CN101824990B - Rock drivage process for four-arm hydraulic drill rig and breaking-loading-transporting-guniting integrated machine - Google Patents

Rock drivage process for four-arm hydraulic drill rig and breaking-loading-transporting-guniting integrated machine Download PDF

Info

Publication number
CN101824990B
CN101824990B CN201010170134XA CN201010170134A CN101824990B CN 101824990 B CN101824990 B CN 101824990B CN 201010170134X A CN201010170134X A CN 201010170134XA CN 201010170134 A CN201010170134 A CN 201010170134A CN 101824990 B CN101824990 B CN 101824990B
Authority
CN
China
Prior art keywords
rock
hydraulic drill
broken
spray
arm hydraulic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201010170134XA
Other languages
Chinese (zh)
Other versions
CN101824990A (en
Inventor
闫振东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201010170134XA priority Critical patent/CN101824990B/en
Publication of CN101824990A publication Critical patent/CN101824990A/en
Application granted granted Critical
Publication of CN101824990B publication Critical patent/CN101824990B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention relates to a rock drivage process for a four-arm hydraulic drill rig and a breaking-loading-transporting-guniting integrated machine. The process is mainly characterized by adopting the four-arm hydraulic drill rig to carry out porthole drilling, hole supporting and anchor bolt and cable supporting, and adopting a rock breaking-loading-transporting-guniting integrated machine combining the functions of rock breaking, rock loading, rock transporting and guniting to cooperate to complete rock operation. The process comprises the specific steps of hole drilling, charging, blasting, temporary supporting, supporting, guniting and the like, and the four-arm hydraulic drill rig and the rock breaking-loading-transporting-guniting integrated machine alternately go into a rock driving face area to perform construction operation in the rock drivage process. The process adopts advanced technical equipment, makes the improvement on the existing rock drivage technology, entirely realizes the comprehensive mechanical operation for rock construction, and has the obvious advantages of improving rock drivage footage level, reducing labor intensity of workers, saving human power, raising efficiency, improving field operating environment, reducing the occurence of occupational diseases, effectively ensuring safe production and the like.

Description

Four arm hydraulic drill rigs and broken stone drifting technology of loading and transporting the spray integral machine
Technical field
The invention belongs to down-hole developing technology, specifically a kind of stone drifting technology that is adapted to down-hole rock lane comprehensive mechanization developing operation.
Background technology
At present, all kinds of rock roadway in coal mine drivings of China generally adopt the big gun pick, and support pattern is anchor pole, anchor cable, joist, anchor net combination supporting.The big gun pick is the perforating of gas leg type air drill; The manual charging, blow out; Blow out the spoil that falls, artificial fragmentation earlier adopts rock rake to transport work plane again; After the work plane spoil cleans out, use the monomer air drill to carry out the anchor shaft anchor cable supporting.Mainly there is following problem:
1, the mechanization equipment level is very low: the down-hole rock gangway mechanized of China has developed decades, but present most of operation is still leaned on artificial the completion, and the mechanization equipment level is very low;
2, tunnelling footage is low: because most of operation is leaned on artificial the completion, so rock gangway list drilling depth is very low, big section drill footage per month generally has only about 50m;
3, personnel selection is many, and work efficiency is low;
4, labor strength is big, and operating environment is poor;
5, safety factor is low.
Summary of the invention
The object of the invention is exactly low to mechanization equipment level in the existing rock gangway construction, and the problem that stone drifting technology is relatively backward provides a kind of stone drifting technology that adopts advanced technical equipment; Realize rock gangway construction comprehensive mechanical equalization, reach and improve stone drifting drilling depth level, reduce labor strength; Subtract the people and put forward effect; Improve site work environment, reduce the generation of occupational disease, realize the purpose of safety in production.
To achieve these goals, technical scheme of the present invention is:
Four arm hydraulic drill rigs and broken stone drifting technology of loading and transporting the spray integral machine; It is characterized in that adopting four arm hydraulic drill rigs to carry out blast hole drilling, eyeshield and anchor shaft anchor cable supporting, and adopt the broken shipment of rock gangway that integrates brokenly rock, muck, Yun Yan, whitewashes to spray integral machine and match and carry out the rock gangway operation; Concrete construction sequence comprises as follows:
1, perforating: with march forward machine to work plane zone of four arm hydraulic drill rigs; According to operating regulation and explosion chart; Adopt the double-deck subregion construction and the method blast hole drilling of parallel operations to construct by four hydraulic drill rigs on the four arm hydraulic drill rigs; Double-deck subregion construction is exactly to be divided into zone up and down with four hydraulic drill rigs on the four arm hydraulic drill rigs with the body platform with the method for parallel operations, and carries out perforating simultaneously;
2, powder charge, blow out: after the blast hole drilling construction finished, four arm hydraulic drill rigs were drawn back machine to safe distance, were accomplished powder charge and were blown out by manual work;
3, broken bulk rock: blow out finish after, with the broken shipment spray of rock gangway integral machine machine to the work plane zone of marching forward, use the broken rock hammer device on the broken shipment spray of the rock gangway integral machine to carry out fragmentation to blowing out the large rock mass of back work plane; The cash that pushes away on the integral machine of the broken shipment spray of rock gangway simultaneously is filled to the rock rake on the belt conveyer on the broken shipment spray of the rock gangway integral machine with rake rock shovel plate, and is transported to outwards transportation on the mobile belt of rock gangway again through elevating conveyor;
4, temporary lining: the shipment of the rock of work plane is finished, and the broken shipment spray of rock gangway integral machine is drawn back machine to safe distance, in order to guarantee operating personnel's safety, by the temporary support device of four arm hydraulic drill rigs top board is carried out temporary lining;
5, supporting: after the temporary lining, use four hydraulic drill rigs of four arm hydraulic drill rigs, carry out lapping simultaneously, go up support process such as joist, perforating and notes anchor, pretension, stretch-draw;
6, whitewashing: after supporting finishes; Four arm hydraulic drill rigs move back the broken shipment spray of machine to rock gangway integral machine rear portion; By the refractory gunning equipment that freely swings and rotate in the broken shipment spray of the rock gangway integral machine, and the wet type whitewashing cylinder stirring system and the high-voltage transmission system that are equipped with at random, the wet type whitewashing is carried out in the tunnel sealed;
7, the broken shipment spray of four arm hydraulic drill rigs and rock gangway integral machine alternately gets into stone drifting face zone and carries out construction operation in this stone drifting technology.
Stone drifting technology provided by the invention compared with prior art has outstanding substantive distinguishing features to be:
1, greatly improved the mechanization level of rock gangway development works face, made the mechanization level of rock gangway development works face reach 96%, improved 66 percentage points than 30% of big gun pick mechanization level.Because mechanization degree improves, and has reduced working strength of workers significantly, has improved workman's operating environment;
2, the single water inlet that has greatly improved rock gangway is put down, and is about 3 times of rock gangway big gun pick level;
3, having improved the developing work efficiency significantly, is about 3 times of rock gangway big gun pick work efficiency;
4, energy-saving and cost-reducing: because the broken shipment spray of rock gangway integral machine adopts the rock of drilling and blasting, energy consumption descends significantly.
5, four arm hydraulic drill rigs have reliable temporary lining, can control top board effectively, prevent the generation of all kinds of roof accidents, have realized safety in production.
6, reduced cost of production: adopt the refractory gunning equipment that freely swings and rotate in the broken shipment spray of the rock gangway integral machine, be equipped with wet type whitewash cylinder stirring system and high-voltage transmission system at random; Promptly guaranteed the whitewashing quality, and rebound degree has been reduced to below 10%.
7, environmental protection effect is obvious: adopt the refractory gunning equipment that freely swings and rotate in the broken shipment spray of four arm hydraulic drill rig perforatings, supporting and the rock gangway integral machine, when being equipped with wet type whitewashing cylinder stirring system and high-voltage transmission system and whitewashing at random; The workman can avoid operation under the mal-condition that the harm of dust and trickle is arranged; Effectively improve workman's operating environment, reduced worker's anthraco-silicosis and rheumatismal generation.
For this reason, the present invention is that mechanization degree reaches 96% rock gangway mechanized and job practices.
The innovative point of rock lane comprehensive mechanization driving technology:
1, the stone drifting operation has all realized the mechanized construction operation from perforating, muck, broken rock, Yun Yan, supporting, whitewashing.
2, realize rock gangway perforating, supporting and broken rock, muck, Yun Yan, the staggered construction technology of whitewashing.
3, borehole, top-assisting anchor rod and anchor cable construction adopt the double-deck subregion construction of 4 bench drill machines, carry out parallel operations.
4, drilling tool adopts 180 ° of oscillating oil cylinder rotation techniques.
5, but employing free lifting, swing, flexible hydraulic pressure drill boom technology have realized the borehole construction of different angles.
6, adopted the construction drilling tool of high pulling torque, high thrust, high pretightning force.
7, broken rock adopts the hydraulic rock breaking device, has guaranteed broken rock speed.
8, broken rock device can have been realized the end, repair group's function.
9, muck adopts high pulling torque, low frequency mechanical rake pawl muck device.
10, the fortune rock adopts high-power adhesive tape fortune rock device.
11, the whitewashing arm can rotate automatically, goes up and down, stretch, but personnel's remote-controlled operation.
12, whitewashing system adopts the high-voltage transmission device, and transmission range can reach more than 500 meters; The whitewashing material stirs and adopts the drum-type mixing plant.
13, realized safe and reliable hydraulic pressure temporary lining.
Description of drawings
Fig. 1 is a borehole construction equipment arrangement diagram of the present invention;
Fig. 2 is the blast firing of powder charge layout of equipment of the present invention;
Fig. 3 is explosion of the present invention, dress, the fortune rock layout of equipment;
Fig. 4 is a support apparatus arrangement diagram of the present invention;
Fig. 5 is a spouting plant arrangement diagram of the present invention;
Fig. 6 is the structural representation of four arm hydraulic drill rigs used in the present invention;
Fig. 7 is the structural representation of broken shipment spray integral machine used in the present invention.
The specific embodiment
Be elaborated below in conjunction with accompanying drawing:
Fig. 1 is to shown in Figure 5, and four arm hydraulic drill rigs of the present invention spray the apparatus arrangement sketch map of each construction sequence of stone drifting technology of integral machine with broken shipment.This stone drifting technology is equipped with one four arm hydraulic anchor drill carriage 1 and a broken shipment spray integral machine 2 in a stone drifting tunnel; This four arms hydraulic anchor drill carriage is in all-in-one the place ahead; Integral machine is installed an elevating conveyor 3 at the back, and the elevating conveyor head overlaps at mobile belt machine tail part 4.
Four arm hydraulic drill rigs and broken stone drifting technology of loading and transporting the spray integral machine; Adopt four arm hydraulic drill rigs to carry out blast hole drilling, eyeshield and anchor shaft anchor cable supporting, and adopt the broken shipment of rock gangway that integrates brokenly rock, muck, Yun Yan, whitewashes to spray integral machine and match and carry out the rock gangway operation; Concrete construction sequence comprises as follows:
1, perforating: with march forward machine to work plane zone of four arm hydraulic drill rigs; According to operating regulation and explosion chart; Adopt the double-deck subregion construction and the method blast hole drilling of parallel operations to construct by four hydraulic drill rigs on the four arm hydraulic drill rigs, perforating hole depth and length of shot are 2-5 rice; Double-deck subregion construction is exactly to be divided into zone up and down with four hydraulic drill rigs on the four arm hydraulic drill rigs with the body platform with the method for parallel operations, and carries out perforating simultaneously.
2, powder charge, blow out: after the blast hole drilling construction finished, four arm hydraulic drill rigs were drawn back machine to safe distance, were accomplished powder charge and were blown out by manual work;
3, broken bulk rock: blow out finish after, with the broken shipment spray of rock gangway integral machine machine to the work plane zone of marching forward, use the broken rock hammer device on the broken shipment spray of the rock gangway integral machine to carry out fragmentation to blowing out the large rock mass of back work plane; The cash that pushes away on the integral machine of the broken shipment spray of rock gangway simultaneously is filled to the rock rake on the belt conveyer on the broken shipment spray of the rock gangway integral machine with rake rock shovel plate, and is transported to outwards transportation on the mobile belt of rock gangway again through elevating conveyor;
4, temporary lining: the shipment of the rock of work plane is finished, and the broken shipment spray of rock gangway integral machine is drawn back machine to safe distance, in order to guarantee operating personnel's safety, by the temporary support device of four arm hydraulic drill rigs top board is carried out temporary lining;
5, supporting: after the temporary lining, use four hydraulic drill rigs of four arm hydraulic drill rigs, carry out lapping simultaneously, go up support process such as joist, perforating and notes anchor, pretension, stretch-draw;
6, whitewashing: after supporting finishes; Four arm hydraulic drill rigs move back the broken shipment spray of machine to rock gangway integral machine rear portion; By the refractory gunning equipment that freely swings and rotate in the broken shipment spray of the rock gangway integral machine, and the wet type whitewashing cylinder stirring system and the high-voltage transmission system that are equipped with at random, the wet type whitewashing is carried out in the tunnel sealed.
7, the broken shipment spray of four arm hydraulic drill rigs and rock gangway integral machine alternately gets into stone drifting face zone in this stone drifting technology
Carry out construction operation.
Employed four arm hydraulic drill rigs in the stone drifting technology of the present invention's four arm hydraulic drill rigs and broken shipment spray integral machine; Being and being the special equipment of stone drifting process exploitation of the present invention, is a kind of movable two-platform partitioned four-arm hanging wall anchor rod and anchor cable construction drill carriage.As shown in Figure 6, it mainly comprises track unit 11, body platform 12, lift platform 13, platform lifting device 14, drill boom part 15, hydraulic drill rig part 16, temporary support device 17, hydraulic operating system 18, pump station part and main motor; Described body platform is loaded on the track unit, at body platform mounting platform lifting gear, connects lift platform on the platform lifting device; Described drill boom partly is loaded on the rear side of the upper and lower of lift platform, and the and arranged on left and right sides of lift platform; Four groups of drill boom parts and hydraulic drill rig part promptly are housed on lift platform altogether; Described hydraulic drill rig partly is loaded on drill boom part front end; Temporary lining is fixedly mounted on the lift platform front end; Described hydraulic operating system, pump station part and main motor are loaded on the back on the body platform.
Employed broken shipment spray integral machine in the stone drifting technology of four arm hydraulic drill rigs of the present invention and broken shipment spray integral machine; Be with for the special equipment of stone drifting process exploitation of the present invention; As shown in Figure 7, the broken shipment spray of this stone drifting integral machine comprises track unit 21, push away that cash and rake rock shovel plate 22, belt conveyer 23, broken petrosa divide 24, hydraulic pressure and operating system 25, body platform 26, refractory gunning equipment 27 and pedestal 28; Push away cash and shovel the place ahead that plate is contained in said track unit with the rake rock, belt conveyer is installed in the rear of shovel plate and the centre of crawler travel portion; Described hydraulic pressure and operating system are loaded on the body platform of top of track unit; Described pedestal is fixed on the front middle part of body platform, and the broken petrosa branch of described rake rock is movably connected on the pedestal, and described refractory gunning equipment is loaded on brokenly a side of rock pneumatic hammer.

Claims (1)

1. the stone drifting technology of the broken shipment spray of arm hydraulic drill rig and rock gangway integral machine; It is characterized in that adopting four arm hydraulic drill rigs to carry out blast hole drilling, eyeshield and anchor shaft anchor cable supporting, and adopt the broken shipment of rock gangway that integrates brokenly rock, muck, Yun Yan, whitewashes to spray integral machine and match and carry out the rock gangway operation; Wherein:
Employed four arm hydraulic drill rigs in the stone drifting technology of the broken shipment spray of four arm hydraulic drill rigs and rock gangway integral machine; Be a kind of movable two-platform partitioned four-arm hanging wall anchor rod and anchor cable construction drill carriage, comprise track unit (11), body platform (12), lift platform (13), platform lifting device (14), drill boom part (15), hydraulic drill rig part (16), temporary support device (17), hydraulic operating system (18), pump station part and main motor; Described body platform is loaded on the track unit, at body platform mounting platform lifting gear, connects lift platform on the platform lifting device; Described drill boom partly is loaded on the rear side of the upper and lower of lift platform, and the and arranged on left and right sides of lift platform; Four groups of drill boom parts and hydraulic drill rig part promptly are housed on lift platform altogether; Described hydraulic drill rig partly is loaded on drill boom part front end; Temporary support device is fixedly mounted on the lift platform front end; Described hydraulic operating system, pump station part and main motor are loaded on the back on the body platform;
The broken shipment spray of employed rock gangway integral machine in the stone drifting technology of the broken shipment spray of four arm hydraulic drill rigs and rock gangway integral machine comprises track unit (21), pushes away cash and rake rock shovel plate (22), belt conveyer (23), broken petrosa branch (24), hydraulic pressure and operating system (25), body platform (26), refractory gunning equipment (27) and pedestal (28); Push away cash and shovel the place ahead that plate is contained in said track unit with the rake rock, belt conveyer is installed in the rear of shovel plate and the centre of track unit; Described hydraulic pressure and operating system are loaded on the body platform of top of track unit; Described pedestal is fixed on the front middle part of body platform, and described broken petrosa is divided into brokenly the rock pneumatic hammer and is movably connected on the pedestal, and described refractory gunning equipment is loaded on brokenly a side of rock pneumatic hammer;
Concrete construction sequence comprises as follows:
(1), perforating: with march forward machine to work plane zone of four arm hydraulic drill rigs; According to operating regulation and explosion chart; Adopt the double-deck subregion construction and the method blast hole drilling of parallel operations to construct by four hydraulic drill rigs on the four arm hydraulic drill rigs; Double-deck subregion construction is exactly to be divided into zone up and down with four hydraulic drill rigs on the four arm hydraulic drill rigs with the body platform with the method for parallel operations, and carries out perforating simultaneously;
(2), powder charge, blow out: after the blast hole drilling construction finished, four arm hydraulic drill rigs were drawn back machine to safe distance, were accomplished powder charge and were blown out by manual work;
(3), broken bulk rock: blow out finish after, with the broken shipment spray of rock gangway integral machine machine to the work plane zone of marching forward, use the broken rock pneumatic hammer on the broken shipment spray of the rock gangway integral machine to carry out fragmentation to blowing out the large rock mass of back work plane; The cash that pushes away on the integral machine of the broken shipment spray of rock gangway simultaneously is filled to outwards transportation on the belt conveyer on the broken shipment spray of the rock gangway integral machine with rake rock shovel plate with the rock rake;
(4), temporary lining: the shipment of the rock of work plane is finished, and the broken shipment spray of rock gangway integral machine is drawn back machine to safe distance, in order to guarantee operating personnel's safety, by the temporary support device of four arm hydraulic drill rigs top board is carried out temporary lining;
(5), supporting: after the temporary lining, use four hydraulic drill rigs of four arm hydraulic drill rigs, carry out lapping simultaneously, go up joist, perforating and notes anchor, pretension, stretch-draw support process;
(6), whitewashing: after supporting finishes; Four arm hydraulic drill rigs move back the broken shipment spray of machine to rock gangway integral machine rear portion; By the refractory gunning equipment that freely swings and rotate in the broken shipment spray of the rock gangway integral machine, and the wet type whitewashing cylinder stirring system and the high-voltage transmission system that are equipped with at random, the wet type whitewashing is carried out in the tunnel sealed;
(7), the broken shipment spray of four arm hydraulic drill rigs and rock gangway integral machine alternately gets into stone drifting face zone and carries out construction operation in this stone drifting technology.
CN201010170134XA 2010-04-20 2010-04-20 Rock drivage process for four-arm hydraulic drill rig and breaking-loading-transporting-guniting integrated machine Expired - Fee Related CN101824990B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010170134XA CN101824990B (en) 2010-04-20 2010-04-20 Rock drivage process for four-arm hydraulic drill rig and breaking-loading-transporting-guniting integrated machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010170134XA CN101824990B (en) 2010-04-20 2010-04-20 Rock drivage process for four-arm hydraulic drill rig and breaking-loading-transporting-guniting integrated machine

Publications (2)

Publication Number Publication Date
CN101824990A CN101824990A (en) 2010-09-08
CN101824990B true CN101824990B (en) 2012-06-06

Family

ID=42689128

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010170134XA Expired - Fee Related CN101824990B (en) 2010-04-20 2010-04-20 Rock drivage process for four-arm hydraulic drill rig and breaking-loading-transporting-guniting integrated machine

Country Status (1)

Country Link
CN (1) CN101824990B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101975069B (en) * 2010-09-16 2012-12-05 沈阳矿山机械有限公司 Automatic telescopic crushing device for tunnelling machine
CN104564089A (en) * 2014-12-31 2015-04-29 闫振东 Rock roadway quick tunneling process of impact crushing rock roadway tunneling machine
CN106401599A (en) * 2016-12-13 2017-02-15 淮南矿业(集团)有限责任公司 Large-section rock drivage system and construction method thereof
CN107060804B (en) * 2017-02-28 2021-02-23 郑东风 Multifunctional self-propelled anchor-support integrated machine behind heading machine
CN107905729B (en) * 2017-11-27 2023-10-03 铁万林 Four-arm rock perforating device and four-arm rock perforating machine with same
CN108049877B (en) * 2018-01-11 2024-08-16 中煤第三建设(集团)有限责任公司 Full-hydraulic intelligent drilling, installing and anchoring integrated machine
CN113123816B (en) * 2021-05-19 2022-04-22 淮南矿业(集团)有限责任公司 Coal mine rock roadway blasting and excavating mechanized construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1482357A (en) * 1975-09-25 1977-08-10 Lockwood Bennett Ltd Equipment for ripping tunnels or roadways and loading the debris
DE3902127A1 (en) * 1989-01-25 1990-07-26 E & Pk Ingbuero Wagon drill with laser-orientated control
CN1987046A (en) * 2006-11-27 2007-06-27 郑生 Supporting type continuous tunnelling machine
CN101220744A (en) * 2007-01-12 2008-07-16 三一重型装备有限公司 Development machine with narrow main body
CN101302933A (en) * 2008-06-25 2008-11-12 闫振东 Method for developing rock lane comprehensive mechanization developing operation
CN101343981A (en) * 2008-09-08 2009-01-14 义马煤业(集团)有限责任公司 Integrated drill rig
CN201273140Y (en) * 2008-09-08 2009-07-15 义马煤业(集团)有限责任公司 Integrated drill rig

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1482357A (en) * 1975-09-25 1977-08-10 Lockwood Bennett Ltd Equipment for ripping tunnels or roadways and loading the debris
DE3902127A1 (en) * 1989-01-25 1990-07-26 E & Pk Ingbuero Wagon drill with laser-orientated control
CN1987046A (en) * 2006-11-27 2007-06-27 郑生 Supporting type continuous tunnelling machine
CN101220744A (en) * 2007-01-12 2008-07-16 三一重型装备有限公司 Development machine with narrow main body
CN101302933A (en) * 2008-06-25 2008-11-12 闫振东 Method for developing rock lane comprehensive mechanization developing operation
CN101343981A (en) * 2008-09-08 2009-01-14 义马煤业(集团)有限责任公司 Integrated drill rig
CN201273140Y (en) * 2008-09-08 2009-07-15 义马煤业(集团)有限责任公司 Integrated drill rig

Also Published As

Publication number Publication date
CN101824990A (en) 2010-09-08

Similar Documents

Publication Publication Date Title
CN101824990B (en) Rock drivage process for four-arm hydraulic drill rig and breaking-loading-transporting-guniting integrated machine
CN103670420B (en) Tunneling boring shaft drilling machine
CN201236704Y (en) Coal drift drill shipping and anchoring integrated machine
CN103924977B (en) Center stand column tunneling boring shaft drilling machine
CN107060795B (en) A kind of underground mine TBM assembly construction methods
CN101858215B (en) Road retained method for extrusion molding of waste rock
CN101302933B (en) Method for developing rock lane comprehensive mechanization developing operation
CN101403302B (en) Pedrail type liftable anchor bar anchor cable construction drill rig and double-lane fast digging technique
CN211342765U (en) Multifunctional impact type hydraulic drill carriage suitable for rock roadway working face construction
CN103790591A (en) Comprehensive mechanized impact type rock tunneling machine
CN202578698U (en) Novel thin seam coal mine downhole mining complete equipment
CN104564089A (en) Rock roadway quick tunneling process of impact crushing rock roadway tunneling machine
CN112412450A (en) Drilling, loading and anchoring integrated machine
CN104747193A (en) Trolley for short-hole drilling, blasting and driving
CN111894596A (en) Vertical shaft raise construction method
CN101302932A (en) Method for underground chamber digging and laneway opening digging
CN203742602U (en) Central stand column full-section vertical shaft drilling machine
CN201810317U (en) Machine integrated with breaking, loading, carrying, spraying and tunneling for a rock roadway
CN109751078B (en) Device and method for filling triangular area at end head of coal face
CN102383795B (en) Comprehensive mechanical rock drift excavating process
CN102182473A (en) Feeding throwing jet for well digging
CN102536312A (en) Anchor rod transloading set
CN203603910U (en) Full-face vertical shaft drill
CN102587904B (en) Comprehensive mechanical rock lane tunneling machine
CN109281674A (en) A kind of hard-rock tunnel driving method using drill loader

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120606

Termination date: 20210420

CF01 Termination of patent right due to non-payment of annual fee