At present, the bathing room of China's overwhelming majority building is all to pour to form using cast-in-place concrete, and this traditional defends
The bathroom process-cycle grow, difficulty is big, maintenance in-convenience in use, use range have some limitations, for this in the market occur
Integral bathroom, general frame that integral bathroom is made up of chassis, wallboard, top cover, and by sanitary ware, bathroom suite, bath screen,
Bathtub, tap, gondola water faucet, ceramic tile accessory etc. are all dissolved into the integrated environment of one, easy to install and use, are used for hotel, doctor
The fields such as institute, ship, fast-assembling room, currently on the market during integral bathroom use, find to have a disadvantage that:First, integral bathroom
Design of Main Structure it is unreasonable, maintenance leak detection is inconvenient, and the water pipe of integral bathroom is all laid in wall, once leak occurs
Or plugging, it will directly pollute periphery wall, and need to knock out back filled region during maintenance, then change pipe and backfill again, construction is extremely difficult,
Even it is also possible to destroy floor;Second, panel structure designs unreasonable, weight weight, carrying and installation is difficult, time-consuming, construction period
Long, difficulty of construction is big, increases cost, and thickness of wall body size is big, and occupancy effective area is more, and cost is high, impracticable;Third, existing bottom
During Pan Chu floor drain co-layer draining, floor drain is placed on chassis surface bottom, if occurring that overall defend can only be dismantled when infiltration or leak
Bath is repaired, very inconvenient, and chassis bill of materials one, lacks composite structured, rigidity, intensity difference, and decoration is more single
One, it is substantially SMC material, it is impossible to meet different requirements.
Utility model content
For the drawbacks described above present in integral bathroom, the utility model provides a kind of agent structure of integral bathroom, tool
Body technique scheme is as follows:
A kind of agent structure of integral bathroom, including ceiling, wallboard, chassis and maintenance passageway, ceiling, wallboard, bottom
Disk assembly and connection is into hollow rectangle bathroom inner chamber, and chassis is provided with floor drain, bathroom inner chamber installation and maintenance passageway, bathroom inner chamber
Inlet/outlet pipe system, which is integrated in maintenance passageway, to be easy to repair.
As a kind of preferred scheme of the present utility model, the wallboard is assembled by polylith combined wall board, combined wall board
Including metal decking, heat-insulating sound-insulating core and connection component, metal decking has two pieces and is spaced, and pacifies between two pieces of metal deckings
Fill heat-insulating sound-insulating core and both ends installation connection component, between combined wall board and combined wall board pass through connection component assembling one.
As a kind of preferred scheme of the present utility model, the connection component includes being separately mounted to metal decking both ends
Spill connection section bar and convex connection section bar, the lug boss of convex connection section bar are matched somebody with somebody with the concave part clamping of spill connection section bar
Close, one is assembled by the mutual cooperation of spill connection section bar and convex connection section bar between combined wall board and combined wall board.
As a kind of preferred scheme of the present utility model, the connection component includes spill connection section bar and cylindricality connecting-type
Material, spill connection section bar have two pieces and are separately mounted to metal decking both ends, and the outline of cylindricality connection section bar is connected with spill
The concave part of section bar is engaged by clamping, and passes through spill connection section bar, cylindricality connection section bar, spill between combined wall board and combined wall board
The mutual cooperation assembling one of connection section bar.
As a kind of preferred scheme of the present utility model, the heat-insulating sound-insulating core is pasted by bonding agent is installed on metal
Panel itself, bonding agent are organic adhesive, inorganic adhesive, and heat-insulating sound-insulating core is made up of incombustible material or nonflammable material.
As a kind of preferred scheme of the present utility model, the thickness of the metal decking is 0.3~1.5mm, metal decking
Material for stainless steel plate, galvanized steel plain sheet, aluminium plating zinc plate, cold-rolled steel sheet, color coated steel sheet, aluminium sheet, metal decking outer surface is provided with
Panel decoration layer, panel decoration layer are PVC, PET, ceramic tile, stone material, glass, mosaic, putty+emulsion paint.
As a kind of preferred scheme of the present utility model, the chassis include chassis body, fixed horizontal adjustment frames and
Floor drain, chassis body is made up of chassis decorative layer from top to down, base layer and grid enhancement layer, positioned at shower area and drying
It is integrally formed fluted at the base layer in area, floor drain is positioned in groove, and filler is installed between floor drain outer wall and groove inner wall
Enrich, be connected horizontal adjustment frames by H connectors below grid enhancement layer.
As a kind of preferred scheme of the present utility model, the chassis decorative layer is ceramic tile or stone material, and base layer is pure Asia
Gram force plate or acrylic composite board, grid enhancement layer are glass-fiber reinforced plastic grille, and base layer passes through glass fibre, tree with grid enhancement layer
Fat bonding one, base layer are integrally formed for molding.
As a kind of preferred scheme of the present utility model, the chassis decorative layer is ceramic tile or stone material, and base layer is metal,
Grid enhancement layer is metallic grid, and base layer is molding or welded shaping.
As a kind of preferred scheme of the present utility model, the decorative layer is fiberglass, and base layer is fiberglass, and grid adds
Strong layer is glass-fiber reinforced plastic grille, and base layer is integrally formed for molding.
The utility model has the advantage of:
(1) agent structure layout designs are reasonable, ceiling, wallboard, chassis stable connection, the inlet/outlet pipe assembly of bathroom inner chamber
It is easy to repair into maintenance passageway, saves space, it is elegant in appearance, leakage pollution periphery wall is prevented, need to only open maintenance folder
Road can repair easily, very convenient without knocking out wall;
(2) wallboard is assembled by connection component by polylith combined wall board, and connection component is spill connection section bar and convex
Connection section bar or spill connection section bar and cylindricality connection section bar, reasonable in design, assembling is easy for installation, time saving quick, can root
Needed according to usable floor area, the size of random assembly composite wall plate, energy-conserving and environment-protective are practical, sound insulation, heat-insulated, watertightness, airtight
Property is good, and use range is wide;
(3) chassis body is made up of decorative layer from top to down, base layer and grid enhancement layer, and layer structure is reasonable, is prevented
Water, weather resistance are good, intensity foot, avoid stress flexural deformation, if Sewer System has seepage is convenient to repair, need to only be split out from groove
Floor drain can repair easily, very convenient without dismantling integral bathroom main body.
Brief description of the drawings
Fig. 1 is schematic perspective view of the present utility model;
Fig. 2 is structure sectional view of the present utility model;
Fig. 3 is the structural representation of combined wall board embodiment one of the present utility model;
Fig. 4 is the structural representation of multiple combined wall board assembling one in Fig. 2;
Fig. 5 is spill connection section bar and convex connection section bar assembling schematic diagram of the present utility model;
Fig. 6 is the structural representation of combined wall board embodiment two of the present utility model;
Fig. 7 is the structural representation of multiple combined wall board assembling one in Fig. 6;
Fig. 8 is spill connection section bar and cylindricality connection section bar assembling schematic diagram of the present utility model;
Fig. 9 is chassis top view of the present utility model;
Figure 10 is the sectional view in A-A directions in Fig. 9;
Figure 11 is the zoomed-in view at I in Figure 10;
Figure 12 is the zoomed-in view at II in Figure 10;
Figure 13 is agent structure top down layout view of the present utility model;
Figure 14 is agent structure main view layout of the present utility model.
In figure, 1-ceiling, 2-wallboard, 21-combined wall board, 22-metal decking, 23-heat-insulating sound-insulating core,
24-spill connection section bar, 25-convex connection section bar, 26-cylindricality connection section bar, 3-chassis, 4-maintenance passageway, 31-
Floor drain, 32-fixation horizontal adjustment frames, 33-chassis decorative layer, 34-base layer, 35-grid enhancement layer, 36-groove,
37-filler, 38-H connectors, the 41-the first drainpipe, the 42-the second drainpipe, 43-threeway drainpipe, 44-closestool
Drain elbow, 45-closestool main sewer, 46-main sewer.
Embodiment
Below in conjunction with the accompanying drawings, specific embodiment of the present utility model is described further:
, it is necessary to explanation in description of the present utility model, term " " center ", " on ", " under ", it is "left", "right", " perpendicular
Directly ", the orientation of the instruction such as " level ", " interior ", " outer " or position relationship are based on orientation shown in the drawings or position relationship, are only
Described for the ease of description the utility model and simplifying, rather than instruction or imply signified position or element must have it is specific
Orientation, with specific azimuth configuration and operation, therefore it is not intended that to limitation of the present utility model.
, it is necessary to which explanation, unless otherwise clearly defined and limited, term " are pacified in description of the present utility model
Dress ", " connected ", " connection " should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or integratedly
Connection;Can be mechanical connection or electrical connection;Can be joined directly together, can also be indirectly connected by intermediary,
It can be the connection of two element internals.For the ordinary skill in the art, it is above-mentioned that concrete condition understanding can be regarded
Concrete meaning of the term in the utility model.
As illustrated in fig. 1 and 2, a kind of agent structure of integral bathroom, including ceiling 1, wallboard 2, chassis 3 and maintenance passageway
4, ceiling 1 is above, and wallboard 2 is located at four the week side of boss, and chassis 3 is located at bottom, ceiling 1, wallboard 2, the assembly and connection of chassis 3 into
Hollow rectangle bathroom inner chamber, ceiling 1, wallboard 2, chassis 3 are each separately mounted on steel skeleton fixed, the front of wallboard 2
Provided with the door entered for people, chassis 3 is provided with floor drain 31, bathroom inner chamber installation and maintenance passageway 4, the inlet/outlet pipe assembly of bathroom inner chamber into
It is easy to repair in maintenance passageway 4.
As shown in Fig. 3~8, wallboard 2 is assembled by polylith combined wall board 21, and monolithic combined wall board 21 includes metal decking
22nd, heat-insulating sound-insulating core 23 and connection component, metal decking 22 have two pieces and are spaced, and single piece of metal panel 22 is Qian shape, and two
Heat-insulating sound-insulating core 23 is installed and both ends installation connection component, two pieces of 22 bent 90 degree of metal deckings between block metal decking 22
Rotary corner plate is made, one is assembled by connection component between combined wall board and combined wall board.
Specifically, the embodiment one of combined wall board 21 is:As shown in figs. 2 to 4, connection component includes being separately mounted to gold
Belong to the spill connection section bar 24 and convex connection section bar 25 at the both ends of panel 22, the lug boss of convex connection section bar 25 is connected with spill
The concave part of section bar 24 is engaged by clamping, and passes through spill connection section bar 24 and convex connection section bar between combined wall board and combined wall board
25 mutual cooperation assembling one.
Specifically, the embodiment two of combined wall board 21 is:As shown in Fig. 5~7, connection component includes spill connection section bar
24 and cylindricality connection section bar 26, spill connection section bar 24 have two pieces and be separately mounted to the both ends of metal decking 22, cylindricality connecting-type
The outline of material 26 is engaged by clamping with the concave part of spill connection section bar 24, is connected between combined wall board and combined wall board by cylindricality
The both ends of direct type material 26 are inserted in the concave part of two pieces of spill connection section bars 24 to connect respectively coordinates assembling one.
It is installed in addition, heat-insulating sound-insulating core 23 is pasted by bonding agent inside metal decking 22, bonding agent is organic viscous
Connect agent, inorganic adhesive, specifically can use polyurethane adhesive, heat-insulating sound-insulating core 23 be bent into it is snakelike, using incombustible material or
Nonflammable material is made, and incombustible material is:Rock wool, glass fibre cotton, aluminium honeycomb, nonflammable material are:Polystyrene foam plate
(EPS), extrusion molding polystyrene polyfoam(XPS), polyurethane thermal insulation board, paper honeycomb, sound insulation, good heat-insulation effect.
Specifically, the material of metal decking 22 is stainless steel plate, galvanized steel plain sheet, aluminium plating zinc plate, cold-rolled steel sheet, color coating steel
Plate, aluminium sheet, thickness are 0.3~1.5mm, and both sides width is 100~1210mm, and two Edge Bend length are 5~50mm. and connection group
Part is made of aluminium alloy or steel plate, good, the stable connection of rigidity, is unlikely to deform and is separated, the concave part tool of spill connection section bar 24
There is certain elasticity to inside contract clamping cylindricality connection section bar 26, convex connection section bar 25.In addition, in order to obtain more preferable vision effect
Fruit, in addition, the outer surface of the metal decking 22 is provided with panel decoration layer, panel decoration deck panels decorative layer is PVC, PET, porcelain
Brick, stone material, glass, mosaic, putty+emulsion paint, are bonded with interfacial agents between decorative layer and metal decking 22, increase is pasted strong
Degree.
As shown in figs. 9 to 12, chassis 3 includes chassis body, fixed horizontal adjustment frames 32 and floor drain 31, floor drain
31 have two to be separately mounted in the shower area and dry section of bathroom inner chamber, in shower area and dry section between be separated by using dividing plate
Open, chassis body is made up of chassis decorative layer 33 from top to down, base layer 34 and grid enhancement layer 35, shower area and dry section
The ground leak of base layer 34 be positioned over integrally formed with groove 36, floor drain 31 in groove 36, between floor drain outer wall and groove inner wall
Filler 37 is installed to enrich, filler 37 be polyurethane foam, is connected water by H connectors 38 below grid enhancement layer 35
The whole framework 32 of Heibei provincial opera, the full-size of floor drain 31 are less than the internal diameter of groove 36, and the activity of floor drain 31 is positioned in groove 36, passes through filling
Thing 4, which enriches, to be fixed, if Sewer System has the convenient maintenance of leakage, only need to open trim splits out floor drain 31 just from groove 36
It can repair easily, it is very convenient without integral demounting chassis.
Specifically, the section of H connectors 38 is H types, and in one end clamping grid enhancement layer 35 of H connectors 38, other end card
Fixed horizontal adjustment frames 32 are connect, quickly grid enhancement layer 35 and fixed horizontal adjustment frames 32 can be integrally connected, fixed water
The whole bottom of framework 32 of Heibei provincial opera is provided with the support feet of adjustable length, and support feet preferably has 4, support feet threaded connection fixed frame
Frame, when the ground inclination of installation is not concordant, manually the length of rotation regulation support feet adapts to the inclination on ground, makes bottom
Disk and ground keep level, people, which tramples up, to be comfortable on.
Specifically, chassis decorative layer 33, base layer 34 and grid enhancement layer 35 are made of multiple material, embodiment 1:Institute
It is ceramic tile or stone material to state chassis decorative layer 33, and base layer 34 is metal, and grid enhancement layer 35 is metallic grid, and base layer 34 is mould
Pressure or welded shaping;Embodiment 2:The chassis decorative layer 33 is fiberglass, and base layer 34 is fiberglass, grid enhancement layer
35 be glass-fiber reinforced plastic grille, and base layer 34 is integrally formed for molding;Embodiment 3:The chassis decorative layer 33 is ceramic tile or stone material, base
Body layer 34 is fiberglass, and grid enhancement layer 35 is glass-fiber reinforced plastic grille, and base layer 34 is integrally formed for molding;Embodiment 4, the bottom
Disk decorative layer 33 is ceramic tile or stone material, and base layer 34 is the pure acrylic board of fiberglass or acrylic composite board, grid enhancement layer 35
For glass-fiber reinforced plastic grille, base layer 34 is molding one by glass fibre, resin bonding one, base layer 34 with grid enhancement layer 35
It is body formed, it is various informative, meet the needs of different users.
As shown in Figs. 13 and 14, the agent structure of integral bathroom also includes water inlet system and drainage system, drainage system bag
Include the first drainpipe 41, the second drainpipe 42, washbowl drainpipe(It is not drawn into), threeway drainpipe 43, closestool drain elbow 44,
Closestool main sewer 45 and main sewer 46, the first drainpipe 41 connect the floor drain 31 of shower area, and the connection of the second drainpipe 42 is dry
The floor drain 31 in dry area, the first drainpipe 41, the second drainpipe 42 are respectively communicated with threeway drainpipe 43, and threeway drainpipe 43 connects always
Drainpipe 46, toilet bowl sewage draining outlet closestool drain elbow 44, closestool drain elbow 44 connect closestool main sewer 45, washed one's face
Basin discharge outlet connects washbowl drainpipe, and washbowl drainpipe, threeway drainpipe 43, closestool drain elbow 44 are installed on maintenance folder
In road, main sewer 46, closestool main sewer 45 communicate to form co-layer draining, dirty mixed flow of giving up, water inlet system include it is total it is cold and hot enter
Water pipe, shower hot water pipe, closestool water inlet pipe and washbowl water inlet pipe, total warm-cold inleting pipe one end are upwardly extended from ceiling top
Portion walks the outside hot water or cold water of pipe connection and plugged into a little, and the other end is arranged in maintenance passageway 4, and shower hot water pipe is embedded in wallboard
Portion connects total warm-cold inleting pipe and used for shower bath, and closestool water inlet pipe connects total warm-cold inleting pipe and used for closestool, washbowl
Water inlet pipe connects total warm-cold inleting pipe and used for closestool washbowl, and taking maintenance passageway 4 apart can be to above-mentioned water inlet system and draining
System carries out maintenance leak detection, very convenient, and above-mentioned piping attachment structure is water inlet system of the present utility model and drainage system
One of which preferred scheme, according to requirements, change number of tubes, size, specification, size etc., it is new should all to belong to this practicality
The protection domain of type.
Above content is to combine specific preferred embodiment further detailed description of the utility model, it is impossible to
Assert that specific implementation of the present utility model is confined to these explanations, for the ordinary skill of the utility model art
For personnel, without departing from the concept of the premise utility, some simple deduction or replace can also be made, should all be regarded
To belong to the scope of protection of the utility model.