CN202164787U - Three-functional separation sanitary intermediate system and drainage system thereof - Google Patents

Three-functional separation sanitary intermediate system and drainage system thereof Download PDF

Info

Publication number
CN202164787U
CN202164787U CN 201120227296 CN201120227296U CN202164787U CN 202164787 U CN202164787 U CN 202164787U CN 201120227296 CN201120227296 CN 201120227296 CN 201120227296 U CN201120227296 U CN 201120227296U CN 202164787 U CN202164787 U CN 202164787U
Authority
CN
China
Prior art keywords
floor
bathroom
face
toilet
drainage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201120227296
Other languages
Chinese (zh)
Inventor
富笑玮
梅晓丽
万忠
薛刚
杜立军
赵春颖
丁小辰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Engineering Corp Ltd CSCEC
China Construction First Group Corp Ltd
Third Construction Co Ltd of China Construction First Group Co Ltd
Original Assignee
China Construction First Group Corp Ltd
Third Construction Co Ltd of China Construction First Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, Third Construction Co Ltd of China Construction First Group Co Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN 201120227296 priority Critical patent/CN202164787U/en
Application granted granted Critical
Publication of CN202164787U publication Critical patent/CN202164787U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Residential Or Office Buildings (AREA)
  • Floor Finish (AREA)
  • Sink And Installation For Waste Water (AREA)

Abstract

The utility model relates to a function trisection health intermediate system and drainage system thereof, seamless concatenation is carried out after the floor of toilet system, face toilet floor and bathroom floor independently set up respectively, and wherein bathtub and bathroom floor compression molding in the bathroom are as an organic whole, and the bathroom floor is lower than other room floor top surfaces, and all prop up the bolt support post between floor and the face toilet floor and the bathroom floor, bathroom floor and face toilet floor top surface parallel and level form the built-up layer between floor layer and the floor, and its drainage system connecting pipe and drainage are violently managed and are all set up at the built-up layer, and the drainage riser sets up in open air public pipe well, and it installs catchment separator in floor position department, and the play water end that the drainage was violently managed is connected with catchment separator's port. The utility model discloses the bathroom is regional need not be water repellent, cancels floor drain, waterproof layer, realizes that the board is gone up the drainage, and the pipeline maintenance need not enter the household. Can be widely applied to the toilets and drainage systems of the houses.

Description

Function three separation washroom system and drainage systems thereof
Technical field
The utility model relates to a kind of washroom system and drainage system thereof.
Background technology
Existing washroom generally all is that lavatory, face-washing chamber and bathing are arranged in the space simultaneously; Floor and floor directly are adjacent to; Based on the said structure form, drainage system often adopts draining under the plate, just in case leak; Or repair issues all can bring disaster to resident family downstairs, and the noise of draining simultaneously also is one of problem of puzzlement user.In addition because the utensil in the washroom basically all separates setting with the washroom base plate; Arrange thin excess surface water through floor drain being set and doing the accomodation ground waterproof; And if this way toilet ventilation condition is not fine; Often cause washroom internal return flavor, waterproofing course is very easily damaged in addition, brings very big life trouble often for after the breakage user of lower floor.
The utility model content
The purpose of the utility model provides a kind of function three separation washroom system and drainage systems thereof, solve the washroom and return flavor easily, the technical problem that waterproofing course is damaged easily; And solution toilet drainage system maintenance need be registered one's residence easy interactional problem between the levels.
For realizing above-mentioned purpose, the utility model adopts following technical scheme:
A kind of function three separation washroom systems; The functional space of enclosing for body of wall and bathroom floor; Be provided with toilet, face-washing chamber and bathroom in it, carry out seamless splicedly after said toilet floor, face-washing chamber floor and bathroom floor independently are provided with respectively, wherein bathtub in the bathroom and bathroom floor compression molding are one; Said bathroom floor is lower than other room floor end face; All prop up the top fastening bolt support column between said toilet floor and face-washing chamber floor and the bathroom floor, said bathroom floor is concordant with face-washing chamber ground plate top surface with the toilet floor, forms Stilt layer between said toilet floor, face-washing chamber floor and bathroom floor and the bathroom floor.
Said toilet floor and face-washing chamber floor are the thick high density bearing plate of 25mm.
The height of said Stilt layer is 180-200mm.
The drainage system of described three separation washroom systems; Comprise tube connector, dewatering horizontal tube and soil stack, said tube connector one end is communicated with the delivery port of sanitary apparatus, and the other end is communicated with dewatering horizontal tube; Said tube connector and dewatering horizontal tube all are arranged on Stilt layer; Said soil stack is arranged in the outdoor public pipe well, and it is equipped with the eliminator that catchments at the floor position place, and the water side of said dewatering horizontal tube is connected with the port of the eliminator that catchments.
Said dewatering horizontal tube and soil stack are the super-silent gutter of polypropylene.
Compared with prior art the utlity model has following characteristics and beneficial effect:
The utility model is seamless spliced through carrying out after toilet floor, face-washing chamber floor and bathroom floor independently are provided with respectively; Wherein bathtub in the bathroom and bathroom floor compression molding are one; The bathtub in bathroom and bathroom floor compression molding are one; Make toilet area need not do waterproofing work, cancellation floor drain, waterproofing course have also been removed broken envelope from and have been returned the influence of flavor.
The said toilet drainage of the utility model system, all soil stacks all concentrate on same public pipe well outlet, and public pipe well is located in the outdoor public domain, has realized keeping in repair and need not register one's residence, and has avoided the interference of maintenance to resident family of lower floor.
In the utility model through the Stilt layer between floor and the floor is set in the washroom system, thereby realize water discharge technology on the same floor plate of drainage system, avoided the phase mutual interference of two family house, be convenient to maintenance.
Dewatering horizontal tube and soil stack are the super-silent gutter of polypropylene in the utility model, have reduced in the washroom use, and influence of noise has each other improved dwelling environment and comfort level.
The utility model can be widely used in the washroom and the drainage system thereof of dwelling house.
Description of drawings
Below in conjunction with accompanying drawing the utility model is done further detailed explanation.
Fig. 1 is the utility model structural representation.
Fig. 2 is the utility model outdoor drainage part detail drawing.
Reference numeral: 1-toilet, 2-face-washing chamber, 3-bathroom, 4-bathroom floor, 5-face-washing chamber floor, other room floor of 6-, 7-toilet floor, 8-bathtub, 9-Stilt layer, 10-bolt support column, 11-bathroom floor, 12-body of wall, 13-tube connector, 14-dewatering horizontal tube, 15-soil stack, the public pipe well of 16-, the 17-eliminator that catchments.
The specific embodiment
Embodiment is referring to shown in Figure 1; A kind of function three separation washroom systems; The functional space of enclosing for body of wall 12 and bathroom floor 4; Be provided with toilet 1, face-washing chamber 2 and bathroom 3 in it, it is characterized in that: carry out seamless splicedly after said toilet floor 7, face-washing chamber floor 5 and bathroom floor 11 independently are provided with respectively, wherein the bathtubs in the bathroom 38 are one with bathroom floor 11 compression moldings; Said bathroom floor 4 is lower than other room floor 6 end faces; All prop up top fastening bolt support column 10 between said toilet floor 7 and face-washing chamber floor 5 and the bathroom floor 4, said bathroom floor 11 is concordant with face-washing chamber floor 5 end faces with toilet floor 7, forms Stilt layer 9 between said toilet floor 7, face-washing chamber floor 5 and bathroom floor 11 and the bathroom floor 4.
Said toilet floor 7 is the thick high density bearing plate of 25mm with face-washing chamber floor 5.
The height of said Stilt layer 9 is 180-200mm.
The drainage system of described three separation washroom systems; Referring to Fig. 1 and Fig. 2; Comprise tube connector 13, dewatering horizontal tube 14 and soil stack 15, said tube connector 13 1 ends are communicated with the delivery port of sanitary apparatus, and the other end is communicated with dewatering horizontal tube 14; Said tube connector 13 all is arranged on Stilt layer 9 with dewatering horizontal tube 14; Said soil stack 15 is arranged in the outdoor public pipe well 16, and it is equipped with the eliminator 17 that catchments at the floor position place, and the water side of said dewatering horizontal tube 14 is connected with the port of the eliminator 17 that catchments.Said sanitary apparatus refers to the lavatory in the washroom system, wash basin and bathtub.
Said dewatering horizontal tube and soil stack are the super-silent gutter of polypropylene.
The utility model is in the process of using; The material characteristics of assembling integral bathroom in also capable of using; Each spare and accessory parts with interior assembling integral bathroom: base plate, wallboard, ceiling, bathtub, lighting, ventilation fan, water nozzle, towel rail, bath towel holder, upper and lower conduit line etc. are used screw, the supporting installation of adhesive.Dewatering installation adopts funnel structure, and one is installed on the bath base, and one is installed on the floor.Middle with the flexible pipe connection, guarantee the draining sealing.
The eliminator 17 that catchments can connect the above dewatering horizontal tube in two families or two families simultaneously.

Claims (5)

1. function three separation washroom systems; The functional space of enclosing for body of wall (12) and bathroom floor (4); Be provided with toilet (1), face-washing chamber (2) and bathroom (3) in it; It is characterized in that: carry out seamless spliced after said toilet floor (7), face-washing chamber floor (5) and bathroom floor (11) independently are provided with respectively; Wherein the bathtub (8) in bathroom (3) is an one with bathroom floor (11) compression molding; Said bathroom floor (4) is lower than other room floor (6) end face; All prop up top fastening bolt support column (10) between said toilet floor (7) and face-washing chamber floor (5) and the bathroom floor (4), said bathroom floor (11) is concordant with face-washing chamber floor (5) end face with toilet floor (7), forms Stilt layer (9) between said toilet floor (7), face-washing chamber floor (5) and bathroom floor (11) and the bathroom floor (4).
2. function three separation washroom system gas according to claim 1 are characterised in that: said toilet floor (7) and face-washing chamber floor (5) are the thick high density bearing plate of 25mm.
3. function three separation washroom system gas according to claim 1 are characterised in that: the height of said Stilt layer (9) is 180mm-200mm.
4. drainage system that is used for the described three separation washroom systems of claim 1~3; Comprise tube connector (13), dewatering horizontal tube (14) and soil stack (15); It is characterized in that: said tube connector (13) one ends are communicated with the delivery port of sanitary apparatus; The other end is communicated with dewatering horizontal tube (14), and said tube connector (13) and dewatering horizontal tube (14) all are arranged on Stilt layer (9), and said soil stack (15) is arranged in the outdoor public pipe well (16); It is equipped with the eliminator that catchments (17) at the floor position place, the water side of said dewatering horizontal tube (14) is connected with the port of the eliminator that catchments (17).
5. the drainage system of three separation washroom systems according to claim 4 is characterized in that: said dewatering horizontal tube and soil stack are the super-silent gutter of polypropylene.
CN 201120227296 2011-06-30 2011-06-30 Three-functional separation sanitary intermediate system and drainage system thereof Expired - Fee Related CN202164787U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120227296 CN202164787U (en) 2011-06-30 2011-06-30 Three-functional separation sanitary intermediate system and drainage system thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120227296 CN202164787U (en) 2011-06-30 2011-06-30 Three-functional separation sanitary intermediate system and drainage system thereof

Publications (1)

Publication Number Publication Date
CN202164787U true CN202164787U (en) 2012-03-14

Family

ID=45800623

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120227296 Expired - Fee Related CN202164787U (en) 2011-06-30 2011-06-30 Three-functional separation sanitary intermediate system and drainage system thereof

Country Status (1)

Country Link
CN (1) CN202164787U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103291089A (en) * 2013-06-05 2013-09-11 张家港市盛港绿色防火建材有限公司 Integrated toilet
CN103485509A (en) * 2013-10-10 2014-01-01 北京首钢建设集团有限公司 Waterproof structure manufacturing method of caisson-type toilet
CN110337517A (en) * 2017-02-24 2019-10-15 株式会社普利司通 Drain structure and siphon drainge system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103291089A (en) * 2013-06-05 2013-09-11 张家港市盛港绿色防火建材有限公司 Integrated toilet
CN103485509A (en) * 2013-10-10 2014-01-01 北京首钢建设集团有限公司 Waterproof structure manufacturing method of caisson-type toilet
CN110337517A (en) * 2017-02-24 2019-10-15 株式会社普利司通 Drain structure and siphon drainge system
CN110337517B (en) * 2017-02-24 2021-03-12 株式会社普利司通 Drainage structure and siphon drainage system

Similar Documents

Publication Publication Date Title
CN100497848C (en) Kitchen-toilet modularized same floor water feeding and draining device
CN202164787U (en) Three-functional separation sanitary intermediate system and drainage system thereof
CN216380401U (en) Integrated bathroom waterproof construction
CN205296314U (en) Water drainage system on same floor
CN201474021U (en) Shower wastewater collector
CN202990036U (en) Connecting piece special for ventilation of high-rise buildings
CN203080622U (en) Bath cabinet type household water-saving device
CN204252576U (en) Concealed type integral bathroom system
CN103015496B (en) Special connector for ventilation of high-rise building
CN202644666U (en) Sanitation combination tool
CN204960228U (en) Integrated bathroom bottom plate
CN204849935U (en) Bathroom is with layer drainage water saving fixtures that catchment
CN210482526U (en) Same-floor type floor drainage device for toilet without lowering floor
CN211080429U (en) Novel toilet water supply and drainage pipe packaging structure
CN201981592U (en) Water drainage support assembly at same layer
CN201785815U (en) After-bath water-saving accumulator
CN204645168U (en) Board-like Homofloor drainage system falls in a kind of environmental protection and energy saving
CN202627088U (en) Same-storey water drainage system for building toilet
CN202124895U (en) Sludge-prevention pipeline connecting device
CN201099889Y (en) Indoor single vertical tube drain system
CN100497850C (en) Kitchen-toilet modularized same floor side water draining device
CN210530414U (en) Wash and defend integral type device and bathroom thereof
CN221095365U (en) Three-way floor drain
CN202559449U (en) Same floor drainage system
CN202124894U (en) Pipeline access device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA STATE CONSTRUCTION ENG. CORP. LTD. CHINA CON

Free format text: FORMER OWNER: CHINA CONSTRUCTION FIRST BUILDING (GROUP) CO., LTD.

Effective date: 20140417

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20140417

Address after: 100161, room 1106, building A, Zhongjian building, No. 52 West Fourth Ring Road, Beijing, Fengtai District

Patentee after: THE THIRD CONSTRUCTION CO., LTD. OF CHINA CONSTRUCTION FIRST Group

Patentee after: CHINA STATE CONSTRUCTION ENGINEERING Corp.,Ltd.

Patentee after: CHINA CONSTRUCTION FIRST Group Corp.,Ltd.

Address before: 100161, room 1110, building A, Zhongjian building, No. 52 West Fourth Ring Road, Beijing, Fengtai District

Patentee before: THE THIRD CONSTRUCTION CO., LTD. OF CHINA CONSTRUCTION FIRST Group

Patentee before: CHINA CONSTRUCTION FIRST Group Corp.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120314

Termination date: 20160630