CN106401599A - Large-section rock drivage system and construction method thereof - Google Patents
Large-section rock drivage system and construction method thereof Download PDFInfo
- Publication number
- CN106401599A CN106401599A CN201611142819.7A CN201611142819A CN106401599A CN 106401599 A CN106401599 A CN 106401599A CN 201611142819 A CN201611142819 A CN 201611142819A CN 106401599 A CN106401599 A CN 106401599A
- Authority
- CN
- China
- Prior art keywords
- loader
- rock
- waste bin
- hydraulic drill
- tunnel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000011435 rock Substances 0.000 title claims abstract description 29
- 238000010276 construction Methods 0.000 title claims abstract description 14
- 238000005553 drilling Methods 0.000 claims abstract description 5
- 239000003245 coal Substances 0.000 claims abstract description 4
- 239000002699 waste material Substances 0.000 claims description 30
- 238000010304 firing Methods 0.000 claims description 3
- 239000000843 powder Substances 0.000 claims description 3
- 230000008901 benefit Effects 0.000 abstract description 8
- 239000010878 waste rock Substances 0.000 abstract 10
- 238000005422 blasting Methods 0.000 abstract 1
- 230000000694 effects Effects 0.000 abstract 1
- 238000000034 method Methods 0.000 description 5
- 238000004140 cleaning Methods 0.000 description 4
- 230000008569 process Effects 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 2
- 230000004899 motility Effects 0.000 description 2
- 238000010924 continuous production Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 239000000686 essence Substances 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 230000005641 tunneling Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/12—Devices for removing or hauling away excavated material or spoil; Working or loading platforms
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/006—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by making use of blasting methods
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Earth Drilling (AREA)
Abstract
The invention discloses a large-section rock drivage system and a construction method thereof. The large-section rock drivage system comprises a waste rock rake machine, a hydraulic drill carriage and a rock discharge system, wherein the waste rock rake machine, the hydraulic drill carriage and the rock discharge system are all arranged in a coal mine tunnel; the waste rock rake machine is arranged on one side of a head-on area of the tunnel to be applied to muck loading operation; the rock discharge system is connected with the waste rock rake machine; the hydraulic drill carriage is arranged on the other side of the head-on area of the tunnel to be applied to drilling (drilling blasting hole) operation. The large-section rock drivage system has the advantages that a side loader is utilized to be matched with the waste rock rake machine to dig and load waste rock, the waste rock rake machine, a belt conveyer and a waste rock cabin are utilized to achieve continuous operation of waste rock discharge in the head-on area, and the effects of mine car supply are avoided; the flexibility of a side loading machine is fully utilized, a mode that the hydraulic drill carriage is matched with the waste rock rake machine to be used becomes possible, and the efficiency is played; the side loader can clean dead angles of a scraper bucket, the manual clean is greatly reduced, the labor intensity is reduced, and the efficiency is improved. The rock drivage system can fully give play to mechanical operation, improves the mechanization degree of a rock gangway, improves the drivage efficiency of a large-section rock tunnel and achieves speedy drivage.
Description
Technical field
The present invention relates to mine development end technical field, more particularly, to a kind of large rock-gateway driving system and its construction party
Method.
Background technology
Current large rock-gateway tunneling construction process typically adopts scraper loader, hydraulic drill rig cooperation mine car using construction,
The situation that wait mine car transport rock often occurs in operation it is impossible to work continuously, whole construction process underaction, and
And road surface often occurs various rubbles during hydraulic drill rig meets head on perforating in entrance, affect drivage efficiency, based on this,
Now study a kind of large rock-gateway driving system and its construction method, solve this problem well.
Content of the invention
It is an object of the invention to overcoming the deficiencies in the prior art, there is provided a kind of large rock-gateway driving system.
The present invention is achieved by the following technical solutions:A kind of large rock-gateway driving system is it is characterised in that include
Scraper loader, hydraulic drill rig, go out series of rocks system, described scraper loader, hydraulic drill rig, go out series of rocks system may be contained within coal mine roadway, described
Scraper loader meets head on side for muck operation located at tunnel, described go out series of rocks system be connected with scraper loader, described hydraulic drill rig located at
Opposite side is met head on for bore operation in tunnel.
One of optimal way as the present invention, described go out series of rocks system include belt feeder, waste bin, described belt feeder one end
Connect scraper loader, the other end connects waste bin.
One of optimal way as the present invention, described go out series of rocks system can also be scraper loader, belt feeder, waste bin, cash
Stone storehouse slips cash eye, mine car, and under described waste bin, mouth setting waste bin slips cash eye, and waste bin slips cash eye and goes out cash to mine car.
One of optimal way as the present invention, described hydraulic drill rig is used cooperatively with scraper loader parallel operations setting.
One of optimal way as the present invention, also includes side loader, described side loader match with hydraulic drill rig for
Cleaning slusher dead angle.
One of optimal way as the present invention, described side loader is matched with scraper loader.
One of optimal way as the present invention, described waste bin rear end can also configure scraper loader.
The invention also discloses a kind of construction method of large rock-gateway driving system is:Comprise the following steps:
Step one:Scraper loader, belt feeder, waste bin are arranged in tunnel side, and tunnel opposite side is hydraulic drill rig, side dress
Machine.
Step 2:The rubble met head in tunnel first with side loader gets right side from left side, and side loader is by route ahead
Leveling, then parks by side, and then hydraulic drill rig smoothly enters perforating of meeting head on, and perforating construction end is stepped back to rear one segment distance
And after effectively being protected, blast firing of powder charge of meeting head on.
Step 3:After big gun, meet head on supporting and the supporting parallel operations of rear portion portion of side.Using side loader by scraper loader opposite side
Go out the rhabdolith after big gun and sweep scraper loader side, thus coordinating scraper loader to clean out side portion's spoil, then supporting.
Step 4:Logistics.Using support time of meeting head on, by rear portion waste bin entrucking, empty it is ensured that subsequent cycle drilling depth.
Circulated with this and carry out ...
Present invention advantage compared to existing technology is:Driving system of the present invention, coordinates scraper loader hoeing using side loader
Spoil, is realized meeting head on out cash continuous production process using scraper loader+belt feeder+waste bin, it is to avoid affected by mine car supply.And fully
Play the motility of side unloading rock loader, be that hydraulic drill rig cooperation scraper loader use is possibly realized, and play efficiency.Side loader is permissible
Cleaning slusher dead angle, greatly reduces labor cleaning, reduces labor intensity, improves efficiency.The driving system of the present invention is fully sent out
Wave mechanical work, improve rock gangway mechanization degree, improve the efficiency of large rock-gateway driving, realize speedy drivage.
Brief description
Fig. 1 is the structural representation of the present invention.
Specific embodiment
Below embodiments of the invention are elaborated, the present embodiment is carried out under premised on technical solution of the present invention
Implement, give detailed embodiment and specific operating process, but protection scope of the present invention is not limited to following enforcements
Example.
Referring to Fig. 1 for following examples brief description:
Embodiment one:A kind of large rock-gateway driving system is it is characterised in that including scraper loader, hydraulic drill rig, going out series of rocks
System, described scraper loader, hydraulic drill rig, goes out series of rocks system and may be contained within coal mine roadway, and described scraper loader is located at meeting head on side in tunnel
For muck operation, described go out series of rocks system be connected with scraper loader, described hydraulic drill rig is used for holing located at tunnel opposite side of meeting head on
(beat and blow out hole) operation.
Embodiment two:Present embodiment is with the difference advantage of embodiment one, described go out series of rocks system include belt feeder,
Waste bin, described belt feeder one end connects scraper loader, and the other end connects waste bin, cash of meeting head on out can be worked continuously, is not subject to
Mine car supply problem affects.
Embodiment three:Present embodiment is with the difference advantage of embodiment two, described go out series of rocks system can also for rake
Cash machine, belt feeder, waste bin, waste bin slip cash eye, mine car, and under described waste bin, mouth setting waste bin slips cash eye, and waste bin slips
Cash eye goes out cash to mine car.
Example IV:Present embodiment is with the difference advantage of embodiment one, and described hydraulic drill rig is put down with scraper loader
Row operation setting uses cooperatively, and improves drivage efficiency.
Embodiment five:Present embodiment is with the difference advantage of embodiment one, also includes side loader, described side loader
Match with hydraulic drill rig for clearing up slusher dead angle, the motility using side loader assists scraper loader, allows scraper loader take off cash not
Stay dead angle, before drill carriage perforating, using side loader, road ahead is flattened, be easy to drill carriage entrance and meet head on, during Bang Bucheng lane, cleaning side
Portion's spoil more convenient and quicker.
Embodiment six:Present embodiment is, described side loader and scraper loader match with the difference advantage of embodiment five
Close, realize parallel operations, make full use of man-hour.
Embodiment seven:Present embodiment is with the difference advantage of embodiment two, and described waste bin rear end can also configure
Scraper loader, improves rock loading efficiency.
The concrete construction method of driving system of the present invention is:Comprise the following steps:
Step one:Scraper loader, belt feeder, waste bin are arranged in tunnel side, and tunnel opposite side is hydraulic drill rig, side dress
Machine.
Step 2:The rubble met head in tunnel first with side loader gets right side from left side, and side loader is by route ahead
Leveling, then parks by side, and then hydraulic drill rig smoothly enters perforating of meeting head on, and perforating construction end is stepped back to rear one segment distance
And after effectively being protected, blast firing of powder charge of meeting head on.
Step 3:After big gun, meet head on supporting and the supporting parallel operations of rear portion portion of side.Using side loader by scraper loader opposite side
Go out the rhabdolith after big gun and sweep scraper loader side, thus coordinating scraper loader to clean out side portion's spoil, then supporting.
Step 4:Logistics.Using support time of meeting head on, by rear portion waste bin entrucking, empty it is ensured that subsequent cycle drilling depth.
Circulated with this and carry out ...
The foregoing is only presently preferred embodiments of the present invention, not in order to limit the present invention, all essences in the present invention
Any modification, equivalent and improvement made within god and principle etc., should be included within the scope of the present invention.
Claims (8)
1. a kind of large rock-gateway driving system is it is characterised in that including scraper loader, hydraulic drill rig, going out series of rocks system, described rake cash
Machine, hydraulic drill rig, go out series of rocks system may be contained within coal mine roadway, described scraper loader located at tunnel meet head on side for muck make
Industry, described go out series of rocks system be connected with scraper loader, described hydraulic drill rig located at tunnel meet head on opposite side be used for bore operation.
2. large rock-gateway driving system according to claim 1 it is characterised in that described go out series of rocks system include belt
Machine, waste bin, described belt feeder one end connects scraper loader, and the other end connects waste bin.
3. large rock-gateway driving system according to claim 1 it is characterised in that described go out series of rocks system can also for rake
Cash machine, belt feeder, waste bin, waste bin slip cash eye, mine car, and under described waste bin, mouth setting waste bin slips cash eye, and waste bin slips
Cash eye goes out cash to mine car.
4. large rock-gateway driving system according to claim 1 is it is characterised in that described hydraulic drill rig is put down with scraper loader
Row operation setting uses cooperatively.
5. it is characterised in that also including side loader, described side fills large rock-gateway driving system according to claim 1
Machine is matched for clearing up slusher dead angle with hydraulic drill rig.
6. large rock-gateway driving system according to claim 5 is it is characterised in that described side loader and scraper loader match
Close.
7. large rock-gateway driving system according to claim 2 is it is characterised in that described waste bin rear end can also configure
Scraper loader.
8. the construction method of the large rock-gateway driving system according to claim 1-7 is:Comprise the following steps:
Step one:Scraper loader, belt feeder, waste bin are arranged in tunnel side, and tunnel opposite side is hydraulic drill rig, side loader.
Step 2:First with side loader, the rubble met head in tunnel is got right side from left side, route ahead is flattened by side loader,
Then park by side, then hydraulic drill rig smoothly enters perforating of meeting head on, perforating construction end is stepped back and gone forward side by side to rear one segment distance
After row effectively protects, blast firing of powder charge of meeting head on.
Step 3:After big gun, meet head on supporting and the supporting parallel operations of rear portion portion of side.Using side loader scraper loader opposite side gone out big gun
Rhabdolith afterwards sweeps scraper loader side, thus coordinating scraper loader to clean out side portion's spoil, then supporting.
Step 4:Logistics.Using support time of meeting head on, by rear portion waste bin entrucking, empty it is ensured that subsequent cycle drilling depth.
Circulated with this and carry out ....
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611142819.7A CN106401599A (en) | 2016-12-13 | 2016-12-13 | Large-section rock drivage system and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611142819.7A CN106401599A (en) | 2016-12-13 | 2016-12-13 | Large-section rock drivage system and construction method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106401599A true CN106401599A (en) | 2017-02-15 |
Family
ID=58084537
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611142819.7A Pending CN106401599A (en) | 2016-12-13 | 2016-12-13 | Large-section rock drivage system and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106401599A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107218077A (en) * | 2017-06-26 | 2017-09-29 | 永城煤电控股集团有限公司 | Rock gangway multimode combines cash technique |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101824990A (en) * | 2010-04-20 | 2010-09-08 | 闫振东 | Rock drivage process for four-arm hydraulic drill rig and breaking-loading-transporting-guniting integrated machine |
CN102213094A (en) * | 2010-04-12 | 2011-10-12 | 淮南矿业(集团)有限责任公司 | Construction system and construction method for mine rock drivage |
CN102587903A (en) * | 2012-02-24 | 2012-07-18 | 河南大有能源股份有限公司 | Comprehensive tunneling system for stone drift |
CN102748032A (en) * | 2012-07-26 | 2012-10-24 | 兖州煤业股份有限公司 | Mechanized rapid construction method for traditional rock drivage |
CN203729998U (en) * | 2014-01-26 | 2014-07-23 | 平顶山天安煤业股份有限公司 | Integrated rock drift tunneling production line |
CN104564089A (en) * | 2014-12-31 | 2015-04-29 | 闫振东 | Rock roadway quick tunneling process of impact crushing rock roadway tunneling machine |
CN206267853U (en) * | 2016-12-13 | 2017-06-20 | 淮南矿业(集团)有限责任公司 | A kind of large rock-gateway driving system |
-
2016
- 2016-12-13 CN CN201611142819.7A patent/CN106401599A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102213094A (en) * | 2010-04-12 | 2011-10-12 | 淮南矿业(集团)有限责任公司 | Construction system and construction method for mine rock drivage |
CN101824990A (en) * | 2010-04-20 | 2010-09-08 | 闫振东 | Rock drivage process for four-arm hydraulic drill rig and breaking-loading-transporting-guniting integrated machine |
CN102587903A (en) * | 2012-02-24 | 2012-07-18 | 河南大有能源股份有限公司 | Comprehensive tunneling system for stone drift |
CN102748032A (en) * | 2012-07-26 | 2012-10-24 | 兖州煤业股份有限公司 | Mechanized rapid construction method for traditional rock drivage |
CN203729998U (en) * | 2014-01-26 | 2014-07-23 | 平顶山天安煤业股份有限公司 | Integrated rock drift tunneling production line |
CN104564089A (en) * | 2014-12-31 | 2015-04-29 | 闫振东 | Rock roadway quick tunneling process of impact crushing rock roadway tunneling machine |
CN206267853U (en) * | 2016-12-13 | 2017-06-20 | 淮南矿业(集团)有限责任公司 | A kind of large rock-gateway driving system |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107218077A (en) * | 2017-06-26 | 2017-09-29 | 永城煤电控股集团有限公司 | Rock gangway multimode combines cash technique |
CN107218077B (en) * | 2017-06-26 | 2019-04-30 | 永城煤电控股集团有限公司 | Rock gangway multimode combines cash technique out |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106121648B (en) | Sublevel open stoping chassis route ore drawing subsequent filling mining method | |
CN104405437B (en) | A kind of solid filling with combine the hybrid working face mining method of adopting | |
CN103216238B (en) | A kind of Opencut coal mine mining technique | |
CN102213094B (en) | Construction system and construction method for mine rock drivage | |
CN103883329B (en) | Mine hard rock excavation construction method | |
CN102996131A (en) | Solid-filling coal mining method with two pre-excavating tunnels for advancing | |
CN101191416A (en) | Rock lane digging method | |
CN201087428Y (en) | Bucket type transloader | |
CN102587903B (en) | Comprehensive tunneling system for stone drift | |
CN107191191A (en) | A kind of rock gangway fast digging technique of the breaking rock gangway anchor driving machine of three hammering blows | |
CN206267853U (en) | A kind of large rock-gateway driving system | |
CN103388478A (en) | Forming method for transportation road of bucket shovel applied to open pit coal mine | |
CN105401951A (en) | Common gangue removal method and system for dual rock roadways of coal mine | |
CN105370280B (en) | A kind of double-deck thin jade ore deposit nondestructive blasting mining methods of underground low-angle dip | |
CN106401599A (en) | Large-section rock drivage system and construction method thereof | |
CN103867203B (en) | Mine working chain saw type hard rock mole | |
CN105626076B (en) | It is a kind of to draw bucket shovel zigzag working berm high-efficiency mining method | |
CN114183140B (en) | Mining and filling method for advanced replacement section coal pillar | |
CN111734413A (en) | Method for rapidly recovering working face of inclined thick coal seam | |
CN102748032B (en) | Mechanized rapid construction method for traditional rock drivage | |
CN111119896A (en) | Bauxite mining method | |
CN104088642A (en) | Super-short-wall coal mining method | |
CN103982184A (en) | Falling ore directional slip control method adopting underground mine bottom-pillar-free caving mining method | |
CN111550246B (en) | Novel caving mining method for steeply-inclined crushed ultra-thick stone coal type vanadium ore | |
RU2585318C1 (en) | Development of thick gently sloping potassium beds |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170215 |