CN106012743A - Semi-rigid base layer anti-cracking pavement structure and construction method suitable for high-temperature-difference area - Google Patents

Semi-rigid base layer anti-cracking pavement structure and construction method suitable for high-temperature-difference area Download PDF

Info

Publication number
CN106012743A
CN106012743A CN201610536479.XA CN201610536479A CN106012743A CN 106012743 A CN106012743 A CN 106012743A CN 201610536479 A CN201610536479 A CN 201610536479A CN 106012743 A CN106012743 A CN 106012743A
Authority
CN
China
Prior art keywords
basic unit
crack
cutting
layer
joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610536479.XA
Other languages
Chinese (zh)
Other versions
CN106012743B (en
Inventor
刘志胜
申俊敏
李润成
张翛
臧博
师永翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Province Transport Science Research Institute
Shanxi Jiaoke Highway Survey and Design Institute
Original Assignee
Shanxi Province Transport Science Research Institute
Shanxi Jiaoke Highway Survey and Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Province Transport Science Research Institute, Shanxi Jiaoke Highway Survey and Design Institute filed Critical Shanxi Province Transport Science Research Institute
Priority to CN201610536479.XA priority Critical patent/CN106012743B/en
Publication of CN106012743A publication Critical patent/CN106012743A/en
Application granted granted Critical
Publication of CN106012743B publication Critical patent/CN106012743B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/32Coherent pavings made in situ made of road-metal and binders of courses of different kind made in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a semi-rigid base layer anti-cracking pavement structure and construction method suitable for a high-temperature-difference area. The pavement structure comprises face layers, base layers and pre-cracking cracks. The base layers and the face layer are arranged from bottom to top in sequence, the base layers comprise a lower base layer and an upper base layer, the face layers comprise a lower face layer and an upper face layer, and the lower face layer is arranged above the upper base layer; the base layers are internally provided with a plurality of the pre-cracking cracks, each pre-cracking crack comprises a pre-cut crack, a crack pouring material and a crack attaching material, the crack opening at the upper end of each pre-cut crack of each pre-cracking crack is flush with the upper end face of the upper base layer, the lower end of each pre-cut crack of each pre-cracking crack penetrates through the upper base layer and is arranged in the lower base layer, the crack pouring materials are poured into the pre-cut cracks of the pre-cracking cracks, and the upper end face of the upper base layer is provided with the crack attaching materials tightly attached to the crack openings at the upper end of the pre-cut cracks correspondingly. According to the semi-rigid base layer anti-cracking pavement structure and the construction method suitable for the high-temperature-difference area, cracks generated in the construction and maintenance period and the operation period of the semi-rigid base layers are actively controlled, the expansion rule in the pavement structure is changed, and damage, caused by crack reflection, to pitch pavement can be effectively lowered.

Description

It is applicable to semi-rigid type base anti-crack road surface structure and the construction method in high temperature difference area
Technical field
The present invention relates to field of road, particularly relate to a kind of semi-rigid type base cracking resistance road being applicable to high temperature difference area Face structure and construction method.
Background technology
Recent two decades comes, and highway in China development is swift and violent, and road network layout gradual perfection, industrial grade improves constantly, and has Support to power society, economic sustained and rapid development.But meanwhile, the high speed of highway transportation, heavy loading are to highway base Construction and the operation of Infrastructure bring severe challenge.Under fully loaded transportation condition, for extenuating the vehicular load dynamic effect to roadbed, half In the range of China and extensively, China is also accumulated from a large amount of warp at aspects such as the construction of semi-rigid pavement, uses in rigid base Test.But, in practice, engineering staff finds, semi-rigid asphalt pavement also exists serious reflection crack problem, and this is Become the Main Bottleneck of containment China Semi-Rigid Pavement Structure development.
Reflection crack be at the old asphalt pavement internal fissure ftractureed under the repeated action of traffic load and temperature load Extend to the phenomenon of asphalt surface course.For semi-rigid asphalt pavement, usually owing to semi-rigid type base is in thermograde and wet First produce contraction fissure in the case of degree change, then under the effect of traffic load crack be reflected up to asphalt surface course and Form the gap run through.It destroys globality and the seriality of pavement structure, and causes structural strength to a certain extent Weaken (as at crack, flexure increases, modulus of resilience reduction etc.).Additionally, in the case of sleety weather, rainwater easily invades road surface, Cause basic unit's deliquescing, cause pavement structure to decline under the repeat function of traffic load, purt mud phenomenon, the drip of both sides, crack occur Green material is damaged, occurs pit-hole therewith, it will be apparent that reduce traffic safety performance, Pavement Performance in Distress and life cycle and cause The impact that can not estimate.
In China, substantial contribution will be put into every year and carry out the maintenance of highway infrastructures, wherein maintenance greatly The disease that engineering causes to reflection crack is relevant.Therefore, it is highly desirable to existing Semi-Rigid Pavement Structure is optimized, solves The reflection crack problem of semi-rigid pavement, significant for improving highway durability;Particularly with high temperature difference area Road, will produce obvious economic benefit.
Summary of the invention
It is an object of the invention to the crack reflection problem overcoming existing Semi rigid bituminous surface structure to exist, it is provided that a kind of It is applicable to semi-rigid type base anti-crack road surface structure and the construction method in high temperature difference area, for semi-rigid type base in construction preserving period Interior and the operation phase, the interior crack produced carried out actively control, changes the propagation law in pavement structure, can effectively reduce and split The destruction that bituminous paving is caused by seam reflection.
The purpose of the present invention is achieved through the following technical solutions:
A kind of semi-rigid type base anti-crack road surface structure being applicable to high temperature difference area, including surface layer, basic unit and precracking, institute State basic unit, surface layer is sequentially arranged from bottom to up, and described basic unit includes that be sequentially arranged from bottom to up goes to a grassroots level and upper basic unit, described Surface layer includes cutting optimal and the upper layer being sequentially arranged from bottom to up, and described cutting optimal is arranged on basic unit;Described basic unit In be provided with several precracking, described precracking include pre-joint-cutting, gap-grouting material and patch seam material, the pre-joint-cutting of described precracking Upper end sealing is concordant with upper basic unit upper surface, and the pre-joint-cutting lower end of described precracking is run through during basic unit is placed in going to a grassroots level, Watering in the pre-joint-cutting of described precracking and be inoculated with gap-grouting material, described upper basic unit upper surface is provided with to sew on pre-cut holds sealing corresponding tight The patch seam material of patch.
In order to the present invention is better achieved, being provided with waterproof layer between described upper basic unit and cutting optimal, described waterproof layer uses Stone mastic asphalt is laid to construct and is formed.
So that upper basic unit is more firm with the base layer structure of composition of going to a grassroots level, described upper basic unit and setting between going to a grassroots level Having sealing, sealing is run through in the pre-joint-cutting lower end of described precracking.
When practice of construction uses, the lower section of going to a grassroots level of described basic unit is provided with roadbed, and roadbed is semi-rigid type base cracking resistance road The structure sheaf of face structural base.
As preferably, go to a grassroots level and the upper basic unit of described basic unit are laid to construct by cement stabilized macadam and form.
As preferably, in described basic unit, the spacing between adjacent two precrackings is 10m, under the pre-joint-cutting of described precracking It is 1/3rd of overall vertical height of going to a grassroots level that end is placed in the vertical height gone to a grassroots level.
As preferably, described upper layer uses the laying of OGFC asphalt to construct and forms, and the thickness of upper layer is 4cm; Described cutting optimal uses the laying of GAC asphalt to construct and forms, and the thickness of cutting optimal is 6cm.
A kind of semi-rigid type base anti-crack road surface construction method being applicable to high temperature difference area, its method step is as follows:
A, base layer construction: roadbed of first constructing out, under then using cement stabilized macadam laying to be built on roadbed Basic unit, damages going to a grassroots level by construction machinery in work progress of going to a grassroots level and produces crack;Structure above going to a grassroots level If building dried layer sealing, sealing for being filled with blocking to the place, crack gone to a grassroots level;Then steady by cement above sealing Determine rubble to lay and be built into basic unit, during upper base layer construction by construction machinery on basic unit damage and produce and split Seam;
B, precracking are constructed: upper basic unit, sealing, the constituted basic unit that goes to a grassroots level are carried out regular pattern of fractures process and obtained Spacing is the pre-joint-cutting that 10m uniformly arranges, and waters gap-grouting material and pre-cut seamed stifled in each pre-joint-cutting, the filling in pre-joint-cutting Seam material is for relying on the cohesive strength of gap-grouting material to reduce the focusing energy of base course crack, and the gap-grouting material in pre-joint-cutting is used for Adhesion by gap-grouting material keeps the globality of cracking basic unit;Arrange in upper basic unit upper surface and sew on end sealing pair with pre-cut The patch seam material that should be close to, reduces the basic crack impact on surface layer by the tensile strength of patch seam material;
C, basic unit integral waterproofing process: construct dried layer the waterproof layer of patch seam material is completely covered if laying in upper basic unit, Waterproof layer processes for basic unit carries out integral waterproofing with the durability guaranteeing basic unit;
D, surface construction: lay the most successively above waterproof layer and construct cutting optimal and upper layer, described cutting optimal Using GAC asphalt to lay and be built into the cutting optimal that thickness is 6cm, described upper layer uses OGFC asphalt to lay It is built into the upper layer that thickness is 4cm.
The present invention compared with the prior art, has the following advantages and beneficial effect:
(1) conventional Pavement on Semi-rigid Type Base needs to carry out the health preserving of basic unit before making surface layer, and typically all divides two Layer or three layers of making, conditioned time needs more than ten days;And the present invention is with little need for health preserving, it is layered making the most in order, There is the advantage that speed of application is fast.
(2) conventional semi-rigid type base is all random cracking, and just forms the initial stage in the intensity gone to a grassroots level in the present invention Carrying out sealing and the construction of upper basic unit, the destruction of machinery causes it to produce more fine fisssure, goes up basic unit when carrying out joint-cutting simultaneously, cuts In the thickness range gone to a grassroots level, artificial releases temperature, drying shrinkage stress, the distribution in crack more rule, such present invention Basic crack regularity high.
(3) present invention is provided with sealing and waterproof layer in the middle of upper and lower basic unit, and all bottoms with cutting optimal, the top of upper basic unit set Sealing and waterproof layer are put, it is ensured that basic unit will not be impacted by rainwater.
(4) present invention has carried out the cementation of fissures and patch seam process at pre-lancing location, by caking property, the cohesiveness of gap-grouting material Tensile property with patch seam material, it is ensured that the overall performance of pavement structure.
Accompanying drawing explanation
Fig. 1 is the structural representation that the present invention is applicable to the semi-rigid type base anti-crack road surface structure in high temperature difference area;
Fig. 2 is the structural representation of the pre-joint-cutting of Tu1Zhong rigid base anti-crack road surface structure.
Wherein, entitled corresponding to the reference in accompanying drawing:
1-upper layer, 2-cutting optimal, 3-waterproof layer, the upper basic unit of 4-, 5-sealing, 6-goes to a grassroots level, 7-roadbed, 8- Pre-joint-cutting, 9-patch seam material, 10-gap-grouting material.
Detailed description of the invention
Below in conjunction with embodiment, the present invention is described in further detail:
Embodiment
As shown in Fig. 1~Fig. 2, a kind of be applicable to high temperature difference area semi-rigid type base anti-crack road surface structure, including surface layer, Basic unit and precracking, basic unit, surface layer be sequentially arranged from bottom to up, and what basic unit included being sequentially arranged from bottom to up go to a grassroots level 6 and upper Basic unit 4, surface layer includes cutting optimal 2 and the upper layer 1 being sequentially arranged from bottom to up, and cutting optimal 2 is arranged on basic unit 4.Base Be provided with several precrackings in Ceng, after upper basic unit 4 has constructed, basic unit 300h DEG C (h DEG C be conditioned time h and The product of ambient temperature DEG C) position carries out pre-joint-cutting, and precracking includes pre-joint-cutting 8, gap-grouting material 10 and patch seam material 9, presplitting The pre-joint-cutting 8 upper end sealing of seam is concordant with upper basic unit 4 upper surface, and pre-joint-cutting 8 lower end of precracking is run through basic unit 4 and is placed in down In basic unit 6, watering and be inoculated with gap-grouting material 10 in the pre-joint-cutting 8 of precracking, the gap-grouting material 10 of the present embodiment is preferably base joint grouting glue, The gap-grouting material 10 of the present embodiment uses the base joint grouting glue that Shanxi Xi Yuefa company limited researches and develops, and gap-grouting material 10 can be again seam Material, gap-grouting material 10 is used for the focusing energy relying on the cohesive strength of gap-grouting material 10 to reduce base course crack, and in pre-joint-cutting 8 Gap-grouting material 10 for keeping the globality of cracking basic unit by the adhesion of gap-grouting material 10;Gap-grouting material 10 and base joint grouting glue Purposes be specifically shown in document: Su little Lei. the making of high performance asphalt pavement base joint grouting glue and application [J]. Chinese Highway, 2012, (20): 115-117.Upper basic unit 4 upper surface is provided with the patch be close to corresponding with pre-joint-cutting 8 upper end sealing seam material 9.The present embodiment Patch seam material 9 is preferably rubber matizhi stress absorption band, and patch seam material 9 uses the rubber agate of Shanxi Prov. Inst. of Traffic Sciences Hoof fat stress absorption band.Rubber matizhi stress absorption band and patch seam material 9 are specifically shown in document: Liu Zhisheng. combination of rigidity and flexibility formula Pavement crack reflection prevention technique progress [J]. material Leader, 2016,30 (2): P (89).
Being provided with waterproof layer 3 between currently preferred upper basic unit 4 and cutting optimal 2, waterproof layer 3 uses asphalt-mastic-broken stone Compound is laid to construct and is formed, and stone mastic asphalt is to be used by high-load coarse aggregate, high-load breeze, bigger Colophonium Amount, the framework dense structure type asphalt of low content median diameter granule composition, stone mastic asphalt is first Being applied to Capital Airport expressway construction in 1992, current stone mastic asphalt has been frequent in road engineering Use is arrivedAsphalt
As it is shown in figure 1, upper basic unit 4 and go to a grassroots level and be provided with sealing 5 between 6, sealing 5 is run through in pre-joint-cutting 8 lower end of precracking, Sealing is a technical term in field of road, a kind of thin layer compound that sealing is prepared by the material such as Colophonium, building stones, envelope The manufacture raw material of layer is commonly referred to slurry seal ES-1 type.Sealing 5 uses the laying of slurry seal ES-1 type to construct as can be seen here Form.The sealing 5 of the present embodiment can also use stone mastic asphalt laying to construct and form.
In actual pavement structure work progress, going to a grassroots level of basic unit is provided with roadbed 7 below 6.
Going to a grassroots level of the present embodiment basic unit 6 is laid by cement stabilized macadam with upper basic unit 4 and is constructed and form.
As it is shown in figure 1, the spacing between adjacent two precrackings is 10m in basic unit, pre-joint-cutting 8 lower end of precracking is placed in Go to a grassroots level 6 vertical height preferably go to a grassroots level 1/3rd of 6 overall vertical height, the present invention pre-joint-cutting 8 lower end is put In go to a grassroots level 6 vertical height be the 1/4~1/3 of 6 overall vertical height of going to a grassroots level.
Currently preferred upper layer 1 uses the laying of OGFC asphalt to construct and forms, and OGFC asphalt is drip One in blue or green compound, the most commonly referred to open-shelf range asphalt.Specific practice is shown in China's people's republicanism State's industry standard (standard specification for construction and acceptance of highway asphalt pavement JTG F40 2004) table 5.3.2-4;The thickness of upper layer 1 is 4cm.Cutting optimal 2 uses the laying of GAC asphalt to construct and forms, and the thickness of cutting optimal 2 is that 6cm, GAC asphalt is for changing Good bituminous concrete AC type, specific practice is shown in People's Republic of China's industry standard (standard specification for construction and acceptance of highway asphalt pavement JTG F40 2004) table 5.3.2-1.The cutting optimal 2 of the present embodiment uses the laying of GAC-13C asphalt to construct and forms.
Semi-rigid type base anti-crack road surface structure of the present invention is mainly the crack reflection extenuating semi-rigid asphalt pavement Asking, therefore divide two-layer to construct semi-rigid type base, 6 constructions of going to a grassroots level carry out sealing 5 immediately and construct and upper basic unit 4 constructs after completing, Purpose is to go to a grassroots level and 66 damages going to a grassroots level by construction machinery during forming intensity, produces fine fisssure.And seal Fine fisssure is added stifled by layer 5, and plays waterproof effect.After upper basic unit 4 has constructed, carry out pre-joint-cutting, by by upper basic unit Partial fracture identical with the partial fracture gone to a grassroots level reach Fracture distribution, the crack of pre-cut reaches and goes to a grassroots level simultaneously 6, release the temperature contracting within basic unit and drying shrinkage stress further.The cementation of fissures now carrying out pre-joint-cutting processes, and is sealed in crack Stifled, reduced the focusing energy of base course crack by the cohesive strength of gap-grouting material 10, keep the globality of cracking basic unit by adhesion. And carry out pasting seam process, extenuate the basic crack impact on surface layer by the tensile strength of patch seam material 9.Additionally, making is waterproof Layer 3, carries out the water-proofing treatment of globality, it is ensured that the durability of basic unit to basic unit.When making waterproof layer 3, in order to prevent heat from mixing Technology causes deformation to the over-heating of patch seam material 9, and reduces due function, uses warm mix when waterproof layer 3 is constructed Technology carries out the making of stone mastic asphalt.Cutting optimal 2 uses GAC asphalt to be that comprehensively to refer to GAC good Good high temperature performance, and upper layer 1 use OGFC be consider high temperature difference area can extenuate highway top layer summer high temperature and Freezed in winter disease.
A kind of semi-rigid type base anti-crack road surface construction method being applicable to high temperature difference area, its method step is as follows:
A, base layer construction: roadbed 7 of first constructing out, then use cement stabilized macadam to lay on roadbed 7 and be built into Go to a grassroots level 6, to going to a grassroots level by construction machinery 6 damage and produce crack in 6 work progress of going to a grassroots level;Going to a grassroots level 6 If dried layer sealing 5 is constructed in top, sealing 5 for go to a grassroots level 6 place, crack be filled with blocking;Then above sealing 5 By cement stabilized macadam lay be built into upper basic unit 4, in upper basic unit 4 work progress by construction machinery on basic unit 4 make Become destroy and produce crack;
B, precracking are constructed: upper basic unit 4, sealing 5,6 basic units constituted that go to a grassroots level are carried out regular pattern of fractures process also Obtaining spacing is the pre-joint-cutting 8 that 10m uniformly arranges, and waters gap-grouting material 10 and blocked, in advance by pre-joint-cutting 8 in each pre-joint-cutting 8 Gap-grouting material 10 in joint-cutting 8 reduces the focusing energy of base course crack, and pre-joint-cutting 8 for relying on the cohesive strength of gap-grouting material 10 In gap-grouting material 10 for keeping the globality of cracking basic unit by the adhesion of gap-grouting material 10;In upper basic unit 4 upper surface The patch be close to corresponding with pre-joint-cutting 8 upper end sealing seam material 9 is set, reduces basic crack by the tensile strength of patch seam material 9 Impact on surface layer;
C, basic unit integral waterproofing process: construct dried layer the waterproof layer of patch seam material 9 is completely covered if laying in upper basic unit 4 3, waterproof layer 3 processes for basic unit carries out integral waterproofing with the durability guaranteeing basic unit;
D, surface construction: lay the most successively above waterproof layer 3 and construct cutting optimal 2 and upper layer 1, cutting optimal 2 Using GAC asphalt to lay and be built into the cutting optimal that thickness is 6cm, upper layer 1 uses OGFC asphalt to lay structure Build up the upper layer that thickness is 4cm.
Above-mentioned embodiment is a preferred embodiment of the present invention, is not for limiting the enforcement of the present invention and power Profit scope, all equivalence change and approximations made according to the content described in the present patent application scope of patent protection are replaced, all should It is within the scope of the present invention.

Claims (7)

1. one kind be applicable to high temperature difference area semi-rigid type base anti-crack road surface structure, it is characterised in that: include surface layer, basic unit and Precracking, described basic unit, surface layer be sequentially arranged from bottom to up, and described basic unit includes go to a grassroots level (6) being sequentially arranged from bottom to up With upper basic unit (4), described surface layer includes cutting optimal (2) and the upper layer (1) being sequentially arranged from bottom to up, described cutting optimal (2) It is arranged on basic unit (4);Being provided with several precrackings in described basic unit, described precracking includes pre-joint-cutting (8), cementation of fissures material Material (10) and patch seam material (9), pre-joint-cutting (8) the upper end sealing of described precracking is concordant with upper basic unit (4) upper surface, described pre- Pre-joint-cutting (8) lower end in crack is run through basic unit (4) and is placed in going to a grassroots level in (6), waters in the pre-joint-cutting (8) of described precracking Being inoculated with gap-grouting material (10), described upper basic unit (4) upper surface is provided with the patch be close to corresponding with pre-joint-cutting (8) upper end sealing seam material (9).
2. according to the semi-rigid type base anti-crack road surface structure being applicable to high temperature difference area described in claim 1, it is characterised in that: It is provided with waterproof layer (3) between described upper basic unit (4) and cutting optimal (2).
3., according to the semi-rigid type base anti-crack road surface structure being applicable to high temperature difference area described in claim 1 or 2, its feature exists In: described upper basic unit (4) and go to a grassroots level and be provided with sealing (5) between (6), sealing is run through in pre-joint-cutting (8) lower end of described precracking (5).
4. according to the semi-rigid type base anti-crack road surface structure being applicable to high temperature difference area described in claim 1, it is characterised in that: (6) lower section of going to a grassroots level of described basic unit is provided with roadbed (7).
5. according to the semi-rigid type base anti-crack road surface structure being applicable to high temperature difference area described in claim 3, it is characterised in that: The going to a grassroots level of described basic unit (6) and upper basic unit (4) are laid to construct by cement stabilized macadam and form.
6. according to the semi-rigid type base anti-crack road surface structure being applicable to high temperature difference area described in claim 1, it is characterised in that: In described basic unit, the spacing between adjacent two precrackings is 10m, and pre-joint-cutting (8) lower end of described precracking is placed in goes to a grassroots level (6) vertical height is 1/3rd of (6) overall vertical height of going to a grassroots level.
7. the semi-rigid type base anti-crack road surface construction method being applicable to high temperature difference area, it is characterised in that: its method Step is as follows:
A, base layer construction: roadbed (7) of first constructing out, then use cement stabilized macadam to lay on roadbed (7) and be built into Go to a grassroots level (6), by construction machinery, go to a grassroots level (6) are damaged and produce crack in (6) work progress of going to a grassroots level;Under Basic unit (6) is if dried layer sealing (5) is constructed in top, and sealing (5) is for being filled with blocking to the place, crack of go to a grassroots level (6);Connect Sealing (5) top by cement stabilized macadam lay be built into upper basic unit (4), in upper basic unit (4) work progress by Upper basic unit (4) is damaged and produces crack by construction machinery;
B, precracking are constructed: the basic unit being constituted upper basic unit (4), sealing (5), go to a grassroots level (6) carries out crack treatment and obtains Spacing is the pre-joint-cutting (8) that 10m uniformly arranges, and in each pre-joint-cutting (8), pre-joint-cutting (8) is sealed by pouring gap-grouting material (10) Stifled;The patch be close to seam material (9) corresponding with pre-joint-cutting (8) upper end sealing is set in upper basic unit (4) upper surface, by patch seam material (9) tensile strength reduces the basic crack impact on surface layer;
C, basic unit's integral waterproofing process: in upper basic unit (4) if dried layer is constructed in upper laying, and the waterproof layer of patch seam material (9) is completely covered (3), waterproof layer (3) processes for basic unit carries out integral waterproofing with the durability guaranteeing basic unit;
D, surface construction: lay the most successively in waterproof layer (3) top and construct cutting optimal (2) and upper layer (1).
CN201610536479.XA 2016-07-08 2016-07-08 Semi-rigid type base anti-crack road surface structure and construction method suitable for high temperature difference area Active CN106012743B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610536479.XA CN106012743B (en) 2016-07-08 2016-07-08 Semi-rigid type base anti-crack road surface structure and construction method suitable for high temperature difference area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610536479.XA CN106012743B (en) 2016-07-08 2016-07-08 Semi-rigid type base anti-crack road surface structure and construction method suitable for high temperature difference area

Publications (2)

Publication Number Publication Date
CN106012743A true CN106012743A (en) 2016-10-12
CN106012743B CN106012743B (en) 2018-09-14

Family

ID=57109109

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610536479.XA Active CN106012743B (en) 2016-07-08 2016-07-08 Semi-rigid type base anti-crack road surface structure and construction method suitable for high temperature difference area

Country Status (1)

Country Link
CN (1) CN106012743B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107044080A (en) * 2016-12-07 2017-08-15 华南农业大学 A kind of concrete panel crack steel plate sewing method
CN109056484A (en) * 2018-08-15 2018-12-21 中国葛洲坝集团股份有限公司 Cement stabilized macadam layer parting construction method
CN110055847A (en) * 2019-05-09 2019-07-26 钱野 A kind of rule presplitting stress compensation prevention and treatment asphalt surface course overlay reflection crack construction technology
CN110306401A (en) * 2019-07-05 2019-10-08 张贵霖 The semi-rigid anti-crack road surface construction method of extremely frigid zones
CN112431086A (en) * 2020-11-26 2021-03-02 湖南省第二工程有限公司 Pavement structure and construction method thereof
CN112942033A (en) * 2021-01-27 2021-06-11 河南中交路通工程监理咨询有限公司 Pre-splitting construction process for large-particle-size water-stable gravel base
CN112942090A (en) * 2021-01-27 2021-06-11 河南中交路通工程监理咨询有限公司 Road and bridge structure with large-particle-size asphalt concrete and construction process thereof
CN113897862A (en) * 2021-09-29 2022-01-07 中电建路桥集团有限公司 Semi-rigid base pavement maintenance structure

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205893846U (en) * 2016-07-08 2017-01-18 山西省交通科学研究院 Anti road surface structure of splitting of semi rigid base course suitable for high temperature difference area

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205893846U (en) * 2016-07-08 2017-01-18 山西省交通科学研究院 Anti road surface structure of splitting of semi rigid base course suitable for high temperature difference area

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
刘敬辉: ""基于内聚力模型的预裂缝技术机理分析"", 《公路交通科技》 *
刘敬辉等: ""采用半刚性基层预裂缝技术减少反射裂缝"", 《中外公路》 *
徐仲赟: ""半刚性基层沥青路面裂缝防治"", 《甘肃科技》 *
杜洪坤: ""市政道路工程施工中预裂缝技术的应用"", 《施工技术》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107044080A (en) * 2016-12-07 2017-08-15 华南农业大学 A kind of concrete panel crack steel plate sewing method
CN109056484A (en) * 2018-08-15 2018-12-21 中国葛洲坝集团股份有限公司 Cement stabilized macadam layer parting construction method
CN109056484B (en) * 2018-08-15 2020-06-23 中国葛洲坝集团股份有限公司 Cement-stabilized gravel layer parting construction method
CN110055847A (en) * 2019-05-09 2019-07-26 钱野 A kind of rule presplitting stress compensation prevention and treatment asphalt surface course overlay reflection crack construction technology
CN110306401A (en) * 2019-07-05 2019-10-08 张贵霖 The semi-rigid anti-crack road surface construction method of extremely frigid zones
CN112431086A (en) * 2020-11-26 2021-03-02 湖南省第二工程有限公司 Pavement structure and construction method thereof
CN112942033A (en) * 2021-01-27 2021-06-11 河南中交路通工程监理咨询有限公司 Pre-splitting construction process for large-particle-size water-stable gravel base
CN112942090A (en) * 2021-01-27 2021-06-11 河南中交路通工程监理咨询有限公司 Road and bridge structure with large-particle-size asphalt concrete and construction process thereof
CN112942090B (en) * 2021-01-27 2022-09-23 河南中交路通工程监理咨询有限公司 Construction process of road and bridge structure with large-particle-size asphalt concrete
CN113897862A (en) * 2021-09-29 2022-01-07 中电建路桥集团有限公司 Semi-rigid base pavement maintenance structure

Also Published As

Publication number Publication date
CN106012743B (en) 2018-09-14

Similar Documents

Publication Publication Date Title
CN106012743A (en) Semi-rigid base layer anti-cracking pavement structure and construction method suitable for high-temperature-difference area
CN111021178B (en) Cement-stabilized anti-crack base newly-built pavement structure and construction method and application thereof
CN107881858B (en) Railway foundation bed surface layer structure and laying method thereof
CN108086113A (en) A kind of road surface precast assembly fast repairing method for being suitable for southern damp-heat area
CN207749370U (en) A kind of novel railway sub-grade surface structure
CN207259961U (en) A kind of Reflection Cracking type heavy traffic drainage pavement paving structure
CN104532716A (en) Assembly asphalt pavement for desert highway and construction method of assembly asphalt pavement
KR100431904B1 (en) Construction method of latex modified concrete for the use of a paving equipment
CN205893846U (en) Anti road surface structure of splitting of semi rigid base course suitable for high temperature difference area
CN104927759B (en) A kind of interface adhesive material and black overlay structure and its construction technology of changing in vain based on the material
US6682260B2 (en) Roller compacted concrete paving sealing method
Tamrakar Overview on causes of flexible pavement distresses
CN110820466A (en) Quick repairing method for cement concrete pavement
CN103334365B (en) The paving structure of a kind of fast quick-recovery road surface and bridge floor function and paving method
KR100991501B1 (en) Permeable concrete and paving method for road using the same
CN204435150U (en) A kind of desert highway assembling flexible pavement
CN108755325B (en) Cold region fabricated road and construction method thereof
RU2318947C2 (en) Road paving construction method
CN1115445C (en) Construction method for preventing airport surface from forming crack and crushed stone
RU2501903C1 (en) Method to repair asphalt-concrete surfaces
CN114960331A (en) Rigid-flexible composite pavement structure and construction method thereof
CN206127797U (en) Prefabricated piece of repairing of bituminous paving
RU84857U1 (en) HIGHWAY
CN210657926U (en) Composite grid anti-cracking belt suitable for treating early cracks of semi-rigid base layer
CN107165012A (en) The road structure and its construction method of a kind of tunnel upper

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant