CN106401599A - Large-section rock drivage system and construction method thereof - Google Patents

Large-section rock drivage system and construction method thereof Download PDF

Info

Publication number
CN106401599A
CN106401599A CN201611142819.7A CN201611142819A CN106401599A CN 106401599 A CN106401599 A CN 106401599A CN 201611142819 A CN201611142819 A CN 201611142819A CN 106401599 A CN106401599 A CN 106401599A
Authority
CN
China
Prior art keywords
loader
rock
waste bin
hydraulic drill
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611142819.7A
Other languages
Chinese (zh)
Inventor
王传兵
喻希乐
芮存山
朱立新
汪林清
黄开忠
徐敬浩
凌锦松
侯立新
刘保贤
吉炫霄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huainan Mining Group Co Ltd
Original Assignee
Huainan Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huainan Mining Group Co Ltd filed Critical Huainan Mining Group Co Ltd
Priority to CN201611142819.7A priority Critical patent/CN106401599A/en
Publication of CN106401599A publication Critical patent/CN106401599A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/12Devices for removing or hauling away excavated material or spoil; Working or loading platforms
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/006Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by making use of blasting methods

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a large-section rock drivage system and a construction method thereof. The large-section rock drivage system comprises a waste rock rake machine, a hydraulic drill carriage and a rock discharge system, wherein the waste rock rake machine, the hydraulic drill carriage and the rock discharge system are all arranged in a coal mine tunnel; the waste rock rake machine is arranged on one side of a head-on area of the tunnel to be applied to muck loading operation; the rock discharge system is connected with the waste rock rake machine; the hydraulic drill carriage is arranged on the other side of the head-on area of the tunnel to be applied to drilling (drilling blasting hole) operation. The large-section rock drivage system has the advantages that a side loader is utilized to be matched with the waste rock rake machine to dig and load waste rock, the waste rock rake machine, a belt conveyer and a waste rock cabin are utilized to achieve continuous operation of waste rock discharge in the head-on area, and the effects of mine car supply are avoided; the flexibility of a side loading machine is fully utilized, a mode that the hydraulic drill carriage is matched with the waste rock rake machine to be used becomes possible, and the efficiency is played; the side loader can clean dead angles of a scraper bucket, the manual clean is greatly reduced, the labor intensity is reduced, and the efficiency is improved. The rock drivage system can fully give play to mechanical operation, improves the mechanization degree of a rock gangway, improves the drivage efficiency of a large-section rock tunnel and achieves speedy drivage.

Description

A kind of large rock-gateway driving system and its construction method
Technical field
The present invention relates to mine development end technical field, more particularly, to a kind of large rock-gateway driving system and its construction party Method.
Background technology
Current large rock-gateway tunneling construction process typically adopts scraper loader, hydraulic drill rig cooperation mine car using construction, The situation that wait mine car transport rock often occurs in operation it is impossible to work continuously, whole construction process underaction, and And road surface often occurs various rubbles during hydraulic drill rig meets head on perforating in entrance, affect drivage efficiency, based on this, Now study a kind of large rock-gateway driving system and its construction method, solve this problem well.
Content of the invention
It is an object of the invention to overcoming the deficiencies in the prior art, there is provided a kind of large rock-gateway driving system.
The present invention is achieved by the following technical solutions:A kind of large rock-gateway driving system is it is characterised in that include Scraper loader, hydraulic drill rig, go out series of rocks system, described scraper loader, hydraulic drill rig, go out series of rocks system may be contained within coal mine roadway, described Scraper loader meets head on side for muck operation located at tunnel, described go out series of rocks system be connected with scraper loader, described hydraulic drill rig located at Opposite side is met head on for bore operation in tunnel.
One of optimal way as the present invention, described go out series of rocks system include belt feeder, waste bin, described belt feeder one end Connect scraper loader, the other end connects waste bin.
One of optimal way as the present invention, described go out series of rocks system can also be scraper loader, belt feeder, waste bin, cash Stone storehouse slips cash eye, mine car, and under described waste bin, mouth setting waste bin slips cash eye, and waste bin slips cash eye and goes out cash to mine car.
One of optimal way as the present invention, described hydraulic drill rig is used cooperatively with scraper loader parallel operations setting.
One of optimal way as the present invention, also includes side loader, described side loader match with hydraulic drill rig for Cleaning slusher dead angle.
One of optimal way as the present invention, described side loader is matched with scraper loader.
One of optimal way as the present invention, described waste bin rear end can also configure scraper loader.
The invention also discloses a kind of construction method of large rock-gateway driving system is:Comprise the following steps:
Step one:Scraper loader, belt feeder, waste bin are arranged in tunnel side, and tunnel opposite side is hydraulic drill rig, side dress Machine.
Step 2:The rubble met head in tunnel first with side loader gets right side from left side, and side loader is by route ahead Leveling, then parks by side, and then hydraulic drill rig smoothly enters perforating of meeting head on, and perforating construction end is stepped back to rear one segment distance And after effectively being protected, blast firing of powder charge of meeting head on.
Step 3:After big gun, meet head on supporting and the supporting parallel operations of rear portion portion of side.Using side loader by scraper loader opposite side Go out the rhabdolith after big gun and sweep scraper loader side, thus coordinating scraper loader to clean out side portion's spoil, then supporting.
Step 4:Logistics.Using support time of meeting head on, by rear portion waste bin entrucking, empty it is ensured that subsequent cycle drilling depth.
Circulated with this and carry out ...
Present invention advantage compared to existing technology is:Driving system of the present invention, coordinates scraper loader hoeing using side loader Spoil, is realized meeting head on out cash continuous production process using scraper loader+belt feeder+waste bin, it is to avoid affected by mine car supply.And fully Play the motility of side unloading rock loader, be that hydraulic drill rig cooperation scraper loader use is possibly realized, and play efficiency.Side loader is permissible Cleaning slusher dead angle, greatly reduces labor cleaning, reduces labor intensity, improves efficiency.The driving system of the present invention is fully sent out Wave mechanical work, improve rock gangway mechanization degree, improve the efficiency of large rock-gateway driving, realize speedy drivage.
Brief description
Fig. 1 is the structural representation of the present invention.
Specific embodiment
Below embodiments of the invention are elaborated, the present embodiment is carried out under premised on technical solution of the present invention Implement, give detailed embodiment and specific operating process, but protection scope of the present invention is not limited to following enforcements Example.
Referring to Fig. 1 for following examples brief description:
Embodiment one:A kind of large rock-gateway driving system is it is characterised in that including scraper loader, hydraulic drill rig, going out series of rocks System, described scraper loader, hydraulic drill rig, goes out series of rocks system and may be contained within coal mine roadway, and described scraper loader is located at meeting head on side in tunnel For muck operation, described go out series of rocks system be connected with scraper loader, described hydraulic drill rig is used for holing located at tunnel opposite side of meeting head on (beat and blow out hole) operation.
Embodiment two:Present embodiment is with the difference advantage of embodiment one, described go out series of rocks system include belt feeder, Waste bin, described belt feeder one end connects scraper loader, and the other end connects waste bin, cash of meeting head on out can be worked continuously, is not subject to Mine car supply problem affects.
Embodiment three:Present embodiment is with the difference advantage of embodiment two, described go out series of rocks system can also for rake Cash machine, belt feeder, waste bin, waste bin slip cash eye, mine car, and under described waste bin, mouth setting waste bin slips cash eye, and waste bin slips Cash eye goes out cash to mine car.
Example IV:Present embodiment is with the difference advantage of embodiment one, and described hydraulic drill rig is put down with scraper loader Row operation setting uses cooperatively, and improves drivage efficiency.
Embodiment five:Present embodiment is with the difference advantage of embodiment one, also includes side loader, described side loader Match with hydraulic drill rig for clearing up slusher dead angle, the motility using side loader assists scraper loader, allows scraper loader take off cash not Stay dead angle, before drill carriage perforating, using side loader, road ahead is flattened, be easy to drill carriage entrance and meet head on, during Bang Bucheng lane, cleaning side Portion's spoil more convenient and quicker.
Embodiment six:Present embodiment is, described side loader and scraper loader match with the difference advantage of embodiment five Close, realize parallel operations, make full use of man-hour.
Embodiment seven:Present embodiment is with the difference advantage of embodiment two, and described waste bin rear end can also configure Scraper loader, improves rock loading efficiency.
The concrete construction method of driving system of the present invention is:Comprise the following steps:
Step one:Scraper loader, belt feeder, waste bin are arranged in tunnel side, and tunnel opposite side is hydraulic drill rig, side dress Machine.
Step 2:The rubble met head in tunnel first with side loader gets right side from left side, and side loader is by route ahead Leveling, then parks by side, and then hydraulic drill rig smoothly enters perforating of meeting head on, and perforating construction end is stepped back to rear one segment distance And after effectively being protected, blast firing of powder charge of meeting head on.
Step 3:After big gun, meet head on supporting and the supporting parallel operations of rear portion portion of side.Using side loader by scraper loader opposite side Go out the rhabdolith after big gun and sweep scraper loader side, thus coordinating scraper loader to clean out side portion's spoil, then supporting.
Step 4:Logistics.Using support time of meeting head on, by rear portion waste bin entrucking, empty it is ensured that subsequent cycle drilling depth.
Circulated with this and carry out ...
The foregoing is only presently preferred embodiments of the present invention, not in order to limit the present invention, all essences in the present invention Any modification, equivalent and improvement made within god and principle etc., should be included within the scope of the present invention.

Claims (8)

1. a kind of large rock-gateway driving system is it is characterised in that including scraper loader, hydraulic drill rig, going out series of rocks system, described rake cash Machine, hydraulic drill rig, go out series of rocks system may be contained within coal mine roadway, described scraper loader located at tunnel meet head on side for muck make Industry, described go out series of rocks system be connected with scraper loader, described hydraulic drill rig located at tunnel meet head on opposite side be used for bore operation.
2. large rock-gateway driving system according to claim 1 it is characterised in that described go out series of rocks system include belt Machine, waste bin, described belt feeder one end connects scraper loader, and the other end connects waste bin.
3. large rock-gateway driving system according to claim 1 it is characterised in that described go out series of rocks system can also for rake Cash machine, belt feeder, waste bin, waste bin slip cash eye, mine car, and under described waste bin, mouth setting waste bin slips cash eye, and waste bin slips Cash eye goes out cash to mine car.
4. large rock-gateway driving system according to claim 1 is it is characterised in that described hydraulic drill rig is put down with scraper loader Row operation setting uses cooperatively.
5. it is characterised in that also including side loader, described side fills large rock-gateway driving system according to claim 1 Machine is matched for clearing up slusher dead angle with hydraulic drill rig.
6. large rock-gateway driving system according to claim 5 is it is characterised in that described side loader and scraper loader match Close.
7. large rock-gateway driving system according to claim 2 is it is characterised in that described waste bin rear end can also configure Scraper loader.
8. the construction method of the large rock-gateway driving system according to claim 1-7 is:Comprise the following steps:
Step one:Scraper loader, belt feeder, waste bin are arranged in tunnel side, and tunnel opposite side is hydraulic drill rig, side loader.
Step 2:First with side loader, the rubble met head in tunnel is got right side from left side, route ahead is flattened by side loader, Then park by side, then hydraulic drill rig smoothly enters perforating of meeting head on, perforating construction end is stepped back and gone forward side by side to rear one segment distance After row effectively protects, blast firing of powder charge of meeting head on.
Step 3:After big gun, meet head on supporting and the supporting parallel operations of rear portion portion of side.Using side loader scraper loader opposite side gone out big gun Rhabdolith afterwards sweeps scraper loader side, thus coordinating scraper loader to clean out side portion's spoil, then supporting.
Step 4:Logistics.Using support time of meeting head on, by rear portion waste bin entrucking, empty it is ensured that subsequent cycle drilling depth.
Circulated with this and carry out ....
CN201611142819.7A 2016-12-13 2016-12-13 Large-section rock drivage system and construction method thereof Pending CN106401599A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611142819.7A CN106401599A (en) 2016-12-13 2016-12-13 Large-section rock drivage system and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611142819.7A CN106401599A (en) 2016-12-13 2016-12-13 Large-section rock drivage system and construction method thereof

Publications (1)

Publication Number Publication Date
CN106401599A true CN106401599A (en) 2017-02-15

Family

ID=58084537

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611142819.7A Pending CN106401599A (en) 2016-12-13 2016-12-13 Large-section rock drivage system and construction method thereof

Country Status (1)

Country Link
CN (1) CN106401599A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107218077A (en) * 2017-06-26 2017-09-29 永城煤电控股集团有限公司 Rock gangway multimode combines cash technique

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101824990A (en) * 2010-04-20 2010-09-08 闫振东 Rock drivage process for four-arm hydraulic drill rig and breaking-loading-transporting-guniting integrated machine
CN102213094A (en) * 2010-04-12 2011-10-12 淮南矿业(集团)有限责任公司 Construction system and construction method for mine rock drivage
CN102587903A (en) * 2012-02-24 2012-07-18 河南大有能源股份有限公司 Comprehensive tunneling system for stone drift
CN102748032A (en) * 2012-07-26 2012-10-24 兖州煤业股份有限公司 Mechanized rapid construction method for traditional rock drivage
CN203729998U (en) * 2014-01-26 2014-07-23 平顶山天安煤业股份有限公司 Integrated rock drift tunneling production line
CN104564089A (en) * 2014-12-31 2015-04-29 闫振东 Rock roadway quick tunneling process of impact crushing rock roadway tunneling machine
CN206267853U (en) * 2016-12-13 2017-06-20 淮南矿业(集团)有限责任公司 A kind of large rock-gateway driving system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102213094A (en) * 2010-04-12 2011-10-12 淮南矿业(集团)有限责任公司 Construction system and construction method for mine rock drivage
CN101824990A (en) * 2010-04-20 2010-09-08 闫振东 Rock drivage process for four-arm hydraulic drill rig and breaking-loading-transporting-guniting integrated machine
CN102587903A (en) * 2012-02-24 2012-07-18 河南大有能源股份有限公司 Comprehensive tunneling system for stone drift
CN102748032A (en) * 2012-07-26 2012-10-24 兖州煤业股份有限公司 Mechanized rapid construction method for traditional rock drivage
CN203729998U (en) * 2014-01-26 2014-07-23 平顶山天安煤业股份有限公司 Integrated rock drift tunneling production line
CN104564089A (en) * 2014-12-31 2015-04-29 闫振东 Rock roadway quick tunneling process of impact crushing rock roadway tunneling machine
CN206267853U (en) * 2016-12-13 2017-06-20 淮南矿业(集团)有限责任公司 A kind of large rock-gateway driving system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107218077A (en) * 2017-06-26 2017-09-29 永城煤电控股集团有限公司 Rock gangway multimode combines cash technique
CN107218077B (en) * 2017-06-26 2019-04-30 永城煤电控股集团有限公司 Rock gangway multimode combines cash technique out

Similar Documents

Publication Publication Date Title
CN106121648B (en) Sublevel open stoping chassis route ore drawing subsequent filling mining method
CN104405437B (en) A kind of solid filling with combine the hybrid working face mining method of adopting
CN103216238B (en) A kind of Opencut coal mine mining technique
CN102213094B (en) Construction system and construction method for mine rock drivage
CN103883329B (en) Mine hard rock excavation construction method
CN102996131A (en) Solid-filling coal mining method with two pre-excavating tunnels for advancing
CN101191416A (en) Rock lane digging method
CN201087428Y (en) Bucket type transloader
CN102587903B (en) Comprehensive tunneling system for stone drift
CN107191191A (en) A kind of rock gangway fast digging technique of the breaking rock gangway anchor driving machine of three hammering blows
CN206267853U (en) A kind of large rock-gateway driving system
CN103388478A (en) Forming method for transportation road of bucket shovel applied to open pit coal mine
CN105401951A (en) Common gangue removal method and system for dual rock roadways of coal mine
CN105370280B (en) A kind of double-deck thin jade ore deposit nondestructive blasting mining methods of underground low-angle dip
CN106401599A (en) Large-section rock drivage system and construction method thereof
CN103867203B (en) Mine working chain saw type hard rock mole
CN105626076B (en) It is a kind of to draw bucket shovel zigzag working berm high-efficiency mining method
CN114183140B (en) Mining and filling method for advanced replacement section coal pillar
CN111734413A (en) Method for rapidly recovering working face of inclined thick coal seam
CN102748032B (en) Mechanized rapid construction method for traditional rock drivage
CN111119896A (en) Bauxite mining method
CN104088642A (en) Super-short-wall coal mining method
CN103982184A (en) Falling ore directional slip control method adopting underground mine bottom-pillar-free caving mining method
CN111550246B (en) Novel caving mining method for steeply-inclined crushed ultra-thick stone coal type vanadium ore
RU2585318C1 (en) Development of thick gently sloping potassium beds

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170215