CN206873230U - Water-permeable brick - Google Patents

Water-permeable brick Download PDF

Info

Publication number
CN206873230U
CN206873230U CN201720631105.6U CN201720631105U CN206873230U CN 206873230 U CN206873230 U CN 206873230U CN 201720631105 U CN201720631105 U CN 201720631105U CN 206873230 U CN206873230 U CN 206873230U
Authority
CN
China
Prior art keywords
water
permeable brick
main body
causeway
muscle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720631105.6U
Other languages
Chinese (zh)
Inventor
朱士勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Hengxuan Building Materials Co Ltd
Original Assignee
Nanjing Hengxuan Building Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Hengxuan Building Materials Co Ltd filed Critical Nanjing Hengxuan Building Materials Co Ltd
Priority to CN201720631105.6U priority Critical patent/CN206873230U/en
Application granted granted Critical
Publication of CN206873230U publication Critical patent/CN206873230U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model provides a kind of water-permeable brick, including:One water-permeable brick main body, water-permeable brick main body includes a substrate layer and a top layer, top layer connects with substrate layer and is located above substrate layer, substrate layer and top layer are formed in one structure, all it is mutually bonded and is formed by curing by the quartz sand with bonded adhesives clad, wherein quartz sand particle size is 1 5mm, on the surrounding side of water-permeable brick main body, if arterial highway causeway muscle is distributed with respectively along the short transverse of water-permeable brick.The water-permeable brick further improves the overall structural strength of water-permeable brick, and weight, prevents to turn on one's side after laying while good permeable effect is provided.

Description

Water-permeable brick
Technical field
It the utility model is related to floor file building material field, more particularly to a kind of water-permeable brick for being applied to laying road surface.
Background technology
Water-permeable brick is on present surface construction using relatively broad.Due to the necessity of current Process of Urbanization Construction, city The large-scale open space such as Route for pedestrians, square uses more road surfacing engineerings, most of in these road surfacing engineerings to adopt With this good water permeability of water-permeable brick, intensity is high, laying is simple, cost economy ground surface material.The inside of water-permeable brick has uniqueness Loose and porous structure, facilitate the water rapid osmotic of accumulation on its surface to avoid the length on water-permeable brick upper strata to the bottom of water-permeable brick Time ponding.
Current water-permeable bricks a large amount of on the market use broken stone-matrix by cementitious, on the premise of water penetration is met, Its overall structural strength is limited, can only achieve C20-C30 ranks, once if intensity is improved again it is necessary to increase water-permeable brick Middle cement content can make water-permeable brick more closely knit simultaneously to improve adhesive strength, reduce permeable porosity in water-permeable brick, make Water brick does not reach permeable standard.On the other hand, the water-permeable brick using cement as jointing material is heavier, is unfavorable for transporting and spreads If its outer surface also ash flutter it is not very attractive in appearance.
After water-permeable brick laying typically floor leveling, spread sand and flatten, water-permeable brick is then directly placed at leveling On Shamian Island afterwards, to ensure the water penetration of permeable brick paving.Water-permeable brick after laying is when by weight, such as is stopped on square When, it is possible that side slightly settles, the lateral edge that water-permeable brick contacts between each other easily mutually extrudes water-permeable brick, works as extruding Damage even entirety in water-permeable brick corner is easily caused when pressure is excessive laterally to rout up, and is influenceed pavement strength and aesthetics, is added road Face maintenance cost.
The content of the invention
The problem of existing for prior art, the utility model provide a kind of water-permeable brick, the increase of its intensity, water penetration Good, weight, when road surface is pressurized after laying can mutually locking avoid fragment of brick rollover from improving pavement strength..
To achieve these goals, water-permeable brick of the present utility model includes:One water-permeable brick main body, water-permeable brick main body include one Substrate layer and a top layer, top layer connect with substrate layer and are located above substrate layer, and substrate layer and top layer are formed in one structure, all It is mutually bonded and is formed by curing by the quartz sand with bonded adhesives clad, wherein quartz sand particle size is 1-5mm, in water-permeable brick main body Surrounding side on, if arterial highway causeway muscle is distributed with respectively along the short transverse of water-permeable brick.
Further, quartz sand particle size 1-3mm.
Further, bonded adhesives clad is fluoropolymer resin clad.
Further, polypropylene filaments are distributed in water-permeable brick main body.
Further, causeway muscle, substrate layer, top layer are formed in one structure.
Further, on each pair opposite flank of water-permeable brick main body, causeway muscle is mutually in staggered distribution.
Further, on the broad side face of water-permeable brick main body, at least twice causeway muscle relative to the broad side face along height Spend the center line mal-distribution in direction.
Further, on the narrower side of water-permeable brick main body, at least one of causeway muscle is relative to the narrower side along height Spend the center line mal-distribution in direction.
Further, top layer is highly 1-3mm, and coat of colo(u)r is brushed with the outer surface on top layer.
Further, coat of colo(u)r forms for iron oxide material is fired.
Brief description of the drawings
The present invention is made below in conjunction with the accompanying drawings further to describe and illustrate.
Fig. 1 is the overall structure diagram of the water-permeable brick of preferred embodiment of the present utility model;
Fig. 2 is the structural representation under the water-permeable brick laying state of preferred embodiment of the present utility model.
Embodiment
As depicted in figs. 1 and 2, water-permeable brick includes in preferred embodiment of the present utility model:One water-permeable brick main body 1, thoroughly Water brick main body 1 includes a substrate layer 10 and a top layer 11, and top layer 11 is located at the top of substrate layer 10.The four of water-permeable brick main body surrounding The causeway muscle 12 for protruding from the side is distributed with individual side along the short transverse of water-permeable brick.Causeway muscle 12 is on each side Relative to the center line mal-distribution along the profile height direction, and the causeway muscle 12 on two opposite flanks mutually staggers. As shown in Fig. 2 in preferred embodiment, the causeway muscle 12 on the relative broad side face 15 and 16 of water-permeable brick 1 two respectively has two Bar and mutually it is in staggered distribution, the causeway muscle on the relative narrower side of another two respectively there are two to be also mutually in staggered distribution.So that After obtaining water-permeable brick road surfacing well, by the causeway muscle on one of water-permeable brick side and separately between every two pieces of adjacent water-permeable bricks The side of one piece of water-permeable brick connects, and the gap formed therebetween will fill out husky processing.Permeable brick paving after laying is by the external world Under the weight of pressure, the causeway muscle in adjacent side between adjacent two water-permeable brick will be separated out certain interval between water-permeable brick, should Fine sand is filled with gap, makes that there is between adjacent water-permeable brick certain mobile surplus, avoid adjacent side directly extrude cause it is permeable Brick side damage or full sized brick are arched upward, turned on one's side.In other embodiments, the quantity of causeway muscle can change as needed Become, such as causeway muscle quantity increases on water-permeable brick broad side face, causeway muscle quantity is reduced to one etc. on narrower side.
Preferably, causeway muscle 12 is formed in one and is made with substrate layer 10, top layer 11.Substrate layer and top layer are all using quartz Sand seepy material, more specifically, using quartz sand of the grain diameter for 1-5mm, it is mutually bonded by fluoropolymer resin glue, through mould Fired after tool sizing, the fluoropolymer resin glue coating layer of solidification is formed on quartz sand particle surface, adjacent quartz sand particle gathers Polymer resin glue coating layer is connected with each other, so as to which adjacent quartz sand particle is mutually bonded into fixation, and with fluoropolymer resin Hole is formed between the quartz sand particle of glue coating layer.Compared to cementitious, the thinner adhesive strength of fluoropolymer resin glue-line is more Greatly, more concrete dynamic modulus can be left between quartz sand particle, water-permeable brick porosity is improved, so as to improve permeability rate.Preferred real Apply in mode, it is preferable that the grain diameter of quartz sand is 1-3mm, preferably to improve water-permeable brick intensity and in quartz sand particle Between obtain enough porositys.Fluoropolymer resin glue can use epoxy resin, acrylic resin, polyurethane etc. various suitable Resin glue.
Polypropylene filaments have light weight, intensity height, good toughness, wear-resisting, corrosion resistant characteristic, will in the spice stage Polypropylene filaments 15 (in Fig. 1 shown in dotted line) are mutually admixed with quartz sand, then mix and stir, use by viscous stick of epoxide-resin glue After mould molding, sizing is fired.After water-permeable brick fires sizing, polypropylene filaments 15 are regularly distributed in the quartz sand of water-permeable brick Between particle, the toughness of water-permeable brick is further improved, strengthens cracking resistance.Comparatively speaking, this resin quartz sand material composition Water-permeable brick weight be less than cement bonded sand stone material composition water-permeable brick same volume weight, the weight of water-permeable brick finished product is dropped As little as 2/3 or so of the water-permeable brick of same volume cement bonded sand stone material composition.And by adjusting quartz sand particle size, water-permeable brick is strong Degree can continue to rise on the basis of C40, remain able to meet permeability rate requirement even if reaching C50-C80.Top layer 11 and substrate layer 10 connecting portions set curved edge so that the structure on top layer 11 is more attractive in appearance.
Preferably, a layer pigment layer is brushed in the outer surface on top layer 11 before the firing, the fixation in the lump when firing.Preferably, The height of top layer 11 is 1-3cm.The material of coat of colo(u)r is iron oxide material, and the outer surface on top layer 11 is attached to after firing, is not easy to take off Color, it can preserve for a long time.
Only the preferred embodiment of the present invention is described for above-mentioned embodiment, and not to the guarantor of the present invention Shield scope is defined.On the premise of design concept of the present invention and scope is not departed from, one of ordinary skill in the art According to word description provided by the present invention, accompanying drawing to the various modifications made by technical scheme, replacement and improvement, The protection category of the present invention all should be belonged to.Protection scope of the present invention is determined by claim.

Claims (10)

1. a kind of water-permeable brick, including:One water-permeable brick main body, the water-permeable brick main body include a substrate layer and a top layer, the table Layer connects with the substrate layer and is located above the substrate layer, it is characterised in that the substrate layer and the top layer are integrated Molding structure, all it is mutually bonded and is formed by curing by the quartz sand with bonded adhesives clad, wherein quartz sand particle size is 1-5mm, On the surrounding side of the water-permeable brick main body, if arterial highway causeway muscle is distributed with respectively along the short transverse of water-permeable brick.
2. water-permeable brick as claimed in claim 1, it is characterised in that the quartz sand particle size is 1-3mm.
3. water-permeable brick as claimed in claim 1, it is characterised in that the bonded adhesives clad is fluoropolymer resin clad.
4. water-permeable brick as claimed in claim 1, it is characterised in that polypropylene filaments are distributed in the water-permeable brick main body.
5. the water-permeable brick as described in claim any one of 1-4, it is characterised in that the causeway muscle, the substrate layer, the table Layer is formed in one structure.
6. water-permeable brick as claimed in claim 5, it is characterised in that on each pair opposite flank of the water-permeable brick main body, institute Causeway muscle is stated mutually to be in staggered distribution.
7. water-permeable brick as claimed in claim 6, it is characterised in that on the broad side face of the water-permeable brick main body, at least two Road causeway muscle is relative to center line mal-distribution of the broad side face along short transverse.
8. water-permeable brick as claimed in claim 6, it is characterised in that on the narrower side of the water-permeable brick main body, at least one Road causeway muscle is relative to center line mal-distribution of the narrower side along short transverse.
9. such as the water-permeable brick any one of claim 1-3, it is characterised in that the top layer is highly 1-3mm, described The outer surface on top layer is brushed with coat of colo(u)r.
10. water-permeable brick as claimed in claim 9, it is characterised in that the coat of colo(u)r forms for iron oxide material is fired.
CN201720631105.6U 2017-06-02 2017-06-02 Water-permeable brick Active CN206873230U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720631105.6U CN206873230U (en) 2017-06-02 2017-06-02 Water-permeable brick

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720631105.6U CN206873230U (en) 2017-06-02 2017-06-02 Water-permeable brick

Publications (1)

Publication Number Publication Date
CN206873230U true CN206873230U (en) 2018-01-12

Family

ID=61337937

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720631105.6U Active CN206873230U (en) 2017-06-02 2017-06-02 Water-permeable brick

Country Status (1)

Country Link
CN (1) CN206873230U (en)

Similar Documents

Publication Publication Date Title
CN206070394U (en) Existed concrete bridge bridge floor overlays thin-layer bituminous paving structure
CN102587256B (en) Water permeable stone paving block
CN204343625U (en) Combined indoor based on decorating film and backing material plate fits up floor
CN206205306U (en) A kind of stair riser decorative structure
CN206873230U (en) Water-permeable brick
CN109930856A (en) A kind of the old and new's wall concatenation construction method
KR101037904B1 (en) Marble block for retaining wall and manufacturing method thereof
CN206971028U (en) A kind of colored road surface
CN204780505U (en) Rubber granule bonding ceramic tile
CN109736539A (en) Ceramic tile close joint paving ground structure and laying method
CN204940786U (en) A kind of non-slip wood porcelain floor
CN209456827U (en) Floating floor decorating structure
CN103774782A (en) Sandwich building block
CN209099088U (en) A kind of high-strength composite permeable brick structure
CN205224533U (en) Art terrace
CN207552838U (en) The efficient water-permeable brick of polyurethane and road surface
CN207484899U (en) A kind of terrace of high abrasion
CN207775646U (en) A kind of roadbed preventing reflection crack
CN207143630U (en) A kind of permeable, anti-settling pavement bricks
CN206477545U (en) Floor structure
CN205382660U (en) Dampproofing high strength ceramic tile
CN110157228A (en) A kind of powdery textured coating and its construction method
CN206971025U (en) A kind of new-type antiskid parian pavement bricks
CN206562740U (en) A kind of wear-resisting parking lot terrace
CN206408899U (en) Ash concrete base level ground is prevented

Legal Events

Date Code Title Description
GR01 Patent grant