CN206408899U - Ash concrete base level ground is prevented - Google Patents

Ash concrete base level ground is prevented Download PDF

Info

Publication number
CN206408899U
CN206408899U CN201621354221.XU CN201621354221U CN206408899U CN 206408899 U CN206408899 U CN 206408899U CN 201621354221 U CN201621354221 U CN 201621354221U CN 206408899 U CN206408899 U CN 206408899U
Authority
CN
China
Prior art keywords
layer
hole
supporting layer
supporting
level ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621354221.XU
Other languages
Chinese (zh)
Inventor
李家虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Liguo Building Decoration Engineering Co Ltd
Original Assignee
Nanjing Liguo Building Decoration Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Liguo Building Decoration Engineering Co Ltd filed Critical Nanjing Liguo Building Decoration Engineering Co Ltd
Priority to CN201621354221.XU priority Critical patent/CN206408899U/en
Application granted granted Critical
Publication of CN206408899U publication Critical patent/CN206408899U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model, which is provided, has prevented ash concrete base level ground, including cement base, in addition to supporting layer, and the supporting layer is covered in the cement base, and the supporting layer opens up multiple through holes;One layer of cured layer is covered in the upper surface of the supporting layer, the lower surface of the cured layer is infiltrated through in the through hole, the cured layer is penetrated into the inside of the supporting layer by through hole.In the utility model, through hole is opened up on supporting layer, cured layer is penetrated into the inside of supporting layer by through hole.Cured layer is penetrated into inside it with through hole from each level of supporting layer, is changed existing curing materials and is only capable of penetrating into by the surface of cement base, the problem of being only capable of realizing the dust-proof solidification to cement layer top layer.Cured layer penetrates into through hole and the internal void connected with through hole so that whole supporting layer and cured layer one hard entity of formation, can prevent any dirt and permeable mass from penetrating into supporting layer, improve its abrasive resistance and surface corrosion resistance, prevented ash.

Description

Ash concrete base level ground is prevented
Technical field
The utility model is related to terrace technical field, more particularly to one kind has prevented ash concrete base level ground.
Technical background
Cement flooring is widely used in building the manufacturing workshop of industrial premises, warehouse logisticses industry, road, harbour, The ground such as lower garage parking, loading/unloading platform, maintenance factory.Cement flooring case hardness of the prior art is not enough, resistance to compression and wearability , there is the problem of cleaning is difficult in difference, easy dusting, a dirt.In order to solve the above problems, one of ordinary skill in the art are used in water The method of mud ground face one layer of oil paint of bedding has reduced ash.Oil paint is by infiltrating through peripheric blister and hair in cement In pore, solidify the particulate in the space of cement surface, so as to prevent its grey sand.But in above-mentioned technical proposal, oiliness is applied Material is only capable of penetrating into by the hole of cement-based surface.If the depth of hole is shallower, the hole inside cement base can not be just packed into. In use, if breakage occurs for cement flooring, the damaged ground and its periphery can all play ash, it is necessary to which overall carried out Turn over work.
Utility model content
The purpose of this utility model is to provide one kind and has prevented ash concrete base level ground, and supporting layer is set in cement base, supports Through hole is opened up on layer, the cured layer on covering supporting layer is penetrated into the inside of supporting layer by through hole so that whole support Layer and cured layer one hard entity of formation, improve its abrasive resistance and surface corrosion resistance, have prevented ash.
In order to achieve the above object, the utility model provides following technical scheme:
Ash concrete base level ground, including cement base, in addition to supporting layer are prevented, the supporting layer is covered in the cement base On, the supporting layer opens up multiple through holes;One layer of cured layer, the following table of the cured layer are covered in the upper surface of the supporting layer Face is infiltrated through in the through hole, the cured layer is penetrated into the inside of the supporting layer by through hole.Opened up on supporting layer logical Hole, enables to be covered in the inside that the cured layer on supporting layer penetrates into supporting layer by through hole.Cured layer is as through hole is from support Each level of layer is penetrated into inside it, is changed existing curing materials and is only capable of penetrating into by the surface of cement base, is only capable of realizing The problem of to the dust-proof solidification on cement layer top layer.Cured layer penetrates into through hole and the internal void connected with through hole so that whole Supporting layer and cured layer one hard entity of formation, can prevent any dirt and permeable mass from penetrating into supporting layer, improve its resistance to Mill ability and surface corrosion resistance, have prevented ash.Using supporting layer, it is to avoid directly open up through hole in cement base, easy construction, And the load-bearing on ground will not be caused to reduce.
In a preferred embodiment, in addition to multiple dividers, the divider is fixed in the cement base, The upper surface of cement base is separated into multiple separate spaces, supporting layer and cured layer are laid successively in the separate space.In each separate space Supporting layer and cured layer are inside laid respectively, unit construction area is reduced, and reduce levelling difficulty.Meanwhile, if consolidating in a certain separate space Change layer and produce breakage, it is only necessary to which the cured layer in the separate space is repaired.
In a preferred embodiment, the thickness of the cured layer is 10-15mm.
In a preferred embodiment, the divider includes two side plates, and two side plates are oppositely arranged, institute The bottom surface for stating side plate stretches out to form supporting plate, formed between two side plates in flexible filling slot, the flexible filling slot according to Secondary laying sand stone layer, epoxy resin layer.
In a preferred embodiment, the cement base includes filling mortar in multiple expansion joints, the expansion joint.
In a preferred embodiment, the expansion joint setting is in the lower section of the divider.
In a preferred embodiment, multiple elongated holes, the elongated hole are opened up in the supporting plate along its length Length direction it is vertical with the length direction of the supporting plate, the elongated hole is fixed by screws in the cement base.
The beneficial effects of the utility model are:
Through hole is opened up on supporting layer, enables to be covered in the cured layer on supporting layer and is penetrated into by through hole in supporting layer Portion.Cured layer is penetrated into inside it with through hole from each level of supporting layer, is changed existing curing materials and is only capable of by water The surface of mud base is penetrated into, the problem of being only capable of realizing the dust-proof solidification to cement layer top layer.Cured layer penetrates into through hole and and through hole The internal void of connection so that whole supporting layer and cured layer one hard entity of formation, can prevent any dirt and permeability Material penetrates into supporting layer, improves its abrasive resistance and surface corrosion resistance, has prevented ash.Avoid directly opening up logical in cement base Hole, easy construction, and the load-bearing on ground will not be caused to reduce.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art Or the accompanying drawing used required in description of the prior art is briefly described, it should be apparent that, drawings in the following description are only It is some embodiments of the present utility model, for those of ordinary skill in the art, before creative labor is not paid Put, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is a kind of sectional view of embodiment of the utility model;
Fig. 2 is multiple connection top views for connecting dividers;
Fig. 3 is the sectional view of the utility model another embodiment;
Fig. 4 is the sectional view of divider;
Fig. 5 is the stereogram of another embodiment of the utility model.
Embodiment
Below in conjunction with accompanying drawing of the present utility model, the technical solution of the utility model is clearly and completely described, Obviously, described embodiment is only a part of embodiment of the utility model, rather than whole embodiments.Based on this practicality Embodiment in new, the every other reality that those of ordinary skill in the art are obtained under the premise of creative work is not made Example is applied, the scope of the utility model protection is belonged to.
With reference to Fig. 1, ash concrete base level ground has been prevented in the present embodiment, one layer of supporting layer 2 is laid in cement base 1.Support Layer 2 is concrete mix.Supporting layer 2 opens up multiple through holes 20, and through hole 20 connects the upper surface of supporting layer 2 and lower surface. Supporting layer 2 upper surface smear one layer of cured layer 3, cured layer 3 during smearing, its liquid penetrate into through hole 20 in and with Through hole 20 is connected in supporting layer hole, so that the lower surface of cured layer 3 is infiltrated through in through hole 20, cured layer 3 and supporting layer 2 Inner tight connection.Change existing curing materials to be only capable of penetrating into by the surface of cement base, be only capable of realizing to cement layer The problem of dust-proof solidification on top layer.Cured layer penetrates into through hole and the internal void that connect with through hole so that whole supporting layer and Cured layer one hard entity of formation, can prevent any dirt and permeable mass from penetrating into supporting layer, improve its abrasive resistance and Surface corrosion resistance, has prevented ash.Using supporting layer, it is to avoid through hole, easy construction are directly opened up in cement base, and will not be led Cause the load-bearing reduction on ground.Preferably, the thickness of cured layer 3 is 10-15mm.The intensity of cured layer is higher, thick by increasing it Degree, improves the intensity of whole terrace, reduces its breakage produced in long-term use process.
In one embodiment, such as Fig. 2-3, in addition to multiple dividers 4.Divider 4 joins end to end to form square Framework, and be fixed on by alite paste in cement base 3, the upper surface of cement base 3 is separated into multiple separate spaces.In each separate space Laying supporting layer 2 and cured layer 3, reduce unit construction area respectively, reduce levelling difficulty.Meanwhile, if consolidating in a certain separate space Change layer and produce breakage, it is only necessary to which the cured layer in the separate space is repaired.
In order to reduce ground cracking, in one embodiment, such as Fig. 3-4, divider 4 includes two side plates 41.Each Side plate 41 all includes riser 411 and supporting plate 412.The bottom of riser 411 is connected with the top surface side of supporting plate 412, makes side plate 41 cross section is L-shaped.Riser 411 and supporting plate 412 can use ferrous materials one-shot forming.Two side plates 41 are relative to be set Put in cement base 3, make to form flexible filling slot 42 between the riser 411 of two side plates 41.Spread successively in flexible filling slot 42 If sand stone layer 421, epoxy resin layer 422.Sand stone layer 421 and epoxy resin layer 422 have certain retractility, and are covered in table The epoxy resin layer 422 in face will not also play ash.Flexible filling slot 42 between multiple dividers 4 communicates with each other.Cement base 1 includes Multiple expansion joints 10.Filling mortar in expansion joint 10, and it is arranged on the lower section of flexible filling slot 42 of divider 4.Work as climate temperature When varying widely, cement base 3 is flexible along expansion joint 30, now, and supporting layer 2 is flexible along divider 4 with cured layer 3, Many levels in terrace are made to be stretched along same position, it is to avoid to produce separation between different layers.
In order that supporting layer 2 and cured layer 3 have flexible surplus, in one embodiment, such as Fig. 5, in supporting plate 412 A platoon leader hole 4120 is opened up along its length.The length direction of elongated hole 4120 is vertical with the length direction of supporting plate 412.In length Screw is screwed into hole 4120, so that side plate 41 is fixed in cement base 1.The connection of screw and elongated hole is flexible with any Amount, supporting plate 412 can carry out micro-shifting by length direction of the screw along elongated hole.Therefore, the supporting plate 412 and cement of side plate Relative position between base 1 can be finely adjusted by the relative position between screw and elongated hole, so that supporting layer 2 and solidification Layer 3 possesses certain flexible surplus that possesses, and terrace is not easy because extruding produces rupture.
It is described above, embodiment only of the present utility model, but protection domain of the present utility model do not limit to In this, any one skilled in the art can readily occur in change in the technical scope that the utility model is disclosed Or replace, it should all cover within protection domain of the present utility model.Therefore, protection domain of the present utility model should be with the power The protection domain that profit is required is defined.

Claims (7)

1. prevent ash concrete base level ground, including cement base, it is characterised in that:Also include supporting layer, the supporting layer is covered in institute State in cement base, the supporting layer opens up multiple through holes;One layer of cured layer, the solidification are covered in the upper surface of the supporting layer The lower surface of layer is infiltrated through in the through hole, the cured layer is penetrated into the inside of the supporting layer by through hole.
2. according to claim 1 prevented ash concrete base level ground, it is characterised in that also including multiple dividers, described point Parting bead is fixed in the cement base, and the upper surface of cement base is separated into multiple separate spaces, the laying successively in the separate space Support layer and cured layer.
3. according to claim 2 prevented ash concrete base level ground, it is characterised in that the thickness of the cured layer is 10- 15mm。
4. prevent ash concrete base level ground according to Claims 2 or 3, it is characterised in that the divider includes two sides Plate, two side plates are oppositely arranged, and the bottom surface of the side plate stretches out to form supporting plate, form flexible between two side plates Sand stone layer, epoxy resin layer are laid successively in filling slot, the flexible filling slot.
5. according to claim 4 prevented ash concrete base level ground, it is characterised in that the cement base includes multiple flexible Mortar is filled in seam, the expansion joint.
6. according to claim 5 prevented ash concrete base level ground, it is characterised in that the expansion joint setting separates described The lower section of bar.
7. prevent ash concrete base level ground according to claim 5 or 6, it is characterised in that in the supporting plate along its length Direction opens up multiple elongated holes, and the length direction of the elongated hole is vertical with the length direction of the supporting plate, and the elongated hole passes through spiral shell Nail is fixed in the cement base.
CN201621354221.XU 2016-12-12 2016-12-12 Ash concrete base level ground is prevented Active CN206408899U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621354221.XU CN206408899U (en) 2016-12-12 2016-12-12 Ash concrete base level ground is prevented

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621354221.XU CN206408899U (en) 2016-12-12 2016-12-12 Ash concrete base level ground is prevented

Publications (1)

Publication Number Publication Date
CN206408899U true CN206408899U (en) 2017-08-15

Family

ID=59550541

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621354221.XU Active CN206408899U (en) 2016-12-12 2016-12-12 Ash concrete base level ground is prevented

Country Status (1)

Country Link
CN (1) CN206408899U (en)

Similar Documents

Publication Publication Date Title
CN102140836B (en) Construction method of large-size floor tile
CN207144170U (en) A kind of prefabricated out-hung panel upper and lower opening waterproof connecting structure of prefabricated concrete structure
CN106677440A (en) Roofing parapet water-floating structure and construction method thereof
CN102433819A (en) Semi-flexible structure permeable street and pavement method thereof
CN104294729A (en) Method for constructing concrete pavement
CN207143724U (en) A kind of pouring asphalt concrete paving structure
CN210659122U (en) Cracking-proof structure of epoxy millstone terrace
CN106012743A (en) Semi-rigid base layer anti-cracking pavement structure and construction method suitable for high-temperature-difference area
CN104894969B (en) A kind of bridge floor spreads block and the bridge of this paving block of mating formation and the processing method of this paving block
CN202247596U (en) Permeable road with semi-flexible structure
CN105625140A (en) Construction method for air-permeable and water-drainage self-grained composite plastic track
CN206408899U (en) Ash concrete base level ground is prevented
CN204000529U (en) Engineering asphalt pavement structure
CN108755325B (en) Cold region fabricated road and construction method thereof
WO2020258631A1 (en) Cement concrete bridge deck double-layer ac asphalt mixture paving structure and paving method
CN107675811B (en) Bathroom waterproof system and construction method
CN108978388A (en) A kind of anti-passage salt tolerant erosion composite block material tube panel of assembled and construction technology
CN214169786U (en) Terrazzo floor used in shopping center
CN104878672A (en) Stone-planted cement concrete bridge deck paving structure and method
RU84857U1 (en) HIGHWAY
CN208884736U (en) A kind of expansion joint integrated water-proof structure
CN109763573B (en) Water stop ridge and construction method thereof
CN210712970U (en) Waterproof structure of basement raft foundation anchor rod
CN207620302U (en) A kind of fastener system of precast floor installation
CN205857241U (en) Different-thickness raft plate underground structure with post-cast strip

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant