KR0147238B1 - Prefabricated bathroom and method of constructing the same - Google Patents

Prefabricated bathroom and method of constructing the same

Info

Publication number
KR0147238B1
KR0147238B1 KR1019940032692A KR19940032692A KR0147238B1 KR 0147238 B1 KR0147238 B1 KR 0147238B1 KR 1019940032692 A KR1019940032692 A KR 1019940032692A KR 19940032692 A KR19940032692 A KR 19940032692A KR 0147238 B1 KR0147238 B1 KR 0147238B1
Authority
KR
South Korea
Prior art keywords
wall panel
bathroom
waterproof plate
wall
assembly structure
Prior art date
Application number
KR1019940032692A
Other languages
Korean (ko)
Other versions
KR960023557A (en
Inventor
정재화
홍성관
Original Assignee
정순착
선경건설주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 정순착, 선경건설주식회사 filed Critical 정순착
Priority to KR1019940032692A priority Critical patent/KR0147238B1/en
Publication of KR960023557A publication Critical patent/KR960023557A/en
Application granted granted Critical
Publication of KR0147238B1 publication Critical patent/KR0147238B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/348Structures composed of units comprising at least considerable parts of two sides of a room, e.g. box-like or cell-like units closed or in skeleton form
    • E04B1/34869Elements for special technical purposes, e.g. with a sanitary equipment
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/348Structures composed of units comprising at least considerable parts of two sides of a room, e.g. box-like or cell-like units closed or in skeleton form
    • E04B1/34815Elements not integrated in a skeleton
    • E04B1/34846Elements not integrated in a skeleton the supporting structure consisting of other specified material, e.g. of plastics
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/61Connections for building structures in general of slab-shaped building elements with each other
    • E04B1/6108Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together
    • E04B1/612Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together by means between frontal surfaces

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Epidemiology (AREA)
  • Public Health (AREA)
  • Residential Or Office Buildings (AREA)

Abstract

[청구범위에 기재된 발명이 속한 기술분야][Technical field to which the invention described in the claims belong]

하나의 FRP 방수판을 이용한 욕실 조립구조 및 그 시공방법Bathroom assembly structure and construction method using one FRP waterproof plate

[발명이 해결하려고 하는 기술적 과제][Technical Challenges to Invent]

완벽한 방수효과를 얻는 동시에 조립시공이 간편하고, 마감재의 다양한 선택, 부착물 위치변경이 자유롭도록 한다.It is easy to assemble and to achieve the perfect waterproof effect, and it is possible to freely select the finishing materials and change the attachment position.

[발명의 해결방법의 요지][Summary of the solution of the invention]

외주연 받침턱(2)이 상향절곡된 하나의 방수판(1)으로 욕실바닥 전체를 커버토록 하고, 벽판넬(10)을 이 받침턱(2)상에 나란히 조립 설치하여서 그 상,하단을 고정금구(12)와 체결봉(9)으로 고정시킨 방수판을 이용한 욕실 조립구조 및 그 시공방법.The outer circumferential base jaw (2) is covered with a single waterproof plate (1) upward bent to cover the entire bathroom floor, and the wall panel 10 is assembled side by side on this base jaw (2) and installed on the top and bottom Assembly structure and construction method of the bathroom using a waterproof plate fixed with a fixing bracket (12) and a fastening rod (9).

[발명의 중요한 용도][Important Uses of the Invention]

종래의 습식 타일공법이나 UBR 조립공법이 지니고 있는 장점만을 취합하여 완벽한 방수효과와 간단한 시공으로 공기단축, 인력절감, 욕실내부의 설계형태 변경 용이, 마감재의 선택 및 부착물 위치 변경이 자유롭고 하자요인을 크게 감축시키게 된다.By combining only the advantages of the conventional wet tile method and UBR assembly method, the airtightness, manpower reduction, easy change of the design form inside the bathroom, the choice of finishing materials and the location of attachments are greatly freed by perfect waterproof effect and simple construction. Will be reduced.

Description

방수판을 이용한 욕실 조립구조 및 그 시공방법Bathroom assembly structure using waterproof plate and construction method

제1도는 본 발명의 구성요부 일부 절개 사시도.1 is a partially cutaway perspective view of the main components of the present invention.

제2도는 본 발명의 바닥 방수판 부분 단면도.2 is a partial cross-sectional view of the bottom waterproof plate of the present invention.

제3도는 본 발명의 벽판넬 부분 단면도.3 is a partial cross-sectional view of the wall panel of the present invention.

제4도의 (a)도는 배관 설치부 벽판넬 조립 단면도.Figure 4 (a) is a cross-sectional view of the pipe mounting wall panel assembly.

(b)도는 일반 벽체부 벽판넬 조립 단면도.(b) is a cross-sectional view of the assembly of the general wall panel.

제5도의 (a)(b)도는 방수판과 벽판넬의 조립상태 설명도.Figure 5 (a) (b) is an explanatory view of the assembled state of the waterproof plate and the wall panel.

제6도는 문틀부재 설치상태 설명도.6 is an explanatory view of the installation state of the door frame member.

제7도의 (a)(b)도는 모서리부위에 조립되는 벽판넬의 조립상태 설명도.Figure 7 (a) (b) is an explanatory view of the assembled state of the wall panel assembled at the corner portion.

제8도는 본 발명의 전체 공정 블럭도.8 is an overall process block diagram of the present invention.

*도면의 주요부분에 대한 부호의 설명* Explanation of symbols for main parts of the drawings

1:방수판 2:받침턱1: waterproofing plate 2: base

2a:조립구멍 3:지지대2a: Assembling hole 3: support

4:합판 5:타일4: plywood 5: tile

6:기판 7:벽타일6: Substrate 7: Wall Tile

8:후레임 8a:조립구멍8: Frame 8a: Assembly hole

9:체결봉 10:벽판넬9: Fastening rod 10: Wall panel

11:문틀부재 12:고정금구11: door frame member 12: fixed bracket

12a:앵커 13:마블판12a: Anchor 13: Marble plate

14:크램프 14a:협지턱14: clamp 14a: narrow jaw

S:배관 스페이스S: Piping space

본 발명은 욕실 바닥전체를 커버하도록 일정한 크기와 형상으로 사출 성형한 FRP 방수판을 사용하여 욕실을 시공하므로서 보다 완벽한 방수효과를 얻을 수 있는 동시에 시공방법의 단순화를 기하여 시공후 하자염려가 없도록 한 욕실 조립구조 및 그 시공방법에 관한 것이다.The present invention uses the FRP waterproof plate injection-molded in a certain size and shape to cover the entire bathroom floor to achieve a more perfect waterproof effect while at the same time simplifying the construction method to prevent the risk of construction after construction An assembly structure and a construction method thereof.

이제까지 시행되어 오던 통상적인 욕실의 조립구조 및 그 시공방법은 바닥 스라브위에 액체방수공사를 하여 방수층을 두텁게 형성한 뒤 다시 그위에 타일공사를 하고, 벽체의 구성에 있어서도 액체방수에 의한 방수층을 형성한 위에 타일공사를 하는 습식공법(濕式工法)인 것이었다.The assembly structure and construction method of a conventional bathroom that has been practiced up to now have a liquid waterproofing on the floor slab to form a thick waterproof layer, and then tiled on it, and also in the construction of a wall to form a waterproof layer by liquid waterproofing. It was a wet method of tile construction above.

그러나, 이러한 습식공법은 바닥에 방수액을 고르게 침투시킨 뒤 그위에 방수제를 혼입한 시멘트 풀(Cemment Paste)을 바르고, 또 방수 몰탈을 바르는 등 일련의 작업공정을 수차례 반복한 방수층 구조를 형성한 뒤 그위에 타일공사를 하는 것이며, 이를 수작업으로 치밀하게 해야만 되는 것이어서 그 작업이 매우 번거롭고 공사기간이 길어지게 되었음은 물론, 시공의 난이도에 따른 정밀시공이 이루어지지 않는 경우가 많은 것이었으며, 습식공법이기 때문에 동절기 영하의 기온에서는 그 시공이 불가능하였고, 품질의 일관성이 결여되어 장기간 사용시 타일이 박리되거나 누수케 되는 등 하자발생이 뒤따르게 되었으며, 사후관리가 어려운 문제가 있는 것이었다.However, this wet method forms a waterproof layer structure that repeats a series of work processes such as applying a cement paste containing a waterproofing agent on the floor evenly and then applying waterproof mortar on the floor. It is to do tile construction on top of it, and it is necessary to make it by hand. Therefore, the work is very cumbersome and the construction period becomes long, and the precision construction according to the difficulty of construction is often not performed. Therefore, the construction was not possible at temperatures below freezing during the winter season, and there was a problem of defects such as peeling or leaking tiles when used for a long time due to lack of consistency of quality, and it was difficult to follow up.

따라서, 이러한 재래식 타일습식 공법이 지니고 있는 문제점을 해결하여 아파트나 연립주택 등 일률적인 구조로 설계된 공동주택 시공시 각 세대별 욕실공사를 보다 간단히 하면서 완벽한 방수효과를 얻을 수 있도록 개량고안된 UBR(Unit Bath Room) 조립공법이 출현되어 각광을 받게되었다. 그러나 이는 바닥, 벽, 천정이 하나의 통체로 일체화된 공장생산 제품인 것이어서 완벽한 방수효과를 얻을 수 있는 동시에 그 설치시공이 간편한 장점이 있는 반면, 이의 설치공간 주변에 쓸모없는 공간(Dead Space)이 필연적으로 발생케 되어 설계시 확보된 욕실공간을 최대한 활용하지 못하는, 다시말해 설계상 확보된 공간보다 협소한 욕실공간으로 조립시공되었으며, 일률적인 공장생산으로 인해 그 재질 및 벽체에 부착되는 내부 부착물(거울, 수납장, 수건걸이, 환풍기 등)의 위치를 최초 설계된 상태에서 전혀 변경시킬 수 없는 제약이 따르게 되므로서 수요자들의 욕구에 부응하는 다양한 마감재의 선택 및 부착물 배치가 불가능한 문제점이 있는 것이었다. 또한, 공장생산시 출입구용으로 미리 뚫어놓은 일정한 크기의 사각(四角)공간에 문틀을 설치함에 있어서도 문틀부재(문울거미)들을 분리시킨 상태에서 각 부재들을 출입구 공간에 대고 일일이 짜 맞추어가며 조립시켜야 되는 것이어서 번거로운 조립공정이 요구되었으며, 그 시공이 난이한 문제가 수반되었던 것이다.Therefore, UBR (Unit Bath) is designed to solve the problems of the conventional tile wet method and to make the bathroom construction for each generation more simple and perfect waterproof effect when constructing the apartment complex designed for uniform structure such as apartment or townhouse. Room) The assembly method appeared and got the spotlight. However, this is a factory-made product in which the floor, the wall and the ceiling are integrated into one body, so that the perfect waterproof effect can be obtained and the installation is easy, while the dead space around the installation space is inevitable. In other words, the bathroom space that was created in the design could not be made full use of the space secured in the design, that is, it was assembled into a bathroom space that is narrower than the space secured by the design. , Cabinets, towel racks, ventilators, etc.) was a condition that can not be changed at all in the initial design state, there was a problem that it is impossible to select a variety of finishing materials and placement of attachments to meet the needs of consumers. In addition, when installing a door frame in a square space of a predetermined size previously drilled for an entrance in a factory production, each member must be assembled to the doorway space by assembling each member into the doorway space with the door frame members separated. It was a cumbersome assembly process, and the construction was accompanied by a difficult problem.

본 발명은 상기와 같은 종래의 재래식 타일공법이나 UBR 조립공법이 지니고 있는 단점을 배제하고, 장점만을 취합한 반 건식(半 乾式)의 새로운 공법으로, 욕실의 바닥에는 그 전체를 커버하는 FRP 방수판을 깔고, 벽체는 방수판의 상단에서 약 80cm 높이까지는 공장에서 변형가공한 판넬을 현장에서 조립하며, 그 상부의 벽체와 천정은 일반적인 재래식 공법으로 시공토록 한 것인바, 첨부도면에 의거 본 발명의 내용을 공정별로 상세히 설명하면 다음과 같다.The present invention is a new method of semi-dry method that combines only the advantages, excluding the disadvantages of the conventional conventional tile method or the UBR assembly method as described above, FRP waterproof plate covering the whole on the floor of the bathroom The wall is assembled from the factory to the factory panel up to a height of about 80cm from the top of the waterproof plate, the wall and ceiling of the upper part is to be constructed by a conventional conventional method, according to the accompanying drawings of the present invention The content is described in detail by process as follows.

(제1공정)(Step 1)

외주연 전체에 걸쳐 벽판넬 재치용 받침턱(2)이 상향 절곡되며, 지지대(3)와 합판(4)으로 강도를 보강하고, 바닥표면에는 타일(5)을 부착하여서 제2도에서와 같이 구성된 FRP 방수판(1)을 욕실바닥이 되는 스라브상에 수평을 맞춰 안착시킨 뒤 몰탈로 고정한다.Through the outer periphery of the wall panel mounting base (2) is bent upward, reinforce the strength with the support (3) and plywood (4), and attach the tile (5) to the bottom surface as shown in Figure 2 The configured FRP waterproof plate (1) is horizontally seated on the slab to be the bathroom floor and then fixed with mortar.

(제2공정)(2nd step)

기판(6)의 전면에 벽타일(7)이 부착되고, 후면에는 후레임(8)을 부착 보강하여 제3도에서와 같이 구성된 벽판넬(10)을 제1공정에서 안착 고정시킨 방수판(1)의 외주연 받침턱(2)위에 올려놓아 제5도의 (a)(b)도에서 설명된 바와 같이 벽판넬 후레임(8)과 방수판 받침턱(2)에 소정의 간격으로 조립구멍(8a)(2a)을 천공하여, 여기에 체결봉(9)을 체결하여 각 벽판넬(10)들의 하단을 밀착 고정시키게 되는데, 이때, 상기와 같은 제2공정중 벽판넬(10)을 조립 설치하는 과정에서 도면 제6도에서와 같이 규격제품으로 조립시킨 문틀부재(11)를 먼저 출입구 위치에 설치시킨 상태에서 벽판넬(10)들을 조립시켜 나간다.The wall tile 7 is attached to the front surface of the substrate 6, and the waterproof plate 1 which mounts and fixes the wall panel 10 configured as shown in FIG. The mounting holes 8a at predetermined intervals on the wall panel frame 8 and the waterproof plate supporting jaw 2 as described in FIG. 5 (a) (b). Perforated (2a), by fastening the fastening rod (9) to the bottom of each of the wall panels 10 to be fixed in close contact, at this time, to install and install the wall panel 10 during the second process as described above In the process, as shown in Figure 6, assembling the wall panel 10 in a state in which the door frame member 11 assembled as a standard product is first installed at the entrance position.

(제3공정)(3rd step)

도면 제4도의 (a)도에서와 같이, 배관 스페이스(S)가 형성되는 벽체측의 벽판넬(10) 상단에는 고정금구(12)를 일정한 간격으로 벽체에 앵커(12a)설치하여 벽판넬(10)의 상단을 견고히 고정시키고, 배관 스페이스(S)가 형성되지 않은 다른 벽체측의 벽판넬(10) 상단에도 제4도의 (b)도에서와 같이 고정금구(12)를 벽체에 앵커(12a) 설치하여 벽판넬(10)의 상단을 견고히 고정시킨다.As shown in (a) of FIG. 4, the anchoring brackets 12 are installed on the wall at regular intervals on the top of the wall panel 10 on the side of the wall where the piping space S is formed. The upper end of 10) is firmly fixed, and the fixing bracket 12 is anchored to the wall as shown in (b) of FIG. 4 on the upper end of the wall panel 10 on the other wall side where the piping space S is not formed. ) To firmly fix the top of the wall panel (10).

(제4공정)(4th step)

이후, 조립완료된 각 벽판넬(10)들 사이에 생긴 모든 틈새를 코킹 처리하여 벽판넬(10)부위의 방수공사를 마감한다.Subsequently, caulking all the gaps generated between each of the assembled wall panel 10 to finish the waterproofing work on the wall panel 10.

(제5공정)(5th process)

배관 스페이스(S)가 형성된 벽체측의 벽판넬(10) 상단에는 제4도의 (a)도에서와 같이 스페이스(S)의 상부를 마감하는 마블판(13)을 설치한다.On the top of the wall panel 10 on the side of the wall on which the piping space S is formed, a marble plate 13 which closes the upper portion of the space S is installed as shown in FIG.

(제6공정)(Step 6)

상부벽체 타일공사를 마감한 뒤 천정공사를 실시한다.After finishing the top wall tile work, ceiling work is carried out.

(제7공정)(7th process)

각종 위생기구(욕조, 세면대, 양변기 등) 및 부착물(거울, 수납장, 수건걸이, 환풍기 등)을 설치한다.Install various sanitary appliances (bathtubs, sinks, toilets, etc.) and attachments (mirrors, cabinets, towel racks, fans, etc.).

본 발명의 벽판넬(10)들을 조립시킬 때 90°각으로 모서리를 이루는 코너부위의 조립에 있어서는 도면 제7도에서 보는 바와 같이, 양단에 협지턱(14a)이 절곡형성된형 크램프(14)를 사용하여 조립하게 된다. 즉 (a)도에서와 같이 조립이 선행(先行)되는 벽판넬(10)의 후레임(8)에 크램프(14)의 일측단 협지턱(14a)을 끼워 조립시킨 다음, 후행(後行)조립되는 벽판넬(10)의 후레임(8)을 크램프(14)의 타측단 협지턱(14a)에 끼워넣어 (b)도와 같이 조립시킨 후 양 벽판넬(10)(10)사이의 틈새를 코킹 처리하여 마감하는 것이다.When assembling the wall panel 10 of the present invention when assembling the corner portion forming a corner at a 90 ° angle as shown in Figure 7, the pinching jaw 14a is bent at both ends It is assembled using the mold clamp (14). That is, as shown in (a), one side clamping jaw 14a of the clamp 14 is assembled to the frame 8 of the wall panel 10 to be assembled, followed by assembling. The frame 8 of the wall panel 10 to be inserted into the clamping jaw 14a of the other end of the clamp 14 is assembled as shown in (b), and then the gap between both wall panels 10 and 10 is caulked. To finish.

본 발명은 이상 설명된 바와 같이, 재래식 습식공법이나 UBR 공법이 지니고 있는 단점은 배제하고, 장점만을 취합한 새로운 시공법인 것인바, 방수판에 의한 완벽한 바닥 방수효과를 얻을 수 있음은 물론 시공이 간단하고 일관된 작업으로 인하여 공기단축, 인력절감의 효과를 제공하는 것이며, 상부벽체 및 천정부위의 설계형태 변경이 용이하므로서 수요자의 욕구에 부응한 마감재의 선택사용이 쉽고, 내부 부착물의 위치변경이 용이하여 개개인 취향에 따른 구조변경이 가능하며, 하자요인이 적고 보수가 손쉬운 효과를 얻게 되는 것이다.The present invention, as described above, is a new construction method that combines only the advantages, excluding the disadvantages of the conventional wet method or UBR method, it is possible to obtain a perfect floor waterproof effect by the waterproof plate, as well as simple construction It provides the effect of shortening the air and reducing manpower due to consistent and consistent work, and it is easy to change the design form of the upper wall and ceiling, so it is easy to select and use the finishing material that meets the needs of the users, and to easily change the position of internal attachment It is possible to change the structure according to individual tastes, and it has less defects and easy maintenance.

Claims (5)

외주연을 따라 받침턱(2)이 상향절곡되며, 지지대(3)와 합판(4)으로 강도 보강된 표면에는 바닥 타일(5)을 부착시킨 하나의 FRP 방수판(1)으로 전체 욕실바닥을 커버토록 구성하고, 전면에 벽타일(7)이 부착되고 후면에는 후레임(8)이 보강 부착된 기판(6)으로 이루어진 벽판넬(10)을 문틀부재(11)와 함께 방수판(1)의 받침턱(2)상에 나란히 조립 설치하여서 되는 방수판을 이용한 욕실 조립구조.The base jaw 2 is bent upward along the outer circumference, and the entire bathroom floor is covered with one FRP waterproof plate 1 having a floor tile 5 attached to the surface reinforced with support 3 and plywood 4. A wall panel 10 made of a substrate 6 having a cover 6 and having a wall tile 7 attached to the front surface and a frame 8 reinforcement attached to the rear surface of the waterproof plate 1 together with the door frame member 11. Bathroom assembly structure using a waterproof plate that is assembled side by side on the support jaw (2). 제1항에 있어서, 방수판(1)의 받침턱(2)과 벽판넬(10)의 후레임(8)에 소정간격으로 천공시킨 조립구멍(2a)(8a)으로 체결봉(9)을 끼워 상호 결합시켜 벽판넬(10)의 하단을 고정하는 방수판을 이용한 욕실 조립구조.The fastening bar (9) according to claim 1, wherein the fastening bar (9) is inserted into the support jaw (2) of the waterproof plate (1) and the frame (8) of the wall panel (10) by assembling holes (2a) (8a) drilled at predetermined intervals. Bathroom assembly structure using a waterproof plate for fixing the bottom of the wall panel 10 by mutual coupling. 제1항에 있어서, 벽판넬(10)의 상단에는 소정 간격으로 고정금구(12)를 벽체에 앵커(12a)설치하여 벽판넬(10)의 상단을 고정하는 방수판을 이용한 욕실 조립구조.The bathroom assembly structure according to claim 1, wherein a fixing bracket (12a) is installed at a top of the wall panel (10) at a predetermined interval to fix the top of the wall panel (10a). 제1항에 있어서, 후레임(8)에 끼워지는 협지턱(14a)을 양단에 절곡 형성시킨형 크램프(14)에 의해 벽판넬(10)의 코너부 조립이 고정되게한 방수판을 이용한 욕실 조립구조.2. The clamping jaw 14a fitted to the frame 8 is bent at both ends. Assembly structure of the bathroom using a waterproof plate that is fixed to the corner assembly of the wall panel 10 by the type clamp (14). 벽판넬(10)재치용 받침턱(2)을 가진 FRP 방수판(1)을 욕실 바닥 스라브상에 수평을 맞춰 안착시킨 뒤 몰탈로 고정하고, 출입구 위치에 규격제품으로 미리 조립완성시킨 문틀부재(11)를 먼저 설치 고정시킨 다음 받침턱(2)을 따라 벽판넬(10)을 끼워놓고 벽판넬 후레임(8)과 방수판 받침턱(2)을 수직 관통하는 조립구멍(8a)(2a)을 소정 간격으로 천공하여 여기에 체결봉(9)을 끼워 체결고정하며, 벽판넬(10)의 상단에는 고정금구(12)를 소정간격으로 벽체에 앵커(12a)설치하여 벽판넬(10)의 상,하단을 견고히 고정시킨 뒤, 조립된 각 벽판넬(10)들 사이에 생긴 모든 틈새를 코킹처리한 다음, 배관 스페이스(S)를 형성시킨 벽체측의 벽판넬(10) 상단에는 마블판(13)을 설치하는 것을 특징으로 한 방수판을 이용한 욕실 시공방법.FRP waterproof plate (1) having a mounting base (2) for mounting the wall panel (10) horizontally seated on the bathroom floor slab and fixed with mortar, and the door frame member pre-assembled as a standard product at the entrance position ( 11) install and fix it first, and then insert the wall panel 10 along the support jaw (2), and then assemble the holes 8a (2a) vertically penetrating the wall panel frame (8) and the waterproof plate support jaw (2). Perforate at predetermined intervals to fasten and fasten the fastening rods 9 therein. The fixing bracket 12 is installed on the upper end of the wall panel 10 at a predetermined interval so that the anchor 12a is installed on the wall. After firmly fixing the bottom, caulking all the gaps formed between each assembled wall panel 10, and then the marble plate (13) on the top of the wall panel 10 of the wall side to form a piping space (S) ) Construction method of the bathroom using a waterproof plate, characterized in that to install.
KR1019940032692A 1994-12-03 1994-12-03 Prefabricated bathroom and method of constructing the same KR0147238B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1019940032692A KR0147238B1 (en) 1994-12-03 1994-12-03 Prefabricated bathroom and method of constructing the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1019940032692A KR0147238B1 (en) 1994-12-03 1994-12-03 Prefabricated bathroom and method of constructing the same

Publications (2)

Publication Number Publication Date
KR960023557A KR960023557A (en) 1996-07-20
KR0147238B1 true KR0147238B1 (en) 1998-09-15

Family

ID=19400250

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1019940032692A KR0147238B1 (en) 1994-12-03 1994-12-03 Prefabricated bathroom and method of constructing the same

Country Status (1)

Country Link
KR (1) KR0147238B1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100865483B1 (en) * 2007-03-21 2008-10-27 이현배쓰(주) Floor waterproofing structure of prefabricated bathroom and method of executing the same
WO2010030060A1 (en) * 2008-09-12 2010-03-18 Lee-Hyun Bath Co., Ltd. Floor waterproofing structure of prefabricated bathroom and method of executing the same
KR101220986B1 (en) * 2012-08-08 2013-02-07 이엔후레쉬 주식회사 Bathroom drainage of the container
NO20141240A1 (en) * 2014-10-17 2016-04-18 Broedrene Dahl Wet Module
KR20210001235A (en) 2019-06-27 2021-01-06 현대건설주식회사 module type bathroom and building method using the same
KR20210001236A (en) 2019-06-27 2021-01-06 현대건설주식회사 module type bathroom and building method using the same
KR102352649B1 (en) * 2021-07-21 2022-01-17 주식회사 성일 The manufacturing method of unit bathroom using multiple vacuum molding method

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100259422B1 (en) * 1997-09-04 2000-06-15 성재갑 Method of constructing unit bathroom
KR100354717B1 (en) * 1999-03-30 2002-10-05 주식회사 엘지씨아이 Prefabricated Bathroom with the Integrated Wall
KR101029839B1 (en) * 2009-03-24 2011-04-15 이현배쓰(주) Waterproofing structure of prefabricated bathroom use in combination with wet and dry by tpr waterproofing plate

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100865483B1 (en) * 2007-03-21 2008-10-27 이현배쓰(주) Floor waterproofing structure of prefabricated bathroom and method of executing the same
WO2010030060A1 (en) * 2008-09-12 2010-03-18 Lee-Hyun Bath Co., Ltd. Floor waterproofing structure of prefabricated bathroom and method of executing the same
KR101220986B1 (en) * 2012-08-08 2013-02-07 이엔후레쉬 주식회사 Bathroom drainage of the container
NO20141240A1 (en) * 2014-10-17 2016-04-18 Broedrene Dahl Wet Module
NO343145B1 (en) * 2014-10-17 2018-11-19 Broedrene Dahl Module comprising a floor and at least one wall, as well as a method for producing a module
KR20210001235A (en) 2019-06-27 2021-01-06 현대건설주식회사 module type bathroom and building method using the same
KR20210001236A (en) 2019-06-27 2021-01-06 현대건설주식회사 module type bathroom and building method using the same
KR102352649B1 (en) * 2021-07-21 2022-01-17 주식회사 성일 The manufacturing method of unit bathroom using multiple vacuum molding method

Also Published As

Publication number Publication date
KR960023557A (en) 1996-07-20

Similar Documents

Publication Publication Date Title
US4171596A (en) Prefabricated room structure for facilities in general such as toilets, baths, kitchens and the like
KR0147238B1 (en) Prefabricated bathroom and method of constructing the same
EP2252188B1 (en) Grab bar assembly
KR200430527Y1 (en) Prefabricated wall for bathroom having shelf
KR20180062087A (en) Prefabrication Wall Of Bathroom And Installation Method Thereof
JP4672444B2 (en) Waterproof pan for renovation
KR102589225B1 (en) Construction method of wall mounted type tile washstand
JPH017792Y2 (en)
KR100244019B1 (en) A construction system of the assembly bath room
KR100259422B1 (en) Method of constructing unit bathroom
JPH068782Y2 (en) Bathtub installation structure
JP2541099Y2 (en) Wall panel fixing structure
JP2003138630A (en) Attaching structure of wall ornament type sanitary facility and equipment in sanitary unit
WO2019093517A1 (en) Sanitary apparatus, room unit, method for constructing sanitary apparatus, and method for constructing room unit
JPH0527663Y2 (en)
JPH0328116Y2 (en)
JP2638716B2 (en) Enclosure of bathroom extension and renovation section and bathroom extension method
JPH0323952Y2 (en)
KR20010083516A (en) Precast concrete panel
JP3132741B2 (en) Underfloor piping inspection port structure
JP2843198B2 (en) Bathroom plumbing structure
JPH0320445Y2 (en)
JPH0542139Y2 (en)
JPH0425885Y2 (en)
JP2586592Y2 (en) Resin floor border

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130410

Year of fee payment: 16

FPAY Annual fee payment

Payment date: 20140326

Year of fee payment: 17

EXPY Expiration of term