CN108049877B - Fully hydraulic intelligent drilling, installation and anchoring machine - Google Patents

Fully hydraulic intelligent drilling, installation and anchoring machine Download PDF

Info

Publication number
CN108049877B
CN108049877B CN201810026886.5A CN201810026886A CN108049877B CN 108049877 B CN108049877 B CN 108049877B CN 201810026886 A CN201810026886 A CN 201810026886A CN 108049877 B CN108049877 B CN 108049877B
Authority
CN
China
Prior art keywords
platform
arm
drilling
anchor
anchoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810026886.5A
Other languages
Chinese (zh)
Other versions
CN108049877A (en
Inventor
杨仁树
徐辉东
侯宝革
周树清
武杰
刘宁
岳中文
刘林林
常龙
汪晓光
李亚
田野
胡森旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Zhongtuo Intelligent Equipment Manufacturing Co ltd
China University of Mining and Technology Beijing CUMTB
China Coal No 3 Construction Group Co Ltd
Original Assignee
Shenyang Zhongtuo Intelligent Equipment Manufacturing Co ltd
China University of Mining and Technology Beijing CUMTB
China Coal No 3 Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Zhongtuo Intelligent Equipment Manufacturing Co ltd, China University of Mining and Technology Beijing CUMTB, China Coal No 3 Construction Group Co Ltd filed Critical Shenyang Zhongtuo Intelligent Equipment Manufacturing Co ltd
Priority to CN201810026886.5A priority Critical patent/CN108049877B/en
Publication of CN108049877A publication Critical patent/CN108049877A/en
Application granted granted Critical
Publication of CN108049877B publication Critical patent/CN108049877B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/006Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by making use of blasting methods
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/003Machines for drilling anchor holes and setting anchor bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/12Devices for removing or hauling away excavated material or spoil; Working or loading platforms
    • E21D9/126Loading devices or installations
    • E21D9/128Loader-conveyors with gathering arms

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Structural Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

The invention relates to the technical field of coal mine heading machines, in particular to a full-hydraulic intelligent drilling, installing and anchoring integrated machine which has drilling, installing, anchoring and protecting functions, and specifically comprises the following steps: the drilling system, the derrick device, the anchor protection platform and the transportation system are all arranged on the body. The invention has the functions of drilling, installing, anchoring, protecting and the like, and can finish various operations by using one device; the drill boom system drills a blasthole to achieve the purpose of burying explosive, and crushed rock and soil blocks after blasting are cleaned and received by a bucket device and conveyed to the rear side of the body through a conveying system to be received by secondary conveying; the anchoring platform can realize the anchoring operation in the tunnel; when the anchoring platform works, the scraper device can be propped against the top of the roadway for temporary support, so that the safety of the operation of workers is improved; one device can realize the functions at the same time, and reduces the labor intensity of workers on the premise of providing working efficiency.

Description

全液压智能钻装锚一体机Fully hydraulic intelligent drilling, installation and anchoring machine

技术领域Technical Field

本发明涉及煤矿掘进机技术领域,尤其涉及一种全液压智能钻装锚一体机。The present invention relates to the technical field of coal mine boring machines, and in particular to a fully hydraulic intelligent drilling, mounting and anchoring integrated machine.

背景技术Background Art

随着国民经济的快速发展,煤矿掘进机逐渐成为煤矿巷道开采的主要设备,但在岩石硬度较高的岩巷中,普遍采用钻爆法进行开拓。With the rapid development of the national economy, coal mine boring machines have gradually become the main equipment for coal mine tunnel mining. However, in rock tunnels with higher rock hardness, drilling and blasting methods are generally used for development.

目前,岩巷钻爆法施工方式及存在以下问题:At present, the construction method of rock tunnel drilling and blasting has the following problems:

1、人工钻孔+扒装机收料+皮带运输机出矸:人工钻孔后响炮,扒装机带动皮带运输机行驶至巷道指定位置,进行收料作业,缺点如下:1. Manual drilling + loading machine collecting materials + belt conveyor unloading gangue: After manual drilling, the blasting machine drives the belt conveyor to the designated position of the tunnel to collect materials. The disadvantages are as follows:

(1)人工钻孔时间长,劳动强度大,排渣水造成工作环境恶化:且危险性高;(1) Manual drilling takes a long time, is labor-intensive, and the slag water deteriorates the working environment and is highly dangerous;

(2)需要反复搬运设备以完成钻孔;(2) The equipment needs to be moved repeatedly to complete the drilling;

(3)需要人工打锚杆,劳动强度大,劳动效率低。(3) Anchor bolts need to be driven manually, which is labor-intensive and has low labor efficiency.

2、液压台车+扒装机+皮带运输机出矸:采用液压台车进行钻孔,响炮后,扒装机带动皮带运输机,组成连续运输系统进行出矸。缺点如下:2. Hydraulic trolley + loader + belt conveyor for gangue discharge: A hydraulic trolley is used for drilling. After the blast, the loader drives the belt conveyor to form a continuous transportation system for gangue discharge. The disadvantages are as follows:

(1)液压台车与扒装机需要在巷道内反复调运、错车。工人需要反复拖拽电缆、水管、气管,劳动强度大;(1) Hydraulic trolleys and loaders need to be repeatedly moved and staggered in the tunnel. Workers need to repeatedly drag cables, water pipes, and gas pipes, which is labor-intensive;

(2)响炮作业时,需要做好两台设备的防护工作,防护工作量较大;(2) When firing cannons, two devices need to be protected, which is a heavy workload;

(3)需要人工打锚杆,劳动强度大,劳动效率低。(3) Anchor bolts need to be driven manually, which is labor-intensive and has low labor efficiency.

发明内容Summary of the invention

(一)要解决的技术问题1. Technical issues to be resolved

本发明要解决的技术问题是:The technical problems to be solved by the present invention are:

1、岩巷钻爆法施工中,设备功能分散,设备轮换中无法避免大量的人力劳动,工人劳动量大,危险性高;1. In the construction of rock tunnel drilling and blasting, the functions of the equipment are dispersed, and a large amount of manual labor cannot be avoided during equipment rotation. The workload of the workers is large and the risk is high;

2、人工打锚杆时,需要先进行巷道临时支护作用,工人反复搬运锚杆机,劳动强度大,打顶锚杆,由于水排渣,造成工作环境恶劣。2. When driving anchor bolts manually, temporary support of the tunnel is required first. Workers repeatedly move the anchor bolt machine, which is labor-intensive. When driving the top anchor bolts, the working environment is harsh due to water slag discharge.

(二)技术方案(II) Technical solution

为了解决上述技术问题,本发明提供了一种全液压智能钻装锚一体机,同时具有钻、装、锚、护功能,具体包括:本体、钻臂系统、扒斗装置、锚护平台、运输系统,所述钻臂系统、扒斗装置、锚护平台、运输系统均设置在所述本体上,所述钻臂系统用于在巷道内打孔以填埋炸药,所述扒斗装置用于收集、清理爆破后掉落的岩土块并将所述岩土块送至所述运输系统内,所述运输系统用于将岩土块运输至所述本体的后侧,所述锚护平台用于对巷道进行锚、护操作,所述扒斗装置还用于在执行锚护操作时抵在巷道内以起到临时支护的作用。In order to solve the above technical problems, the present invention provides a fully hydraulic intelligent drilling, installation, anchoring and protection machine, which has the functions of drilling, installation, anchoring and protection, and specifically includes: a main body, a drill arm system, a bucket device, an anchor protection platform, and a transportation system. The drill arm system, the bucket device, the anchor protection platform, and the transportation system are all arranged on the main body. The drill arm system is used to drill holes in the tunnel to fill explosives. The bucket device is used to collect and clean up the rock and soil blocks that fall after blasting and send the rock and soil blocks to the transportation system. The transportation system is used to transport the rock and soil blocks to the rear side of the main body. The anchor protection platform is used to anchor and protect the tunnel. The bucket device is also used to rest in the tunnel when performing the anchor protection operation to provide temporary support.

其中,所述本体的左右两侧均设有所述钻臂系统和锚护平台。Wherein, the drilling arm system and the anchor protection platform are provided on both the left and right sides of the main body.

其中,所述本体的左右两侧均设有所述钻臂系统,所述锚护平台位于所述本体的上方。Wherein, the drilling arm system is provided on both the left and right sides of the main body, and the anchor protection platform is located above the main body.

其中,所述钻臂系统、锚护平台均能沿前后方向在所述本体上移动,所述钻臂系统、锚护平台分别通过轨道安装在滑台组件上,所述滑台组件与所述本体连接。Wherein, the drilling arm system and the anchor protection platform can both move on the main body in the front-rear direction, and the drilling arm system and the anchor protection platform are respectively installed on the slide assembly through rails, and the slide assembly is connected to the main body.

其中,所述锚护平台包括:锚杆机、工作平台、升降油缸、以及能沿所述轨道移动的小车,所述锚杆机安装在所述工作平台上,所述工作平台通过平行四连杆平动系统与所述小车一侧的连接板连接,所述平行四连杆平动系统包括升降油缸,所述升降油缸用于调节所述工作平台相对于所述小车的空间位置。Among them, the anchor protection platform includes: an anchor machine, a working platform, a lifting cylinder, and a trolley that can move along the track. The anchor machine is installed on the working platform, and the working platform is connected to the connecting plate on one side of the trolley through a parallel four-bar linkage system. The parallel four-bar linkage system includes a lifting cylinder, and the lifting cylinder is used to adjust the spatial position of the working platform relative to the trolley.

其中,所述平行四连杆平动系统还包括主臂、两根辅助臂、以及多个转座,所述主臂的两端均通过转座与所述工作平台和连接板连接,所述辅助臂的两端均通过转座与所述工作平台和连接板连接,所述转座具有一对相互垂直的连接轴,所述转座通过所述连接轴分别与所述工作平台、主臂、辅助臂、连接板铰接;所述升降油缸的两端分别与所述连接板、主臂铰接;连接所述主臂与连接板的转座、与小车之间连接有摆动油缸,所述摆动油缸用于带动所述主臂左右摆动。Among them, the parallel four-bar linkage translation system also includes a main arm, two auxiliary arms, and multiple swivels. Both ends of the main arm are connected to the working platform and the connecting plate through a swivel, and both ends of the auxiliary arm are connected to the working platform and the connecting plate through a swivel. The swivel has a pair of mutually perpendicular connecting shafts, and the swivel is respectively hinged to the working platform, the main arm, the auxiliary arm, and the connecting plate through the connecting shafts; the two ends of the lifting cylinder are respectively hinged to the connecting plate and the main arm; a swing cylinder is connected between the swivel connecting the main arm and the connecting plate and the trolley, and the swing cylinder is used to drive the main arm to swing left and right.

其中,所述工作平台连接有滑动平台,所述滑动平台能沿所述工作平台前后滑动且滑动距离可调节;所述滑动平台上转动连接有转角可调的翻转支座,所述翻转支座与所述锚杆机连接。Among them, the working platform is connected to a sliding platform, and the sliding platform can slide back and forth along the working platform and the sliding distance is adjustable; the sliding platform is rotatably connected to a flip support with adjustable rotation angle, and the flip support is connected to the anchor machine.

其中,所述扒斗装置、钻臂系统、锚护平台彼此互锁。Wherein, the scraper device, the drill arm system and the anchor protection platform are interlocked with each other.

其中,所述扒斗装置依次通过液压臂、回转座与所述本体连接,所述扒斗装置通过快换接头与所述液压臂连接。Wherein, the scraper device is connected to the main body through a hydraulic arm and a swivel seat in sequence, and the scraper device is connected to the hydraulic arm through a quick-change joint.

其中,还包括设置在所述本体上的:操作台、液压系统、电气系统、铲板、行走装置,所述操作台通过所述液压系统、电气系统同所述钻臂系统、扒斗装置、锚护平台、运输系统连接以实现全局控制;铲板设置在所述本体的前端,所述铲板用于与所述扒斗装置配合以收集、清理巷道内的岩土块;所述行走装置用于带动所述本体移动。Among them, it also includes: an operating table, a hydraulic system, an electrical system, a shovel board, and a walking device arranged on the main body. The operating table is connected with the drill arm system, the bucket device, the anchor protection platform, and the transportation system through the hydraulic system and the electrical system to achieve global control; the shovel board is arranged at the front end of the main body, and the shovel board is used to cooperate with the bucket device to collect and clean rock and soil blocks in the tunnel; the walking device is used to drive the main body to move.

(三)有益效果(III) Beneficial effects

本发明的上述技术方案与现有技术相比具有如下优点:本发明同时具有钻、装、锚、护等功能,利用一台设备就可以实现多种功能;钻臂系统打炮眼以实现填埋炸药的目的,爆破后破碎后的岩土块由扒斗装置进行清理、收料,并通过运输系统运至本体后侧由二运接收;锚护平台可以实现巷道内的锚、护操作;在锚护平台工作时,也可将扒斗装置抵在巷道顶部起到临时支护的作用;一台设备可以同时实现上述多种功能,在提供工作效率的前提下、降低工人劳动强度。Compared with the prior art, the above technical solution of the present invention has the following advantages: the present invention has the functions of drilling, loading, anchoring and protecting at the same time, and multiple functions can be realized by using one device; the drill arm system drills blast holes to achieve the purpose of landfilling explosives, and the broken rock and soil blocks after blasting are cleaned and collected by the scraper device, and transported to the rear side of the main body through the transportation system to be received by the second transport; the anchor protection platform can realize the anchoring and protecting operations in the tunnel; when the anchor protection platform is working, the scraper device can also be placed against the top of the tunnel to play a temporary support role; one device can realize the above multiple functions at the same time, while improving work efficiency, reducing the labor intensity of workers.

附图说明BRIEF DESCRIPTION OF THE DRAWINGS

图1是本发明实施例所述全液压智能钻装锚一体机的侧视图;FIG1 is a side view of a fully hydraulic intelligent drilling, mounting and anchoring machine according to an embodiment of the present invention;

图2是本发明实施例所述全液压智能钻装锚一体机的俯视图;FIG2 is a top view of the fully hydraulic intelligent drilling, installation and anchoring machine according to an embodiment of the present invention;

图3是本发明实施例所述全液压智能钻装锚一体机的立体图;FIG3 is a three-dimensional diagram of the fully hydraulic intelligent drilling, installation and anchoring machine according to an embodiment of the present invention;

图4是本发明实施例所述锚护平台的立体图之一;FIG4 is a perspective view of the anchoring platform according to an embodiment of the present invention;

图5是本发明实施例所述锚护平台的立体图之二。FIG. 5 is a second stereoscopic view of the anchoring platform according to the embodiment of the present invention.

图中:1、扒斗装置;2、破碎装置;3、操作台;4、左钻臂;5、本体;6、右钻臂;7、运输系统;8、液压系统;9、电气系统;10、运输机连接装置;11、后支承;12、行走装置;13、左锚护平台;131、驱动装置;132、小车;1321、连接板;133、转座;134、主臂;135、升降油缸;136、辅助臂;137、转座;138、工作平台;139、滑动平台;1391、翻转支座;1392、锚杆机;1310、轨道;14、铲板;15、右锚护平台;16、滑台组件;17、液压臂。In the figure: 1. bucket device; 2. crushing device; 3. operating table; 4. left drill arm; 5. main body; 6. right drill arm; 7. transportation system; 8. hydraulic system; 9. electrical system; 10. conveyor connecting device; 11. rear support; 12. walking device; 13. left anchor protection platform; 131. driving device; 132. trolley; 1321. connecting plate; 133. swivel seat; 134. main arm; 135. lifting cylinder; 136. auxiliary arm; 137. swivel seat; 138. working platform; 139. sliding platform; 1391. flip support; 1392. anchor bolter; 1310. track; 14. shovel plate; 15. right anchor protection platform; 16. slide assembly; 17. hydraulic arm.

具体实施方式DETAILED DESCRIPTION

为使本发明实施例的目的、技术方案和优点更加清楚,下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本发明的一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动的前提下所获得的所有其他实施例,都属于本发明保护的范围。In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

如图1至图3所示,本发明实施例提供的一种全液压智能钻装锚一体机,同时具有钻、装、锚、护功能,具体包括:本体5、钻臂系统、扒斗装置1、锚护平台、运输系统7,所述钻臂系统、扒斗装置1、锚护平台、运输系统7均设置在所述本体5上,所述钻臂系统用于在巷道内打孔以填埋炸药,所述扒斗装置1用于收集、清理爆破后掉落的岩土块并将所述岩土块送至所述运输系统7内,所述运输系统7用于将岩土块运输至所述本体5的后侧,所述锚护平台用于对巷道进行锚、护操作,所述扒斗装置1还用于在执行锚护操作时抵在巷道内以起到临时支护的作用。本发明同时具有钻、装、锚、护等功能,利用一台设备就可以完成上述多种操作;钻臂系统打炮眼以实现填埋炸药的目的,爆破后破碎后的岩土块由扒斗装置1进行清理、收料,并通过运输系统7运至本体5后侧由二运接收;锚护平台可以实现巷道内的锚护操作;在锚护平台工作时,也可将扒斗装置1抵在巷道顶部起到临时支护的作用;一台设备可以同时实现上述多种功能,在提供工作效率的前提下、降低工人劳动强度;整个过程无需搬运锚杆机,没有较大的体力消耗,工人劳动量大大减少。As shown in Figures 1 to 3, an embodiment of the present invention provides a fully hydraulic intelligent drilling, installation, anchoring and protection machine, which has the functions of drilling, installation, anchoring and protection, and specifically includes: a main body 5, a drill arm system, a bucket device 1, an anchor protection platform, and a transportation system 7. The drill arm system, the bucket device 1, the anchor protection platform, and the transportation system 7 are all arranged on the main body 5. The drill arm system is used to drill holes in the tunnel to bury explosives. The bucket device 1 is used to collect and clean up the rock and soil blocks that fall after blasting and send the rock and soil blocks to the transportation system 7. The transportation system 7 is used to transport the rock and soil blocks to the rear side of the main body 5. The anchor protection platform is used to anchor and protect the tunnel. The bucket device 1 is also used to rest in the tunnel when performing the anchor protection operation to play a temporary support role. The present invention has the functions of drilling, loading, anchoring and protecting at the same time, and the above-mentioned multiple operations can be completed by using one device; the drill arm system drills blast holes to achieve the purpose of landfilling explosives, and the broken rock and soil blocks after blasting are cleaned and collected by the scraper device 1, and transported to the rear side of the main body 5 through the transportation system 7 to be received by the second transport; the anchor protection platform can realize the anchor protection operation in the tunnel; when the anchor protection platform is working, the scraper device 1 can also be placed against the top of the tunnel to play a temporary support role; one device can realize the above-mentioned multiple functions at the same time, while improving work efficiency, reducing the labor intensity of workers; the whole process does not require the transportation of the anchor bolt machine, there is no great physical exertion, and the workload of workers is greatly reduced.

优选的,所述本体5的左右两侧均设有所述钻臂系统和锚护平台。左钻臂4和右钻臂6分别设置在本体5的左右两侧,两个钻臂可同时进行打孔操作,互不影响,大大提升了打孔工作的效率;左锚护平台13与右锚护平台15可同时进行工作锚护平台,两者各自负责巷道一侧的锚护工作,且互不影响,锚护操作方便。Preferably, the drilling arm system and the anchor protection platform are provided on both the left and right sides of the body 5. The left drilling arm 4 and the right drilling arm 6 are respectively provided on the left and right sides of the body 5, and the two drilling arms can perform drilling operations at the same time without affecting each other, which greatly improves the efficiency of the drilling work; the left anchor protection platform 13 and the right anchor protection platform 15 can be used as working anchor protection platforms at the same time, and both are responsible for the anchor protection work on one side of the tunnel, and do not affect each other, and the anchor protection operation is convenient.

优选的,所述本体5的左右两侧均设有所述钻臂系统,所述锚护平台位于所述本体5的上方。左钻臂4和右钻臂6分别设置在本体5的左右两侧,两个钻臂可同时进行打孔操作,互不影响,大大提升了打孔工作的效率;左锚护平台13与右锚护平台15均设置在本体5上方,锚护平台与钻臂系统互不影响,锚护平台具有更大的活动空间,针对巷道顶部较高的工况,也可以顺利地进行锚护操作;左锚护平台13与右锚护平台15各自负责巷道一侧的锚护工作,锚护操作方便。Preferably, the drill arm system is provided on both the left and right sides of the body 5, and the anchor protection platform is located above the body 5. The left drill arm 4 and the right drill arm 6 are respectively arranged on the left and right sides of the body 5, and the two drill arms can perform drilling operations at the same time without affecting each other, which greatly improves the efficiency of drilling work; the left anchor protection platform 13 and the right anchor protection platform 15 are both arranged above the body 5, and the anchor protection platform and the drill arm system do not affect each other. The anchor protection platform has a larger activity space, and can also smoothly perform anchor protection operations for working conditions with a higher top of the tunnel; the left anchor protection platform 13 and the right anchor protection platform 15 are each responsible for the anchor protection work on one side of the tunnel, and the anchor protection operation is convenient.

优选的,所述钻臂系统、锚护平台均能沿前后方向在所述本体5上移动,所述钻臂系统、锚护平台分别通过轨道1310安装在滑台组件16上,所述滑台组件16与所述本体5连接。需要打孔时,将左钻臂4或右钻臂6移动到本体5的前部——即车身前部,打孔结束后移回车身后部,移动操作由液压系统8实现,操作轻松,不影响扒斗装置1的工作,互不干涉;锚护平台可根据需要前后移动,可以对车身周围的巷道侧壁、顶部进行全面锚护,工人站在锚护平台上就可以进行操作,无需多次爬上爬下,体力消耗少。Preferably, the drill arm system and the anchor protection platform can move on the body 5 in the front-rear direction, and the drill arm system and the anchor protection platform are respectively installed on the slide assembly 16 through the track 1310, and the slide assembly 16 is connected to the body 5. When drilling is required, the left drill arm 4 or the right drill arm 6 is moved to the front of the body 5, that is, the front of the vehicle body, and moved back to the rear of the vehicle body after drilling. The moving operation is realized by the hydraulic system 8, which is easy to operate, does not affect the work of the bucket device 1, and does not interfere with each other; the anchor protection platform can move forward and backward as needed, and can fully anchor the side walls and top of the tunnel around the vehicle body. Workers can operate while standing on the anchor protection platform, without having to climb up and down many times, and less physical exertion.

优选的,如图4和图5所示,所述锚护平台包括:锚杆机1392、工作平台138、升降油缸135、以及能沿所述轨道1310移动的小车132,所述锚杆机1392安装在所述工作平台138上,所述工作平台138通过平行四连杆平动系统与所述小车132一侧的连接板1321连接,所述平行四连杆平动系统包括升降油缸135,所述升降油缸135用于调节所述工作平台138相对于所述小车132的空间位置。小车132始终沿轨道1310移动,小车132不会发生前后摆动或左右摆动,这样通过四连杆机构与小车132连接的工作平台138也不会出现倾斜现象,锚护工作进行时工人无不适感,方便操作,提高操作效率。升降油缸135带动四连杆机构上下摆动,实现调节锚杆机1392高度的操作,小车132可在驱动装置131的驱动下,沿轨道1310前后移动,从而带动锚杆机1392前后移动,锚杆机1392在前后、上下两个维度上位置可调节,工人无需其他工具辅助就可以完成各处的锚护工作,锚护操作更加方便。Preferably, as shown in Fig. 4 and Fig. 5, the anchoring platform comprises: an anchor bolter 1392, a working platform 138, a lifting cylinder 135, and a trolley 132 that can move along the track 1310, the anchor bolter 1392 is installed on the working platform 138, the working platform 138 is connected to a connecting plate 1321 on one side of the trolley 132 through a parallel four-link translation system, the parallel four-link translation system comprises a lifting cylinder 135, and the lifting cylinder 135 is used to adjust the spatial position of the working platform 138 relative to the trolley 132. The trolley 132 always moves along the track 1310, and the trolley 132 will not swing forward and backward or left and right, so that the working platform 138 connected to the trolley 132 through the four-link mechanism will not tilt, and the workers will not feel uncomfortable during the anchoring work, which is convenient for operation and improves the operation efficiency. The lifting cylinder 135 drives the four-bar mechanism to swing up and down to adjust the height of the anchor bolt machine 1392. The trolley 132 can move forward and backward along the track 1310 under the drive of the driving device 131, thereby driving the anchor bolt machine 1392 to move forward and backward. The position of the anchor bolt machine 1392 is adjustable in two dimensions, front and back and up and down. Workers can complete the anchoring work in various places without the assistance of other tools, and the anchoring operation is more convenient.

进一步的,所述平行四连杆平动系统还包括主臂134、两根辅助臂136、以及多个转座,所述主臂134的两端均通过转座133、转座137与所述工作平台138和连接板1321连接,所述辅助臂136的两端均通过转座137与所述工作平台138和连接板1321连接,所述转座具有一对相互垂直的连接轴,所述转座通过所述连接轴分别与所述工作平台138、主臂134、辅助臂136、连接板1321铰接;所述升降油缸135的两端分别与所述连接板1321、主臂134铰接。工作平台138实际上是一个L形托板,工作平台138的竖板与主臂134和辅助臂136连接,工作平台138的横板托举在锚杆机1392下方;这样,工作平台138的竖板、主臂134、连接板1321、辅助臂136四者共同构成四连杆机构,升降油缸135通过调节两个相邻杆——即主臂134与连接板1321之间的夹角,实现调节工作平台138高度的目的;辅助臂136为两根,都安装在主臂134下方,可以防止工作平台138不受控制地左右摆动,保证安全;除了能沿轨道1310前后滑动,连接板1321在其他维度的空间位置始终保不变,因此也能保证工作平台138的竖板也始终保持与具有连接板1321相同的空间姿态,保证整个锚杆机1392在工作过程中始终保持水平,不影响工人站立,方便操作。Furthermore, the parallel four-bar linkage translation system also includes a main arm 134, two auxiliary arms 136, and multiple swivels. Both ends of the main arm 134 are connected to the working platform 138 and the connecting plate 1321 through a swivel 133 and a swivel 137. Both ends of the auxiliary arm 136 are connected to the working platform 138 and the connecting plate 1321 through a swivel 137. The swivel has a pair of mutually perpendicular connecting axes, and the swivel is respectively hinged to the working platform 138, the main arm 134, the auxiliary arm 136, and the connecting plate 1321 through the connecting axes; both ends of the lifting cylinder 135 are respectively hinged to the connecting plate 1321 and the main arm 134. The working platform 138 is actually an L-shaped support plate, the vertical plate of the working platform 138 is connected to the main arm 134 and the auxiliary arm 136, and the horizontal plate of the working platform 138 is lifted under the anchor machine 1392; in this way, the vertical plate of the working platform 138, the main arm 134, the connecting plate 1321, and the auxiliary arm 136 together constitute a four-link mechanism, and the lifting cylinder 135 adjusts the height of the working platform 138 by adjusting the angle between two adjacent rods, that is, the main arm 134 and the connecting plate 1321; there are two auxiliary arms 136, both installed under the main arm 134, which can prevent the working platform 138 from swinging left and right uncontrollably to ensure safety; in addition to being able to slide back and forth along the track 1310, the spatial position of the connecting plate 1321 in other dimensions is always kept unchanged, so it can also ensure that the vertical plate of the working platform 138 always maintains the same spatial posture as the connecting plate 1321, ensuring that the entire anchor machine 1392 always remains horizontal during the working process, does not affect the workers' standing, and is convenient for operation.

优选的,连接所述主臂134与连接板1321的转座133、与小车132之间连接有摆动油缸,所述摆动油缸用于带动所述主臂134左右摆动。通过摆动油缸带动该转座133左右摆动,进而带动与其连接的主臂134、工作平台138、辅助臂136同步摆动,从而可以精确地调节工作平台138在第三个维度上的空间位置,这样工作平台138相对于车身本体5的三维空间位置都可以控制,可根据具体工况灵活调节工作平台138上的锚杆机1392的位置,满足对巷道帮、顶等各处进行锚护的操作。Preferably, a swing cylinder is connected between the swivel seat 133 connecting the main arm 134 and the connecting plate 1321 and the trolley 132, and the swing cylinder is used to drive the main arm 134 to swing left and right. The swing cylinder drives the swivel seat 133 to swing left and right, and then drives the main arm 134, the working platform 138, and the auxiliary arm 136 connected thereto to swing synchronously, so that the spatial position of the working platform 138 in the third dimension can be accurately adjusted, so that the three-dimensional spatial position of the working platform 138 relative to the vehicle body 5 can be controlled, and the position of the anchor bolt machine 1392 on the working platform 138 can be flexibly adjusted according to the specific working conditions, so as to meet the operation of anchoring protection at the side and top of the tunnel.

进一步的,所述工作平台138连接有滑动平台139,所述滑动平台139能沿所述工作平台138前后滑动且滑动距离可调节;所述滑动平台139上转动连接有转角可调的翻转支座1391,所述翻转支座1391与所述锚杆机1392连接。这样锚杆机1392相对工作平台138的前后位置也可以调节,可以在需要时进行微调;通过油缸等设备调节翻转支座1391与滑动平台139的转角,可以调节锚杆机1392的仰角,可以实现在不同角度打锚杆,满足更多、更复杂的巷道工况的锚护操作。工人站在滑动平台139上就可以操作,操作安全。Furthermore, the working platform 138 is connected to a sliding platform 139, and the sliding platform 139 can slide forward and backward along the working platform 138 and the sliding distance is adjustable; the sliding platform 139 is rotatably connected to a flip support 1391 with an adjustable rotation angle, and the flip support 1391 is connected to the anchor bolt machine 1392. In this way, the front and rear positions of the anchor bolt machine 1392 relative to the working platform 138 can also be adjusted, and fine-tuning can be performed when necessary; by adjusting the rotation angle of the flip support 1391 and the sliding platform 139 through equipment such as a cylinder, the elevation angle of the anchor bolt machine 1392 can be adjusted, and anchor bolts can be driven at different angles to meet more and more complex anchor protection operations in tunnel working conditions. Workers can operate while standing on the sliding platform 139, and the operation is safe.

优选的,所述扒斗装置1、钻臂系统、锚护平台彼此互锁。钻臂系统用于在爆破前打炮眼,扒斗装置1用于在爆破后清理、收集岩土块,锚护平台用于对巷道顶、帮进行锚护,三者依次执行操作,不需要同按时进行,因此将三者设置为彼此互锁,即只要有一台处于开启状态,其余两台都无法启动;防止误操作,提高操作安全性。Preferably, the bucket device 1, the drill arm system, and the anchor protection platform are interlocked with each other. The drill arm system is used to drill blast holes before blasting, the bucket device 1 is used to clean and collect rock and soil blocks after blasting, and the anchor protection platform is used to anchor the top and side of the tunnel. The three are operated in sequence and do not need to be performed at the same time. Therefore, the three are set to be interlocked with each other, that is, as long as one is in the turned-on state, the other two cannot be started, which prevents misoperation and improves operational safety.

优选的,所述扒斗装置1依次通过液压臂17、回转座与所述本体5连接,所述扒斗装置1通过快换接头与所述液压臂17连接。回转座连接在本体5上,液压臂17连接在回转座上,扒斗装置1通过快换接头与液压臂17连接;可以根据需要,将扒斗装置1拆下,通过快换接头将操作平台、托梁器、破碎装置2等其他工作部件与液压臂17连接在一起,完成不同的工作。比如:可以在锚护操作时更换成托梁器支撑在巷道顶部;可以在打炮眼后、锚护后更换为破碎装置2对巷道壁面进行敲打,防止有松动的岩土遗留或者锚护不严实的地方,实现进一步排查;可以在需要时更换为操作平台对巷道的局部进行处理,操作方便。快换接头的设置,使得操作自由度更高,能够满足各种突发情况等特殊的工况需求。Preferably, the scraper device 1 is connected to the body 5 through the hydraulic arm 17 and the swivel seat in sequence, and the scraper device 1 is connected to the hydraulic arm 17 through a quick-change joint. The swivel seat is connected to the body 5, the hydraulic arm 17 is connected to the swivel seat, and the scraper device 1 is connected to the hydraulic arm 17 through a quick-change joint; the scraper device 1 can be removed as needed, and the operating platform, beam support, crushing device 2 and other working parts can be connected to the hydraulic arm 17 through the quick-change joint to complete different tasks. For example: during the anchor protection operation, it can be replaced with a beam support to support the top of the tunnel; it can be replaced with a crushing device 2 after drilling the blast hole and anchoring to knock the tunnel wall to prevent loose rock and soil from being left or the anchor protection from being loose, so as to achieve further investigation; it can be replaced with an operating platform when necessary to process the local part of the tunnel, which is convenient to operate. The setting of the quick-change joint makes the operation more free and can meet the special working conditions such as various emergencies.

优选的,本发明所述全液压智能钻装锚一体机还包括设置在所述本体5上的:操作台3、液压系统8、电气系统9、铲板14、行走装置12、后支承11,所述操作台3通过所述液压系统8、电气系统9同所述钻臂系统、扒斗装置1、锚护平台、运输系统7连接以实现全局控制;铲板14设置在所述本体5的前端,所述铲板14用于与所述扒斗装置1配合以收集、清理巷道内的岩土块;所述行走装置12用于带动所述本体5移动;后支承11用于对本体5的后侧进行支撑,维持本体5稳定。Preferably, the fully hydraulic intelligent drilling, installation and anchoring machine of the present invention also includes: an operating table 3, a hydraulic system 8, an electrical system 9, a shovel plate 14, a walking device 12, and a rear support 11 arranged on the main body 5. The operating table 3 is connected to the drill arm system, the bucket device 1, the anchor protection platform, and the transportation system 7 through the hydraulic system 8 and the electrical system 9 to achieve global control; the shovel plate 14 is arranged at the front end of the main body 5, and the shovel plate 14 is used to cooperate with the bucket device 1 to collect and clean rock and soil blocks in the tunnel; the walking device 12 is used to drive the main body 5 to move; the rear support 11 is used to support the rear side of the main body 5 to maintain the stability of the main body 5.

优选的,所述本体5的后端设有运输机连接装置10,所述液压系统8控制所述运输机连接装置10的连接与拆卸动作。通过液压系统8,可实现快速链接、拆卸二运,更换速度快,不耽误施工进度。Preferably, a conveyor connection device 10 is provided at the rear end of the body 5, and the hydraulic system 8 controls the connection and removal of the conveyor connection device 10. Through the hydraulic system 8, fast connection and removal can be achieved, and the replacement speed is fast without delaying the construction progress.

综上所述,本发明所述全液压智能钻装锚一体机具有以下优势:In summary, the fully hydraulic intelligent drilling, installation and anchoring machine of the present invention has the following advantages:

1、整机具有钻、装、锚、护等功能;1. The whole machine has the functions of drilling, installing, anchoring and protecting;

2、各功能模块之间配有互锁机构,确保设备运行安全;2. Each functional module is equipped with an interlocking mechanism to ensure the safe operation of the equipment;

3、左钻臂4、右钻臂6相互配合,可以实现巷道全断面钻孔;3. The left drill arm 4 and the right drill arm 6 cooperate with each other to achieve full-section drilling of the tunnel;

4、左锚护平台13、右锚护平台15的设置,可以实现巷道内顶、帮锚杆的作业;4. The setting of the left anchor protection platform 13 and the right anchor protection platform 15 can realize the operation of top and auxiliary anchor rods in the tunnel;

5、扒斗装置1可以进行辅助收料,在锚杆机1392工作时,起到临时支护的作用。5. The bucket device 1 can assist in collecting materials and play a role of temporary support when the anchor machine 1392 is working.

最后应说明的是:以上实施例仅用以说明本发明的技术方案,而非对其限制;尽管参照前述实施例对本发明进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本发明各实施例技术方案的精神和范围。Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims (8)

1.一种全液压智能钻装锚一体机,其特征在于,同时具有钻、装、锚、护功能,具体包括:本体、钻臂系统、扒斗装置、锚护平台、运输系统,所述钻臂系统、扒斗装置、锚护平台、运输系统均设置在所述本体上,所述钻臂系统用于在巷道内打孔以填埋炸药,所述扒斗装置用于收集、清理爆破后掉落的岩土块并将所述岩土块送至所述运输系统内,所述运输系统用于将岩土块运输至所述本体的后侧,所述锚护平台用于对巷道进行锚、护操作,所述扒斗装置还用于在执行锚护操作时抵在巷道内以起到临时支护的作用;1. A fully hydraulic intelligent drilling, loading and anchoring machine, characterized in that it has the functions of drilling, loading, anchoring and protecting at the same time, and specifically comprises: a main body, a drilling arm system, a bucket device, an anchor protection platform, and a transportation system, wherein the drilling arm system, the bucket device, the anchor protection platform, and the transportation system are all arranged on the main body, the drilling arm system is used to drill holes in the tunnel to bury explosives, the bucket device is used to collect and clean the rock and soil blocks dropped after blasting and send the rock and soil blocks to the transportation system, the transportation system is used to transport the rock and soil blocks to the rear side of the main body, the anchor protection platform is used to anchor and protect the tunnel, and the bucket device is also used to abut against the tunnel when performing the anchor protection operation to play a role of temporary support; 所述本体的左右两侧均设有所述钻臂系统和锚护平台,所述锚护平台位于所述本体的上方。The drilling arm system and the anchor protection platform are arranged on both the left and right sides of the main body, and the anchor protection platform is located above the main body. 2.根据权利要求1所述的全液压智能钻装锚一体机,其特征在于,所述钻臂系统、锚护平台均能沿前后方向在所述本体上移动,所述钻臂系统、锚护平台分别通过轨道安装在滑台组件上,所述滑台组件与所述本体连接。2. The fully hydraulic intelligent drilling, installation and anchoring machine according to claim 1 is characterized in that the drill arm system and the anchor protection platform can move on the main body in the front and rear directions, and the drill arm system and the anchor protection platform are respectively installed on the slide assembly through rails, and the slide assembly is connected to the main body. 3.根据权利要求2所述的全液压智能钻装锚一体机,其特征在于,所述锚护平台包括:锚杆机、工作平台、升降油缸、以及能沿所述轨道移动的小车,所述锚杆机安装在所述工作平台上,所述工作平台通过平行四连杆平动系统与所述小车一侧的连接板连接,所述平行四连杆平动系统包括升降油缸,所述升降油缸用于调节所述工作平台相对于所述小车的空间位置。3. The fully hydraulic intelligent drilling, installation and anchoring machine according to claim 2 is characterized in that the anchor protection platform includes: an anchor bolt machine, a working platform, a lifting cylinder, and a trolley that can move along the track, the anchor bolt machine is installed on the working platform, and the working platform is connected to the connecting plate on one side of the trolley through a parallel four-bar linkage system, and the parallel four-bar linkage system includes a lifting cylinder, and the lifting cylinder is used to adjust the spatial position of the working platform relative to the trolley. 4.根据权利要求3所述的全液压智能钻装锚一体机,其特征在于,所述平行四连杆平动系统还包括主臂、两根辅助臂、以及多个转座,所述主臂的两端均通过转座与所述工作平台和连接板连接,所述辅助臂的两端均通过转座与所述工作平台和连接板连接,所述转座具有一对相互垂直的连接轴,所述转座通过所述连接轴分别与所述工作平台、主臂、辅助臂、连接板铰接;所述升降油缸的两端分别与所述连接板、主臂铰接;连接所述主臂与连接板的转座、与小车之间连接有摆动油缸,所述摆动油缸用于带动所述主臂左右摆动。4. The fully hydraulic intelligent drilling, installation and anchoring machine according to claim 3 is characterized in that the parallel four-bar linkage translation system also includes a main arm, two auxiliary arms, and multiple swivels, both ends of the main arm are connected to the working platform and the connecting plate through a swivel, and both ends of the auxiliary arm are connected to the working platform and the connecting plate through a swivel, and the swivel has a pair of mutually perpendicular connecting shafts, and the swivel is respectively hinged to the working platform, the main arm, the auxiliary arm, and the connecting plate through the connecting shafts; the two ends of the lifting cylinder are respectively hinged to the connecting plate and the main arm; a swing cylinder is connected between the swivel connecting the main arm and the connecting plate and the trolley, and the swing cylinder is used to drive the main arm to swing left and right. 5.根据权利要求4所述的全液压智能钻装锚一体机,其特征在于,所述工作平台连接有滑动平台,所述滑动平台能沿所述工作平台前后滑动且滑动距离可调节;所述滑动平台上转动连接有转角可调的翻转支座,所述翻转支座与所述锚杆机连接。5. The fully hydraulic intelligent drilling, installation and anchoring machine according to claim 4 is characterized in that the working platform is connected to a sliding platform, the sliding platform can slide back and forth along the working platform and the sliding distance is adjustable; a flip support with adjustable angle is rotatably connected to the sliding platform, and the flip support is connected to the anchor machine. 6.根据权利要求1所述的全液压智能钻装锚一体机,其特征在于,所述扒斗装置、钻臂系统、锚护平台彼此互锁。6. The fully hydraulic intelligent drilling, installation and anchoring machine according to claim 1 is characterized in that the bucket device, the drill arm system and the anchor protection platform are interlocked with each other. 7.根据权利要求1所述的全液压智能钻装锚一体机,其特征在于,所述扒斗装置依次通过液压臂、回转座与所述本体连接,所述扒斗装置通过快换接头与所述液压臂连接。7. The fully hydraulic intelligent drilling, installation and anchoring machine according to claim 1 is characterized in that the scraper device is connected to the main body through a hydraulic arm and a swivel seat in sequence, and the scraper device is connected to the hydraulic arm through a quick-change joint. 8.根据权利要求1所述的全液压智能钻装锚一体机,其特征在于,还包括设置在所述本体上的:操作台、液压系统、电气系统、铲板、行走装置,所述操作台通过所述液压系统、电气系统同所述钻臂系统、扒斗装置、锚护平台、运输系统连接以实现全局控制;铲板设置在所述本体的前端,所述铲板用于与所述扒斗装置配合以收集、清理巷道内的岩土块;所述行走装置用于带动所述本体移动。8. The fully hydraulic intelligent drilling, installation and anchoring machine according to claim 1 is characterized in that it also includes: an operating table, a hydraulic system, an electrical system, a shovel board, and a walking device arranged on the main body, and the operating table is connected to the drill arm system, the bucket device, the anchor protection platform, and the transportation system through the hydraulic system and the electrical system to achieve global control; the shovel board is arranged at the front end of the main body, and the shovel board is used to cooperate with the bucket device to collect and clean rock and soil blocks in the tunnel; the walking device is used to drive the main body to move.
CN201810026886.5A 2018-01-11 2018-01-11 Fully hydraulic intelligent drilling, installation and anchoring machine Active CN108049877B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810026886.5A CN108049877B (en) 2018-01-11 2018-01-11 Fully hydraulic intelligent drilling, installation and anchoring machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810026886.5A CN108049877B (en) 2018-01-11 2018-01-11 Fully hydraulic intelligent drilling, installation and anchoring machine

Publications (2)

Publication Number Publication Date
CN108049877A CN108049877A (en) 2018-05-18
CN108049877B true CN108049877B (en) 2024-08-16

Family

ID=62126458

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810026886.5A Active CN108049877B (en) 2018-01-11 2018-01-11 Fully hydraulic intelligent drilling, installation and anchoring machine

Country Status (1)

Country Link
CN (1) CN108049877B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110410090A (en) * 2019-01-26 2019-11-05 江西蓝翔重工有限公司 A multi-arm, multi-drill, drilling and anchoring integrated machine with a telescopic structure
CN111305863A (en) * 2020-03-31 2020-06-19 中煤第三建设(集团)有限责任公司 Intelligent full-hydraulic drilling, anchoring and protecting four-arm integrated machine for coal mine
CN111379564A (en) * 2020-03-31 2020-07-07 中煤第三建设(集团)有限责任公司 Intelligent full-hydraulic drilling, anchoring and protecting three-arm integrated machine for coal mine
CN114150721B (en) * 2021-11-26 2023-02-03 国家能源集团宁夏煤业有限责任公司 Slagging-off, loading and supporting integrated machine equipment

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN207701135U (en) * 2018-01-11 2018-08-07 中煤第三建设(集团)有限责任公司 All-hydraulic intelligence bores dress anchor all-in-one machine

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2362996A1 (en) * 1976-08-25 1978-03-24 Lockwood Bennett Ltd Mine heading or tunnelling machine - has boom end shovel permanently fitted with tooling for loading out heading spoil
CN101824990B (en) * 2010-04-20 2012-06-06 闫振东 Rock drivage process for four-arm hydraulic drill rig and breaking-loading-transporting-guniting integrated machine
CN104265166A (en) * 2014-09-17 2015-01-07 北京景隆重工机械有限公司 Eight-arm fully-hydraulic anchor rod-anchor cable drill carriage used with continuous miner

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN207701135U (en) * 2018-01-11 2018-08-07 中煤第三建设(集团)有限责任公司 All-hydraulic intelligence bores dress anchor all-in-one machine

Also Published As

Publication number Publication date
CN108049877A (en) 2018-05-18

Similar Documents

Publication Publication Date Title
CN108049877B (en) Fully hydraulic intelligent drilling, installation and anchoring machine
CN110714775A (en) Exploring, supporting and anchoring all-in-one machine system for underground rapid tunneling and using method thereof
WO2018228217A1 (en) Complementary transportation and support system used after rapid excavation
CN113898362B (en) A cantilever anchor mining machine and anchor support method
CN207701135U (en) All-hydraulic intelligence bores dress anchor all-in-one machine
CN114233318A (en) Multifunctional heading machine with cutting part capable of extending integrally
EA036916B1 (en) Advance working and loading machine and method for quarrying rock
CN105626082B (en) A kind of construction of underground tunnel equipment
CN109763818B (en) Crawler-type loading and anchoring integrated roadway repairing machine
US20010032402A1 (en) Continuous shovel
US5636903A (en) Mining system for removing overburden
CN112096407A (en) mining equipment
CN221220461U (en) Tunneling and anchoring integrated system
CN105649619A (en) Multifunctional drill loader
CN114893199B (en) A drilling and anchoring machine and drilling and anchoring system for high-gas mines
CN113153327A (en) Tunneling and anchoring all-in-one machine and working method thereof
CN115929368B (en) Anchor rod transfer unit suitable for arch roadway, combined device and construction method
CN203668994U (en) Ditcher
RU2103507C1 (en) Method and cutter-loader machine for development of seam deposits of minerals
CN102383449B (en) Digging loader
Frangakis A review of lashing methods used in shaft sinking
CN115596452A (en) Multifunctional impact rock cracking equipment
CN109630108B (en) Crawler digging type tunnel repairing machine
CN207315380U (en) A kind of shallow buried covered excavation system suitable for soft soil layer
WO2017202446A1 (en) Mobile transfer conveyor

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant