Utility model content
The purpose of this utility model is to overcome the deficiencies in the prior art, there is provided it is a kind of not only easy for installation,
And it is possible to prevente effectively from auto car rear silencer assembly is holding the rear noise elimination of the problem of destroyed during clamping and vibration test
Device assembly vibration tong device.
The technical solution of the utility model is:
A kind of rear muffler assembly vibration tong device, including fixture body frame, the silencer that is arranged on fixture body frame are hung
Hang device and the airduct clamping device for coordinating with the airduct of rear muffler assembly, the silencer erecting by overhang include passing through
The the first rubber shock-absorbing mounting blocks and be arranged on by the second suspension rod on fixture body frame that first suspension rod is arranged on fixture body frame
Second rubber shock-absorbing mounting blocks, the first rubber shock-absorbing mounting blocks are provided with the first hole for hoist, the second rubber shock-absorbing peace
Dress block is provided with the second hole for hoist, and the airduct clamping device includes lower gripping block and the upper clamping being arranged on fixture body frame
Block.
This programme passes through the hole for hoist and rear muffler on the first rubber shock-absorbing mounting blocks and the second rubber shock-absorbing mounting blocks
Mounting rod inserting on assembly coordinates, and then the airduct of rear muffler assembly is consolidated by lower gripping block and upper clamping block
It is fixed, its not only rear muffler assembly it is easy for installation, and rubber shock-absorbing mounting blocks have to be flexible coupling(With buffer capacity),
Thus it is possible to prevente effectively from auto car rear silencer assembly is holding the problem of destroyed during clamping and vibration test.
Preferably, silencer erecting by overhang also includes the first fixed block and the second fixed block, and the first fixed block and
Two fixed blocks are connected by bolt with fixture body frame respectively, and first suspension rod is arranged on the first fixed block, and described second
Suspension rod is arranged on the second fixed block.This programme is easy to the actual installation of grip device, made.
Preferably, the first fixed block is provided with two pieces of first vertical installing plates for down extending and being parallel to each other, it is described
First vertical installing plate is provided with the first connection through hole, and first suspension rod is provided with the first nut of two threaded connections, institute
The first suspension rod is stated through the first connection through hole on two piece of first vertical installing plate, and two piece of first vertical installing plate is positioned at two the
Between one nut, the first suspension rod is fixed on the first vertical installing plate by the first nut check, the first rubber shock-absorbing peace
Block is filled between two first vertical installing plates.This programme is easy to the actual installation of grip device, made.
Preferably, the second fixed block is provided with two pieces of second vertical installing plates for down extending and being parallel to each other, it is described
Second vertical installing plate is provided with the second connection through hole, and second suspension rod is provided with the second nut of two threaded connections, institute
The second suspension rod is stated through the second connection through hole on two piece of second vertical installing plate, and two piece of second vertical installing plate is positioned at two the
Between two nuts, the second suspension rod is fixed on the second vertical installing plate by the second nut check, the second rubber shock-absorbing peace
Block is filled between two second vertical installing plates.This programme is easy to the actual installation of grip device, made.
Preferably, the first connection through hole is the bar hole extended up and down.This programme structure can adjust the first suspension rod
Height and position, so as to adjust the setting height(from bottom) position of rear muffler assembly, rear muffler assembly is set to be in rational position, this is not only
Be advantageous to the vibration test of rear muffler assembly, and the use range of grip device can be improved.
Preferably, the second connection through hole is the bar hole extended up and down.This programme structure can adjust the second suspension rod
Height and position, so as to adjust the setting height(from bottom) position of rear muffler assembly, rear muffler assembly is set to be in rational position, this is not only
Be advantageous to the vibration test of rear muffler assembly, and the use range of grip device can be improved.
Preferably, the first hole for hoist is located at the lower section of the first fixed block, the second hole for hoist is located under the second fixed block
Side.This programme structure is easy to the installation operation of rear muffler assembly.
Preferably, the first suspension rod is one, second suspension rod is two.This programme structure can be few by trying one's best
Suspension rod installs rear muffler assembly, improving installation effectiveness;Meanwhile ensure the mounting stability of rear muffler assembly.
Preferably, the upper surface of lower gripping block is provided with lower clamping groove, and lower clamping groove medial surface is provided with down
Rubber damping layer, the lower surface of the upper clamping block is provided with the upper clamping groove relative with lower clamping groove, and upper clamp is led to
Groove medial surface is provided with upper rubber damping layer.The rubber damping layer of this programme can be played fixed and protected by the airduct of clamping.
Preferably, lower gripping block is bolted with upper clamping block.
Preferably, silencer erecting by overhang is arranged on the top of fixture body frame, the airduct clamping device is arranged on folder
Has the bottom of body frame.
The beneficial effects of the utility model are:With it is easy for installation the characteristics of, and it is possible to prevente effectively from eliminated the noise after automobile
Device assembly is holding the problem of destroyed during clamping and vibration test.
Brief description of the drawings
Fig. 1 is the front view of rear muffler assembly vibration tong device of the present utility model.
Fig. 2 is Fig. 1 side view.
Fig. 3 is that a kind of structure of rear muffler assembly vibration tong device of the present utility model in actual use is shown
It is intended to.
In figure:Fixture body frame 1, lower gripping block 2, lower rubber damping layer 21, upper clamping block 3, upper rubber damping layer 31, first
Fixed block 4, first connects through hole 41, the first suspension rod 5, the first rubber shock-absorbing mounting blocks 6, the first hole for hoist 61, the second fixed block
7th, the second connection through hole 71, the second suspension rod 8, the second rubber shock-absorbing mounting blocks 9, the second hole for hoist 91, muffler ASSY 10, installation
Bar 101, airduct 102.
Embodiment
The utility model is described in further detail with embodiment below in conjunction with the accompanying drawings:
As shown in Figure 1 and Figure 2, a kind of rear muffler assembly vibration tong device includes fixture body frame 1, is arranged on fixture master
Silencer erecting by overhang on frame and the airduct clamping device for coordinating with the airduct of rear muffler assembly.Silencer hanging dress
Put the top for being arranged on fixture body frame.Airduct clamping device is arranged on the bottom of fixture body frame.
Silencer erecting by overhang includes being arranged on fixture by the first fixed block 4, the second fixed block 7, by the first suspension rod 5
The first rubber shock-absorbing mounting blocks 6 on body frame and the second rubber shock-absorbing being arranged on by the second suspension rod 8 on fixture body frame are installed
Block 9.First fixed block is connected by bolt with fixture body frame respectively with the second fixed block.First suspension rod is horizontally disposed with.First
Suspension rod is arranged on the first fixed block.Second suspension rod is horizontally disposed with.Second suspension rod is arranged on the second fixed block.The present embodiment
In:First suspension rod is one, and the second suspension rod is two.
First fixed block is provided with two pieces of first vertical installing plates for down extending and being parallel to each other.First vertical installing plate
It is provided with the first connection through hole 41.First connection through hole is the bar hole extended up and down.First suspension rod is provided with two screw threads and connected
The first nut connect.First suspension rod is through the first connection through hole on two piece of first vertical installing plate, and two piece first is vertically pacified
Loading board is between two first nuts.First suspension rod is fixed on the first vertical installing plate by the first nut check.First rubber
Glue damping mounting blocks are between two first vertical installing plates.First rubber shock-absorbing mounting blocks are provided with the first hole for hoist 61.The
One hole for hoist is located at the lower section of the first fixed block.First hole for hoist is horizontally disposed with.
Second fixed block is provided with two pieces of second vertical installing plates for down extending and being parallel to each other.Second vertical installing plate
It is provided with the second connection through hole 71.Second connection through hole is the bar hole extended up and down.Second suspension rod is provided with two screw threads and connected
Second the second suspension rod of nut connect is through the second connection through hole on two piece of second vertical installing plate, and two piece second is vertically installed
Plate is between two second nuts.Second suspension rod is fixed on the second vertical installing plate by the second nut check.Second rubber
Damping mounting blocks are between two second vertical installing plates.Second rubber shock-absorbing mounting blocks are provided with the second hole for hoist 91.Second
Hole for hoist is located at the lower section of the second fixed block.Second hole for hoist is horizontally disposed with.
Airduct clamping device includes the lower gripping block 2 and upper clamping block 3 being arranged on fixture body frame.Lower gripping block and upper folder
Tight block is bolted.The upper surface of lower gripping block is provided with lower clamping groove, and lower clamping groove medial surface is provided with down
Rubber damping layer 21.The lower surface of upper clamping block is provided with the upper clamping groove relative with lower clamping groove, and upper clamping groove
Medial surface is provided with upper rubber damping layer 31.
The specifically used process of the rear muffler assembly vibration tong device of the present embodiment is as follows:
A the first hole for hoist mounting rod 101 on rear muffler assembly 10 being inserted on the first rubber shock-absorbing mounting blocks
On, another mounting rod on rear muffler assembly is inserted on the second hole for hoist on the second rubber shock-absorbing mounting blocks, after disappear
Two mounting rods having on sound device assembly are the mounting rod that rear muffler assembly carries, and the mounting rod is used to connect rear muffler
Assembly and vehicle body.The airduct 102 of rear muffler assembly is clamped between lower gripping block and upper clamping block, so as to by rear muffler
Assembly clamping is on rear muffler assembly vibration tong device.Rear muffler assembly vibration tong device is fixed on shake table
On, you can carry out the vibration test of rear muffler assembly.