CN206928948U - One kind repaiies system along empty lane mechanization lane - Google Patents
One kind repaiies system along empty lane mechanization lane Download PDFInfo
- Publication number
- CN206928948U CN206928948U CN201720709480.8U CN201720709480U CN206928948U CN 206928948 U CN206928948 U CN 206928948U CN 201720709480 U CN201720709480 U CN 201720709480U CN 206928948 U CN206928948 U CN 206928948U
- Authority
- CN
- China
- Prior art keywords
- lane
- mechanization
- excavator
- along empty
- scrapper conveyor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
The utility model discloses one kind system is repaiied along empty lane mechanization lane, it is characterized in that, including scrapper conveyor induction system, face conveyor, excavator, the output end of the scrapper conveyor induction system is connected with work transporter, the excavator coordinates scrapper conveyor induction system mutually to run, and the input of the scrapper conveyor induction system coordinates with excavator to be run.The utility model compared with prior art the advantages of be:The use that the utility model passes through MWY6/0.3 coals hydraulic excavator for mine and 40Z chain mat machines, going down the hill in the grooves of Gu Qiaokuang 11, the mechanization of air way planted agent's operation has been gone up in realization to 1124 (1) working faces substantially along empty lane in exploiting field, the realization of mechanization planted agent, both worker's labor intensity had been reduced, planted agent's speed is accelerated again, while also a saving a large amount of costs of human resources.
Description
Technical field
It the utility model is related to lane and repair technical field, more particularly to one kind repaiies system along empty lane mechanization lane.
Background technology
To ensure air way ventilation section on fully-mechanized mining working, accelerate lane repair degree, reduce worker's labor intensity, realize manpower
The reasonably optimizing of resource, my ore deposit air way on 1124 (1) working faces put into a set of MWY6/0.3 coals hydraulic excavator for mine and
40Z chain mat machines, carry out lane and repair operation.Being shown by mining type and ore deposit pressure influences, and cares for the groove of bridge ore deposit 11 and goes down the hill on each working face in exploiting field
Air way is gob side entry, in exploitation process, tunnel roof and floor and two helps the amount of shifting near very big, the section deficiency that causes to divulge information is, it is necessary to logical
Cross planted agent, kaneh section is repaiied in Si Bangdeng lanes, because big workload and upper air way humid environment, sultry, people's work are repaiied in lane
Industry progress is slow, while because lane space is narrow and cost of human resources limitation, can not largely put into labour, therefore be badly in need of carrying out
Repair in mechanization lane.
As Fig. 1 be initial stage lane repair the structural representation of system, working face is using flat car by excavator whole Transporting to rail
Along continuous rope tail, it then will start excavator after connection excavation electromechanical source and run to rail along canopy mouth is changed, for convenience of 40Z scrapper conveyors
The connection of power supply and switch and the drawing of itself are moved, used, and select 40Z scrapper conveyor heads being arranged in work surface side, tail outside,
Scrapper conveyor backward running shipment.Drawn using a 17.5kw puffer and move 40Z scrapper conveyors.During normal back production, upper air way is advanced
Pressure manifestation scope be working face to away from working face wall 50m, the regional roadway two helps displacement big and needs marguise to prop up in advance
Shield, while limited by methane gas extraction pipeline, excavator work department rotates horizontally scope only 2.8m or so, can not meet excavator
360 ° of rotations, while 40Z scrapper conveyors, because of shipment of moving backward, the limit uses length only 40~50m.Therefore excavator can only be in 40Z scraper plates
Acted as a planted agent in the range of machine head (away from 40~50m of working face), and by digger operating device towards working face, before excavator retrusive
Enter.The MWY6/0.3 type excavators that we use, Excavating bucket is coordinated to be acted as a planted agent in vertical direction using hydraulic arm, digging operation
Certain stroke is needed, minimum operation height cannot be below 2.5m.During crossing exceptions area, the upper advanced pressure manifestation scope of air way reaches
120m or so, Floor Heave in Roadway amount is big in the range of this, and pucking speed is fast, and the operating type at initial stage can not meet that planted agent requires,
On the contrary may be because of pucking, tunnel can not meet small digging machine normal operation, on the contrary be removed small digging machine by the way of manually acting as a planted agent.
Meanwhile during crossing exceptions area, to strengthen roof timbering, it is also necessary to which the advanced marguise distance of air way in extension, 40Z chain mat machines length is more
Planted agent's demand can not be met.Initial stage using 40Z scrapper conveyors to during face conveyor shipment, using two section enameled troughs as
Cross, still, often alluvial on enameled trough, influences normal shipment, two workers need to be arranged to be responsible for specially taking off goods goods, both unrestrained
It is again dangerous to take manpower.Based on this, now research one kind repaiies system along empty lane mechanization lane, solves this problem well.
Utility model content
The purpose of this utility model is overcome the deficiencies in the prior art, there is provided one kind is repaiied along empty lane mechanization lane is
System.
The utility model is achieved through the following technical solutions:One kind repaiies system along empty lane mechanization lane, and its feature exists
In, including scrapper conveyor induction system, face conveyor, excavator, output end and the work fortune of the scrapper conveyor induction system
Defeated machine is connected, and the excavator coordinates scrapper conveyor induction system mutually to run, the input of the scrapper conveyor induction system and excavation
Machine coordinates operation.
As one of preferred embodiment of the present utility model, the scrapper conveyor induction system includes 40Z drag conveyors.
As one of preferred embodiment of the present utility model, the 40Z drag conveyors are the 40Z of two length 75m, 45m
Drag conveyor, described 75m, 45m 40Z drag conveyors are front and rear to be overlapped.
As one of preferred embodiment of the present utility model, described 75m, 45m 40Z drag conveyors conveying direction it is consistent and
It is synchronised.
As one of preferred embodiment of the present utility model, in addition to reprint belt, the output of the scrapper conveyor induction system
End is connected by reprinting belt with work transporter.
As one of preferred embodiment of the present utility model, the scrapper conveyor induction system both sides are provided with advanced marguise supporting.
As one of preferred embodiment of the present utility model, the excavator is MWY6/0.3 type excavators.
As one of preferred embodiment of the present utility model, the MWY6/0.3 types excavator includes excavator body, described
Excavator body is fixed on flat car.
As one of preferred embodiment of the present utility model, roller and sleeper or sheeting caps, institute are provided with below the flat car
State and anchor chain is provided with below roller, woven bag is provided with below the big plate in flat car rear.
As one of preferred embodiment of the present utility model, the scrapper conveyor induction system, face conveyor, excavator are equal
The grooves of Gu Qiaokuang 11 exploiting field of going down the hill is placed in be used cooperatively along empty lane.
The utility model compared with prior art the advantages of be:The utility model passes through MWY6/0.3 collieries hydraulic excavating
The use of machine and 40Z chain mat machines, going down the hill in the grooves of Gu Qiaokuang 11, air way has been gone up in realization to 1124 (1) working faces substantially along empty lane in exploiting field
The mechanization of planted agent's operation, the realization of mechanization planted agent, had both reduced worker's labor intensity, and had accelerated planted agent's speed again, simultaneously
It also a saving a large amount of costs of human resources.
Brief description of the drawings
Fig. 1 is improvement pre-structure schematic diagram of the present utility model;
Fig. 2 is excavator structure schematic diagram of the present utility model;
Fig. 3 is structural representation of the present utility model.
Embodiment
Embodiment of the present utility model is elaborated below, the present embodiment using technical solutions of the utility model before
Put and implemented, give detailed embodiment and specific operating process, but the scope of protection of the utility model is unlimited
In following embodiments.
Referring to Fig. 2,3:It is a kind of to repair system along empty lane mechanization lane, including scrapper conveyor induction system 1, face conveyor 2,
Excavator 3, the output end of the scrapper conveyor induction system 1 are connected with work transporter 2, and the excavator 3 coordinates scrapper conveyor defeated
The phase of system 1 is sent to run, the input of the scrapper conveyor induction system 1 coordinates with excavator 3 to be run.
As one of preferred embodiment of the present utility model, the scrapper conveyor induction system 1 includes 40Z drag conveyors.
As one of preferred embodiment of the present utility model, the 40Z drag conveyors are the 40Z of two length 75m, 45m
Drag conveyor, described 75m, 45m 40Z drag conveyors are front and rear to be overlapped.
As one of preferred embodiment of the present utility model, described 75m, 45m 40Z drag conveyors conveying direction it is consistent and
It is synchronised.
As one of preferred embodiment of the present utility model, in addition to reprint belt 4, the scrapper conveyor induction system 1 it is defeated
Go out end and be connected by reprinting belt 4 with work transporter 2.
As one of preferred embodiment of the present utility model, the both sides of scrapper conveyor induction system 1 are provided with advanced marguise supporting
5。
As one of preferred embodiment of the present utility model, the excavator 3 is MWY6/0.3 type excavators.
As one of preferred embodiment of the present utility model, the MWY6/0.3 types excavator includes excavator body 301, institute
Excavator body 301 is stated to be fixed on flat car 302.
As one of preferred embodiment of the present utility model, the lower section of the flat car 302 be provided with roller 303 and sleeper 307 with
Sheeting caps 308, the lower section of roller 303 are provided with anchor chain 304, and the big lower section of plate 305 in the rear of flat car 302 is provided with woven bag
306。
As one of preferred embodiment of the present utility model, the scrapper conveyor induction system 1, face conveyor 2, excavator
3 are placed in caring for the groove of bridge ore deposit 11 exploiting field of going down the hill is used cooperatively along empty lane.
The utility model uses MWY6/0.3 type excavators, coordinates Excavating bucket to be crouched in vertical direction using hydraulic arm
Bottom, digging operation need certain stroke, and minimum operation height cannot be below 2.5m.During crossing exceptions area, the upper advanced pressure of air way
Show scope up to 120m or so, Floor Heave in Roadway amount is big in the range of this, and pucking speed is fast, and the operating type at initial stage can not meet
Planted agent's requirement, on the contrary may be because of pucking, and tunnel can not meet small digging machine normal operation, on the contrary will be small by the way of manually acting as a planted agent
Digging machine removes.Meanwhile during crossing exceptions area, to strengthen roof timbering, it is also necessary to the advanced marguise distance of air way, 40Z chains in extension
Trigger length can not more meet planted agent's demand.Initial stage uses two section enamel using 40Z scrapper conveyors to during face conveyor shipment
Chute is as transition, and still, often alluvial on enameled trough, influences normal shipment, two workers need to be arranged specially to bear goods
Duty takes off goods, not only waste of manpower but also dangerous.Once acted as a planted agent scope for increase excavator, consider to extend 40Z drag conveyors, but by
Scrapper conveyor power of motor and chain load resistance energy power restriction, it is impossible to take the mode of increase chute to extend chain mat machine shipment length.
Therefore consider to overlap two scrapper conveyors, and a set of overlap joint stand is processed, it is respectively 45m and 75m scraper plate prow by two length
Tail connects, and is linked to be entirety, is drawn simultaneously using winch and moves two scrapper conveyors.So, scrapper conveyor can be placed side bottom by excavator in advance
Plate is sleeping to be removed and goods is deposited in into opposite side temporarily, is then drawn shifting scrapper conveyor again, is realized that tunneling boring is acted as a planted agent in advance.To solve scraper plate
Machine to face conveyor shift goods automatically the problem of, utilize support roller for belt machine and one section of 800mm belt to coordinate wind coal borer structure
Part devises a typhoon turn and carries belt, had so both saved manpower and turn avoid unsafe factor.
Preferred embodiment of the present utility model is the foregoing is only, it is all at this not to limit the utility model
All any modification, equivalent and improvement made within the spirit and principle of utility model etc., should be included in the utility model
Protection domain within.
Claims (10)
1. one kind repaiies system along empty lane mechanization lane, it is characterised in that including scrapper conveyor induction system, face conveyor, digging
Pick machine, the output end of the scrapper conveyor induction system are connected with work transporter, and the excavator coordinates scrapper conveyor induction system
Mutually run, the input of the scrapper conveyor induction system coordinates with excavator to be run.
2. according to claim 1 repair system along empty lane mechanization lane, it is characterised in that the scrapper conveyor induction system bag
Include 40Z drag conveyors.
3. according to claim 2 repair system along empty lane mechanization lane, it is characterised in that the 40Z drag conveyors are
The 40Z drag conveyors of two length 75m, 45m, described 75m, 45m 40Z drag conveyors are front and rear to be overlapped.
4. according to claim 3 repair system along empty lane mechanization lane, it is characterised in that described 75m, 45m 40Z scraper plates
Conveyer conveying direction is consistent and is synchronised.
5. according to claim 1 repair system along empty lane mechanization lane, it is characterised in that also include reprinting belt, it is described
The output end of scrapper conveyor induction system is connected by reprinting belt with work transporter.
6. according to claim 1 repair system along empty lane mechanization lane, it is characterised in that the scrapper conveyor induction system two
Side is provided with advanced marguise supporting.
7. according to claim 1 repair system along empty lane mechanization lane, it is characterised in that the excavator is MWY6/0.3
Type excavator.
8. according to claim 7 repair system along empty lane mechanization lane, it is characterised in that the MWY6/0.3 types excavator
Including excavator body, the excavator body is fixed on flat car.
9. according to claim 8 repair system along empty lane mechanization lane, it is characterised in that rolling is provided with below the flat car
Wheel and sleeper or sheeting caps, the roller lower section are provided with anchor chain, woven bag are provided with below the big plate in flat car rear.
10. described system is repaiied along empty lane mechanization lane according to claim 1-9 is any, it is characterised in that the scrapper conveyor is defeated
Send system, face conveyor, excavator to be placed in caring for the groove of bridge ore deposit 11 exploiting field of going down the hill to be used cooperatively along empty lane.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720709480.8U CN206928948U (en) | 2017-06-16 | 2017-06-16 | One kind repaiies system along empty lane mechanization lane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720709480.8U CN206928948U (en) | 2017-06-16 | 2017-06-16 | One kind repaiies system along empty lane mechanization lane |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206928948U true CN206928948U (en) | 2018-01-26 |
Family
ID=61346195
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720709480.8U Withdrawn - After Issue CN206928948U (en) | 2017-06-16 | 2017-06-16 | One kind repaiies system along empty lane mechanization lane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206928948U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107060777A (en) * | 2017-06-16 | 2017-08-18 | 淮南矿业(集团)有限责任公司 | One kind repaiies system along empty lane mechanization lane |
-
2017
- 2017-06-16 CN CN201720709480.8U patent/CN206928948U/en not_active Withdrawn - After Issue
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107060777A (en) * | 2017-06-16 | 2017-08-18 | 淮南矿业(集团)有限责任公司 | One kind repaiies system along empty lane mechanization lane |
CN107060777B (en) * | 2017-06-16 | 2023-07-25 | 淮南矿业(集团)有限责任公司 | Gob-side entry mechanized roadway repair system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104564050B (en) | Equipment for heading and anchoring parallel operation construction | |
CN108150172A (en) | A kind of single method of mining coal from heavy pitch thick coal seam | |
CN1932240B (en) | Full-seam cutting, retreating, separate moving and full-caving comprehensive mechanized coal mining method | |
CN101858215B (en) | Road retained method for extrusion molding of waste rock | |
CN104088643B (en) | A kind of high-dipping point blank coal seam Sub-Level Caving coal-mining method | |
CN101915100B (en) | Loess-filling coal-mining method in a coal mine | |
CN101403302B (en) | Pedrail type liftable anchor bar anchor cable construction drill rig and double-lane fast digging technique | |
CN104653182A (en) | Coal mining method for coal and gangue separate recovery of coal seam with dirt band | |
CN109751078B (en) | Device and method for filling triangular area at end head of coal face | |
CN101881162A (en) | Drill loader | |
CN105952453A (en) | Long wall advancing type mechanical non-roadway mining complete plant for coal seam face | |
CN101824990B (en) | Rock drivage process for four-arm hydraulic drill rig and breaking-loading-transporting-guniting integrated machine | |
CN204921002U (en) | Transport and stock anchor rope support system | |
CN205154176U (en) | Two rock gangway sharing discharge refuse systems in colliery | |
CN105401951A (en) | Common gangue removal method and system for dual rock roadways of coal mine | |
CN103174424A (en) | Breast and pillar method under long-wall arrangement | |
CN206928948U (en) | One kind repaiies system along empty lane mechanization lane | |
CN207829887U (en) | A kind of single steep-inclined thick coal seam coal mining system | |
CN204476407U (en) | A kind of pick anchor parallel operations construction equipment | |
CN104088642B (en) | A kind of super Shortwall mining method | |
CN209780954U (en) | Coal face end triangular space filling device | |
CN209494569U (en) | A kind of novel coal lane high-speed driving machine | |
CN104329117A (en) | Installation method of comprehensive mechanized filling, coal mining and open-off cutting equipment | |
CN107060777A (en) | One kind repaiies system along empty lane mechanization lane | |
CN115043138A (en) | Coal mine underground gangue backfill continuous conveying equipment and gangue backfill method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20180126 Effective date of abandoning: 20230725 |
|
AV01 | Patent right actively abandoned |
Granted publication date: 20180126 Effective date of abandoning: 20230725 |