CN207552838U - The efficient water-permeable brick of polyurethane and road surface - Google Patents

The efficient water-permeable brick of polyurethane and road surface Download PDF

Info

Publication number
CN207552838U
CN207552838U CN201720864252.8U CN201720864252U CN207552838U CN 207552838 U CN207552838 U CN 207552838U CN 201720864252 U CN201720864252 U CN 201720864252U CN 207552838 U CN207552838 U CN 207552838U
Authority
CN
China
Prior art keywords
brick
full sized
main body
polyurethane
deflector hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720864252.8U
Other languages
Chinese (zh)
Inventor
李冰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Sponge City Construction Co Ltd
Original Assignee
Henan Sponge City Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Sponge City Construction Co Ltd filed Critical Henan Sponge City Construction Co Ltd
Priority to CN201720864252.8U priority Critical patent/CN207552838U/en
Application granted granted Critical
Publication of CN207552838U publication Critical patent/CN207552838U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Abstract

The utility model is related to the efficient water-permeable brick of polyurethane and road surfaces;A kind of efficient water-permeable brick of polyurethane, is formed by granular aggregates by polyurethane sticking, including full sized brick and fills out brick, and the deflector hole that its main body is run through in four longitudinal directions is correspondingly provided in the middle part of full sized brick, and the deflector hole is uniformly distributed about full sized brick longitudinal projection;Notch is correspondingly provided in the middle part of the full sized brick main body both ends, gap width is the half of full sized brick main body;Full sized brick is filled out brick and is formed by polyurethane adhesive mixing aggregate, with stronger load-carrying ability, at the same time, aggregate mutually bonding forms irregular hole, surface rain can be penetrated into, do not blocked by sundries, surface humidity also can freely discharge into the atmosphere simultaneously, alleviate urban heat land effect, reduce the formation of haze.

Description

The efficient water-permeable brick of polyurethane and road surface
Technical field
A kind of municipal road surfacing field of the utility model design, and in particular to a kind of efficient water-permeable brick of polyurethane and road Face.
Background technology
At present city square, commercial street, pavement, community activity, the ground in parking lot etc. is mainly with granite, Dali The fluid-tight material such as stone, glazed tile, cement and pitch is laid with, fluid-tightly very big in face of the harm of urban environment.Under During rain, waterproof ground prevent rainwater directly infiltrate through ground, completely ponding make one trip become very inconvenient;Rain A large amount of be lost in of water causes level of ground water to be difficult to, and directly influences the health of urban vegetation so that the earth's surface in city is planted Object is difficult to normal growth, aggravates municipal administration greening burden;The a large amount of of rainwater are lost in arid, the water shortage problem that city is further aggravated. At present, people gradually appreciate the seriousness of the above problem, and existing water-permeable brick directly penetrates into road by water-permeable brick Ground, be easy to cause the loosening of ground, a degree of destruction can be caused to road;It also researchs and develops in the prior art A kind of water-permeable brick for setting osculum, can solve the problems, such as that draining is difficult to a certain extent, but when amount of rainfall is larger, arrange Water hole has little time rainwater being completely exhausted out, and easily generates rainwater accumulation.
Utility model content
To solve the above-mentioned problems, a kind of novel water permeable brick that can be carried out rainwater diversion and have overflow capability is provided, The utility model devises a kind of efficient water-permeable brick of polyurethane and road surface.
The specific technical solution of the utility model is:A kind of efficient water-permeable brick of polyurethane, passes through poly- ammonia by granular aggregates Ester bonds to be formed, and including full sized brick and fills out brick, and the deflector hole that its main body is run through in four longitudinal directions, the water conservancy diversion are correspondingly provided in the middle part of full sized brick Hole is uniformly distributed about full sized brick longitudinal projection;
Notch is correspondingly provided in the middle part of the full sized brick main body both ends, gap width is the half of full sized brick main body;Full sized brick two End face is respectively equipped with the interspersed tenon or inserting hole of corresponding deflector hole edges at two ends, the interspersed tenon and mutual of inserting hole Match;
Preferably, it fills out brick to fill out brick including first or second fill out brick, described first fills out brick main body or second fill out brick main body A quarter for full sized brick main body;Brick wherein one end is filled out equipped with notch, the notch is close to fill out brick main body wherein side side wall, wide Spend the half to fill out brick main body;The deflector hole for running through its main body there are two being set in the middle part of brick is filled out, the deflector hole is vertical about filling out It is uniformly distributed to projection;
Further, interspersed tenon or inserting hole that brick main body both ends are equipped with corresponding water conservancy diversion bore edges, the interspersed tenon are filled out Head and inserting hole are mutually matched.
Excellent as selection of land, full sized brick downside side wall is equipped with waterproof layer, and several overflow pipes, which correspond to, extends to full sized brick middle part, described to overflow Flow tube is correspondingly arranged at deflector hole gap location, and end extends to waterproof layer outer wall;The waterproof layer is Waterproof glue line.Graininess Aggregate is coloured building stones or pigment is added in polyurethane.
A kind of efficient porous pavement of polyurethane, by several full sized bricks or fill out brick splicing form, several full sized bricks are arranged in juxtaposition to be formed Full sized brick group, several full sized brick groups are staggered to form base portion;Front and rear two adjacent full sized bricks are connected by interspersed tenon with inserting hole; Two groups of full sized brick group outer end faces at base portion both ends are filled and led up by corresponding brick of filling out, described to fill out brick with full sized brick by interting tenon and interting Hole connects;Two adjacent groups full sized brick group side is filled and led up by filling out brick, and the brick of filling out is connect with full sized brick by interspersed tenon and inserting hole
Preferably, full sized brick waterproof layer, which corresponds to, contradicts on the ground;The water-permeable brick full sized brick of the different color fills out brick It carries out being spliced to form colorful road surface.
Advantageous effects:Full sized brick is filled out brick and is formed by polyurethane adhesive mixing aggregate, has stronger load-carrying ability, with this Meanwhile aggregate mutually bonding forms irregular hole, can penetrate into surface rain, alleviate municipal drainage problem;Deflector hole is set, Front and rear two adjacent brick body internal diversion holes connects by interspersed tenon with inserting hole, can realize rainwater export, avoid Rainwater directly penetrates into roadbed, sets waterproof layer, can be further ensured that rainwater is exported by deflector hole, improves and roadbed is prevented Shield;Set overflow pipe, avoid rainwater excessive and caused by ponding can not be completely exhausted out forming bulk deposition by deflector hole, will The rainwater of accumulation penetrates into ground by spout hole, while surface humidity also can freely discharge into the atmosphere, and alleviates urban heat island Effect reduces the formation of haze.
Granular aggregates is coloured building stones or pigment is added in polyurethane, make brick body that different colors be presented, pass through Color splicing makes road surface that more beautiful pattern be presented.
Description of the drawings
Fig. 1 is full sized brick structure diagram;
Fig. 2 is full sized brick sectional view;
Fig. 3 is Fig. 2 to sectional view along A-A;
Fig. 4 fills out brick structure schematic diagram for first;
Fig. 5 fills out brick structure schematic diagram for second;
Fig. 6 is porous pavement schematic diagram.
In figure 1 full sized brick, 2 interspersed tenons, 3 deflector holes, 4 inserting holes, 5 waterproof layers, 6a first fill out brick, 6b second fill out brick, 7 overflow Flow tube.
Specific embodiment
A kind of efficient water-permeable brick of polyurethane, referring to Fig. 1-5:It is formed by granular aggregates by polyurethane sticking, including whole Brick 1 is correspondingly provided with the deflector hole 3 that its main body is run through in four longitudinal directions with brick, 1 middle part of full sized brick is filled out, and the deflector hole 3 is vertical about full sized brick 1 It is uniformly distributed to projection;
Notch is correspondingly provided in the middle part of the 1 main body both ends of full sized brick, gap width is the half of 1 main body of full sized brick;Full sized brick 1 Both ends of the surface are respectively equipped with the interspersed tenon 2 or inserting hole 4 of corresponding 3 edges at two ends of deflector hole, the interspersed tenon 2 and inserting hole 4 It is mutually matched;
It fills out brick and fills out brick 6a or second including first and fill out brick 6b, described first fills out brick 6a main bodys or second to fill out brick 6b main bodys be whole The a quarter of 1 main body of brick;Brick wherein one end is filled out equipped with notch, the notch is close to fill out brick main body wherein side side wall, width To fill out the half of brick main body;The deflector hole 3 for running through its main body there are two being set in the middle part of brick is filled out, the deflector hole 3 is vertical about filling out It is uniformly distributed to projection;
It fills out interspersed tenon 2 or inserting hole 4 that brick main body both ends are equipped with corresponding 3 edge of deflector hole, the interspersed tenon 2 and wears Jack 4 is mutually matched.
1 downside side wall of full sized brick is equipped with waterproof layer 5, and several correspondences of overflow pipe 7 extend to 1 middle part of full sized brick, and the overflow pipe 7 is right 3 gap location of deflector hole should be arranged on, end extends to 5 outer wall of waterproof layer;The waterproof layer 5 is Waterproof glue line;Granular bone Expect to add pigment for coloured building stones or in polyurethane.
A kind of efficient porous pavement of polyurethane, referring to Fig. 1-6:By several full sized bricks 1 or fill out brick splicing form, several full sized bricks 1 It is arranged in juxtaposition to form 1 group of full sized brick, several 1 group of full sized bricks are staggered to form base portion;Front and rear two adjacent full sized bricks 1 are by interting tenon First 2 and inserting hole 4 connect;Two groups of full sized bricks, 1 group of outer end face at base portion both ends is filled and led up by corresponding brick of filling out, described to fill out brick and full sized brick 1 is connected by interspersed tenon 2 and inserting hole 4;1 group of side of two adjacent groups full sized brick is filled and led up by filling out brick, and the brick of filling out leads to full sized brick 1 It crosses interspersed tenon 2 and inserting hole 4 connects.
1 waterproof layer 5 of full sized brick, which corresponds to, to be contradicted on the ground.
Full sized brick 1 is filled out brick and is formed by polyurethane adhesive mixing aggregate, has stronger load-carrying ability, at the same time, aggregate phase Mutually bonding forms irregular hole, can penetrate into surface rain, alleviate municipal drainage problem;Deflector hole 3 is set, it is front and rear adjacent Two brick body internal diversion holes 3 are connected by interspersed tenon 2 and inserting hole 4, can realize that rainwater exports, rainwater is avoided directly to ooze Enter roadbed;Interspersed tenon 2 and inserting hole 4 connect the planarization that can be further ensured that road surface simultaneously, reduce road surface and loosen probability.
Waterproof layer 5 is set, can be further ensured that rainwater is exported by deflector hole 3, improve the protection to roadbed;Setting is overflow Flow tube 7, on the downside of the brick body, overflow pipe 7 stretches into the middle part of brick body diversion pipe, rainwater can be avoided excessive and caused by ponding can not It is completely exhausted out forming bulk deposition by deflector hole 3, the protection to roadbed is just abandoned when rainwater is excessive, by the rainwater of accumulation Ground is penetrated into, while surface humidity also can freely discharge into the atmosphere by spout hole, alleviates urban heat land effect, reduces mist The formation of haze.
Aggregate is coloured building stones or hybrid pigment, road surface can be made to show different color, improve the aesthetics on road surface.

Claims (3)

1. a kind of efficient water-permeable brick of polyurethane, is formed by granular aggregates by polyurethane sticking, including full sized brick and brick is filled out, it is special Sign is:The deflector hole that its main body is run through in four longitudinal directions is correspondingly provided in the middle part of full sized brick, the deflector hole is equal about full sized brick longitudinal projection Even distribution;
Notch is correspondingly provided in the middle part of the full sized brick main body both ends, gap width is the half of full sized brick main body;Full sized brick both ends of the surface The interspersed tenon or inserting hole of corresponding deflector hole edges at two ends are respectively equipped with, the interspersed tenon and inserting hole are mutually matched;
It fills out brick to fill out brick including first or second fill out brick, described first fills out brick main body or the second fill out that brick main body is full sized brick main body four points One of;Brick wherein one end is filled out equipped with notch, for the notch close to brick main body wherein side side wall is filled out, width is fill out brick main body two / mono-;It fills out and is set in the middle part of brick there are two the deflector hole for running through its main body, the deflector hole is uniformly distributed about longitudinal projection is filled out;
Interspersed tenon or inserting hole that brick main body both ends are equipped with corresponding water conservancy diversion bore edges are filled out, the interspersed tenon and inserting hole are mutual Matching.
2. the efficient water-permeable brick of polyurethane according to claim 1, it is characterized in that:Side wall is equipped with waterproof layer on the downside of full sized brick, if Dry overflow pipe correspondence is extended in the middle part of full sized brick, and the overflow pipe is correspondingly arranged at deflector hole gap location, and end extends to waterproof Layer outer wall.
3. the efficient water-permeable brick of polyurethane according to claim 2, it is characterized in that:The waterproof layer is Waterproof glue line.
CN201720864252.8U 2017-07-17 2017-07-17 The efficient water-permeable brick of polyurethane and road surface Active CN207552838U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720864252.8U CN207552838U (en) 2017-07-17 2017-07-17 The efficient water-permeable brick of polyurethane and road surface

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720864252.8U CN207552838U (en) 2017-07-17 2017-07-17 The efficient water-permeable brick of polyurethane and road surface

Publications (1)

Publication Number Publication Date
CN207552838U true CN207552838U (en) 2018-06-29

Family

ID=62671972

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720864252.8U Active CN207552838U (en) 2017-07-17 2017-07-17 The efficient water-permeable brick of polyurethane and road surface

Country Status (1)

Country Link
CN (1) CN207552838U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2592718A (en) * 2020-03-05 2021-09-08 Morgan Sindall Construction & Infrastructure Ltd Vehicle refuge for a motor carriageway

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2592718A (en) * 2020-03-05 2021-09-08 Morgan Sindall Construction & Infrastructure Ltd Vehicle refuge for a motor carriageway

Similar Documents

Publication Publication Date Title
CN102337714B (en) Ecological environmental-friendly economical and durable pavement combination panel design and assembly technologies
CN211036597U (en) Municipal administration road surface infiltration drainage brick
CN201074307Y (en) Crash-proof wall for road-bridge greening
CN207552838U (en) The efficient water-permeable brick of polyurethane and road surface
CN215210279U (en) Modular permeable pavement system
CN205591075U (en) Ecology structure of mating formation
CN207700330U (en) A kind of concave herbaceous field grass-planting ecological ditch
CN201080590Y (en) Water seepage floor tile
CN206352236U (en) A kind of just dismounting type draining gardens floor tile
CN206784541U (en) A kind of road is quickly percolated, water storage greening band
CN104631279A (en) Space utilization road surface unit
CN114892502A (en) Environment-friendly road and bridge structure and construction method thereof
CN212670167U (en) Cement-based water permeable brick
CN210194383U (en) Road surface structure of colored runway
CN109423939A (en) Ecological garden all-purpose road
CN207143630U (en) A kind of permeable, anti-settling pavement bricks
CN205917569U (en) Sidewalk brick that permeates water
CN208415040U (en) A kind of ecological permeable bricks
CN110725171A (en) Sponge layered road greening construction method
CN204738199U (en) Water guide type floor tile
CN210013083U (en) Permeable terrace structure coated with water-based finishing agent
CN211596240U (en) Novel water-permeable granite fragment of brick
CN220035087U (en) Colorful anti-skid pavement structure
CN201056664Y (en) Novel permeation pavement
CN107869099A (en) A kind of easy-to-dismount draining gardens floor tile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant