- Publication number
- CN107313615A CN107313615A CN201710621294.3A CN201710621294A CN107313615A CN 107313615 A CN107313615 A CN 107313615A CN 201710621294 A CN201710621294 A CN 201710621294A CN 107313615 A CN107313615 A CN 107313615A
- Authority
- CN
- China
- Prior art keywords
- chassis
- section bar
- agent structure
- connection section
- wallboard
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H1/00—Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
- E04H1/12—Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/61—Connections for building structures in general of slab-shaped building elements with each other
- E04B1/6108—Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together
- E04B1/612—Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together by means between frontal surfaces
- E04B1/6125—Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together by means between frontal surfaces with protrusions on the one frontal surface co-operating with recesses in the other frontal surface
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/61—Connections for building structures in general of slab-shaped building elements with each other
- E04B1/6108—Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together
- E04B1/612—Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together by means between frontal surfaces
- E04B1/6145—Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together by means between frontal surfaces with recesses in both frontal surfaces co-operating with an additional connecting element
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C2/00—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
- E04C2/02—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials
- E04C2/26—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials composed of materials covered by two or more of groups E04C2/04, E04C2/08, E04C2/10 or of materials covered by one of these groups with a material not specified in one of the groups
- E04C2/284—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials composed of materials covered by two or more of groups E04C2/04, E04C2/08, E04C2/10 or of materials covered by one of these groups with a material not specified in one of the groups at least one of the materials being insulating
- E04C2/292—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials composed of materials covered by two or more of groups E04C2/04, E04C2/08, E04C2/10 or of materials covered by one of these groups with a material not specified in one of the groups at least one of the materials being insulating composed of insulating material and sheet metal
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H1/00—Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
- E04H1/12—Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
- E04H1/125—Small buildings, arranged in other buildings
- E04H1/1266—Cubicles for dressing; Toilets
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Finishing Walls (AREA)
Abstract
The present invention relates to a kind of agent structure of integral bathroom, including ceiling, wallboard, chassis and maintenance passageway, ceiling, wallboard, chassis assembly and connection is into hollow rectangle bathroom inner chamber, chassis is provided with floor drain, bathroom inner chamber installation and maintenance passageway, agent structure layout designs are reasonable, ceiling, wallboard, chassis stable connection, the inlet/outlet pipe system of bathroom inner chamber, which is integrated in maintenance passageway, is easy to maintenance, save space, it is elegant in appearance, maintenance passageway, which need to only be opened, to repair easily, and wallboard is assembled by connection component by polylith combined wall board, assembling is time saving quick, can be according to usable floor area needs, the size of random assembly composite wall plate, energy-conserving and environment-protective, sound insulation, it is heat-insulated, watertightness, air-tightness is good, chassis stratiform is rational in infrastructure, waterproof, weather resistance is good, intensity foot, avoid stress flexural deformation, if Sewer System has the convenient maintenance of seepage, floor drain only need to be split out from groove can to repair easily, integral bathroom main body need not be dismantled, it is very convenient.
Description
Technical field
The present invention relates to building field, and in particular to a kind of agent structure of integral bathroom.
Background technology
At present, the bathing room of China's overwhelming majority building is all to pour to form using cast-in-place concrete, and this traditional defends
The bathroom process-cycle is long, and difficulty is big, maintenance in-convenience in use, had some limitations using scope, be that this in the market occurs
Integral bathroom, general frame that integral bathroom is made up of chassis, wallboard, top cover, and by sanitary ware, bathroom suite, bath screen,
Bathtub, tap, gondola water faucet, ceramic tile accessory etc. are all dissolved into the integrated environment of one, easy to install and use, are used for hotel, doctor
The fields such as institute, ship, fast-assembling room, currently on the market during integral bathroom use, find to have a disadvantage that:One is integral bathroom
Design of Main Structure it is unreasonable, maintenance leak detection is inconvenient, and the water pipe of integral bathroom is all laid in wall, once occur leak
Or plugging, periphery wall will be directly polluted, needs to knock out back filled region during maintenance, then changes pipe and backfill again, will be constructed extremely difficult,
Even it is also possible to destroy floor;Two be that panel structure designs unreasonable, weight weight, and carrying and installation is difficult, time-consuming, construction period
Long, difficulty of construction is big, increases cost, and thickness of wall body size is big, and occupancy effective area is more, and cost is high, impracticable;Three be existing bottom
During Pan Chu floor drain co-layer draining, floor drain is placed on chassis surface bottom, if occurring that overall defend can only be dismantled when infiltration or leak
Bath is repaired, very inconvenient, and chassis bill of materials one, lacks composite structured, rigidity, intensity difference, is decorated more single
One, it is substantially SMC material, it is impossible to meet different use requirements.
The content of the invention
For the drawbacks described above present in integral bathroom, the present invention provides a kind of agent structure of integral bathroom, specific skill
Art scheme is as follows:
A kind of agent structure of integral bathroom, including ceiling, wallboard, chassis and maintenance passageway, ceiling, wallboard, chassis group
Load is connected into hollow rectangle bathroom inner chamber, and chassis is provided with floor drain, bathroom inner chamber installation and maintenance passageway, the turnover of bathroom inner chamber
Piping, which is integrated in maintenance passageway, is easy to maintenance.
As a preferred embodiment of the present invention, the wallboard is assembled by polylith combined wall board, and combined wall board includes
Metal decking, heat-insulating sound-insulating core and connection component, metal decking have two pieces and are spaced, installed between two pieces of metal deckings every
Connection component is installed at hot sound insulation core and two ends, passes through connection component assembling one between combined wall board and combined wall board.
As a preferred embodiment of the present invention, the connection component includes being separately mounted to the spill at metal decking two ends
Connection section bar and convex connection section bar, the lug boss of convex connection section bar are engaged by clamping with the concave part of spill connection section bar, multiple
Close the mutual cooperation assembling one by spill connection section bar and convex connection section bar between wallboard and combined wall board.
As a preferred embodiment of the present invention, the connection component includes spill connection section bar and cylindricality connection section bar,
Spill connection section bar has two pieces and is separately mounted to metal decking two ends, outline and the spill connection section bar of cylindricality connection section bar
Concave part be engaged by clamping, between combined wall board and combined wall board pass through spill connection section bar, cylindricality connection section bar, spill connect
The mutual cooperation assembling one of section bar.
As a preferred embodiment of the present invention, the heat-insulating sound-insulating core is pasted by bonding agent is installed on metal decking
Inside, bonding agent is organic adhesive, inorganic adhesive, and heat-insulating sound-insulating core is made up of incombustible material or nonflammable material.
As a preferred embodiment of the present invention, the thickness of the metal decking is 0.3~1.5mm, the material of metal decking
Matter is stainless steel plate, galvanized steel plain sheet, aluminium plating zinc plate, cold-rolled steel sheet, color coated steel sheet, aluminium sheet, and metal decking outer surface is provided with panel
Decorative layer, panel decoration layer is PVC, PET, ceramic tile, stone material, glass, mosaic, putty+emulsion paint.
As a preferred embodiment of the present invention, the chassis includes chassis body, fixed horizontal adjustment frames and floor drain,
Chassis body is made up of chassis decorative layer from top to down, base layer and grid enhancement layer, positioned at shower area and the base of dry section
It is integrally formed fluted at body layer, floor drain is positioned in groove, filler is installed between floor drain outer wall and groove inner wall and enriched, lattice
It is connected horizontal adjustment frames by H connectors below grid enhancement layer.
As a preferred embodiment of the present invention, the chassis decorative layer is ceramic tile or stone material, and base layer is pure acrylic
Plate or acrylic composite board, grid enhancement layer are glass-fiber reinforced plastic grille, and base layer is glued with grid enhancement layer by glass fibre, resin
One is connect, base layer is integrally formed for molding.
As a preferred embodiment of the present invention, the chassis decorative layer is ceramic tile or stone material, and base layer is metal, grid
Enhancement layer is metallic grid, and base layer is molding or welded shaping.
As a preferred embodiment of the present invention, the decorative layer is fiberglass, and base layer is fiberglass, grid enhancement layer
For glass-fiber reinforced plastic grille, base layer is integrally formed for molding.
The advantage of the invention is that:
(1) rationally, ceiling, wallboard, chassis stable connection, the inlet/outlet pipe system of bathroom inner chamber are integrated in agent structure layout designs
Maintenance is easy to maintenance in passageway, saves space, elegant in appearance, prevents leakage pollution periphery wall, need to only open maintenance passageway just
It can repair easily, it is very convenient without knocking out wall;
(2) wallboard is assembled by connection component by polylith combined wall board, and connection component is that spill connection section bar and convex are connected
Section bar or spill connection section bar and cylindricality connection section bar, reasonable in design assemble easy for installation, time saving quick, can be according to making
Needed with area, the size of random assembly composite wall plate, energy-conserving and environment-protective are practical, sound insulation, heat-insulated, watertightness, air-tightness are good
It is good, it is wide using scope;
(3) chassis body is made up of decorative layer from top to down, base layer and grid enhancement layer, and layer structure is rationally, waterproof, resistance to
Wait performance good, intensity foot, it is to avoid stress flexural deformation, if Sewer System has the convenient maintenance of seepage, only need to split out floor drain from groove
It can repair easily, it is very convenient without dismantling integral bathroom main body.
Brief description of the drawings
Fig. 1 is the schematic perspective view of the present invention;
Fig. 2 is the structure sectional view of the present invention;
Fig. 3 is the structural representation of the combined wall board embodiment one of the present invention;
Fig. 4 is the structural representation of multiple combined wall board assembling one in Fig. 2;
Fig. 5 is the spill connection section bar and convex connection section bar assembling schematic diagram of the present invention;
Fig. 6 is the structural representation of the combined wall board embodiment two of the present invention;
Fig. 7 is the structural representation of multiple combined wall board assembling one in Fig. 6;
Fig. 8 is the spill connection section bar and cylindricality connection section bar assembling schematic diagram of the present invention;
Fig. 9 is the chassis top view of the present invention;
Figure 10 is the sectional view in A-A directions in Fig. 9;
Figure 11 is the zoomed-in view at I in Figure 10;
Figure 12 is the zoomed-in view at II in Figure 10;
Figure 13 is the agent structure top down layout view of the present invention;
Figure 14 is the agent structure main view layout of the present invention.
In figure, 1-ceiling, 2-wallboard, 21-combined wall board, 22-metal decking, 23-heat-insulating sound-insulating core,
24-spill connection section bar, 25-convex connection section bar, 26-cylindricality connection section bar, 3-chassis, 4-maintenance passageway, 31-
Floor drain, 32-fixation horizontal adjustment frames, 33-chassis decorative layer, 34-base layer, 35-grid enhancement layer, 36-groove,
37-filler, 38-H connectors, the 41-the first drainpipe, the 42-the second drainpipe, 43-threeway drainpipe, 44-closestool
Drain elbow, 45-closestool main sewer, 46-main sewer.
Embodiment
Below in conjunction with the accompanying drawings, the embodiment to the present invention is described further:
In the description of the invention, it is necessary to explanation, term " " center ", " on ", " under ", "left", "right", " vertical ", " water
It is flat ", " interior ", the orientation of the instruction such as " outer " or position relationship for based on orientation shown in the drawings or position relationship, merely to just
In the description present invention and simplify description, rather than indicate or imply signified position or element must have specific orientation, with
Specific azimuth configuration and operation, therefore be not considered as limiting the invention.
In the description of the invention, it is necessary to illustrate, unless otherwise clearly defined and limited, term " installation ", " phase
Even ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected, or be integrally connected;Can
To be mechanical connection or electrical connection;Can be joined directly together, can also be indirectly connected to by intermediary, Ke Yishi
The connection of two element internals.For the ordinary skill in the art, concrete condition can be regarded and understands that above-mentioned term exists
Concrete meaning in the present invention.
As illustrated in fig. 1 and 2, a kind of agent structure of integral bathroom, including ceiling 1, wallboard 2, chassis 3 and maintenance passageway 4, day
Card 1 is above, and wallboard 2 is located at four the week side of boss, and chassis 3 is located at bottom, and ceiling 1, wallboard 2, the assembly and connection of chassis 3 are into hollow
Rectangle bathroom inner chamber, ceiling 1, wallboard 2, chassis 3 are each separately mounted on steel skeleton fixed, and the front of wallboard 2 is provided with
The door entered for people, chassis 3 is provided with floor drain 31, and bathroom inner chamber installation and maintenance passageway 4, the inlet/outlet pipe system of bathroom inner chamber is integrated in dimension
Repair and be easy to maintenance in passageway 4.
As shown in Fig. 3~8, wallboard 2 is assembled by polylith combined wall board 21, and monolithic combined wall board 21 includes metal decking
22nd, heat-insulating sound-insulating core 23 and connection component, metal decking 22 have two pieces and are spaced, and single piece of metal panel 22 is Qian shape, two
Heat-insulating sound-insulating core 23 is installed between block metal decking 22 and connection component, two pieces of 22 bent 90 degree of metal deckings are installed in two ends
Rotary corner plate is made, one is assembled by connection component between combined wall board and combined wall board.
Specifically, the embodiment one of combined wall board 21 is:As shown in figs. 2 to 4, connection component includes being separately mounted to gold
Belong to the spill connection section bar 24 and convex connection section bar 25 at the two ends of panel 22, the lug boss of convex connection section bar 25 is connected with spill
The concave part of section bar 24 is engaged by clamping, and passes through spill connection section bar 24 and convex connection section bar between combined wall board and combined wall board
25 mutual cooperation assembling one.
Specifically, the embodiment two of combined wall board 21 is:As shown in Fig. 5~7, connection component includes spill connection section bar
24 and cylindricality connection section bar 26, spill connection section bar 24 has two pieces and is separately mounted to the two ends of metal decking 22, cylindricality connecting-type
The outline of material 26 is engaged by clamping with the concave part of spill connection section bar 24, is connected between combined wall board and combined wall board by cylindricality
The two ends of direct type material 26, which are inserted to connect in the concave part of two pieces of spill connection section bars 24 respectively, coordinates assembling one.
It is installed in addition, heat-insulating sound-insulating core 23 is pasted by bonding agent inside metal decking 22, bonding agent is organic viscous
Connect agent, inorganic adhesive, specifically can use polyurethane adhesive, heat-insulating sound-insulating core 23 be bent into it is snakelike, using incombustible material or
Nonflammable material is made, and incombustible material is:Rock wool, glass fibre cotton, aluminium honeycomb, nonflammable material is:Polystyrene foam plate
(EPS), extrusion molding polystyrene polyfoam(XPS), polyurethane thermal insulation board, paper honeycomb, sound insulation, good heat-insulation effect.
Specifically, the material of metal decking 22 is stainless steel plate, galvanized steel plain sheet, aluminium plating zinc plate, cold-rolled steel sheet, color coating steel
Plate, aluminium sheet, thickness are 0.3~1.5mm, and both sides width is 100~1210mm, and two Edge Bend length are 5~50mm. and connection group
Part is made of aluminium alloy or steel plate, good, the stable connection of rigidity, is unlikely to deform and is separated, the concave part tool of spill connection section bar 24
There is certain elasticity to inside contract clamping cylindricality connection section bar 26, convex connection section bar 25.In addition, in order to obtain more preferable vision effect
Really, in addition, the outer surface of the metal decking 22 is provided with panel decoration layer, panel decoration deck panels decorative layer is PVC, PET, porcelain
Brick, stone material, glass, mosaic, putty+emulsion paint, are bonded with interfacial agents between decorative layer and metal decking 22, increase is pasted strong
Degree.
As shown in figs. 9 to 12, chassis 3 includes chassis body, fixed horizontal adjustment frames 32 and floor drain 31, floor drain
31 have two to be separately mounted in the shower area and dry section of bathroom inner chamber, in shower area and dry section between be separated by using dividing plate
Open, chassis body is made up of chassis decorative layer 33 from top to down, base layer 34 and grid enhancement layer 35, shower area and dry section
The ground leak of base layer 34 integrally formed with groove 36, floor drain 31 is positioned in groove 36, between floor drain outer wall and groove inner wall
Filler 37 is installed to enrich, filler 37 is polyurethane foam, the lower section of grid enhancement layer 35 is connected water by H connectors 38
The whole framework 32 of Heibei provincial opera, the full-size of floor drain 31 is less than the internal diameter of groove 36, and the activity of floor drain 31 is positioned in groove 36, passes through filling
Thing 4, which enriches, to be fixed, if Sewer System has the convenient maintenance of leakage, only need to open trim splits out floor drain 31 just from groove 36
It can repair easily, it is very convenient without integral demounting chassis.
Specifically, the section of H connectors 38 is H types, and in one end clamping grid enhancement layer 35 of H connectors 38, other end card
Fixed horizontal adjustment frames 32 are connect, quickly grid enhancement layer 35 and fixed horizontal adjustment frames 32 can be integrally connected, fixed water
The whole bottom of framework 32 of Heibei provincial opera is provided with the support feet of adjustable length, and support feet preferably has 4, support feet threaded connection fixed frame
Frame, when the ground inclination of installation is not concordant, manually rotation adjusts the length of support feet to adapt to the inclination on ground, makes bottom
Disk keeps level with ground, and people, which tramples up, to be comfortable on.
Specifically, chassis decorative layer 33, base layer 34 and grid enhancement layer 35 are made of multiple material, embodiment 1:Institute
Chassis decorative layer 33 is stated for ceramic tile or stone material, base layer 34 is metal, grid enhancement layer 35 is metallic grid, and base layer 34 is mould
Pressure or welded shaping;Embodiment 2:The chassis decorative layer 33 is fiberglass, and base layer 34 is fiberglass, grid enhancement layer
35 be glass-fiber reinforced plastic grille, and base layer 34 is integrally formed for molding;Embodiment 3:The chassis decorative layer 33 is ceramic tile or stone material, base
Body layer 34 is fiberglass, and grid enhancement layer 35 is glass-fiber reinforced plastic grille, and base layer 34 is integrally formed for molding;Embodiment 4, the bottom
Disk decorative layer 33 is ceramic tile or stone material, and base layer 34 is the pure acrylic board of fiberglass or acrylic composite board, grid enhancement layer 35
For glass-fiber reinforced plastic grille, base layer 34 is with grid enhancement layer 35 by glass fibre, resin bonding one, and base layer 34 is molding one
It is body formed, it is various informative, meet the needs of different users.
As shown in Figs. 13 and 14, the agent structure of integral bathroom also includes water inlet system and drainage system, drainage system bag
Include the first drainpipe 41, the second drainpipe 42, washbowl drainpipe(It is not drawn into), threeway drainpipe 43, closestool drain elbow 44,
Closestool main sewer 45 and main sewer 46, the first drainpipe 41 connect the floor drain 31 of shower area, and the connection of the second drainpipe 42 is dry
The floor drain 31 in dry area, the first drainpipe 41, the second drainpipe 42 are respectively communicated with threeway drainpipe 43, and threeway drainpipe 43 is connected always
Drainpipe 46, toilet bowl sewage draining outlet closestool drain elbow 44, the connection closestool of closestool drain elbow 44 main sewer 45 washes one's face
Basin discharge outlet connects washbowl drainpipe, and washbowl drainpipe, threeway drainpipe 43, closestool drain elbow 44 are installed on maintenance folder
In road, main sewer 46, closestool main sewer 45 communicate to form co-layer draining, dirt mixed flow of giving up, water inlet system include it is total it is cold and hot enter
Water pipe, shower hot water pipe, closestool water inlet pipe and washbowl water inlet pipe, total warm-cold inleting pipe one end is upwardly extended from ceiling top
Portion walks the outside hot water or cold water of pipe connection and plugged into a little, and the other end is arranged in maintenance passageway 4, and shower hot water pipe is embedded in wallboard
Portion connects total warm-cold inleting pipe and used for shower bath, and closestool water inlet pipe connects total warm-cold inleting pipe and used for closestool, washbowl
Water inlet pipe connects total warm-cold inleting pipe and used for closestool washbowl, and taking maintenance passageway 4 apart can be to above-mentioned water inlet system and draining
System carry out maintenance leak detection, it is very convenient, above-mentioned piping attachment structure for the present invention water inlet system and drainage system wherein
A kind of preferred scheme, according to requirements, changes number of tubes, size, specification, size etc., should all belong to the protection of the present invention
Scope.
Above content is to combine specific preferred embodiment further description made for the present invention, it is impossible to assert
The specific implementation of the present invention is confined to these explanations, for general technical staff of the technical field of the invention,
On the premise of not departing from present inventive concept, some simple deduction or replace can also be made, should all be considered as belonging to the present invention's
Protection domain.
Claims (10)
1. a kind of agent structure of integral bathroom, it is characterised in that:Including ceiling, wallboard, chassis and maintenance passageway, smallpox
Plate, wallboard, chassis assembly and connection are into hollow rectangle bathroom inner chamber, and chassis is provided with floor drain, bathroom inner chamber installation and maintenance passageway,
The water inlet pipe and water outlet pipe system of bathroom inner chamber, which is integrated in maintenance passageway, is easy to maintenance.
2. a kind of agent structure of integral bathroom according to claim 1, it is characterised in that:The wallboard is combined by polylith
Wallboard is assembled, and combined wall board includes metal decking, heat-insulating sound-insulating core and connection component, and metal decking has two pieces and is separated by
Open, heat-insulating sound-insulating core and two ends are installed between two pieces of metal deckings connection component is installed, between combined wall board and combined wall board
One is assembled by connection component.
3. a kind of agent structure of integral bathroom according to claim 2, it is characterised in that:The connection component includes dividing
Not An Zhuan metal decking two ends spill connection section bar and convex connection section bar, the lug boss of convex connection section bar connects with spill
The concave part of direct type material is engaged by clamping, and passes through spill connection section bar and convex connection section bar between combined wall board and combined wall board
Cooperate assembling one.
4. a kind of agent structure of integral bathroom according to claim 2, it is characterised in that:The connection component includes recessed
Shape connection section bar and cylindricality connection section bar, spill connection section bar have two pieces and are separately mounted to metal decking two ends, cylindricality connection
The outline of section bar is engaged by clamping with the concave part of spill connection section bar, is connected between combined wall board and combined wall board by spill
Section bar, cylindricality connection section bar, the mutual cooperation assembling one of spill connection section bar.
5. a kind of agent structure of integral bathroom according to claim 2, it is characterised in that:The heat-insulating sound-insulating core leads to
Cross bonding agent and paste and be installed on inside metal decking, bonding agent is organic adhesive, inorganic adhesive, and heat-insulating sound-insulating core is not
Combustible material or nonflammable material are made.
6. a kind of agent structure of integral bathroom according to claim 2, it is characterised in that:The thickness of the metal decking
For 0.3~1.5mm, the material of metal decking is stainless steel plate, galvanized steel plain sheet, aluminium plating zinc plate, cold-rolled steel sheet, color coated steel sheet, aluminium
Plate, metal decking outer surface is provided with panel decoration layer, and panel decoration layer is PVC, PET, ceramic tile, stone material, glass, mosaic, greasy
Son+emulsion paint.
7. a kind of agent structure of integral bathroom according to claim 1, it is characterised in that:The chassis includes chassis sheet
Body, fixed horizontal adjustment frames and floor drain, chassis body is by chassis decorative layer from top to down, base layer and grid enhancement layer
Composition, is integrally formed fluted at the base layer of shower area and dry section, and floor drain is positioned in groove, floor drain outer wall with it is recessed
Filler is installed between groove inwall to enrich, is connected horizontal adjustment frames by H connectors below grid enhancement layer.
8. a kind of agent structure of integral bathroom according to claim 7, it is characterised in that:The chassis decorative layer is porcelain
Brick or stone material, base layer are pure acrylic board or acrylic composite board, and grid enhancement layer is glass-fiber reinforced plastic grille, base layer and grid
Enhancement layer is integrally formed by glass fibre, resin bonding one, base layer for molding.
9. a kind of agent structure of integral bathroom according to claim 7, it is characterised in that:The chassis decorative layer is porcelain
Brick or stone material, base layer are metal, and grid enhancement layer is metallic grid, and base layer is molding or welded shaping.
10. a kind of agent structure of integral bathroom according to claim 7, it is characterised in that:The decorative layer is glass
Steel, base layer is fiberglass, and grid enhancement layer is glass-fiber reinforced plastic grille, and base layer is integrally formed for molding.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710621294.3A CN107313615A (en) | 2017-07-27 | 2017-07-27 | A kind of agent structure of integral bathroom |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710621294.3A CN107313615A (en) | 2017-07-27 | 2017-07-27 | A kind of agent structure of integral bathroom |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107313615A true CN107313615A (en) | 2017-11-03 |
Family
ID=60169829
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710621294.3A Pending CN107313615A (en) | 2017-07-27 | 2017-07-27 | A kind of agent structure of integral bathroom |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107313615A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109171520A (en) * | 2018-08-31 | 2019-01-11 | 宁波联城住工科技有限公司 | Artificial quartz stone bathroom chassis and its manufacturing method |
CN109853776A (en) * | 2019-03-22 | 2019-06-07 | 华科住宅工业(东莞)有限公司 | Composite high-molecular wallboard, assembled integral vacuum toilet main body and its manufacture craft |
CN113914674A (en) * | 2021-11-04 | 2022-01-11 | 北京世纪天创智业系统集成技术有限公司 | Plate composite bathroom integrated module |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2414717Y (en) * | 2000-03-16 | 2001-01-17 | 海尔集团公司 | Waterproof tray for bathroom |
CN102409870A (en) * | 2010-09-21 | 2012-04-11 | 苏州科逸住宅设备股份有限公司 | Dual-layer chassis of whole bathroom |
CN202279214U (en) * | 2011-09-26 | 2012-06-20 | 华南建材(深圳)有限公司 | Fire-resistant and sound-proof wall board |
CN204571081U (en) * | 2015-02-06 | 2015-08-19 | 华南建材(深圳)有限公司 | Integral bathroom wallboard |
CN204645720U (en) * | 2015-03-31 | 2015-09-16 | 中民筑友有限公司 | A kind of integral bathroom |
CN206189914U (en) * | 2016-09-29 | 2017-05-24 | 中民筑友科技投资有限公司 | Bathroom room |
CN206942232U (en) * | 2017-07-27 | 2018-01-30 | 华科住宅工业(东莞)有限公司 | A kind of agent structure of integral bathroom |
-
2017
- 2017-07-27 CN CN201710621294.3A patent/CN107313615A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2414717Y (en) * | 2000-03-16 | 2001-01-17 | 海尔集团公司 | Waterproof tray for bathroom |
CN102409870A (en) * | 2010-09-21 | 2012-04-11 | 苏州科逸住宅设备股份有限公司 | Dual-layer chassis of whole bathroom |
CN202279214U (en) * | 2011-09-26 | 2012-06-20 | 华南建材(深圳)有限公司 | Fire-resistant and sound-proof wall board |
CN204571081U (en) * | 2015-02-06 | 2015-08-19 | 华南建材(深圳)有限公司 | Integral bathroom wallboard |
CN204645720U (en) * | 2015-03-31 | 2015-09-16 | 中民筑友有限公司 | A kind of integral bathroom |
CN206189914U (en) * | 2016-09-29 | 2017-05-24 | 中民筑友科技投资有限公司 | Bathroom room |
CN206942232U (en) * | 2017-07-27 | 2018-01-30 | 华科住宅工业(东莞)有限公司 | A kind of agent structure of integral bathroom |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109171520A (en) * | 2018-08-31 | 2019-01-11 | 宁波联城住工科技有限公司 | Artificial quartz stone bathroom chassis and its manufacturing method |
CN109853776A (en) * | 2019-03-22 | 2019-06-07 | 华科住宅工业(东莞)有限公司 | Composite high-molecular wallboard, assembled integral vacuum toilet main body and its manufacture craft |
CN113914674A (en) * | 2021-11-04 | 2022-01-11 | 北京世纪天创智业系统集成技术有限公司 | Plate composite bathroom integrated module |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107313615A (en) | A kind of agent structure of integral bathroom | |
CN206942232U (en) | A kind of agent structure of integral bathroom | |
KR200430527Y1 (en) | Prefabricated wall for bathroom having shelf | |
CN204531496U (en) | A kind of integral bathroom | |
CN204645720U (en) | A kind of integral bathroom | |
CN104712152A (en) | Unit bathroom | |
CN210263531U (en) | Waterproof ALC panel | |
CN208168445U (en) | Assembled integral vacuum toilet | |
CN111321864A (en) | Whole bathroom is with concatenation formula ceramic tile | |
CN206189914U (en) | Bathroom room | |
CN206189916U (en) | Bathroom room | |
CN206189908U (en) | Bathroom room | |
CN206189909U (en) | Bathroom room | |
CN204492243U (en) | A kind of integral bathroom | |
CN206329067U (en) | A kind of bathing room | |
CN204492250U (en) | A kind of integral bathroom | |
CN104763176A (en) | Integrated bathroom | |
CN207392511U (en) | A kind of assembled toilet wall suitable for cold hot water piping concealed installation | |
CN204510912U (en) | A kind of integral bathroom | |
CN204510897U (en) | A kind of integral bathroom | |
CN204510907U (en) | A kind of integral bathroom | |
CN204510909U (en) | A kind of integral bathroom | |
CN204510911U (en) | A kind of integral bathroom | |
CN204626540U (en) | A kind of integral bathroom | |
CN204627034U (en) | A kind of integral bathroom |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |