CN107165012A - The road structure and its construction method of a kind of tunnel upper - Google Patents

The road structure and its construction method of a kind of tunnel upper Download PDF

Info

Publication number
CN107165012A
CN107165012A CN201710452887.1A CN201710452887A CN107165012A CN 107165012 A CN107165012 A CN 107165012A CN 201710452887 A CN201710452887 A CN 201710452887A CN 107165012 A CN107165012 A CN 107165012A
Authority
CN
China
Prior art keywords
layer
waterproof
tunnel
road structure
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710452887.1A
Other languages
Chinese (zh)
Inventor
谢燕青
徐亭
张铭
孔德志
黄轶
褚伟青
郑晏华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 4 Group Co Ltd
Original Assignee
Shanghai Construction No 4 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 4 Group Co Ltd filed Critical Shanghai Construction No 4 Group Co Ltd
Priority to CN201710452887.1A priority Critical patent/CN107165012A/en
Publication of CN107165012A publication Critical patent/CN107165012A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C1/00Design or layout of roads, e.g. for noise abatement, for gas absorption
    • E01C1/04Road crossings on different levels; Interconnections between roads on different levels
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/02Concrete base for bituminous paving
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/06Methods or arrangements for protecting foundations from destructive influences of moisture, frost or vibration
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/32Coherent pavings made in situ made of road-metal and binders of courses of different kind made in situ
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • E21D11/383Waterproofing; Heat insulating; Soundproofing; Electric insulating by applying waterproof flexible sheets; Means for fixing the sheets to the tunnel or cavity wall

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Road Paving Structures (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

For the overburden layer in the case where cancelling road, while reaching the purpose for raising the overall absolute altitude in tunnel, reduction construction cost and difficulty, tunnel top waterproof layer is effectively protected, the present invention provides the road structure and its construction method of a kind of tunnel upper.A kind of technical scheme of the road structure of tunnel upper of the present invention is as follows, a kind of road structure of tunnel upper, including waterproof matrix, waterproof layer, fish tail and waterproof layer, the supercrust set gradually from the bottom to top, and the waterproof matrix is laid on above tunnel roof.

Description

The road structure and its construction method of a kind of tunnel upper
Technical field
The invention belongs to the realm of building construction, the road structure and its construction method of more particularly to a kind of tunnel upper.
Background technology
Now, building for the underground space especially tunnel becomes the key content in each urban planning and construction.Many feelings Under condition, road can be also built in tunnel upper, therefore building for tunnel generally requires overall examine with building for tunnel upper road Consider.
Common method is the absolute altitude for the road for determining tunnel upper first, it is then determined that the height of road bottom overburden layer Degree, on this basis, the top mark for redesigning tunnel are high.So, the thickness of road elevation and overburden layer will certainly reduce tunnel The overall absolute altitude in road, makes the cutting depth in tunnel further decline, and virtually adds the difficulty of construction and cost in tunnel.
The overall absolute altitude in tunnel can be raised by cancelling overburden layer.But, the waterproof of tunnel top can be caused by cancelling overburden layer Layer is slowly lost because of dynamic vehicle load, in addition, in the case where no overburden layer is protected, common waterproof layer can not also be adapted to The larger temperature difference produced during the use of road, the anti-hidden danger waterborne that there is durability in tunnel.
How in the case where cancelling road overburden layer, reach the mesh for raising the overall absolute altitude in tunnel, reduction construction cost and difficulty While, be effectively protected tunnel top waterproof layer, be a urgent problem.
The content of the invention
For the overburden layer in the case where cancelling road, the mesh for raising the overall absolute altitude in tunnel, reduction construction cost and difficulty is reached While, be effectively protected tunnel top waterproof layer, the present invention provides a kind of road structure and its construction party of tunnel upper Method.
A kind of technical scheme of the road structure of tunnel upper of the present invention is as follows:
A kind of road structure of tunnel upper, including waterproof matrix, waterproof layer, the waterproofing protection set gradually from the bottom to top Layer, supercrust, the waterproof matrix are laid on above tunnel roof.
A kind of road structure of the tunnel upper of the present invention has the beneficial effect that:
The present invention has set gradually waterproof matrix, waterproof layer, waterproof and protected from the bottom to top between tunnel roof and supercrust Sheath, instead of the overburden layer in the prior art between tunnel roof and supercrust so that the overall absolute altitude in tunnel is raised, And from the case where ensureing tunnel water proofing effect, reached reduction constructing tunnel difficulty, and reduction constructing tunnel cost Purpose.
Further, in the road structure of the tunnel upper, the waterproof matrix includes being laid on above tunnel roof Solvent free bi-component epoxy resin basic unit and the quartz sand that is laid on above solvent free bi-component epoxy resin basic unit Layer.The thickness of solvent free bi-component epoxy resin basic unit is 2-3cm, its can with the waterproof layer on top using heating by the way of Infiltration combination is carried out, the anti-shear ability between waterproof matrix and waterproof layer faying face is enhanced, so as to reduce sliding phenomenon Generation.And quartz sand layer is laid above solvent free bi-component epoxy resin basic unit, waterproof matrix and waterproof can be expanded The contact area of layer, so that the anti-shear ability between waterproof matrix and waterproof layer faying face is further enhanced, quartz sand layer Thickness is 0.2-0.7mm, and consumption is 300-500g/m2
Further, in the road structure of the tunnel upper, the waterproof layer includes slightly embryonic sack bridge modified pitch Waterproof roll, the slightly embryonic sack bridge includes lower bitumen layer, the tire base set gradually from the bottom to top with modified asphalt waterproof coiled material Layer and upper bitumen layer, the thickness of the lower bitumen layer are more than the upper bitumen layer.The slightly embryonic sack bridge modified asphalt waterproof The thickness of coiled material is 3-5cm, can be in rapidly paste after thicker lower bitumen layer hot melt, so as to enhance itself and waterproof matrix Cohesive force, improves waterproof effect;Tire basic unit and this inclined tire design of relatively thin upper bitumen layer can buffer traffic loading under The influence of bitumen layer, is reduced under heavy traffic loading, the probability for the phenomenon such as waterproof layer does not plan a successor because of deformation, slid.Separately Outside, slightly embryonic sack bridge is about 125 DEG C -130 DEG C with the heatproof of modified asphalt waterproof coiled material, will not occur lower drip in use The phenomenon that cyan layer, tire basic unit and upper bitumen layer are mutually disengaged.
Further, in the road structure of the tunnel upper, the fish tail and waterproof layer includes pea gravel concreten layer.Microlith Concrete layer can completely cut off supercrust and waterproof layer, disperse the shearing force produced by traffic loading come from supercrust transmission, from And issuable hardness destruction is avoided, play a part of protecting waterproof layer.The thickness of pea gravel concreten layer is 10-20cm.
Further, in the road structure of the tunnel upper, the supercrust includes the road set gradually from the bottom to top Face basic unit, slurry seal, Coarse Graded Bituminous Concrete layer, middle grain formula bituminous concrete, top course, the sub-surface are water Cement-stabilizing broken stone layer or the big Stone layer of concrete layer or cement, the top course is asphalt-mastic-broken stone layer or modified Bitumen layer or bituminous macadam.Sub-surface can be by road surface load, when especially braking as last layer of supercrust Lateral sliding power is entered row buffering and shared equally, to protect waterproof layer.Sub-surface is preferentially using cement stabilized macadam layer, thickness 40- 50cm。
The present invention also provides a kind of construction method of the road structure of tunnel upper.
A kind of technical scheme of the construction method of the road structure of tunnel upper of the present invention comprises the following steps:
The first step, to being cleaned above tunnel roof, laying solvent free bi-component epoxy resin basic unit, and described Dispensed above solvent free bi-component epoxy resin basic unit with the dried quartz sand of fire, form quartz sand layer;
Second step, after solvent free bi-component epoxy resin basic unit is stiff, lays slightly embryonic sack road above quartz sand layer Bridge modified asphalt waterproof coiled material, heats solvent free bi-component epoxy resin basic unit and slightly embryonic sack simultaneously by the way of hot melt Bridge modified asphalt waterproof coiled material, makes both close blending bond;
3rd step, after the construction of slightly embryonic sack bridge modified asphalt waterproof coiled material is finished, is dripped in slightly embryonic sack bridge with modified Pea gravel concreten layer, sub-surface, slurry seal, Coarse Graded Bituminous Concrete layer, middle grain are laid above blue or green waterproof roll successively Formula bituminous concrete, top course, the sub-surface are cement stabilized macadam layer or concrete layer or the big Stone of cement Layer, the top course is asphalt-mastic-broken stone layer or modified asphalt layer or bituminous macadam.
A kind of construction method of the road structure of the tunnel upper of the present invention has the beneficial effect that:
The present invention has set gradually waterproof matrix, waterproof layer, waterproof and protected from the bottom to top between tunnel roof and supercrust Sheath, instead of the overburden layer in the prior art between tunnel roof and supercrust so that the overall absolute altitude in tunnel is raised, And from the case where ensureing tunnel water proofing effect, reached reduction constructing tunnel difficulty, and reduction constructing tunnel cost Purpose.In addition, solvent free bi-component epoxy resin basic unit can be permeated with the waterproof layer on top by the way of hot melt With reference to the anti-shear ability between waterproof matrix and waterproof layer faying face being enhanced, so as to reduce the generation of sliding phenomenon.And Quartz sand layer is laid above solvent free bi-component epoxy resin basic unit, the contact surface of waterproof matrix and waterproof layer can be expanded Product, so as to further enhance the anti-shear ability between waterproof matrix and waterproof layer faying face.
Further, in order to strengthen in waterproof effect, a kind of construction method of the road structure of tunnel upper, second In step, slightly embryonic sack bridge meets a batch 15cm with the short side of modified asphalt waterproof coiled material, and long side meets a batch 10cm, and negative and positive angle, section part are applied Work waterproof reinforced layer.
Brief description of the drawings
Fig. 1 is a kind of profile of the road structure of tunnel upper of the present invention;
Fig. 2 is a kind of schematic diagram of the road structure of tunnel upper of the present invention.
Embodiment
The road structure to a kind of tunnel upper proposed by the present invention and its construction below in conjunction with the drawings and specific embodiments Method is described in further detail.According to following explanation and claims, advantages and features of the invention will become apparent from.Need Bright, accompanying drawing is using very simplified form and uses non-accurately ratio, only conveniently, lucidly to aid in illustrating The purpose of the embodiment of the present invention.
Embodiment 1:
Referring to figs. 1 to Fig. 2, a kind of road structure of tunnel upper of the present embodiment, including set gradually from the bottom to top Waterproof matrix 2, waterproof layer 3, fish tail and waterproof layer 4, supercrust 5, the waterproof matrix 2 are laid on the top of tunnel roof 1.Due to Between tunnel roof 1 and supercrust 5, waterproof matrix 2, waterproof layer 3, fish tail and waterproof layer 4 have been set gradually from the bottom to top, instead of Overburden layer between tunnel roof 1 and supercrust 5 in the prior art so that the overall absolute altitude in tunnel is raised, and from protecting In the case of demonstrate,proving tunnel water proofing effect, reduction constructing tunnel difficulty is reached, and reduce the purpose of constructing tunnel cost.
As preferably embodiment, in the road structure of the tunnel upper, the waterproof matrix 2 includes being laid on tunnel The solvent free bi-component epoxy resin basic unit 202 of the top of road top plate 1 and it is laid on solvent free bi-component epoxy resin-matrix The quartz sand layer 201 of the top of layer 202.The thickness of solvent free bi-component epoxy resin basic unit 202 be 2-3cm, its can with it is upper The waterproof layer 3 in portion carries out infiltration combination by the way of hot melt, enhances anti-between waterproof matrix 2 and the faying face of waterproof layer 3 Shear ability, so as to reduce the generation of sliding phenomenon.And in the top laying stone of solvent free bi-component epoxy resin basic unit 202 Sand layer 201, can expand the contact area of waterproof matrix 2 and waterproof layer 3, so as to further enhance waterproof matrix 2 and waterproof Anti-shear ability between 3 faying face of layer, the thickness of quartz sand layer 201 is 0.2-0.7mm, and consumption is 300-500g/m2
As preferably embodiment, in the road structure of the tunnel upper, the waterproof layer 3 includes slightly embryonic sack bridge With modified asphalt waterproof coiled material 301, the slightly embryonic sack bridge is included setting gradually from the bottom to top with modified asphalt waterproof coiled material 301 Lower bitumen layer, tire basic unit and upper bitumen layer, the thickness of the lower bitumen layer is more than the upper bitumen layer.The slightly embryonic sack bridge Thickness with modified asphalt waterproof coiled material 301 is 3-5cm, can be in rapidly paste after thicker lower bitumen layer hot melt, so as to increase Its strong cohesive force with waterproof matrix 2, improves waterproof effect;This inclined tire design of tire basic unit and relatively thin upper bitumen layer can To buffer influence of the traffic loading to lower bitumen layer, reduce under heavy traffic loading, waterproof layer 3 do not plan a successor because of deformation, The probability of the phenomenons such as sliding.In addition, slightly embryonic sack bridge is about 125 DEG C -130 DEG C with the heatproof of modified asphalt waterproof coiled material 301, no Can occur the phenomenon that lower bitumen layer, tire basic unit and upper bitumen layer are mutually disengaged in use.
As preferably embodiment, in the road structure of the tunnel upper, the fish tail and waterproof layer 4 is mixed including microlith Solidifying soil layer 401.Pea gravel concreten layer 401 can completely cut off supercrust 5 and waterproof layer 3, disperse from the transmission of supercrust 5 because of traffic lotus The shearing force for carrying and producing, so as to avoid issuable hardness destruction, plays a part of protecting waterproof layer 3.Pea gravel concreten The thickness of layer 401 is 10-20cm.
As preferably embodiment, in the road structure of the tunnel upper, the supercrust 5 include from the bottom to top according to The sub-surface 505 of secondary setting, slurry seal 504, Coarse Graded Bituminous Concrete floor 503, middle grain formula bituminous concrete 502, road Face surface layer 501, the sub-surface 505 is cement stabilized macadam layer or concrete layer or the big Stone layer of cement, the road Face surface layer 501 is asphalt-mastic-broken stone layer or modified asphalt layer or bituminous macadam.Sub-surface 505 is used as supercrust 5 Last layer can be by road surface load, and lateral sliding power when especially braking is entered row buffering and shared equally, to protect waterproof layer 3. Sub-surface 505 is preferentially using cement stabilized macadam layer, thickness 40-50cm.
Embodiment 2:
Referring to figs. 1 to Fig. 2, a kind of construction method of the road structure of tunnel upper of the present embodiment comprises the following steps:
The first step, is cleaned to the top of tunnel roof 1, laying solvent free bi-component epoxy resin basic unit 202, and The top of solvent free bi-component epoxy resin basic unit 202 is dispensed with the dried quartz sand of fire, forms quartz sand layer 201;
Second step, it is inclined in the laying of the top of quartz sand layer 201 after solvent free bi-component epoxy resin basic unit 202 is stiff Tire base bridge modified asphalt waterproof coiled material 301, heats solvent free bi-component epoxy resin-matrix simultaneously by the way of hot melt Layer 202 and slightly embryonic sack bridge modified asphalt waterproof coiled material 301, make both close blending bond;
3rd step, after the construction of slightly embryonic sack bridge modified asphalt waterproof coiled material 301 is finished, is modified in slightly embryonic sack bridge Pea gravel concreten layer 401, sub-surface 505, slurry seal 504, coarse grain formula pitch are laid successively in the top of asphalt water-proof coiled material 301 Concrete layer 503, middle grain formula bituminous concrete 502, top course 501, the sub-surface 505 be cement stabilized macadam layer or Concrete layer or the big Stone layer of cement, the top course 501 is asphalt-mastic-broken stone layer or modified asphalt layer or drip Blue or green metalling.
The present embodiment set gradually between tunnel roof 1 and supercrust 5, from the bottom to top waterproof matrix 2, waterproof layer 3, Fish tail and waterproof layer 4, instead of the overburden layer in the prior art between tunnel roof 1 and supercrust 5 so that the overall absolute altitude in tunnel Raised, and from the case where ensureing tunnel water proofing effect, reached reduction constructing tunnel difficulty, and reduction tunnel is applied The purpose of work cost.In addition, solvent free bi-component epoxy resin basic unit 202 can use hot melt with the waterproof layer 3 on top Mode carries out infiltration combination, the anti-shear ability between waterproof matrix 2 and the faying face of waterproof layer 3 is enhanced, so as to reduce cunning Move the generation of phenomenon.And in the top laying quartz sand layer 201 of solvent free bi-component epoxy resin basic unit 202, can expand anti- The contact area of water-base 2 and waterproof layer 3, so as to further enhance anti-shearing between waterproof matrix 2 and the faying face of waterproof layer 3 Ability.
As preferably embodiment, in order to strengthen waterproof effect, a kind of construction of the road structure of tunnel upper In method, in second step, slightly embryonic sack bridge meets a batch 15cm with the short side of modified asphalt waterproof coiled material 301, and long side meets a batch 10cm, i.e., Adjacent slightly embryonic sack the bridge overlapping 15cm of short side, the overlapping 10cm in long side between modified asphalt waterproof coiled material 301, it is negative and positive angle, disconnected Construction waterproof enhancement layer at face.
Foregoing description is only the description to present pre-ferred embodiments, not to any restriction of the scope of the invention, this hair Any change, modification that the those of ordinary skill in bright field does according to the disclosure above content, belong to the protection of claims Scope.

Claims (7)

1. a kind of road structure of tunnel upper, it is characterised in that including the waterproof matrix (2), anti-set gradually from the bottom to top Water layer (3), fish tail and waterproof layer (4), supercrust (5), the waterproof matrix (2) are laid on above tunnel roof (1).
2. the road structure of tunnel upper as claimed in claim 1, it is characterised in that the waterproof matrix (2) includes laying Solvent free bi-component epoxy resin basic unit (202) above tunnel roof (1) and it is laid on solvent free bi-component ring Quartz sand layer (201) above epoxy resin-based layer (202).
3. the road structure of tunnel upper as claimed in claim 1, it is characterised in that the waterproof layer (3) includes slightly embryonic sack Bridge is included from the bottom to top with modified asphalt waterproof coiled material (301), the slightly embryonic sack bridge with modified asphalt waterproof coiled material (301) Lower bitumen layer, tire basic unit and the upper bitumen layer set gradually, the thickness of the lower bitumen layer is more than the upper bitumen layer.
4. the road structure of tunnel upper as claimed in claim 1, it is characterised in that the fish tail and waterproof layer (4) includes thin Stone concrete layer (401).
5. the road structure of tunnel upper as claimed in claim 1, it is characterised in that the supercrust (5) include by it is lower extremely On set gradually sub-surface (505), slurry seal (504), Coarse Graded Bituminous Concrete layer (503), middle grain formula pitch mix Solidifying soil (502), top course (501), the sub-surface (505) are cement stabilized macadam layer or concrete layer or the big grain of cement Footpath metalling, the top course (501) is asphalt-mastic-broken stone layer or modified asphalt layer or bituminous macadam.
6. a kind of construction method of the road structure of tunnel upper, it is characterised in that comprise the following steps:
The first step, to being cleaned above tunnel roof (1), laying solvent free bi-component epoxy resin basic unit (202), and Dispensed above the solvent free bi-component epoxy resin basic unit (202) with the dried quartz sand of fire, form quartz sand layer (201);
Second step, after solvent free bi-component epoxy resin basic unit (202) is stiff, laying is inclined above quartz sand layer (201) Tire base bridge heats solvent free bi-component epoxy resin simultaneously with modified asphalt waterproof coiled material (301) by the way of hot melt Basic unit (202), with modified asphalt waterproof coiled material (301), makes both close blending bond with slightly embryonic sack bridge;
3rd step, after slightly embryonic sack bridge modified asphalt waterproof coiled material (301) construction is finished, is dripped in slightly embryonic sack bridge with modified Pea gravel concreten layer (401), sub-surface (505), slurry seal (504), coarse grain are laid above blue or green waterproof roll (301) successively Formula asphalt concrete layer (503), middle grain formula bituminous concrete (502), top course (501), the sub-surface (505) are water Cement-stabilizing broken stone layer or the big Stone layer of concrete layer or cement, the top course (501) is asphalt-mastic-broken stone layer Or modified asphalt layer or bituminous macadam.
7. the construction method of the road structure of tunnel upper as claimed in claim 6, it is characterised in that in second step, inclined tire Base bridge meets a batch 15cm with the short side of modified asphalt waterproof coiled material (301), and long side meets a batch 10cm, and negative and positive angle, section part construction are anti- Water enhancement layer.
CN201710452887.1A 2017-06-15 2017-06-15 The road structure and its construction method of a kind of tunnel upper Pending CN107165012A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710452887.1A CN107165012A (en) 2017-06-15 2017-06-15 The road structure and its construction method of a kind of tunnel upper

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710452887.1A CN107165012A (en) 2017-06-15 2017-06-15 The road structure and its construction method of a kind of tunnel upper

Publications (1)

Publication Number Publication Date
CN107165012A true CN107165012A (en) 2017-09-15

Family

ID=59818736

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710452887.1A Pending CN107165012A (en) 2017-06-15 2017-06-15 The road structure and its construction method of a kind of tunnel upper

Country Status (1)

Country Link
CN (1) CN107165012A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108425296A (en) * 2018-04-28 2018-08-21 中铁二院重庆勘察设计研究院有限责任公司 A kind of open-cut tunnel structure in levels overlapping railway line
CN111734442A (en) * 2020-05-15 2020-10-02 江苏瑞沃建设集团有限公司 Box roof structure of urban tunnel branch mouth

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010024667A (en) * 2008-07-17 2010-02-04 Kfc Ltd Tunnel waterproof structure and construction method for the same
CN203639777U (en) * 2014-01-09 2014-06-11 重庆钢铁集团设计院有限公司 Road pavement structure
CN104264561A (en) * 2014-09-12 2015-01-07 上海市政工程设计研究总院(集团)有限公司 A non-earthing composite structure for a waterproof pavement layer of a top plate for a road tunnel
CN104747204A (en) * 2015-01-20 2015-07-01 广东省建筑工程集团有限公司 Construction technology for foundation slab sliding layer of super-long tunnel
CN205152746U (en) * 2015-10-22 2016-04-13 华南理工大学 Combined type long -life bituminous pavement structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010024667A (en) * 2008-07-17 2010-02-04 Kfc Ltd Tunnel waterproof structure and construction method for the same
CN203639777U (en) * 2014-01-09 2014-06-11 重庆钢铁集团设计院有限公司 Road pavement structure
CN104264561A (en) * 2014-09-12 2015-01-07 上海市政工程设计研究总院(集团)有限公司 A non-earthing composite structure for a waterproof pavement layer of a top plate for a road tunnel
CN104747204A (en) * 2015-01-20 2015-07-01 广东省建筑工程集团有限公司 Construction technology for foundation slab sliding layer of super-long tunnel
CN205152746U (en) * 2015-10-22 2016-04-13 华南理工大学 Combined type long -life bituminous pavement structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108425296A (en) * 2018-04-28 2018-08-21 中铁二院重庆勘察设计研究院有限责任公司 A kind of open-cut tunnel structure in levels overlapping railway line
CN108425296B (en) * 2018-04-28 2024-04-05 中铁二院重庆勘察设计研究院有限责任公司 Open cut tunnel structure for upper and lower layer overlapped railway lines
CN111734442A (en) * 2020-05-15 2020-10-02 江苏瑞沃建设集团有限公司 Box roof structure of urban tunnel branch mouth
CN111734442B (en) * 2020-05-15 2022-06-28 江苏瑞沃建设集团有限公司 Box roof structure of urban tunnel branch mouth

Similar Documents

Publication Publication Date Title
CN207227890U (en) A kind of environment protection asphalt pavement structure
MX2011001966A (en) Composition and process of using an asphalt emulsion to convert an unpaved surface into a paved surface.
CN100497828C (en) Hydraulic fill sand expansion polystyrene mixing light road bank stuffing construction method
CN206495104U (en) Noise reduction drainage type asphalt concrete road surface
EP2202359A1 (en) Semi-flexible multi-layer paving
CN104452510B (en) Immediate construction method of rural road
CN103882788B (en) Based on the method for constructing roadway of the modification roller compacted concrete surface layer of enzyme soil cured substrate layer
CN106012743A (en) Semi-rigid base layer anti-cracking pavement structure and construction method suitable for high-temperature-difference area
US11840482B2 (en) Dry mix and concrete composition containing bed ash and related methods
CN114351529A (en) Pavement structure adopting warm-mix ultrathin layer overlay and construction method thereof
CN206736664U (en) A kind of durability Rut resistance highway extension project pavement structure
CN107165012A (en) The road structure and its construction method of a kind of tunnel upper
KR102044882B1 (en) Road paving method
KR101635963B1 (en) Eco-Friendly Roadside tree shroud and Construction method thereof
CN108755325A (en) A kind of cold area's assembled road and its construction method
CN208362832U (en) A kind of spongeization road structure of cracking resistance
CN105421183A (en) Ecological glue-building water-permeable terrace and preparation method thereof
CN210086044U (en) Bridge deck pavement structure for assembled bridge
CN205711601U (en) A kind of super viscous wearing course paving structure of cement pavement enhancement mode
CN210481937U (en) White and black pavement structure adopting high-viscosity modified asphalt
CN210737260U (en) Rigid roadbed and flexible roadbed interface
CN204343129U (en) A kind of energy-saving cement bridge floor thin layer paving structure
CN221052379U (en) Durable no muscle bridge deck pavement structure
CN110295525A (en) A kind of asphalt plus concrete road structure using high glutinous modified pitch
CN110776280A (en) Roadbed material and preparation method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170915