CN107060777A - One kind repaiies system along empty lane mechanization lane - Google Patents
One kind repaiies system along empty lane mechanization lane Download PDFInfo
- Publication number
- CN107060777A CN107060777A CN201710457822.6A CN201710457822A CN107060777A CN 107060777 A CN107060777 A CN 107060777A CN 201710457822 A CN201710457822 A CN 201710457822A CN 107060777 A CN107060777 A CN 107060777A
- Authority
- CN
- China
- Prior art keywords
- lane
- mechanization
- excavator
- scrapper conveyor
- along empty
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000006698 induction Effects 0.000 claims abstract description 26
- 230000008439 repair process Effects 0.000 claims description 14
- 241001669679 Eleotris Species 0.000 claims description 3
- 238000005096 rolling process Methods 0.000 claims description 2
- 230000001360 synchronised effect Effects 0.000 claims 1
- 230000008901 benefit Effects 0.000 abstract description 2
- 239000003795 chemical substances by application Substances 0.000 description 15
- 238000000034 method Methods 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 230000006872 improvement Effects 0.000 description 2
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 2
- 238000005065 mining Methods 0.000 description 2
- 238000009423 ventilation Methods 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 239000000872 buffer Substances 0.000 description 1
- 239000003245 coal Substances 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000686 essence Substances 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
- 230000005641 tunneling Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G19/00—Conveyors comprising an impeller or a series of impellers carried by an endless traction element and arranged to move articles or materials over a supporting surface or underlying material, e.g. endless scraper conveyors
- B65G19/18—Details
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Mechanical Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
The invention discloses one kind system is repaiied along empty lane mechanization lane, it is characterized in that, including scrapper conveyor induction system, face conveyor, excavator, the output end of the scrapper conveyor induction system is connected with work transporter, the excavator coordinates scrapper conveyor induction system mutually to run, and the input of the scrapper conveyor induction system coordinates with excavator to be run.The advantage of the present invention compared with prior art is:The use that the present invention passes through MWY6/0.3 coals hydraulic excavator for mine and 40Z chain mat machines, realize that upper air way is acted as a planted agent the mechanization of operation substantially in the grooves of Gu Qiaokuang 11 exploiting field 1124 (1) working faces along along empty lane of going down the hill, the realization of mechanization planted agent, both worker's labor intensity had been reduced, planted agent's speed is accelerated again, while also a saving a large amount of costs of human resources.
Description
Technical field
Technical field is repaiied the present invention relates to lane, more particularly to one kind repaiies system along empty lane mechanization lane.
Background technology
To ensure air way ventilation section on fully-mechanized mining working, accelerate lane repair degree, reduce worker's labor intensity, realize manpower
The reasonably optimizing of resource, my ore deposit air way on 1124 (1) working faces put into a set of MWY6/0.3 coals hydraulic excavator for mine and
40Z chain mat machines, carry out lane and repair operation.Being shown by mining type and ore deposit pressure influences, and turns round and look at the groove of bridge ore deposit 11 and goes down the hill on each working face in exploiting field
During air way is gob side entry, exploitation process, tunnel roof and floor and two the amount of shifting near is helped greatly, cause ventilation section not enough, it is necessary to logical
Cross planted agent, Si Bangdeng lanes and repair kaneh section, because big workload and upper air way humid environment, sultry, people's work are repaiied in lane
Industry progress is slow, while because lane space is narrow and cost of human resources limitation, it is impossible to largely put into labour, therefore be badly in need of carrying out
Repair in mechanization lane.
Such as Fig. 1 repaiies the structural representation of system for lane at initial stage, and working face uses flat car by excavator whole Transporting to rail
Along continuous rope tail, then connection, which excavates to start excavator after electromechanical source and run to rail is suitable, changes canopy mouthful, for convenience of 40Z scrapper conveyors
The connection of power supply and switch and the drawing of itself are moved, used, and 40Z scrapper conveyor heads are arranged in work surface side by selection, tail outside,
Scrapper conveyor backward running shipment.Drawn using a 17.5kw puffer and move 40Z scrapper conveyors.During normal back production, upper air way is advanced
Pressure manifestation scope be working face to away from working face wall 50m, the region roadway's sides displacement is big and needs marguise to prop up in advance
Shield, while being limited by methane gas extraction pipeline, excavator work department horizontal rotation scope only 2.8m or so, it is impossible to meet excavator
360 ° of rotations, while 40Z scrapper conveyors are because of reversing shipment, the limit uses length only 40~50m.Therefore excavator can only be in 40Z scraper plates
Acted as a planted agent in the range of machine head (away from 40~50m of working face), and by digger operating device towards working face, before excavator retrusive
Enter.The MWY6/0.3 type excavators that we use, coordinate Excavating bucket to be acted as a planted agent in vertical direction, digging operation using hydraulic arm
Certain stroke is needed, minimum operation height cannot be below 2.5m.During crossing exceptions area, the upper advanced pressure manifestation scope of air way reaches
120m or so, should in the range of Floor Heave in Roadway amount it is big, pucking speed is fast, and the operating type at initial stage can not meet planted agent and require,
It may can not meet small digging machine because of pucking, tunnel on the contrary and normally run, on the contrary be removed small digging machine by the way of manually acting as a planted agent.
Meanwhile, during crossing exceptions area, to strengthen roof timbering, in addition it is also necessary to which the advanced marguise distance of air way in extension, 40Z chain mat machines length is more
Planted agent's demand can not be met.Initial stage is used as mistake to during face conveyor shipment using 40Z scrapper conveyors using two section enameled troughs
Cross, still, often alluvial on enameled trough, influences normal shipment, two workers need to be arranged to be responsible for specially taking off goods goods, both unrestrained
Take manpower again dangerous.Based on this, now study one kind and repair system along empty lane mechanization lane, this problem is solved well.
The content of the invention
It is an object of the invention to overcome the deficiencies of the prior art and provide one kind system is repaiied along empty lane mechanization lane.
The present invention is achieved by the following technical solutions:One kind repaiies system along empty lane mechanization lane, it is characterised in that bag
Include scrapper conveyor induction system, face conveyor, excavator, output end and the work transporter phase of the scrapper conveyor induction system
Even, the excavator coordinates scrapper conveyor induction system mutually to run, and input and the excavator of the scrapper conveyor induction system coordinate
Operation.
One of preferred embodiment as the present invention, the scrapper conveyor induction system includes 40Z drag conveyors.
One of preferred embodiment as the present invention, the 40Z drag conveyors are the 40Z scraper plates of two length 75m, 45m
Overlapped before and after conveyer, described 75m, 45m 40Z drag conveyors.
One of preferred embodiment as the present invention, described 75m, 45m 40Z drag conveyor conveying directions are consistent and identical
Step.
One of preferred embodiment as the present invention, in addition to belt is reprinted, the output end of the scrapper conveyor induction system is led to
Reprinting belt is crossed with work transporter to be connected.
One of preferred embodiment as the present invention, the scrapper conveyor induction system both sides are provided with advanced marguise supporting.
One of preferred embodiment as the present invention, the excavator is MWY6/0.3 type excavators.
One of preferred embodiment as the present invention, the MWY6/0.3 types excavator includes excavator body, the excavation
Machine body is fixed on flat car.
Provided with roller and sleeper or sheeting caps, the rolling below one of preferred embodiment as the present invention, the flat car
Wheel lower section is provided with below anchor chain, the big plate in flat car rear and is provided with woven bag.
One of preferred embodiment as the present invention, the scrapper conveyor induction system, face conveyor, excavator are placed in
The groove of bridge ore deposit 11 exploiting field of going down the hill is turned round and look to use cooperatively along along empty lane.
The advantage of the present invention compared with prior art is:The present invention passes through MWY6/0.3 coals hydraulic excavator for mine and 40Z
The use of chain mat machine, has realized that upper air way planted agent makees substantially in the grooves of Gu Qiaokuang 11 exploiting field 1124 (1) working faces along along empty lane of going down the hill
The mechanization of industry, the realization of mechanization planted agent, had both reduced worker's labor intensity, planted agent's speed is accelerated again, while also saving
A large amount of costs of human resources.
Brief description of the drawings
Fig. 1 is the improvement pre-structure schematic diagram of the present invention;
Fig. 2 is the excavator structure schematic diagram of the present invention;
Fig. 3 is the structural representation of the present invention.
Embodiment
Embodiments of the invention are elaborated below, the present embodiment is carried out lower premised on technical solution of the present invention
Implement, give detailed embodiment and specific operating process, but protection scope of the present invention is not limited to following implementations
Example.
Referring to Fig. 2,3:It is a kind of to repair system along empty lane mechanization lane, including scrapper conveyor induction system 1, face conveyor 2,
Excavator 3, the output end of the scrapper conveyor induction system 1 is connected with work transporter 2, and the excavator 3 coordinates scrapper conveyor defeated
System 1 is sent mutually to run, the input of the scrapper conveyor induction system 1 coordinates with excavator 3 to be run.
One of preferred embodiment as the present invention, the scrapper conveyor induction system 1 includes 40Z drag conveyors.
One of preferred embodiment as the present invention, the 40Z drag conveyors are the 40Z scraper plates of two length 75m, 45m
Overlapped before and after conveyer, described 75m, 45m 40Z drag conveyors.
One of preferred embodiment as the present invention, described 75m, 45m 40Z drag conveyor conveying directions are consistent and identical
Step.
One of preferred embodiment as the present invention, in addition to reprint belt 4, the output end of the scrapper conveyor induction system 1
It is connected by reprinting belt 4 with work transporter 2.
One of preferred embodiment as the present invention, the both sides of scrapper conveyor induction system 1 are provided with advanced marguise supporting 5.
One of preferred embodiment as the present invention, the excavator 3 is MWY6/0.3 type excavators.
One of preferred embodiment as the present invention, the MWY6/0.3 types excavator includes excavator body 301, described to dig
Pick machine body 301 is fixed on flat car 302.
One of preferred embodiment as the present invention, the lower section of flat car 302 is provided with roller 303 and sleeper 307 and headblock
Plate 308, the lower section of roller 303 is provided with anchor chain 304, and the big lower section of plate 305 in the rear of flat car 302 is provided with woven bag 306.
One of preferred embodiment as the present invention, the scrapper conveyor induction system 1, face conveyor 2, excavator 3 are equal
The grooves of Gu Qiaokuang 11 exploiting field of going down the hill is placed in use cooperatively along along empty lane.
The present invention uses MWY6/0.3 type excavators, coordinates Excavating bucket to be acted as a planted agent in vertical direction using hydraulic arm, digs
Digging operation needs certain stroke, and minimum operation height cannot be below 2.5m.During crossing exceptions area, the upper advanced pressure manifestation model of air way
Enclose up to 120m or so, should in the range of Floor Heave in Roadway amount it is big, pucking speed is fast, and the operating type at initial stage can not meet planted agent will
Ask, may can not meet small digging machine because of pucking, tunnel on the contrary and normally run, on the contrary be moved small digging machine by the way of manually acting as a planted agent
Go out.Meanwhile, during crossing exceptions area, to strengthen roof timbering, in addition it is also necessary to the advanced marguise distance of air way in extension, 40Z carrier bar captains
Degree can not more meet planted agent's demand.Initial stage is made using 40Z scrapper conveyors to during face conveyor shipment using two section enameled troughs
For transition, still, often alluvial on enameled trough, influences normal shipment, two workers need to be arranged to be responsible for specially taking off goods goods,
Not only waste of manpower but also dangerous.Once acted as a planted agent scope for increase excavator, it is considered to extend 40Z drag conveyors, but by scrapper conveyor
Power of motor and chain load resistance energy power restriction, it is impossible to take the mode of increase chute to extend chain mat machine shipment length.Therefore consider
Two scrapper conveyors are overlapped, and process a set of overlap joint stand, the scrapper conveyor for being respectively 45m and 75m by two length is end to end,
It is linked to be entirety, is drawn simultaneously using winch and move two scrapper conveyors.So, scrapper conveyor can be placed side bottom plate in advance and crouched except simultaneously by excavator
Goods is deposited in opposite side temporarily, shifting scrapper conveyor is then drawn again, realizes that tunneling boring is acted as a planted agent in advance.To solve scrapper conveyor to work
The problem of face transporter shifts goods automatically, coordinates wind coal borer component to devise using support roller for belt machine and one section of 800mm belt
One typhoon is dynamic to reprint belt, had so both saved manpower and turn avoid unsafe factor.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention
Any modifications, equivalent substitutions and improvements made within refreshing and principle etc., should be included in the scope of the protection.
Claims (10)
1. one kind repaiies system along empty lane mechanization lane, it is characterised in that including scrapper conveyor induction system, face conveyor, digging
Pick machine, the output end of the scrapper conveyor induction system is connected with work transporter, and the excavator coordinates scrapper conveyor induction system
Mutually run, the input of the scrapper conveyor induction system coordinates with excavator to be run.
2. according to claim 1 repair system along empty lane mechanization lane, it is characterised in that the scrapper conveyor induction system bag
Include 40Z drag conveyors.
3. according to claim 2 repair system along empty lane mechanization lane, it is characterised in that the 40Z drag conveyors are
Overlapped before and after the 40Z drag conveyors of two length 75m, 45m, described 75m, 45m 40Z drag conveyors.
4. according to claim 3 repair system along empty lane mechanization lane, it is characterised in that described 75m, 45m 40Z scraper plates
Conveyer conveying direction is consistent and is synchronised.
5. according to claim 1 repair system along empty lane mechanization lane, it is characterised in that described also including reprinting belt
The output end of scrapper conveyor induction system is connected by reprinting belt with work transporter.
6. according to claim 1 repair system along empty lane mechanization lane, it is characterised in that the scrapper conveyor induction system two
Side is provided with advanced marguise supporting.
7. according to claim 1 repair system along empty lane mechanization lane, it is characterised in that the excavator is MWY6/0.3
Type excavator.
8. according to claim 7 repair system along empty lane mechanization lane, it is characterised in that the MWY6/0.3 types excavator
Including excavator body, the excavator body is fixed on flat car.
9. according to claim 8 repair system along empty lane mechanization lane, it is characterised in that provided with rolling below the flat car
It is provided with below wheel and sleeper or sheeting caps, the roller below anchor chain, the big plate in flat car rear and is provided with woven bag.
10. described system is repaiied along empty lane mechanization lane according to claim 1-9 is any, it is characterised in that the scrapper conveyor is defeated
Send system, face conveyor, excavator to be placed in turning round and look at the groove of bridge ore deposit 11 exploiting field of going down the hill to use cooperatively along along empty lane.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710457822.6A CN107060777B (en) | 2017-06-16 | 2017-06-16 | Gob-side entry mechanized roadway repair system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710457822.6A CN107060777B (en) | 2017-06-16 | 2017-06-16 | Gob-side entry mechanized roadway repair system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107060777A true CN107060777A (en) | 2017-08-18 |
CN107060777B CN107060777B (en) | 2023-07-25 |
Family
ID=59594042
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710457822.6A Active CN107060777B (en) | 2017-06-16 | 2017-06-16 | Gob-side entry mechanized roadway repair system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107060777B (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001082073A (en) * | 1999-09-13 | 2001-03-27 | Shimizu Corp | Tunnel widening method and extension belt conveyor |
CN102155219A (en) * | 2011-03-29 | 2011-08-17 | 吕国安 | Comprehensive dredging machine |
CN104481532A (en) * | 2014-12-09 | 2015-04-01 | 辽宁威跃集团机械制造有限公司 | Mineral offset adjusting excavator |
CN205858354U (en) * | 2016-06-14 | 2017-01-04 | 淮南矿业(集团)有限责任公司 | A kind of mining tunnel driving system |
CN106368619A (en) * | 2016-11-08 | 2017-02-01 | 内蒙古科技大学 | Novel gas drainage drilling rig with self-moving and stabilizing device |
CN206928948U (en) * | 2017-06-16 | 2018-01-26 | 淮南矿业(集团)有限责任公司 | One kind repaiies system along empty lane mechanization lane |
-
2017
- 2017-06-16 CN CN201710457822.6A patent/CN107060777B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001082073A (en) * | 1999-09-13 | 2001-03-27 | Shimizu Corp | Tunnel widening method and extension belt conveyor |
CN102155219A (en) * | 2011-03-29 | 2011-08-17 | 吕国安 | Comprehensive dredging machine |
CN104481532A (en) * | 2014-12-09 | 2015-04-01 | 辽宁威跃集团机械制造有限公司 | Mineral offset adjusting excavator |
CN205858354U (en) * | 2016-06-14 | 2017-01-04 | 淮南矿业(集团)有限责任公司 | A kind of mining tunnel driving system |
CN106368619A (en) * | 2016-11-08 | 2017-02-01 | 内蒙古科技大学 | Novel gas drainage drilling rig with self-moving and stabilizing device |
CN206928948U (en) * | 2017-06-16 | 2018-01-26 | 淮南矿业(集团)有限责任公司 | One kind repaiies system along empty lane mechanization lane |
Non-Patent Citations (1)
Title |
---|
王之泰等: "《非金属材料学参考资料 上》", 31 October 1984, 物资出版社 * |
Also Published As
Publication number | Publication date |
---|---|
CN107060777B (en) | 2023-07-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104564050B (en) | Equipment for heading and anchoring parallel operation construction | |
CN102996131B (en) | Solid-filling coal mining method with two pre-excavating tunnels for advancing | |
CN101858215B (en) | Road retained method for extrusion molding of waste rock | |
CN108150172A (en) | A kind of single method of mining coal from heavy pitch thick coal seam | |
CN101881162B (en) | Drill loader | |
CN105298496B (en) | Complete adopt of reserved working face coal column is set to fill coal-mining method entirely | |
CN102587914A (en) | Strip-type Wongawilli mining method of coal buried under building | |
CN104405437A (en) | Mining method employing solid filling and fully-mechanized coal mining hybrid working face | |
CN104131829A (en) | Method for removing hydraulic supports for solid filling coal mining | |
CN105386771A (en) | Shield type digging and anchoring machine | |
CN202500562U (en) | Excavating, supporting and anchoring parallel operating system | |
CN104088643A (en) | High-dipping extremely-close-distance coal seam top coal caving mining method | |
CN101749020A (en) | Forward coal mining by filling method | |
CN104653182A (en) | Coal mining method for coal and gangue separate recovery of coal seam with dirt band | |
CN101403302A (en) | Pedrail type liftable anchor bar anchor cable construction drill rig and double-lane fast digging technique | |
CN105952453A (en) | Long wall advancing type mechanical non-roadway mining complete plant for coal seam face | |
CN201401166Y (en) | Drill loader | |
CN204921002U (en) | Transport and stock anchor rope support system | |
CN103174424A (en) | Breast and pillar method under long-wall arrangement | |
CN205154176U (en) | Two rock gangway sharing discharge refuse systems in colliery | |
CN204476407U (en) | A kind of pick anchor parallel operations construction equipment | |
CN211648172U (en) | Ten-arm tunneling and tracing machine | |
CN206928948U (en) | One kind repaiies system along empty lane mechanization lane | |
CN209494569U (en) | A kind of novel coal lane high-speed driving machine | |
CN104088642B (en) | A kind of super Shortwall mining method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |