CN206928948U - One kind repaiies system along empty lane mechanization lane - Google Patents

One kind repaiies system along empty lane mechanization lane Download PDF

Info

Publication number
CN206928948U
CN206928948U CN201720709480.8U CN201720709480U CN206928948U CN 206928948 U CN206928948 U CN 206928948U CN 201720709480 U CN201720709480 U CN 201720709480U CN 206928948 U CN206928948 U CN 206928948U
Authority
CN
China
Prior art keywords
lane
mechanization
excavator
along empty
scrapper conveyor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201720709480.8U
Other languages
Chinese (zh)
Inventor
谢杨华
彭矿
李南南
苏毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huainan Mining Group Co Ltd
Original Assignee
Huainan Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huainan Mining Group Co Ltd filed Critical Huainan Mining Group Co Ltd
Priority to CN201720709480.8U priority Critical patent/CN206928948U/en
Application granted granted Critical
Publication of CN206928948U publication Critical patent/CN206928948U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model discloses one kind system is repaiied along empty lane mechanization lane, it is characterized in that, including scrapper conveyor induction system, face conveyor, excavator, the output end of the scrapper conveyor induction system is connected with work transporter, the excavator coordinates scrapper conveyor induction system mutually to run, and the input of the scrapper conveyor induction system coordinates with excavator to be run.The utility model compared with prior art the advantages of be:The use that the utility model passes through MWY6/0.3 coals hydraulic excavator for mine and 40Z chain mat machines, going down the hill in the grooves of Gu Qiaokuang 11, the mechanization of air way planted agent's operation has been gone up in realization to 1124 (1) working faces substantially along empty lane in exploiting field, the realization of mechanization planted agent, both worker's labor intensity had been reduced, planted agent's speed is accelerated again, while also a saving a large amount of costs of human resources.

Description

One kind repaiies system along empty lane mechanization lane
Technical field
It the utility model is related to lane and repair technical field, more particularly to one kind repaiies system along empty lane mechanization lane.
Background technology
To ensure air way ventilation section on fully-mechanized mining working, accelerate lane repair degree, reduce worker's labor intensity, realize manpower The reasonably optimizing of resource, my ore deposit air way on 1124 (1) working faces put into a set of MWY6/0.3 coals hydraulic excavator for mine and 40Z chain mat machines, carry out lane and repair operation.Being shown by mining type and ore deposit pressure influences, and cares for the groove of bridge ore deposit 11 and goes down the hill on each working face in exploiting field Air way is gob side entry, in exploitation process, tunnel roof and floor and two helps the amount of shifting near very big, the section deficiency that causes to divulge information is, it is necessary to logical Cross planted agent, kaneh section is repaiied in Si Bangdeng lanes, because big workload and upper air way humid environment, sultry, people's work are repaiied in lane Industry progress is slow, while because lane space is narrow and cost of human resources limitation, can not largely put into labour, therefore be badly in need of carrying out Repair in mechanization lane.
As Fig. 1 be initial stage lane repair the structural representation of system, working face is using flat car by excavator whole Transporting to rail Along continuous rope tail, it then will start excavator after connection excavation electromechanical source and run to rail along canopy mouth is changed, for convenience of 40Z scrapper conveyors The connection of power supply and switch and the drawing of itself are moved, used, and select 40Z scrapper conveyor heads being arranged in work surface side, tail outside, Scrapper conveyor backward running shipment.Drawn using a 17.5kw puffer and move 40Z scrapper conveyors.During normal back production, upper air way is advanced Pressure manifestation scope be working face to away from working face wall 50m, the regional roadway two helps displacement big and needs marguise to prop up in advance Shield, while limited by methane gas extraction pipeline, excavator work department rotates horizontally scope only 2.8m or so, can not meet excavator 360 ° of rotations, while 40Z scrapper conveyors, because of shipment of moving backward, the limit uses length only 40~50m.Therefore excavator can only be in 40Z scraper plates Acted as a planted agent in the range of machine head (away from 40~50m of working face), and by digger operating device towards working face, before excavator retrusive Enter.The MWY6/0.3 type excavators that we use, Excavating bucket is coordinated to be acted as a planted agent in vertical direction using hydraulic arm, digging operation Certain stroke is needed, minimum operation height cannot be below 2.5m.During crossing exceptions area, the upper advanced pressure manifestation scope of air way reaches 120m or so, Floor Heave in Roadway amount is big in the range of this, and pucking speed is fast, and the operating type at initial stage can not meet that planted agent requires, On the contrary may be because of pucking, tunnel can not meet small digging machine normal operation, on the contrary be removed small digging machine by the way of manually acting as a planted agent. Meanwhile during crossing exceptions area, to strengthen roof timbering, it is also necessary to which the advanced marguise distance of air way in extension, 40Z chain mat machines length is more Planted agent's demand can not be met.Initial stage using 40Z scrapper conveyors to during face conveyor shipment, using two section enameled troughs as Cross, still, often alluvial on enameled trough, influences normal shipment, two workers need to be arranged to be responsible for specially taking off goods goods, both unrestrained It is again dangerous to take manpower.Based on this, now research one kind repaiies system along empty lane mechanization lane, solves this problem well.
Utility model content
The purpose of this utility model is overcome the deficiencies in the prior art, there is provided one kind is repaiied along empty lane mechanization lane is System.
The utility model is achieved through the following technical solutions:One kind repaiies system along empty lane mechanization lane, and its feature exists In, including scrapper conveyor induction system, face conveyor, excavator, output end and the work fortune of the scrapper conveyor induction system Defeated machine is connected, and the excavator coordinates scrapper conveyor induction system mutually to run, the input of the scrapper conveyor induction system and excavation Machine coordinates operation.
As one of preferred embodiment of the present utility model, the scrapper conveyor induction system includes 40Z drag conveyors.
As one of preferred embodiment of the present utility model, the 40Z drag conveyors are the 40Z of two length 75m, 45m Drag conveyor, described 75m, 45m 40Z drag conveyors are front and rear to be overlapped.
As one of preferred embodiment of the present utility model, described 75m, 45m 40Z drag conveyors conveying direction it is consistent and It is synchronised.
As one of preferred embodiment of the present utility model, in addition to reprint belt, the output of the scrapper conveyor induction system End is connected by reprinting belt with work transporter.
As one of preferred embodiment of the present utility model, the scrapper conveyor induction system both sides are provided with advanced marguise supporting.
As one of preferred embodiment of the present utility model, the excavator is MWY6/0.3 type excavators.
As one of preferred embodiment of the present utility model, the MWY6/0.3 types excavator includes excavator body, described Excavator body is fixed on flat car.
As one of preferred embodiment of the present utility model, roller and sleeper or sheeting caps, institute are provided with below the flat car State and anchor chain is provided with below roller, woven bag is provided with below the big plate in flat car rear.
As one of preferred embodiment of the present utility model, the scrapper conveyor induction system, face conveyor, excavator are equal The grooves of Gu Qiaokuang 11 exploiting field of going down the hill is placed in be used cooperatively along empty lane.
The utility model compared with prior art the advantages of be:The utility model passes through MWY6/0.3 collieries hydraulic excavating The use of machine and 40Z chain mat machines, going down the hill in the grooves of Gu Qiaokuang 11, air way has been gone up in realization to 1124 (1) working faces substantially along empty lane in exploiting field The mechanization of planted agent's operation, the realization of mechanization planted agent, had both reduced worker's labor intensity, and had accelerated planted agent's speed again, simultaneously It also a saving a large amount of costs of human resources.
Brief description of the drawings
Fig. 1 is improvement pre-structure schematic diagram of the present utility model;
Fig. 2 is excavator structure schematic diagram of the present utility model;
Fig. 3 is structural representation of the present utility model.
Embodiment
Embodiment of the present utility model is elaborated below, the present embodiment using technical solutions of the utility model before Put and implemented, give detailed embodiment and specific operating process, but the scope of protection of the utility model is unlimited In following embodiments.
Referring to Fig. 2,3:It is a kind of to repair system along empty lane mechanization lane, including scrapper conveyor induction system 1, face conveyor 2, Excavator 3, the output end of the scrapper conveyor induction system 1 are connected with work transporter 2, and the excavator 3 coordinates scrapper conveyor defeated The phase of system 1 is sent to run, the input of the scrapper conveyor induction system 1 coordinates with excavator 3 to be run.
As one of preferred embodiment of the present utility model, the scrapper conveyor induction system 1 includes 40Z drag conveyors.
As one of preferred embodiment of the present utility model, the 40Z drag conveyors are the 40Z of two length 75m, 45m Drag conveyor, described 75m, 45m 40Z drag conveyors are front and rear to be overlapped.
As one of preferred embodiment of the present utility model, described 75m, 45m 40Z drag conveyors conveying direction it is consistent and It is synchronised.
As one of preferred embodiment of the present utility model, in addition to reprint belt 4, the scrapper conveyor induction system 1 it is defeated Go out end and be connected by reprinting belt 4 with work transporter 2.
As one of preferred embodiment of the present utility model, the both sides of scrapper conveyor induction system 1 are provided with advanced marguise supporting 5。
As one of preferred embodiment of the present utility model, the excavator 3 is MWY6/0.3 type excavators.
As one of preferred embodiment of the present utility model, the MWY6/0.3 types excavator includes excavator body 301, institute Excavator body 301 is stated to be fixed on flat car 302.
As one of preferred embodiment of the present utility model, the lower section of the flat car 302 be provided with roller 303 and sleeper 307 with Sheeting caps 308, the lower section of roller 303 are provided with anchor chain 304, and the big lower section of plate 305 in the rear of flat car 302 is provided with woven bag 306。
As one of preferred embodiment of the present utility model, the scrapper conveyor induction system 1, face conveyor 2, excavator 3 are placed in caring for the groove of bridge ore deposit 11 exploiting field of going down the hill is used cooperatively along empty lane.
The utility model uses MWY6/0.3 type excavators, coordinates Excavating bucket to be crouched in vertical direction using hydraulic arm Bottom, digging operation need certain stroke, and minimum operation height cannot be below 2.5m.During crossing exceptions area, the upper advanced pressure of air way Show scope up to 120m or so, Floor Heave in Roadway amount is big in the range of this, and pucking speed is fast, and the operating type at initial stage can not meet Planted agent's requirement, on the contrary may be because of pucking, and tunnel can not meet small digging machine normal operation, on the contrary will be small by the way of manually acting as a planted agent Digging machine removes.Meanwhile during crossing exceptions area, to strengthen roof timbering, it is also necessary to the advanced marguise distance of air way, 40Z chains in extension Trigger length can not more meet planted agent's demand.Initial stage uses two section enamel using 40Z scrapper conveyors to during face conveyor shipment Chute is as transition, and still, often alluvial on enameled trough, influences normal shipment, two workers need to be arranged specially to bear goods Duty takes off goods, not only waste of manpower but also dangerous.Once acted as a planted agent scope for increase excavator, consider to extend 40Z drag conveyors, but by Scrapper conveyor power of motor and chain load resistance energy power restriction, it is impossible to take the mode of increase chute to extend chain mat machine shipment length. Therefore consider to overlap two scrapper conveyors, and a set of overlap joint stand is processed, it is respectively 45m and 75m scraper plate prow by two length Tail connects, and is linked to be entirety, is drawn simultaneously using winch and moves two scrapper conveyors.So, scrapper conveyor can be placed side bottom by excavator in advance Plate is sleeping to be removed and goods is deposited in into opposite side temporarily, is then drawn shifting scrapper conveyor again, is realized that tunneling boring is acted as a planted agent in advance.To solve scraper plate Machine to face conveyor shift goods automatically the problem of, utilize support roller for belt machine and one section of 800mm belt to coordinate wind coal borer structure Part devises a typhoon turn and carries belt, had so both saved manpower and turn avoid unsafe factor.
Preferred embodiment of the present utility model is the foregoing is only, it is all at this not to limit the utility model All any modification, equivalent and improvement made within the spirit and principle of utility model etc., should be included in the utility model Protection domain within.

Claims (10)

1. one kind repaiies system along empty lane mechanization lane, it is characterised in that including scrapper conveyor induction system, face conveyor, digging Pick machine, the output end of the scrapper conveyor induction system are connected with work transporter, and the excavator coordinates scrapper conveyor induction system Mutually run, the input of the scrapper conveyor induction system coordinates with excavator to be run.
2. according to claim 1 repair system along empty lane mechanization lane, it is characterised in that the scrapper conveyor induction system bag Include 40Z drag conveyors.
3. according to claim 2 repair system along empty lane mechanization lane, it is characterised in that the 40Z drag conveyors are The 40Z drag conveyors of two length 75m, 45m, described 75m, 45m 40Z drag conveyors are front and rear to be overlapped.
4. according to claim 3 repair system along empty lane mechanization lane, it is characterised in that described 75m, 45m 40Z scraper plates Conveyer conveying direction is consistent and is synchronised.
5. according to claim 1 repair system along empty lane mechanization lane, it is characterised in that also include reprinting belt, it is described The output end of scrapper conveyor induction system is connected by reprinting belt with work transporter.
6. according to claim 1 repair system along empty lane mechanization lane, it is characterised in that the scrapper conveyor induction system two Side is provided with advanced marguise supporting.
7. according to claim 1 repair system along empty lane mechanization lane, it is characterised in that the excavator is MWY6/0.3 Type excavator.
8. according to claim 7 repair system along empty lane mechanization lane, it is characterised in that the MWY6/0.3 types excavator Including excavator body, the excavator body is fixed on flat car.
9. according to claim 8 repair system along empty lane mechanization lane, it is characterised in that rolling is provided with below the flat car Wheel and sleeper or sheeting caps, the roller lower section are provided with anchor chain, woven bag are provided with below the big plate in flat car rear.
10. described system is repaiied along empty lane mechanization lane according to claim 1-9 is any, it is characterised in that the scrapper conveyor is defeated Send system, face conveyor, excavator to be placed in caring for the groove of bridge ore deposit 11 exploiting field of going down the hill to be used cooperatively along empty lane.
CN201720709480.8U 2017-06-16 2017-06-16 One kind repaiies system along empty lane mechanization lane Withdrawn - After Issue CN206928948U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720709480.8U CN206928948U (en) 2017-06-16 2017-06-16 One kind repaiies system along empty lane mechanization lane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720709480.8U CN206928948U (en) 2017-06-16 2017-06-16 One kind repaiies system along empty lane mechanization lane

Publications (1)

Publication Number Publication Date
CN206928948U true CN206928948U (en) 2018-01-26

Family

ID=61346195

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720709480.8U Withdrawn - After Issue CN206928948U (en) 2017-06-16 2017-06-16 One kind repaiies system along empty lane mechanization lane

Country Status (1)

Country Link
CN (1) CN206928948U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107060777A (en) * 2017-06-16 2017-08-18 淮南矿业(集团)有限责任公司 One kind repaiies system along empty lane mechanization lane

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107060777A (en) * 2017-06-16 2017-08-18 淮南矿业(集团)有限责任公司 One kind repaiies system along empty lane mechanization lane
CN107060777B (en) * 2017-06-16 2023-07-25 淮南矿业(集团)有限责任公司 Gob-side entry mechanized roadway repair system

Similar Documents

Publication Publication Date Title
CN104564050B (en) Equipment for heading and anchoring parallel operation construction
CN108150172A (en) A kind of single method of mining coal from heavy pitch thick coal seam
CN1932240B (en) Full-seam cutting, retreating, separate moving and full-caving comprehensive mechanized coal mining method
CN101858215B (en) Road retained method for extrusion molding of waste rock
CN104088643B (en) A kind of high-dipping point blank coal seam Sub-Level Caving coal-mining method
CN101915100B (en) Loess-filling coal-mining method in a coal mine
CN101403302B (en) Pedrail type liftable anchor bar anchor cable construction drill rig and double-lane fast digging technique
CN104653182A (en) Coal mining method for coal and gangue separate recovery of coal seam with dirt band
CN109751078B (en) Device and method for filling triangular area at end head of coal face
CN101881162A (en) Drill loader
CN105952453A (en) Long wall advancing type mechanical non-roadway mining complete plant for coal seam face
CN101824990B (en) Rock drivage process for four-arm hydraulic drill rig and breaking-loading-transporting-guniting integrated machine
CN204921002U (en) Transport and stock anchor rope support system
CN205154176U (en) Two rock gangway sharing discharge refuse systems in colliery
CN105401951A (en) Common gangue removal method and system for dual rock roadways of coal mine
CN103174424A (en) Breast and pillar method under long-wall arrangement
CN206928948U (en) One kind repaiies system along empty lane mechanization lane
CN207829887U (en) A kind of single steep-inclined thick coal seam coal mining system
CN204476407U (en) A kind of pick anchor parallel operations construction equipment
CN104088642B (en) A kind of super Shortwall mining method
CN209780954U (en) Coal face end triangular space filling device
CN209494569U (en) A kind of novel coal lane high-speed driving machine
CN104329117A (en) Installation method of comprehensive mechanized filling, coal mining and open-off cutting equipment
CN107060777A (en) One kind repaiies system along empty lane mechanization lane
CN115043138A (en) Coal mine underground gangue backfill continuous conveying equipment and gangue backfill method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20180126

Effective date of abandoning: 20230725

AV01 Patent right actively abandoned

Granted publication date: 20180126

Effective date of abandoning: 20230725