interior to wear wirerope guiding steel pipe (41), on structure top Main haulage cable fixation steel plate (40) is arranged in plate (1) top, and steel is respectively set in main haulage cable fixation steel plate (40) two sides Plate banking pin (43), it is pre- equipped with steel plate that structure roof preformed hole (38) top corresponds to main haulage cable fixation steel plate (40) position It boxes out (42), one end of main haulage cable (39), main haulage cable (39) is fixed at left side steel plate preformed hole (42) Steel pipe (41) are oriented to across left side wirerope, main haulage cable (39) connects under structure roof hangs a liter balancing stand (46), and master leads Draw wirerope (39) and is connected to hoist engine out from right side steel plate preformed hole (42) across right side wirerope guiding steel pipe (41) (44) on, main traction steel wire rope clamp (48) is arranged in right side steel plate preformed hole (42) top, and hoist engine (44) is arranged in hoist engine On regularization bracket (45);
Furred ceiling is whole spell sliding auxiliary device be installed and check it is errorless, and after the completion of the construction of steel joist suspended ceiling system, A liter balancing stand (46) are hung in main haulage cable (39) lower part connection, hang a liter balancing stand (46) and the whole spelling system in lightgage steel joist ground (52) pass through symmetrical haulage cable (47) and regularization suspension hook (49) connection.It opens hoist engine (44) and starts the whole spelling cunning of furred ceiling Construction is risen, turns off hoist engine (44) to predetermined position and opens main traction steel wire rope clamp to lightweight steel joist system is sliding (48), sliding system then is spelled with fixed device fixed ceilings are whole.
Step 8: repeat Step 6: step 7 is constructed, also can different whole ingredient blocks construct simultaneously.
Step 9: the corresponding whole sliding auxiliary device of spelling of furred ceiling is removed, to structure after completing the sliding fixed construction of whole spelling lifting Top plate preformed hole (38) is with same concrete sealing of hole (50).
Specifically, combined support derrick type furred ceiling include: sunpender monoblock type fixing end, the reinforced combined type sunpender in top, The whole sliding system of spelling of combined type sunpender steel joist suspended ceiling system and derrick type furred ceiling ground;Sunpender monoblock type fixing end packet It includes: pre-buried sunpender (51) ruggedized construction, structure roof (1) water sealing structure, pre-buried sunpender (51) shoulder, structure roof (1) Downside sunpender;The reinforced combined type sunpender in top includes: sunpender on the downside of structure roof (1), the connection of hog frame brace (20) top Portion connecting structure under structure, hog frame brace (20);Combined type sunpender steel joist suspended ceiling system include: inter-tie (55) with The connection structure system of lower sunpender (29), main joist (24) hanging piece structure, secondary joist (25) mounting structure;Derrick type furred ceiling ground The whole sliding system of spelling includes: the sliding system of main haulage cable (39), symmetrical the sliding system of haulage cable (47), structure top Plate preformed hole (38) sealing of hole.
The pre-buried sunpender (51) reinforces support construction: the band horizontal platform sling of peg (5) connects pre-buried sunpender (51) below Top is hung stud frame (4) with connecting on the horizontal platform sling of peg (5), and on the downside of the band horizontal platform sling of peg (5) and pre-buried sunpender two sides set frame Stud frame (3), pre-buried sunpender (51) outside set band silk braid cylinder (6), band silk braid cylinder (6) peripheral hardware flexible collar (7).
Described structure roof (1) water sealing structure: the band horizontal platform sling of peg (5) top and top plate main reinforcement (2) lower part are set Steel plate for sealing water (10).
Described pre-buried sunpender (51) shoulder: the band horizontal platform sling of peg (5) two sides connect vertical pull rod by peg (8), vertical pull rod (8) bottom connecting rod end plate (9) sets end plate peg (11) on pull rod end plate (9), pull rod end plate (9) with And flexible isolating block (12) are set on the outside of end plate peg (11).
Sunpender on the downside of the structure roof (1): sunpender uses zinc-plated threaded screw rod (15) on the downside of structure roof (1), Zinc-plated threaded screw rod (15) peripheral hardware galvanized steel casing (14).
Sunpender on the downside of the structure roof (1): sunpender uses zinc-plated threaded screw rod (15) on the downside of structure roof (1), Zinc-plated threaded screw rod (15) peripheral hardware galvanized steel casing (14).
Portion connecting structure on the hog frame brace (20): the band horizontal platform sling of peg (5) two sides are connected perpendicular by peg To pull rod (8), vertical pull rod (8) bottom connecting rod end plate (9) sets end plate peg (11), pull rod end plate on pull rod end plate (9) (9) it is fixedly connected by screw rod sliding slot (23) with end plate peg (11) with the brace upper plate (22) of hog frame brace (20), most (13) are blocked with same label mortar afterwards.
Portion connecting structure under the hog frame brace (20): hog frame brace (20) lower part bracing diagonal opening is boxed out bottom Ring flat-plate (21), brace opening bottom circumferential lamella (21) of boxing out cover on zinc-plated threaded screw rod (15), and brace opening boxes out bottom circumferential lamella (21) Box out with mobile hog frame shelf (18) through fixing bolt (19) fixation, galvanized steel casing (14) local ambient applies steel bushing Pipe part mantle fiber (17) sets mobile hog frame shelf (18), mobile hog frame in steel sleeve part mantle fiber (17) range Galvanized steel casing (14) housing steel plate washer (28) under shelf (18), steel plate washer (28) divide into nut (16).
The connection structure system of the inter-tie (55) and lower sunpender (29): it covers and holds in the palm on lower sunpender part mantle fiber (33) Strip silk braid cylinder (36), supporting plate shelve chamber (34) with dress tie-rod fastening supporting plate (35) and tie-rod on silk braid cylinder (36) and pass through supporting plate pair Tight screw (37) is fixed, and inter-tie (55) passes through tie-rod and shelves chamber (34) cavity.
Described main joist (24) the hanging piece structure: big hanging piece (26) suspention main joist (24), big hanging piece (26) utilize main dragon Bone fastening bolt (30) fastens main joist (24), and big hanging piece (26) top is connected by steel plate washer (28) and sunpender nut (27) fastening Connect lower sunpender (29).
Described secondary joist (25) mounting structure: secondary joist (25) and main joist (24) are connected by secondary joist pendant (31) It connects, connects under secondary joist (25) Thistle board (32), Thistle board (32) reinforces connection with self-tapping screw (54).
Described main haulage cable (39) the sliding system: perforative structure roof preformed hole is reserved in structure roof (1) (38), wirerope guiding steel pipe (41) is worn in structure roof preformed hole (38), and on structure roof (1) top, main traction steel is set Steel plate banking pin (43), structure roof is respectively set in cord fixation steel plate (40), main haulage cable fixation steel plate (40) two sides Preformed hole (38) top corresponds to main haulage cable fixation steel plate (40) position equipped with steel plate preformed hole (42), and in left side, steel plate is pre- It boxes out and fixes one end of main haulage cable (39) at (42), main haulage cable (39) passes through left side wirerope and is oriented to steel pipe (41), main haulage cable (39) connects under structure roof hangs a liter balancing stand (46), and main haulage cable (39) passes through right side steel Cord be oriented to steel pipe (41) from right side steel plate preformed hole (42) come out be connected on hoist engine (44), right side steel plate preformed hole (42) main traction steel wire rope clamp (48) is arranged in top, and hoist engine (44) is arranged on hoist engine regularization bracket (45).
The sliding system of symmetrical secondary haulage cable (47): a liter balancing stand is hung in main haulage cable (39) lower part connection (46), a liter balancing stand (46) and the whole spelling system (52) in lightgage steel joist ground are hung and passes through symmetrical haulage cable (47) and regularization Suspension hook (49) connection.
Described structure roof preformed hole (38) sealing of hole;After the completion of the whole sliding construction of spelling system in derrick type furred ceiling ground, To structure roof preformed hole (38) with same concrete sealing of hole (50).
The present invention is not limited to above-mentioned preferred forms, anyone can show that other are various under the inspiration of the present invention The product of form, however, make any variation in its shape or structure, it is all that there is skill identical or similar to the present application Art scheme, is within the scope of the present invention.

Claims (5)

1. a kind of combined support derrick type furred ceiling, is lifted in structure roof, it is characterised in that: including reinforced combined type sunpender Structure and combined type sunpender steel joist suspended ceiling system;
The reinforced combined type hanging rod structure, including pre-buried sunpender, pre-buried sunpender ruggedized construction and hog frame brace, it is described pre- The upper end for burying sunpender is fixed in structure roof, and the pre-buried sunpender ruggedized construction is located at structure roof for reinforcing pre-buried hang Bar;The top of the hog frame brace is connect with pre-buried sunpender ruggedized construction, the lower part of the hog frame brace and pre-buried sunpender Lower end connection;Multiple hog frame braces are symmetrical arranged by center line of pre-buried sunpender;
The combined type sunpender steel joist suspended ceiling system, including lower sunpender, inter-tie, main joist, secondary joist, tie-rod are shelved Chamber, big hanging piece, Skeleton hanging part and Thistle board;The lower sunpender is equipped with lower sunpender part mantle fiber, the lower sunpender part It is arranged with supporting plate band silk braid cylinder on mantle fiber, tie-rod fastening supporting plate, the tie-rod fastening support are connected on the supporting plate band silk braid cylinder Plate is equipped with tie-rod and shelves chamber, and the tie-rod shelves chamber and tie-rod fastening supporting plate is sleeved on lower sunpender, the tie-rod fastening Supporting plate is shelved chamber with tie-rod and is fixed by screw, and the inter-tie shelves the cavity of chamber through tie-rod;The main joist is under Sunpender is connected by big hanging piece, and one end of the big hanging piece is connect with lower sunpender, and the other end and main joist of the big hanging piece connect It connects;Secondary joist is connect with main joist by secondary joist pendant;Thistle board, the Paper-faced gyp are connected on the secondary joist Plate is connect with secondary joist by self-tapping screw;
The lower end of the pre-buried sunpender is connect with the upper end of lower sunpender.
2. combined support derrick type furred ceiling according to claim 1, it is characterised in that: the pre-buried sunpender ruggedized construction packet It includes the horizontal platform sling of band peg, hang stud frame, vertical pull rod, pull rod end plate, end plate peg and flexible isolating block, the band peg water Between upper plate main reinforcement and lower roof plate main reinforcement, the upper end of the pre-buried sunpender is connect flat platform sling with the horizontal platform sling of peg, The horizontal platform sling of band peg is connect by hanging stud frame with upper plate main reinforcement, and the both ends with the horizontal platform sling of peg pass through Peg is connected separately with vertical pull rod, and the bottom of the vertical pull rod is connected with pull rod end plate, the pull rod end plate and lower roof plate Main reinforcement connection, the pull rod end plate are equipped with end plate peg;The top of the hog frame brace is connect with end plate peg.
3. combined support derrick type furred ceiling according to claim 1, it is characterised in that: the lower end of the pre-buried sunpender covers It boxes out bottom circumferential lamella and mobile hog frame shelf equipped with brace opening, the brace opening is boxed out bottom circumferential lamella and mobile hog frame Shelf is fixed by fixing bolt, and the movable type hog frame shelf is fixed on pre-buried sunpender by nut, the movable type Steel plate washer is equipped between hog frame shelf and nut.
4. combined support derrick type furred ceiling according to claim 1, it is characterised in that: the lower end of the pre-buried sunpender is Zinc-plated threaded screw rod, the zinc-plated threaded screw rod outside are equipped with galvanized steel casing.
5. the construction method of combined support derrick type furred ceiling according to any one of claims 1-4, which is characterized in that packet Include following steps:
Step 1: mounting structure roof plate template, is arranged pre-buried sunpender and pre-buried sunpender ruggedized construction in structure roof template;
Step 2: with concrete pouring structure roof plate template, after structure roof molding, dismounting structure roof plate template;The knot There are structure roof preformed holes for structure top plate;
Step 3: between pre-buried sunpender and pre-buried sunpender ruggedized construction install hog frame brace, the hog frame brace it is upper Portion is connect with pre-buried sunpender ruggedized construction, and the lower part of the hog frame brace is connect with the lower end of pre-buried sunpender;
Step 4: lifting combined type sunpender steel joist suspended ceiling system by the whole sliding system of spelling in derrick type furred ceiling ground;
Derrick type furred ceiling ground is whole to spell sliding system, using structure roof as support frame, including the sliding knot of main haulage cable Structure and the symmetrical sliding structure of haulage cable;
The sliding structure of main haulage cable includes main haulage cable, main haulage cable fixation steel plate, hoist engine and volume Raise machine regularization bracket;It is set in the structure roof there are two structure roof preformed hole, in one of structure roof preformed hole It is oriented to steel pipe equipped with left side wirerope, right side wirerope is equipped in another structure roof preformed hole and is oriented to steel pipe;The master leads Draw wirerope fixation steel plate and is located at structure roof upper end;After described main haulage cable one end passes through left side wirerope guiding steel pipe Connect with main haulage cable fixation steel plate, the main haulage cable other end pass through right side wirerope guiding steel pipe after with hoist engine Connection, the hoist engine are mounted on hoist engine regularization bracket, and the hoist engine regularization bracket is arranged in structural slab top plate Top;The symmetrical sliding structure of haulage cable includes hanging a liter balancing stand, it is described hang be evenly equipped on liter balancing stand it is several Symmetrical haulage cable is connected with regularization suspension hook on each symmetrical haulage cable;The left side wirerope is led A liter balancing stand is hung to the main haulage cable connection between steel pipe and right side wirerope guiding steel pipe;
The regularization suspension hook is for hooking combined type sunpender steel joist suspended ceiling system;
Step 5: the lower sunpender upper end of combined type sunpender steel joist suspended ceiling system and the lower end of the pre-buried sunpender connect It connects;
Step 6: removing, derrick type furred ceiling ground is whole to spell sliding system;
Step 7: structure roof preformed hole is with concrete come sealing of hole.
CN201910027369.4A 2019-01-11 2019-01-11 Combined supporting and hanging rod type suspended ceiling and construction method Active CN109555257B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910027369.4A CN109555257B (en) 2019-01-11 2019-01-11 Combined supporting and hanging rod type suspended ceiling and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910027369.4A CN109555257B (en) 2019-01-11 2019-01-11 Combined supporting and hanging rod type suspended ceiling and construction method

Publications (2)

Publication Number Publication Date
CN109555257A true CN109555257A (en) 2019-04-02
CN109555257B CN109555257B (en) 2020-11-10

Family

ID=65872973

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910027369.4A Active CN109555257B (en) 2019-01-11 2019-01-11 Combined supporting and hanging rod type suspended ceiling and construction method

Country Status (1)

Country Link
CN (1) CN109555257B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110469027A (en) * 2019-08-08 2019-11-19 北京城建六建设集团有限公司 A kind of connecting member system reversely supported for furred ceiling and its construction method
CN112252565A (en) * 2020-10-28 2021-01-22 金螳螂精装科技(苏州)有限公司 Mounting and limiting structure for assembled ceiling acoustic panel
CN114718241A (en) * 2022-04-15 2022-07-08 中建一局集团第三建筑有限公司 Ultrahigh-height hollow slab suspended ceiling structure and construction method
CN116905717A (en) * 2023-06-15 2023-10-20 杭州建工集团有限责任公司 Integral light steel keel suspended ceiling installation construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5325647A (en) * 1992-08-21 1994-07-05 Armstrong World Industries, Inc. Composite ceiling grid
TW201350654A (en) * 2012-06-05 2013-12-16 Usg Interiors Llc Two-piece modular yoke
CN205875496U (en) * 2016-07-29 2017-01-11 中建三局东方装饰设计工程有限公司 Hang steel sheet connection structure
CN107460988A (en) * 2017-08-29 2017-12-12 深圳市建艺装饰集团股份有限公司 A kind of plaster tablet suspended ceiling active anti-cracking structure and construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5325647A (en) * 1992-08-21 1994-07-05 Armstrong World Industries, Inc. Composite ceiling grid
TW201350654A (en) * 2012-06-05 2013-12-16 Usg Interiors Llc Two-piece modular yoke
CN205875496U (en) * 2016-07-29 2017-01-11 中建三局东方装饰设计工程有限公司 Hang steel sheet connection structure
CN107460988A (en) * 2017-08-29 2017-12-12 深圳市建艺装饰集团股份有限公司 A kind of plaster tablet suspended ceiling active anti-cracking structure and construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110469027A (en) * 2019-08-08 2019-11-19 北京城建六建设集团有限公司 A kind of connecting member system reversely supported for furred ceiling and its construction method
CN112252565A (en) * 2020-10-28 2021-01-22 金螳螂精装科技(苏州)有限公司 Mounting and limiting structure for assembled ceiling acoustic panel
CN114718241A (en) * 2022-04-15 2022-07-08 中建一局集团第三建筑有限公司 Ultrahigh-height hollow slab suspended ceiling structure and construction method
CN116905717A (en) * 2023-06-15 2023-10-20 杭州建工集团有限责任公司 Integral light steel keel suspended ceiling installation construction method

Also Published As

Publication number Publication date
CN109555257B (en) 2020-11-10

Similar Documents

Publication Publication Date Title
CN109555257A (en) Combined support derrick type furred ceiling and construction method
CN103523683B (en) Construction method for dismantling tower crane by use of small hoisting equipment
CN101672102A (en) Steel structural overhead ceiling construction platform
CN104746883B (en) A kind of arcuate space truss lifts construction method of installation with three machines
CN104343086B (en) Cable-stayed bridge upper king-post strut steel anchor beam anchoring section little space construction method
CN212689564U (en) Temporary supporting device and temporary supporting structure for floor bearing plate
CN104480863B (en) The steel anchor beam installation and locating method of Cable stayed Bridge Main Tower construction
CN204876547U (en) Big template system of APC shell structure
CN109132843B (en) The installation method of super-section metal bellows in a kind of vertical shaft
CN115538792A (en) Residential building machine installation construction method and structure
CN209873584U (en) Hang basket template and demolish device
CN102733608A (en) Construction method for spray head layer of granulation tower
CN107587711A (en) A kind of regularization assembled overhanging protection canopy and its assembly method
CN209429275U (en) The pre-buried fixed end structure of sunpender monoblock type
CN105776092A (en) Stretching type basket device and construction method thereof
CN204038917U (en) Detachable external hanging type operating platform
CN208981742U (en) A kind of builder's jack for housing construction
CN113445723A (en) Construction platform for mounting overhanging structure curtain wall and mounting method
CN106760464B (en) Elevator shaft operating platform and its construction method
CN209429362U (en) Reinforced combined type hanging rod structure
CN105926915B (en) Grow the construction method for workbench of encorbelmenting in Bailey beam high-altitude
CN220599128U (en) Assembled fixed suspension mechanism of electric hanging basket
CN219260750U (en) Hanging basket for bridge side construction
CN115538678B (en) Construction method for small side surface platform of large-angle overhanging view platform
CN102795558A (en) Method for dismounting tower crane installed by lift well, and mast hanger

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20201014

Address after: 629000 zhuotang Avenue, Penglai Town, Daying County, Suining City, Sichuan Province

Applicant after: SICHUAN YAOSHUN CONSTRUCTION GROUP Co.,Ltd.

Address before: 310003 room 1901, unit 3, 3 Wanda Commercial Center, Gongshu District, Hangzhou, Zhejiang.

Applicant before: HANGZHOU JIANGRUN TECHNOLOGY Ltd.

TA01 Transfer of patent application right